NHS Rotherham Clinical Commissioning Group

Similar documents
MEETING OF THE GOVERNING BODY IN PUBLIC

Sheffield s Emotional Wellbeing and Mental Health Strategy for Children and Young People

GOVERNING BODY REPORT

National Diabetes Treatment and Care Programme

GOVERNING BODY MEETING in Public 22 February 2017 Agenda Item 3.4

Lincolnshire JSNA: Stroke

Aiming for Excellence in Stroke Care

Trust Board Meeting in Public: Wednesday 11 July 2018 TB

Cancer Improvement Plan Update. September 2014

(i) This FAQ does not deal with clinical issues (eg What is the definition of a stroke unit? or

Integrated Cancer Services Action Plan. Colchester Hospital University NHS Foundation Trust 31 March 2014

Meeting the Future Challenge of Stroke

That the Single Commissioning Board supports the project outlined in this report and proceeds as described.

Sentinel Stroke National Audit Programme (SSNAP)

Dorset Health and Wellbeing Board

Supporting and Caring in Dementia

NZ Organised Stroke Rehabilitation Service Specifications (in-patient and community)

Report to Trust Board 26/01/2017. Report Title Operational Performance Report - December 2016 & Quarter /17 Report from

The Prime Minister s Challenge on Dementia Lorraine Jackson Deputy Director: Dementia Policy Department of Health 12 April 2016

Diabetes in Pregnancy Network: Scoping survey March 2013

Dementia Strategy MICB4336

Core Standard 24. Cass Sandmann Emergency Planning Officer. Pat Fields Executive Director for Pandemic Flu Planning

LUTON STROKE PATHWAY REVIEW. DRAFT PAPER 4 th APRIL 2014

TRANSFORMING STROKE CARE IN THE CAPITAL: THE LONDON STROKE STRATEGY

Freedom of Information Act Request Physiotherapy Services for Neurological Conditions

Greater Manchester Stroke Operational Delivery Network Supporting Stroke Care in Greater Manchester

Commissioning for value focus pack

Bedfordshire, Luton and Milton Keynes (BLMK) Sustainability and Transformation Partnership (STP) Central Brief: October 2017

2. The role of CCG lay members and non-executive directors

Integrated Diabetes Care in Oxfordshire -patient's perspective. Avril Surridge

Implementing a new Orthogeriatric model to improve patient care and outcomes Aiming for Excellence!

REPORT TO CLINICAL COMMISSIONING GROUP

British Association of Stroke Physicians Strategy 2017 to 2020

National information for commissioners on commissioning specialist level palliative care. Maureen McGinn, Senior Project Manager, RM Partners

Commissioning for Outcomes in Diabetes. Joanne Taylor Primary Care Commissioning Manager

A Whole Pathway Integrated Approach to Improving Foot Care

Appendix 1. Cognitive Impairment and Dementia Service Elm Lodge 4a Marley Close Greenford Middlesex UB6 9UG

The audit is managed by the Royal College of Psychiatrists in partnership with:

Lung cancer timed clinical pathways

Mental Health in STH Mike Richmond, Medical Director Mark Cobb, Clinical Director of Professional Services Debate & Note

Commissioning Living with and Beyond Cancer in Yorkshire and Humber; an Overview.

The Secretary of State (2009) endorsed the Boorman Review and provided the NHS with three clear messages:

This specification should be read in conjunction with the Rotherham Hospice overall contract and schedules.

A Best Practice Clinical Care Pathway for Major Amputation Surgery

Acute Oncology Martin Eatock Consultant Medical Oncologist NICaN Medical Director

apability, pportunity and otivation

The Greater Manchester Stroke Operational Delivery Network

DUMFRIES AND GALLOWAY ALCOHOL AND DRUG PARTNERSHIP; PRIORITY ACTIONS AND

Progress in improving cancer services and outcomes in England. Report. Department of Health, NHS England and Public Health England

Shaping Diabetes Services in Southern Derbyshire. A vision for Diabetes Services For Southern Derbyshire CCG

KEY QUESTIONS What outcome do you want to achieve for mental health in Scotland? What specific steps can be taken to achieve change?

National Peer Review Report: Wales Paediatric Diabetes 2014

Communications and engagement for integrated health and care

Resilience and Future-proofing Stroke services for the North East and North Cumbria A Stroke Service Review

Suicide Prevention. a PHE Perspective. Diane Lee Public Health England

Centralising to a 7 day stroke stroke service in Greater Manchester - lessons learnt

Number of records submitted: 14,750 Number of participants: Part 1 = 146 hospitals (120 trusts); Part 2 = 140 hospitals (119 trusts)

Streamlining the lung diagnostic pathway (A87)

Atrial Fibrillation Collaborative. Thursday 7 May 2015

CCG Merger Proposal Consultation Event

SAFEGUARDING ANNUAL REPORT

Project Initiation Document:

NHS PREPAREDNESS FOR A MAJOR INCIDENT

HC 963 SesSIon november Department of Health. Young people s sexual health: the National Chlamydia Screening Programme

FRAILTY PATIENT FOCUS GROUP

Stroke care in England, Wales and Northern Ireland. This report is for stroke survivors and their families

FINANCE COMMITTEE DEMOGRAPHIC CHANGE AND AGEING POPULATION INQUIRY SUBMISSION FROM NATIONAL OSTEOPOROSIS SOCIETY

Dementia Programme Kevin Mullins Head of Mental Health Services

HERTS VALLEYS CCG PALLIATIVE AND END OF LIFE CARE STRATEGY FOR ADULTS AND CHILDREN

Diabetes Network

EQUALITY IMPACT ASSESSMENT. Business Division/Directorate: Name of Service/Title of Policy or Strategy, Name of Event:

We have reviewed the Winter Planning guidance for 2011/12 and have applied the guidance, where relevant, within this refreshed plan.

Integrated Cancer Services Action Plan. Colchester Hospital University NHS Foundation Trust 30 th June 2014

Improving services for upper GI (OG) cancer Application template (Version 2)

Updated Activity Work Plan : Drug and Alcohol Treatment

Health and Wellbeing Board 10 November 2016

National Cancer Peer Review Programme

MCIP Recruitment Pack

NHS RightCare Frailty Pathway An optimal frailty system

Dementia Action Alliance survey for carers and professionals

NHS England (West Yorkshire) Dental Commissioning Update 2015/16

A. Service Specifications

Children and Young People s STP Work Stream

Acute Oncology & Chemotherapy Clinical Network Group (CNG)

Briefing Paper. Single Cancer Pathway

TRUST WIDE DOCUMENT DOCUMENT NUMBER: ELHT Version 1

abcdefghijklmnopqrstu

Test and Learn Community Frailty Service for frail housebound patients and those living in care homes in South Gloucestershire

Barnsley Youth Justice Plan 2017/18. Introduction

Report by the Comptroller and. SesSIon January Improving Dementia Services in England an Interim Report

How to make changes in the NHS

Draft Falls Prevention Strategy

Strengthening the voice of neighbourhoods Why CCGs and Health and Wellbeing Boards need to connect more with communities and neighbourhoods.

Board of Directors 26 September A Memorandum of Understanding (MOU) for the West Yorkshire and Harrogate Health and Care Partnership

R e s e a r c h S t r a t e g y

South Norfolk CCG Dementia Strategy and Action Plan Dr Tony Palframan, SNCCG Governing Body Member

NORCOM North Derbyshire, South Yorkshire and Bassetlaw Commissioning Consortium

Compare your care. How asthma care in England matches up to standards R E S P I R AT O R Y S O C I E T Y U K

Interventions to reduce emergency hospital admissions for falls. Cath Lewis. Liverpool Public Health Observatory

2016 SURVEY FINDINGS REPORT

Transcription:

NHS Rotherham Clinical Commissioning Group Operational Executive: 2 nd November 2015 Governing Body: 4 th November 2015 Review of Stroke Care Pathway GP Lead: Dr Phil Birks Lead Executive: Keely Firth Lead Officer: Dominic Blaydon Purpose: Strategic Clinical Executive GP Chief Finance Officer Head of LTC and Urgent Care This report provides a summary of the stroke care pathway review attached. Background: The May 2015 Governing Body considered the Stroke Annual Peer Review, which was intended to provide RCCG with assurance that the local stroke care pathway is fit for purpose. The review highlighted areas of poor performance and drew attention to gaps in the local service model. The attached review looks at progress made since the Peer Review. It benchmarks performance against other areas and makes recommendations on future commissioning arrangements. Analysis of key issues and of risks 1. Performance Performance on the stroke care pathway has improved significantly since the last report to Governing Body. The service is now; Surpassing the target set (80%) for time spent on the stroke ward with a current YTD figure of 84% Meeting the target set (50%) for patients scanned within 1 hour with a current YTD figure of 52% Surpassing the target set (60%) for patients with stroke AF anti-coagulated on discharge with a current YTD figure of 94% The service has also shown improvements in the ASIs that remain under target including; An increase in the percentage of patients admitted directly to acute stroke unit. Target set at 90% with a YTD figure of 73% in September compared to 52% in May An increase in performance on the percentage of patients receiving thrombolysis. Target set at 11% with a YTD figure of 4%, however the service achieved 9% in September 2. Benchmarking The recently released atlas of variation also shows that Rotherham is performing well compared to other CCGs in South Yorkshire; There is significant improvement in patients being admitted to the stroke unit within 4 hours. Rotherham is higher than the median and only Sheffield, who are ranked 6 th nationally, are outperforming Rotherham within the sub-region Page 1 of 2

Rotherham is also performing well on the proportion of patients institutionalised after stroke, outperforming all CCGs except Barnsley One area of concern is the standard mortality ratio which is currently higher than the average mortality rate in England and the 2 nd highest in the sub-region after Barnsley. Remedial action plan and next steps As previously reported, the Working Together Programme is considering the rationalisation of hyper-acute services. However there is currently a need for local reconfiguration to address some of the issues identified in the review. It is clear that, although there has been an improvement in performance, this is not sustainable in the medium term. It is therefore proposed that RCCG ensure that RFT progress with the following; 1. Development of a Remedial Action Plan to ensure sustainability over the winter period 2. Consider the possibilities of integration of consultant cover across a wider provider base 3. Consideration of an expansion of therapy and nursing capacity Recommendations: It is recommended that Governing Body: Notes the findings of the service review Receives an update in January regarding progress on remedial actions Page 2 of 2

Rotherham CCG Service Review Rotherham Stroke Care Pathway Author: Dominic Blaydon

1. Introduction In May 2015 Governing Body considered the Stroke Annual Peer Review, which was intended to provide RCCG with assurance that local stroke care pathway was fir for purpose. The review highlighted areas of poor performance and drew attention to gaps in the local service model. This review looks at progress made since the Peer Review. It benchmarks performance against other areas and makes recommendations on future commissioning arrangements. 2. Summary of Peer Review The Peer Review of Rotherham s Stroke Care Pathway was carried out by the Yorkshire and Humber Clinical Network. It considered 5 sets of criteria to establish whether the pathway was fit for purpose. Criteria 1: Core Criteria Rotherham achieved all the core criteria. RFT have a dedicated Stroke Unit. The Unit carries out weekly MDT meetings. The pathway has clear clinical leadership. Continuing professional development is in place for all staff working with stroke patients. Information is provided to patients and there are formal links between the stroke service and patient organisations Criteria 2: Workforce Rotherham FT achieved the required nurse staffing levels for the Acute Stroke Unit, Rehabilitation and social work support. However the review panel was concerned that there was not 24/7 specialist consultant cover on the Stroke Unit. Also, the following areas did not meet the required minimum staffing requirements; HASU (by 2.6 wte), Physiotherapy (by 0.72 wte), Dieticians (by 1.9 wte), SALT (by 0.9 wte), Occupational Therapy (by1.1 wte) and Psychology (by 2.0 wte) Criteria 3: TIA Services Rotherham FT achieved all the criteria for TIA Services. The service has a policy for referral of TIA patients. It is able to identify patients who are at high risk of stroke. All patients are assessed by a stroke specialist nurse or specialist physician. There is a daily service in place for high-risk TIAs and a 1 month follow up is routinely offered. Criteria 4: Acute Stroke Services Rotherham achieved the following criteria on Acute Stroke Services. All acute patients have access to HASU beds. There is continuous psychological monitoring in HASU. The service has contingency plans in place for scanner breakdown and there are clear acute stroke management protocols. However, the review panel found no evidence of a completed policy on end of life care.

Criteria 5: SSNAP Data The review panel examined Accelerated Stroke Indicators that fell within the poorest performing quartile. Proportion of patients scanned within 1 hour Proportion of stroke patients given thrombolysis Proportion of patients assessed by a specialist physician within 24 hours Rotherham s stroke service also fell within the poorest performing quartile for Nurse assessments within 24 hours First therapy assessment within 24 hours All therapy assessments within 72 hours Rehabilitation goals identified within 5 days The Governing Board acknowledged the issues highlighted by the Stroke Peer Review. The Board recognised the recent improvement in performance on the ASIs and support the remedial actions identified by Rotherham FT. It supported the proposals on Quality Premium and Local Incentive Scheme. Finally the Governing Board agreed to receive an evaluation report in the autumn setting out progress that has been made, with recommendations relating to future commissioning arrangement. 3. Current State Rotherham FT has responded positively to the issues raised in the Peer Review. Below is a summary of actions and the impact they have made on performance. 3.1 Accelerated Stroke Indicators Rotherham CCG monitors performance of the local stroke care pathway through the Specialised Services Performance Group. Table 1 provides a summary of local performance against national accelerated stroke indicators. Table 1: ASI Targets ASI Target Description Target May YTD Sept YTD 1 % of patients presenting with stroke AF anti-coagulated on discharge 60% 73% 94% 2 % of patients admitted directly to an acute stroke unit within 4 hours 90% 52% 73% 3 % of patients spending 90% of their stay on a stroke unit 80% 78% 84% 4a % of patients scanned within 1 hour 50% 36% 52% 4b % of patients scanned within 24 hours 100% 99% 96% 5 % of high risk TIA patients treated within 24 hrs of first contact 60% 84% 90% 6 % of patients who receive psychological support in 6 months 40% 99% 100%

ASI Target Description Target May YTD Sept YTD 7 % of patients with joint care plans on discharge from hospital 85% 100% 100% 8 % of stroke patients reviewed 6 months after leaving hospital 95% 99% 100% L % of patients receiving thrombolysis 11% 3% 4% Rotherham FT is now on target to achieve 7 of the 10 accelerated stroke indicators. Of these, only 1 ASI is a major concern to commissioners. Since the peer review there has been a significant improvement in performance across all ASIs. Specifically the following actions have been taken to address those issues of most concern in May. ASI 2: arrival ASI 3: Proportion of patients admitted directly to an acute stroke unit within 4 hours of hospital 90% stay on a Stroke Unit In May these targets were not being achieved because non-elective workloads had meant that stroke beds were being used to accommodate medical outliers. To address this issue Rotherham FT implemented a new policy, setting out criteria for exceptional utilisation of the Stroke Unit beds. Medical outliers on the Stroke Unit were identified at daily bed meetings and the patient flow team were instructed to prioritise repatriation. This policy is starting to gain traction. Performance on ASI 2 has improved significantly with 73% of all patients admitted to the stroke unit within 4 hours. ASI 3 is now on target, with 84% of patients spending 90% of their time on the stroke unit. ASI 4a: Access to Brain Imaging Scanning rates within 1 hour are now on target. Rotherham FT carried out a process mapping exercise, which led to a revision of standard operating procedures. The use of the Emergency Department acute stroke protocol was reinforced with all staff to ensure that the stroke nurses are alerted immediately to a patient s arrival at A&E. Local Indicator: Number of patients who receive thrombolysis following acute stroke The main reasons for poor take-up of thrombolysis are late presentation and lack of information on onset time. TRFT now provides an audit of reasons for non-thrombolysis. They report that all patients who did not receive thrombolysis were excluded for legitimate reasons and have provided patient level details at relevant performance meetings to evidence this. Data on all patients presenting with no time of onset is being systematically collected and reviewed monthly through Stroke Business Meetings and local performance meetings. Presentations on the acute stroke pathway and TIAs have been presented at GP events to raise awareness. Emergency Department and Stroke Unit processes have been reviewed at Thrombolysis MDT meetings.

3.2 Atlas of Variation in Healthcare The Atlas of variation in Healthcare benchmarks CCGs on a rage of care pathways for 13/14. It incorporates 2 stroke indicators; Proportion of stroke patients admitted to stroke unit <4 hours Proportion of people prescribed anti-coagulation after a stroke Proportion of patients discharged to institutional care after a stroke Figures 1-3 show how Rotherham performs on these indicators relative to other CCGs in South Yorkshire. Figure 1: Proportion of stroke patients admitted to stroke unit < 4 hours 90 80 70 60 50 40 30 20 10 0 53.2 82.1 48.6 36.7 51.9 60.3 73.0 Rotherham s performance on patients being admitted to the stroke unit within 4 hours is significantly higher than the median and steadily improving. Only Sheffield, currently ranked 6 th nationally, is outperforming Rotherham within the sub-region. Figure 2 % of patients with atrial fibrillation prescribed anti-coagulation prior to stroke 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 34.0 28.4 32.0 55.8 55.6 37.2 94.0

Rotherham s performance on patients with atrial fibrillation being prescribed anti-coagulation is now significantly higher than the median in the Atlas of Variation. There has been a significant improvement since 2013/14. Rotherham increased its rate of prescribing from 34%, just below the media, to 94%. Figure 3: Proportion of patients institutionalised after stroke 20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 7.9 10.3 3.1 13.8 19.8 7.9 Rotherham is also performing well on the proportion of patienst institutionalised after stroke. We outperform all CCGs except Barnsley and are currently the median CCG nationally. Figure 4: Standard mortality ratio 30 days post stroke 1.40 1.30 1.38 1.20 1.00 1.01 0.96 1.00 1.00 0.80 0.60 0.40 0.20 0.00 One area of concern for Rotherham is its standard mortality ratio on mortality. This is currently 38% higher than the average mortality rate in England. We are the have the 2 nd highest standard mortality ratio in the sub-region.

4. Key Issues Performance on the stroke care pathway has improved since the last report to Governing Board. The service is now achieving the target on the proportion of patients spending 90% of time on stroke and the proportion of patients scanned within 1 hour. All other KPIs are also being achieved. The recently released Atlas of Variation shows that Rotherham is performing well compared to other CCGs in South Yorkshire. However, there are a number of issues which need to be addressed before commissioners are assured that the current care pathway is sustainable. 1. Sustaining current performance RFT has committed additional resources to support the stroke care pathway and improve performance. Although successful it may not be possible to sustain this level of input. There is a developing issue on the current target for carrying out scans within 24 hours. This is scheduled to be changed so that stroke services have to carry out 100% of scans within 12 hours. RFT senior managers have informed commissioners that this target will be difficult to achieve within current resources. 2. Implementing recommendations from peer review A number of the recommendations from the Peer Review have not yet been implemented. Rotherham s stroke service is struggling to carry out assessments within the recommended time frames; Nurse assessments within 24 hours First therapy assessment within 24 hours All therapy assessments within 72 hours Rehabilitation goals identified within 5 days 3. Consultant cover RFT currently have issues with consultant cover. The lead consultant on stroke is currently on long term sickness. It has been difficult to difficult to find a replacement and provide the levels of consultant cover recommended in the peer review 5. Future Development The Working Together Programme is considering rationalisation of hyper-acute services. This is a longer tem plan for stroke services in the region and Rotherham CCG is fully engaged in network discussions. However there is currently a need for local reconfiguration to address some of the issues identified in this report. It is clear that, although there has been an improvement in performance, this is not sustainable in the medium term. It is therefore proposed that RCCG and RFT work together on the following areas;

1. Remedial Action Plan It is proposed that RFT develop a remedial action plan aimed at maintaining performance on the stroke care pathway over the winter period. This would include details of additional capacity required, timescales for introducing additional therapy and nursing assessments, transitional arrangements for consultant cover, assurance on ring-fence of acute stroke beds and escalation processes. 2. Integration of consultant cover It is proposed that RFT colleagues consider options with neighbouring FTs on integrating consultant cover for the stroke care pathway. There is a strong argument for working with the Northern General Hospital, developing a pool of consultants who work across both hospitals. This would improve prospects of recruitment and ensure that both hospitals had appropriate cover arrangements 2. Business case therapy services It is proposed that RFT consider appropriate investment in therapy services to meet the requirements set out in national guidance. This will ensure that the timeframes identified in the peer review for therapy assessments are met. Additional investment in therapy services will improve patient outcomes and reduce length of stay in the stroke unit.