ESBN Presentatin t the IGG Jhn Bracken 27 th June 2018
Agenda Meter Update - ESBN Meter Update, RM259 Update and Tken Meter Replacement Priritisatin Prcess Update Interim Slutins remain in place - New Registratins, Eircdes and Public Lighting Business As Usual Nthing t Reprt Prjects - SLR, LTCA Smart Metering (Elaine Sextn) ISEM (Jim Lng) 2 esbnetwrks.ie
Smart Metering Prject Industry Gvernance Grup (IGG) Update Wednesday 27 th June 2018 Elaine Sextn, SMART Prject
Agenda ESBN SMART Prject Phased Apprach Overview & Milestnes Market Release Schema v12.00.00 Status Milestne Plan ESBN SMART Update SAP IS-U Unicde Cnversin Market Release Schema v12.00.00 SMART Market Release Schema v13.00.00 SMART Gvernance 4 esbnetwrks.ie
ESBN SMART - Phased Apprach Phase 1 Phase 2 Phase 3 250K Smart Meters safely installed by December 2020 Prcure, build & test new slutin Tw Market Schema releases t facilitate Smart Metering (nn -Smart MCRs als incl) Daily cllectin & prcessing f interval data. The pprtunity fr Suppliers t ffer new Time-f-Use based tariffs 1 millin Smart Meters installed by 2022 Enable remte peratin f the service switch in Smart Electricity Meters Smart Pre-Payment services with secure remte deenergisatin/energisatin Advanced meter alerts & events Remaining Smart Meters installed by end f 2024 Gas Meter integratin Cmmence installatin f gas smart meters In-Hme Channel (HAN) In-Hme Displays fr realtime custmer infrmatin 2017 2018 2019 2020 2021 2022 2023 2024 Market Release 1 (April 19) Market Release 2 (December) Market Release 3 (December) Market Release 4 (December) 5 esbnetwrks.ie
ESBN SMART - Overview & Milestnes High Level Scpe Planned G-Live Cmment SAP IS-U Unicde Cnversin August Bank Hliday 2018 N Market Design Changes Market Assurance Deplyment & Lgistics Q4 2018 Updates prvided at Smart ILG Market Release v12.00.00 MCRs SMART Enablement fr Meter Installatin Technical Upgrades Easter Weekend April 2019 Significant bdy f wrk Market Assurance IPT AMI Prcurement & Enablement Q4 2019 Updates prvided at Smart ILG Deplyment Cntractr Q4 2020 Updates prvided at Smart ILG Market Release v13.00.00 SMART MCRs Other Market Changes (TBC) SMART Dec 2020 (TBC-Priritisatin Prcess) Market Assurance IPT * CBLCR changes will be raised as required 6 esbnetwrks.ie
Market Release v12.00.00 Status MCR Descriptin Status MCR0175 New Reject Reasns fr Address Change Rejectin MCR1173 Vulnerable Custmer Implementatin in ROI f SI 463 MCR1167 MCR1140 MCR1169 MCR1175 MCR1180 Facilitate energy efficiencies in Lcal Authrity Public Lighting Intrductin f Eircdes int the Retail Market Design in Ireland Additin f Pstal Cde t tw Dwnladable Meter Pint Details Files Prvide Market Participant Business Reference (MPBusinessReference) fr Reading New Registratin Default Supplier MCR1183 010 Custmer Validatin Agreement (NI) ReMCWG/CDA MCR1154 New Unmetered Tariff fr NI ReMCWG/CDA Other Cmment Status Smart Enablement SAP IS-U Enhancement Pack (8.0) SMART Enablement fr Meter Installatin SAP Hana 7 esbnetwrks.ie
Market Release v.12.00.00 - Milestne Plan 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 16 th 7 th 7 th 4 th 3 rd 30 th 25 th 29 th 3 rd 8 th 27 th 5 th V.12.00.00 Schema Published Jan 28th Design/Build/Test IPT Prep IPT Exec CRU Decisin G Live Easter 2019 Other Market Assurance G live August B/H 2018 Unicde Cnversin SAP Hana SAP IS-U Enhancement Pack (8.0) Smart Enablement fr Meter Installatin Market Engagement v G Live Easter 2019 G Live Easter 2019 G Live Easter 2019 8 esbnetwrks.ie
ESBN SMART Update Element SAP IS-U Unicde Cnversin Planned G-Live Date August Bank Hliday 2018 Update Gemserv Market Assurance Frmal Assessment - Wed 13 th June 2018 Planned G-Live August Bank Hliday weekend is n track Planned Outage will be cmmunicated as per RMDS Scheduled Outages Prcess Market Release v12.00.00 MCRs SMART Enablement fr Meter Installatin Technical Upgrades Easter Weekend April 2019 Prgressing n track Future IGG engagement schedule n track as per appendix Market Release v13.00.00 SMART MCRs Other Market Changes (TBC) Dec 2020 (TBC-Priritisatin Prcess) Priritisatin Prcess n track Cmmunicatin Pack t Market Participants n track - w/e Friday 27 th July SMART Gvernance Mdel Gvernance Framewrk agreed and in place 9 esbnetwrks.ie
Appendix 10 esbnetwrks.ie
Market Release Schema v12.00.00 Future IGGs Tpic MCR# Descriptin Tpic IGG Meeting Implementatin Details MCR1167 Public Lighting ESBN Publicatin: Standard Prfiles Burn Hur Calendars Effective Wattages MCR1140 Eircdes Uplad mechanism and schedule fr circa 1.5 Millin Eircdes MCR1180 MCR1173 MCR1140 MCR1173 MCR1167 MCR1169 MCR1140 MCR1173 MCR1167 New Registratin Default Supplier Vulnerable Custmers Dwnladable Meter Pint Files RMP Extranet screenshts Indicative Dates Aug 2018 Nv 2018 Wrk In Prgress items will be discussed Nv 2018 Recnciliatin with suppliers fr new cdes & Rejectin Reasns Nv 2018 Samples files Jan 2019 Samples screenshts Jan 2019 MCR1167 700 Series MMs Samples 700MMs Feb 2019 Cutver & Cntingency Planning All Cutver & Cntingency Planning Cutver & Cntingency Apprach Nv 2018 11 esbnetwrks.ie
ROI Market Release 2019 Schema MCRs MCR Descriptin Change Details Cmments MCR0175 Versin 5.0 New Reject Reasns fr Address Change Rejectin Nine New cde values are being added (I.e. AD1->AD9) Market Message (MM): 014R 9 New Data Cdes Appendix MCR0175 refers MCR1173 Vulnerable Custmer Implementatin in ROI f SI 463 Change existing Cde 0008 t be valid in ROI & Tw new cde values (I.e. 0009 & 0010) Market Messages (MM): 010, 013, 016 & 017 3 New Data Cdes fr ROI CBL, 2 f which will be added t schema Appendix MCR1173 refers Data Cde values will nw be used n Extranet and Dwnladable files nt the Central Market System Cdes as per current design Appendix MCR1173 refers Versin 2.0 Cde 0010 shuld nt be used at this time it s being intrduced fr future prfing and will be rejected. Rejectin reasns and assciated rejectin messages will be cmmunicated at a future IGG. The cdes will appear in cnfirmatin messages in line with current market rules Mdified dwnladable files will be available t Suppliers frm May 2019 Appendix MCR1173 refers ROI Webfrms :cde 0010 will be selectable, nt display nly as riginally cmmunicated Appendix MCR1173 refers MCR1167 Facilitate energy efficiencies in Lcal Authrity Public Lighting Eleven New cde values are being added (I.e. U13->U23) Market Messages (MM): 591, 700, 700W, 701 & 701W 11 New Data Cdes & 11 New Standard Prfiles Appendix MCR1167 refers 25 New Burn Hur Calendars Appendix MCR1167 refers Versin 3.0 Effective wattage fr every lamp type will be published by ESBN (when available) CBLCR changes will be raised, as needed Dwnladable file with new data values and structure will be available t Suppliers frm May 2019 Appendix MCR1167 refers MCR1183 010 Custmer Validatin Agreement (NI) NI Requirements NI Schema changes are cvered in ReMCWG/CDA MCR1154 New Unmetered Tariff fr NI 12 esbnetwrks.ie
ROI Market Release 2019 Nn-Schema MCRs MCR1140 MCR Descriptin Cmments Intrductin f Eircdes int the Retail Market Design in Ireland Eircdes can be submitted n MMs in the existing Pstal Cde field : 010, 012, 012W,013 & 021 Eircdes where available will be returned in the existing Pstal Cde fields n MM: 014R, 101, 101P, 101R, 102, 102P, 102R, 105, 105L, 110, 112, 112R, 112W, 114, 301, 301N& 330 Versin 3.0 ESBN will agree schedule fr mass uplads f Eircdes int the Meter Pint Address Pstal Cde field in the Central Market System at a future IGG. ESBN intend t update these in batch mechanism and schedule t be discussed at a future IGG MCR1169 Versin 2.0 MCR1175 Versin 3.0 MCR1180 Versin 4.0 Additin f Pstal Cde t tw Dwnladable Meter Pint Details Files Prvide Market Participant Business Reference (MPBusinessReferen ce) fr Reading New Registratin Default Supplier Once the Pstal Cde field has been ppulated it will be visible n the Retail Market Participant Extranet Appendix MCR1140 refers Nte: Existing Market Defect riginally intended t g-live with MCR1187 will nw be implemented alngside this MCR. Mdified dwnladable files will be available t Suppliers frm May 2019 Appendix MCR1169 refers Hwever, ppulatin f field will be determined by the Eircde uplad schedule fr MCR1140 ESB Netwrks intend t discuss the uplad schedule fr these tw files at future IGGs The Market Participant Business Reference (MPBusinessReference) n the 300MM will be ppulated with that frm the assciated riginal 210MM (i.e. where it ppulated a peridic meter reading rder) Read Reasn 95/ Nt fr COS is the nly case fr which the abve applies If the custmer reading which ppulates the pen Meter Reading Order is implausible and is estimated ppulate the MPBusinessReference n the crrespnding 305MM If the custmer reading which ppulates the pen Meter Reading Order is withdrawn ppulate the MPBusinessReference n the crrespnding 300WMM Fr sites with MIC <30kVa, the Custmer must nw register with a Supplier The 010MM must be received by the Central Market system befre a cnnectin pint can be energised 13 esbnetwrks.ie