The Unfinished Business Project in South West Uganda Closing the Adult- Pediatric Treatment Gap

Similar documents
Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV. Male Champions: Men as Change Agents in Uganda MALE CHAMPIONS

Finding the missing children: Proven Strategies for Increasing Identification of HIV+ Children. October 2017

The CQUIN Learning Network. Adolescents Living with HIV: Legal framework for testing, treatment, and transition, Challenges and Priorities: Uganda

targets for HIV-positive children

Ensuring Adherence and Retention to HIV Care and Treatment among Orphans and Vulnerable Children A Multi-Country Experience

ADOLESCENTS AND HIV:

STRENGTHENING THE COORDINATION, DELIVERY AND MONITORING OF HIV AND AIDS SERVICES IN MALAWI THROUGH FAITH-BASED INSTITUTIONS.

REACHING ORPHANS AND VULNERABLE CHILDREN WITH CARE & SUPPORT SERVICES IN CÔTE D IVOIRE: EXPERIENCE FROM PROJECT KENEYA

Applying Improvement to Keep HIV+ Mothers and Exposed Infants in Care. Anisa Ismail Improvement Advisor University Research Co.

Review of the Democratic Republic of the Congo (DRC) by the Committee on the Elimination of Discrimination Against Women (CEDAW)

Improving care of HIV-infected breastfeeding

The Global Partnership for HIV-Free Survival (PHFS): Quality Improvement and Breastfeeding / ART compliance

Essential minimum package ALHIV service provision: Community level

UNFINISHED BUSINESS: INDEX TESTING TO FIND AND LINK HIV POSITIVE CHILDREN AND ADOLESCENTS INTO CARE. Immaculate Monica Awor MITYANA HOSPITAL,UGANDA

LOGFRAME TEMPLATE FOR SWAZILAND. SIDA s Contributions

Overview of Paediatric HIV Treatment and Prevention: From Then to Now. Peter Mugyenyi, Joint Clinical Research Centre Kampala, Uganda

STRENGTHENING SOCIAL ACCOUNTABILITY

The CQUIN Learning Network

The New Policy Guidelines Increase Utilization of Services for Elimination of Mother-to-Child HIV Transmission in Uganda: Demonstrate Research Gaps:

Cote d Ivoire Country Report FY15

The CQUIN Learning Network

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

Bukoba Combination Prevention Evaluation: Effective Approaches to Linking People Living with HIV to Care and Treatment Services in Tanzania

RESEARCH. All Photos: Eric Bond/EGPAF,2017

Scaling Up Treatment in Zimbabwe: The path to high coverage

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

Safe Generations Harnessing Implementation Science to Assess the Impact of Option B+ in Swaziland

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

PERFORMANCE INDICATOR REFERENCE SHEETS FOR KEY POPULATIONS

From HIV Rapid Scale up to a Sustainable HIV Program: Strengthening Health Care Delivery Systems and Human Resources for Health in Ethiopia

Nairobi City s Progress Towards Ending the HIV Epidemic. Dr. Carol Ngunu-Gituathi Deputy Director, Health Services, NAIROBI

TECHNICAL ASSISTANCE TO EXPAND HIV PREVENTION, CARE, AND TREATMENT IN NAMPULA, MOZAMBIQUE

PLANNING INTEGRATED HIV SERVICES AT THE HEALTH CENTRE

ICASA SATELLITE SYMPOSIUM Tuesday, 1 December 18:30 20:30 Prof. Soudre Room Rainbow Towers Conference Centre. Twitter Hash Tag: #EIDInnovation

Community Client Tracing Through Mentor Mothers in the Democratic Republic of the Congo

Returning HIV-exposed infants to care in Lilongwe, Malawi

Differentiated Care for Antiretroviral Therapy for Key Populations: Case Examples from the LINKAGES Project

Monitoring of HIV positive mothers and HIV exposed infants in context of Option B+ implementation

The Elizabeth Glaser Pediatric AIDS Foundation

USAID ASSIST has successfully coordinated the First Tanzania

Malawi s Experience Shows How Nutrition Services Can Help Meet the HIV Treatment and Epidemic Control Targets FANTA III

KAPC 10 th Conference;Safari Park Hotel 1 st to 3rd Sept.2009

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

Key Strategic Decisions Common Options Country Examples

POC EID Implementation Models, Linkage to Care & Operational Challenges

Investing for Impact Prioritizing HIV Programs for GF Concept Notes. Lisa Nelson, WHO Iris Semini, UNAIDS

Increasing Access to Healthcare Services in the Karamoja Sub-region, Uganda

Global Perspectives on Treat All for Children and Adolescents with HIV. PATA Global Summit Shaffiq Essajee

South Africa s National HIV Programme. Dr Zuki Pinini HIV and AIDS and STIs Cluster NDOH. 23 October 2018

Operational Research on PMTCT Lessons Learned and Gaps

TABLE OF CONTENTS. Elizabeth Glaser Pediatric AIDS Foundation A Winnable Battle Report 2

INTRODUCTION AND GUIDING PRINCIPLES

Accelerating Children s HIV Treatment (ACT): Rationale, Progress & Challenges

Promoting FP/RH-HIV/AIDS Integration: A Summary of Global Health Initiative Strategies in Ethiopia, Kenya, Tanzania, and Zambia

Report for TCE Community Testing Gaza

Using Routine Health Information to Improve Voluntary Counseling and Testing in Cote d Ivoire

Ministry of Health and Social Welfare PARTNERSHIP FOR HIV-FREE SURVIVAL (PHFS) SCALE-UP PLAN FOR TANZANIA

Treat All : From Policy to Action - What will it take?

Tanzania Country Report FY14

ESSENTIAL PACKAGE FOR HIV CARE AND TREATMENT. Essential Package for HIV Care and Treatment

Direct Clinical Services

CHAI Cambodia: HIV Program Update NCHADS Annual Operational Comprehensive Planning Workshop Dec 3, 2012

Differentiated Care Improving Engagement and Retention in HIV Care. Meg Doherty, MD PhD MPH World Health Organization

APPROACH TO GEOGRPAPHIC AND/OR POPULATION FOCUS:

DEPARTMENT OF HEALTH RESPONSE TO KEY POPULATIONS

Community Client Tracing Through Community Health Workers in Côte d Ivoire

Annex A: Impact, Outcome and Coverage Indicators (including Glossary of Terms)

Overview November 2017

APPLICANT REQUEST FOR MATCHING FUNDS. IMPORTANT: To complete this form, refer to the Instructions for Matching Funds Requests.

Democratic Republic of Congo Country Report FY14

Reaching Men with Multi-Disease Testing

Prioritized research questions for adolescent HIV testing, treatment and service delivery

Rapid Assessment of Sexual and Reproductive Health

From Africa to Georgia: What We Have Learned From the Treatment for All Initiative

COMMUNITY SYSTEMS TOOLBOX COMMUNITY SYSTEMS STRENGTHENING. Increasing access to quality health and social services. Building strong communities.

EXPRESSION OF INTEREST New Horizons Advancing Pediatric HIV Care Donation Program

AN ACTIVITY-BASED COSTING TOOL

Monitoring HIV/AIDS Programs: Participant Guide

Impact of POC EID on infant case finding and treatment initiation. Durban, South Africa June

KidzAlive Model: Best practice in providing holistic HIV testing, disclosure, care and support for children and their families.

Surveillance of Recent HIV Infections: Using a Pointof-Care Recency Test to Rapidly Detect and Respond to Recent Infections

COMMUNITY-BASED TBHIV CASE-FINDING KENYAN EXPERIENCE

ASEAN Declaration of Commitment on HIV and AIDS: Fast-Tracking and Sustaining HIV and AIDS Responses To End the AIDS Epidemic by 2030

Summary of PEPFAR State of Program Area (SOPA): Care & Support

Overview of the Current National PMTCT program in Ethiopia. Dr Tadesse Ketema January 2014 Addis Abeba

Botswana Advocacy paper on Resource Mobilisation for HIV and AIDS

Zimbabwe MoH Experience in Adolescent HIV Care. Dr HT Bara HIV Program Manager Harare City Health Department

A Systems Approach to Lifesaving Maternal and Newborn Care. Kate Cassidy, SMGL USAID Initiative Manager Mona Mehta Steffen, SMGL USAID M&E Advisor

WHO Global Health Sector Strategies HIV; Viral Hepatitis; Sexually Transmitted Infections

Integrated VL/EID& TB Data Review Meeting 23/3/2018 PIATO

Progress in scaling up voluntary medical male circumcision for HIV prevention in East and Southern Africa

GLOBAL AIDS MONITORING REPORT

Guidance on Matching Funds: Tuberculosis Finding the Missing People with TB

PROJECT ŚVETANA (Dawn) Elimination of new HIV infections among children by Scaling up PPTCT services in private health sector

Strengthening the Integration of PMTCT within MNCH Services

Ever enrolled Currently enrolled Ever on ART Sub- County Adults Peds Total Adults Peds Total Adults Peds Total Adults Peds Total

Children and AIDS Fourth Stocktaking Report 2009

Global database on the Implementation of Nutrition Action (GINA)

Ministry of Health. National Tuberculosis Control Program INTEGRATED TB HIV PROGRAM REPORT (JANUARY JUNE 2015)

Transcription:

Photo: Eric Bond/EGPAF, 215 Elizabeth Glaser Pediatric AIDS Foundation The Unfinished Business Project in South West Uganda Closing the Adult- Pediatric Treatment Gap Background While Uganda achieved significant reduction in new HIV infections among children by 214, pediatric antiretroviral therapy (ART) coverage has been slow. By June 214, 27% of HIV-infected children were receiving ART, compared to 52% of HIV-positive adults in Uganda.1 By December 214, only 42% of children and adolescents estimated to be living with HIV were enrolled in care and treatment programs in Uganda.1 Factors contributing to the low rates included poor levels of pediatric HIV testing services in facilities; only 56% of HIV-exposed infants were tested in 212 and 213. There was limited knowledge regarding pediatric and adolescent provider-initiated HIV testing and counseling (PITC) among health workers, and lack of standard protocols in health facilities to guide implementation of PITC. To close the adult-pediatric HIV treatment gap, the ELMA Foundation provided funds to support implementation of activities that would accelerate pediatric HIV case identification, ensure linkage to ART, and improve the quality of chronic HIV care and treatment services for children and adolescents. In October 215, the Elizabeth Glaser Pediatric AIDS Foundation (EGPAF) in partnership with the Ministry of Health (MOH) of Uganda, launched a two-and-a-half-year Unfinished Business (UB) project to improve pediatric HIV care and treatment in six priority districts of Southwest Uganda, contributing to increased parity between pediatric and adult HIV treatment in the country by 218. The priority districts were Bushenyi, Isingiro, Kabale, Ntungamo, Rukungiri, and Sheema. Guided by the number of children in HIV care in relation to estimates of HIV-positive children living in the catchment area of health facilities within the six districts. The MOH identified 34 health facilities with the widest gap in pediatric HIV care, and these were referred to as priority health facilities. 1 UAC (215), The National HIV Strategic Plan, 215/216-219/22 Bushenyi Mbarara Mitooma Rukungiri Sheema Kanungu Isingiro Ntungamo Rubanda Kisoro Kabale ELMA Supported Districts Figure 1: Map of southwest Uganda showing districts supported by the Unfinished Business project Objectives of the UB project 1. Promote earlier diagnosis of children and adolescents living with HIV by increasing screening, testing, case finding, and linkages to treatment and support. 2. Increase access to quality HIV treatment for children and adolescents.

Key Accomplishments Recruitment of human resources for health. EGPAF used UB project funds to recruit and place counselors in priority health facilities to improve pediatric and adolescent HIV case finding through provision of pre- and post-test HIV counseling. Counselors were also responsible for improving treatment outcomes through ongoing adherence support; strengthening family psychosocial support to HIV-infected children and adolescents in care; client appointment tracking, and active follow-up of those who missed their clinic appointments. By May 218, the UB project supported 59 counsellors in the 34 priority health facilities. Capacity building of health workers. Using a quality improvement approach, EGPAF supported training and mentorship of more than 893 health workers in pediatric and adolescent PITC in the 34 priority health facilities. By close of the second year of the UB project, staff at 23 health facilities had been trained and mentored in pediatric and adolescent PITC, and staff at an additional eleven facilities were trained during year three of the project. This effort facilitated the integration of pediatric and adolescent PITC eligibility screening and testing in the routine package of services provided at service points. EGPAF also trained adolescent peer educators to strengthen the provision of psychosocial support and follow-up of children and adolescents with treatment adherence challenges. Within the region, EGPAF built the capacity of 2 regional MOH pediatric HIV trainers and mentors to provide ongoing technical assistance to health facility staff. Improved access to HIV testing services, especially among orphans and vulnerable children (OVC). Uganda s MOH recommends routine provision of HIV testing to OVC. The average HIV positivity yield among OVC of ages -18 years in five districts of Southwest Uganda was.5%, second to 1.4% yield for children from routine PITC in out-patients departments. Following the training and mentorship of health workers in pediatric and adolescent PITC, HIV screening and testing of children and adolescents became routine at the different service points, which included out-patients departments, in-patient wards, OVC outreaches, young child and ART clinics. Introduction of the pediatric and adolescent PITC eligibility screening tool (Appendix 1). The screening tool currently being validated under the DELTA project serves as a quick guide to identification of children at risk of HIV, who should access HIV testing services. It prioritizes targeted HIV testing among children hence improve yield and case identification. The UB project supported introduction of the tool and provided copies at service points in the targeted health facilities. Strengthened partnerships and collaboration with other implementing partners. During the implementation of the UB project, EGPAF worked closely with various partners in the region. These partners included OVC partners, community-based organizations, people living with HIV (PLHIV) networks, civil society organizations, and district local governments. Key Achievements The project has achieved progress in improving pediatric and adolescents HIV treatment indicators in the supported districts.2 At baseline, 26% and 45% of infants eligible for the 1st and 2nd DNA PCR accessed the test (Figure 2). Following training, mentorship and coaching of service providers in Early Infant retention and Birth Cohort monitoring, uptake of the PCR tests improved to 4% and 67% respectively by the end of fiscal year 3 of the project. The current gaps in EID uptake are mainly due to continued emigration of mothers after birth, resignation and transfer of trained service providers with replacement by midwives who are naïve to Early Infant retention and Birth Cohort monitoring. No. of HEI identified and no. of infants who accessed DNA PCR within 2 months of life No. of infants eligible for 2nd DNA and No. who accessed the test EID: Access to 1st DNA PCR within 2 months by HEI during FY1, 2, and 3 of the UB project 8 7 6 5 4 3 2 1 Eligible for 1st PCR 1st PCR done % PCR Uptake Oct 215- Mar 216 Apr 216- Mar 217 Apr 217- Mar 218 3787 7462 6651 99 274 2669 26% 37% 4% 45% 4% 35% 3% 25% 2% 15% 1% 5% % Percentage uptake of 1st DNA PCR within 2 months EID: Access to 2nd DNA PCR by HEI during FY1, 2, and 3 of the UB project 5 45 4 35 3 25 2 15 1 Eligible for 2nd PCR 2nd PCR done % PCR Uptake Oct 215- Mar 216 Apr 216- Mar 217 Apr 217- Mar 218 1915 3841 442 863 2472 2979 45% 64% 67% 8% 7% 6% 5% 4% 3% 2% 15% 1% Percentage uptake of 2nd DNA PCR Figure 2: Uptake of the first and second test via polymerase chain reaction (PCR) diagnosis among HIV-Exposed infants (HEI) % 2 EGPAF Uganda program data 3 Ministry of Health (216). National HIV Testing Services Policy and Implementation Guidelines. 4th Edition

5, 4, 3, 2,952 4,72 2, 1, Children <15 Years Figure 3: Number of children under 15 years and adolescents 15-19 years active on ART 275 1,588 Adolescents 15-19 years Baseline (October 215) Mar-18 The project realized a 38% growth in number of children below 15 years active on ART while adolescents 15-19 years increased by 477% (Figure 3). Limited HIV case identification among children <15 years resulted in the observed small increment (38%) of children active in care compared to the 477% growth among adolescents 15-19 years, the age bracket where sexual transmission of HIV often occurs making it easier to identify more cases in the age group and link them to care. 9% Whereas care givers of children <15 years, and adolescents 15-19 years received on going adherence counseling, the latter had a better improvement in viral suppression rates (11%) compared to children <15 years (1%) Figure 4. This was because children <15 years still relied on care givers for their medication yet some care givers were elderly and often forgot to adhere to the treatment schedules. 89% 85% 8% 75% 79% 78% 77% 7% Children <15 Years Adolescents 15-19 years Figure 4: Viral Load Suppression for children under 15 years of age and adolescents 15-19 years of age Baseline (October 215) Mar-18 Lessons Learned Know Your Child s Status campaigns* were associated with very low yield and were discontinued Routine provision of targeted PITC to children and adolescents in outpatient departments was associated with high yield (1.4%) Partnerships with OVC organizations are crucial in enabling improved access to HIV testing among OVC. Opening ART clinics all working days to allow same-day linkages and working with linkage facilitators to physically escort newly identified, HIV-positive children and adolescents to ART clinics significantly improve treatment initiation rates. Challenges Missed opportunities for children and adolescents to access HIV testing were still seen, due to occasional stock-outs of HIV test kits which was most often due to inadequate supplies from the national system Missed opportunities to link all newly identified HIV-positive children and adolescents to care and ART, This was mainly observed among children and adolescents newly identified in outreaches and among those whose care givers had the tendency to seek the opinion of the parents before such children are linked to care. Only a few of such care givers brought back the children for enrolment. In year two, mothers of 36 out of 122 (29.5%) HIV-positive infants identified could not be traced in the communities they earlier indicated as their home villages. Relocation of HIV-positive mothers after birth made it difficult to track infants who potentially seroconvert. Between October 216 and February 217, the turnaround time of EID results increased from the expected two weeks to two months (on average), due to delays during transportation of dry blood spots from health facilities to the central laboratories where samples were examined. There were also delays in transportation of printed results from the central laboratories to the health facilities. Delays in transportation of samples and results resulted in delayed ART initiation for some newly identified HIV-infected infants. During the period, six of the 122 HIV-positive infants identified in year two had died by the time their results were received in the health facilities. The 24-month retention of children and adolescents 2 19 years of age was 78% by the end of year two of the UB project, compared to 71% among adults.3 *Know Your Child s Status Campaigns were activities that entailed mass mobilization of index clients in care to take their biological children for HIV testing at the respective health facilities.

Stock-outs of pediatric antiretroviral formulations due to inconsistencies in the national supply chain hampered treatment initiation, retention and viral load suppression. Poor viral load suppression of 79% among children under 15 years and 89% among adolescents 15 19 years or age, as of the end of September 217. Next Steps EGPAF will continue providing technical assistance to health facilities to fully institutionalize pediatric and adolescent PITC eligibility screening and testing at all service points in the priority health facilities and thus improve case identification and the yield from pediatric and adolescent HIV testing services. The technical assistance will also aim at monitoring stock levels of laboratory commodities and pediatric ARV formulations and redistribution to minimize stock-outs. Strengthening strategic collaboration with OVC partners with a goal of enhancing integration of HIV testing in planned OVC activities. Improving linkages to care by working with linkage facilitators to achieve same-day linkages and active follow-up of HIV-positive children newly identified in outreach. Improving retention of children and adolescents in care by facilitating counselors provision of quality psychosocial support and through routine appointment tracking and active follow-up of those who miss appointments. Counselors will strengthen ongoing adherence counseling support to adolescents and caregivers of children, leading to improved treatment outcomes. Supporting Ariel club activities. Ariel club activities are psychosocial events targeting HIV infected and affected children and adolescents. They are an avenue to engage caregivers in issues of looking after HIV-infected children, and strengthening psychosocial support to children and adolescents with expected outcomes of improved retention in care and viral load suppression. Continue working with existing/sustainable structures (district heath officers, district health team officials, health workers, peer educators, village health teams, PLHIV networks) to implement the UB project. Engaging the 2 trained regional and district MOH trainers/ mentors to champion and foster ongoing and future supportive supervision of pediatric HIV activities. Building health worker capacity for the provision of quality pediatric and adolescent HIV diagnosis, care, and treatment services. Mentoring and coaching health workers, especially those who are new on board to capture and report pediatric and adolescent HIV data using the standard MOH health management information system tools and electronic systems. References: 1. Uganda AIDS Commission (UAC), The National HIV Strategic Plan, 215/216 219/22 (Kampala, Uganda: UAC, 215). 2. GLASER database. Washington, DC: Elizabeth Glaser Pediatric AIDS Foundation. Accessed May 6th 218 3. USAID RHITES SW October 216 March 31st 217 semiannual report. Accessed June 26th 218 Photo: Eric Bond/EGPAF, 215

Appendix 1: The pediatric and adolescent provider-initiated testing and counseling eligibility screening tool HCT guidance or children and adolescents (18mo-18 years) Is mother HIV positive? Is the child symptomatic for HIV? Is the child malnourished (MAM or SAM)? Is the child hospitalized or was hospitalized in the last 6 months? Is the child diagnosed with TB (presumptive or confirmed) or child has history of TB treatment? Does the child have history of sexual abuse or sexual activity? Has child had accidental exposure, needlestick inury, and other sharps? Does child abuse drugs/alcohol? Is child an OVC? Any yes All No Test Child Test Mother Provide routine clinical care Test Child Provide routine clinical care Link to care/art All children below 18 months whose exposure status is determined using rapid testing should be re-tested using PCR following the National EID algorithm Retesting for children and adults Children testing negative should be retested in the following situations: specific incident of HIV exposure within the three months prior to HIV testing, any form of exposure after the previous test, have STIs or TB, are symptomatic of HIV infection, are receiving PEP. The following categories of children should not be subjected to an HIV rapid test: 1. Unaccompanied minors (children less than 12 years); unless for diagnostic or mandatory testing 2. Children and adolescents with known HIV negative status who have not had HIV risk exposure within the last 3 months and do not fall under the categories described above. 3. Known HIV positive children/adolescents