PRELIMINARY DRILLING RESULTS FROM FIVE NEW DRILL HOLES EXTEND IRON MINERALISATION AT MARIELA

Similar documents
First Results Prospector Drilling Program

Mutiny continues to hit high grade gold and copper intersections in latest Deflector drilling

ASX/Media Announcement 24 December 2010

SCOUT DRILLING COMPLETED ON KELLERBERRIN URANIUM PROJECT

For personal use only

Disclaimer. Matrix Metals Limited Presentation October

28 April 2017 ASX Code: COY. March 2017 Quarterly Activity Report

January A different kind of Zinc Explorer

DNI Metals - First 12 of 28 Diamond Core Assays Received; Including 34m Grading 5.63% Graphitic Carbon

Riesling Base Metal Project pxrf Soil Geochemistry

Palmer Deposit 2018 Resource* INDICATED 5.2% Zn, 1.5% Cu, 30.8 g/t Ag, 0.3 g/t Au INFERRED 5.2% Zn, 1.0% Cu, 29.2 g/t Ag, 0.

Kihabe Zn, Pb, Ag Project Botswana

For personal use only

Accelerated Mining and Gold Production Completion of Strategic Alliance with Territory Resources for Tennant Creek $2m Placement at 56.

HISTORICAL OVERVIEW OF GOLD COPPER MINERAL DISCOVERIES & MINE DEVELOPMENTS IN THE PHILIPPINES

TRI ORIGIN MINERALS LTD

BISIE PROJECT UPDATE

WONGAN HILLS, W.A. - base metals and gold project

For personal use only

Ayawilca Zinc Project Peru: Targeting Resource Growth in 2017

For personal use only

ASX/Media Announcement

Star Zinc Project Update Released 07:00 15-Oct-2018

For personal use only

Expanding Resources in the Caribbean

A Zinc Play With A Bright Future. Corporate Presentation CSE: PSE FSE: PNX

Mobile Metal Ions Soil Geochemical Survey Kincaid Fault 2008

ASX/Media Announcement

TSX: LUN OMX: LUMI Corpora Corpor t a e t Presen esen a t tion

White Rose Research Online URL for this paper: Version: Accepted Version

ASX/Media Announcement

2018: Growing & De-risking the Ayawilca Zinc Project in Peru

For personal use only

Akie & Kechika Regional Projects. Akie Project: Zn Pb Ag Cardiac Creek Deposit Advanced Exploration

CASE STUDIES USING PORTABLE XRF ANALYSERS DURING SOIL CONTAMINATION AND MINERAL EXPLORATION PROJECTS. Todd Houlahan 21 st IGES, Dublin, Ireland, 2003

Macmillan Pass Zinc Project: Growing an Already World-Class Asset

For personal use only

TEXADA ISLAND MINERAL CLAIMS

OPEMISKA COPPER MINE COMPLEX. PORE: TSXV powerore.com

FEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT

Mine schedule optimisation with ventilation constraints: a case study

2008 Soil Geochemistry. on the. Serpentinite Lakes Property,

M.P.K. Rathnayake, D. Kumaragamage' and K. Dahanayake 2. Department of Earth Science Institute of Fundamental Studies Kandy.

Effect of calcified seaweed application on grazing preference by dairy cows

Shea Clark Smith / MEG, Inc., P.O. Box 18325, Reno, Nevada, USA Tel:

Amended Submission of the Republic of Côte d Ivoire regarding its continental shelf beyond 200 nautical miles.

Kiwa CMT Testing. CMT (Testing) Ltd. Established in 1976 Located in Derby with 27 employees

GEOGENIC IRON EXPOSURE: ACUTE RESPIRATORY CONDITIONS AND INFECTIONS AMONG IRON ORE WORKERS IN WESTERN AUSTRALIA

Figure 1. Location of 43 benchmark sites across Alberta.

Cambridgeshire and Peterborough Minerals and Waste Development Framework

Research on trace minerals in the common bean

Trends in Micro-Nutrient Soil Test Levels in Saskatchewan Pat Flaten, PAg 1, Brandon Green, PAg 2, Paul Routledge, PAg 3

Spiros Nomikos Chief Executive Officer Solvay Sodi Bulgaria

Magellan s Transport Route Lead Monitoring Program

Proposed New Code of Practice for Copper Supplementation of Ruminant Livestock April 2011 Bulletin Richard Keel

Corporate Presentation January 2019

Compost Analysis. Sustainable Soil Management with the Mikhail Balance System

Comparison of Actual and Calculated Lag Times in Humidity Cell Tests Kelly Sexsmith, Dylan MacGregor, Andrew Barnes

Resource Estimation of Tsumeb Tailings Dump, Namibia, August 2011

Europa Oil & Gas in Ireland

Enclosed are the tissue analysis results for the samples from the greens at Golf Club.

Investor Presentation

1Q 2015 Results A Positive Start to 2015

ABSTRACT Process Economics Program Report 17C PROPANE-BASED ACRYLONITRILE (June 2001)

Vetiver System for Infrastructure Protection in Vietnam: A Review after Fourteen Years of Application on the Ho Chi Minh Highway

Acquisition of BP s Interests in Bruce, Keith and Rhum Fields in the North Sea Frequently Asked Questions

Compost Analysis. Sustainable Soil Management with the Mikhail Balance System

Calcium-Based Stabilizer Induced Heave in Oklahoma Sulfate-Bearing Soils

Celtic Sea Minerals. Natural, bio-available minerals from the seabed

Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No: County of Butte Contract Number: 18050

Sprott Investment Conference July 17-20, Booth 6

Zinc T mg/l Zn Zincon

TSADILAS Christos, SAMARAS Vasilios, SIMONIS Asterios, SETATOU Helen

Seasonal Trends in Nutrient Composition of Hass Avocado Leaves 1

Comparison of Actual and Calculated Lag Times in Humidity Cell Tests

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

Public Meeting to Discuss Proposed Noise Wall along Western Avenue

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa

Soil fertility status and nutrient recommendations based on soil analysis of Jaisalmer district of western Rajasthan

Different Fertilisers

Important Notices. BASIS CPD Points PN/50971/1516/g

Richfield Ventures Corp. By

PHYTOTECH, FIRST MEDICAL CANNABIS COMPANY TO LIST ON THE ASX

Investor Presentation

Transfer of Some Major and Trace Elements From Phosphate Rock to Super-Phosphate Fertilizers

WEST FRASER MILLS LTD. FERTILIZATION SCREENING TRIALS

10/23/2018. Ishik University / Sulaimani. Architecture Department. Surveying ARCH 224 CHAPTER -3- Level and Leveling LEVEL AND LEVELING

Kinetic testing program

2. SITUATION ANALYSIS

Transforming IVF and Biological Separations Presentation by Executive Chairman, Alison Coutts

Choluteca. Better solutions. Fewer disasters. Safer world. Honduras National Disaster Preparedness Baseline Assessment Department Profile

Introduction of Daehan Salty Mineral Water. It s healthy water similar to body fluids!!!

Environmental Health Impacts from Artisanal Gold Mining

Governing Body 322nd Session, Geneva, 30 October 13 November 2014

Materials Declaration Form

MARKET NEWS for pig meat

Preservation of organic compounds in circumneutral iron deposits

ORGANIC APPROVED COMPOUND FEEDS, FEED BLOCKS AND MINERALS

Ground-breaking Discovery in Medicinal Cannabis Research

Transcription:

LATIN RESOURCES LIMITED ACN: 131 405 144 Suite 2, Level 1, 254 Rokeby Road Subiaco, Western Australia, 6008. P 08 9485 0601 F 08 9321 6666 E info@latinresources.com.au 30 January 2013 PRELIMINARY DRILLING RESULTS FROM FIVE NEW DRILL HOLES EXTEND IRON MINERALISATION AT MARIELA Highlights Preliminary results from five new drill holes at Mariela confirm that a magnetic anomaly is associated with magnetite iron mineralisation, which was intersected by each of the five new holes along more than 1 km of strike. Drill hole MA20-06 intersected several Fe mineralised zones including 61.2m @ 40.4% Fe from 455.85m followed by 17.5m @ 34.5%Fe from 538.9m: Hole ID From To Interval Fe (%) MA20-06 455.85 517.04 61.19 40.41 MA20-06 517.04 538.90 21.86 mainly no assays MA20-06 538.90 556.36 17.46 34.47 MA20-06 556.36 593.50 37.14 19.39 67 individual samples between 0.3m and 2.2m thickness were selected for copper analyses and showed values up to 0.50% with a continuous interval of 5.34m assaying 0.34% Cu. Preliminary results are available for 7 holes (out of 11 completed) with 4 holes currently being logged or assayed. Five holes are underway. 6 drill rigs continue to operate on the project. A total of twenty (20) exploration diamond drill holes were planned to test a coincident magnetic-gravity anomaly measuring some 3,000 x 1,000 m (reported 29 Feb 2012). The project is located immediately adjacent to a major road transport route and only 60 km from the mining port of Ilo. Exploration of the Mariela project is being managed by Junefield as per the Earn-In Option Agreement (reported Nov 2011). The agreement allows Junefield to earn up to 70% of the Mariela Project by funding all activities to the completion of a Bankable Feasibility Study or to a total cost of US$35 million. Latin Resources Limited (LRS.ASX) has received updated preliminary assay results of drilling at the Mariela Project from Total Genius Iron Mining SAC (TGIM), Junefield s Peruvian subsidiary, in a letter stating that the results will be subject to verification by a competent third party (SRK geological consultants) in the near future (See full TGIM letter enclosed as Appendix 2). New results included in the letter are summarised in tables in Appendix 1. Page 1

The results in Appendix 2 include previously reported results for drill holes MA-02 and MA18-04 and are incomplete, with samples representing only intervals where Fe mineralisation was visually observed. Table 1 compares total meters sampled in each hole with the total depth of the hole. The samples were analysed by SGS laboratories in Lima, Peru, for Total Iron (by volumetry), and a very limited selection of these samples were analysed for Copper (by mixed acid digest, with AAS finish), Sulphur (by LECO), Phosphorus (by colorimetry) and Ferrous Iron Oxide (by volumetry). Table 1 Total meters sampled for each hole against hole depth Hole Number Intervals Sampled (m) Hole Depth (m) % of drill hole sampled MA20-03 28.90 798.20 3.6 MA14-06 69.32 561.10 12.4 MA20-06 196.07 827.86 23.7 MA29-06 129.10 540.10 23.9 MA33-05 37.65 1,031.40 3.7 The most significant Fe mineralisation intersection was in the drill hole MA20-06 of 49.63 m grading 42.0% total Iron (15% cut-off) from 465.17 m to 514.80 m included within a thicker unit of 61.2m @ 40.4% Fe from 455.85m. Numerous other intersections of lesser thickness were obtained from the incomplete sampling of MA20-06 and from the other four new holes (MA20-03, MA14-06, MA29-06 and MA33-05): Drill holes MA20-03 and MA14-06 intersected multiple Fe mineralised zones from 294.0m to 780.60m and from 90.6m to 561.10m, respectively, with grades ranging from 16.1% to 48.7% Fe; Drill hole MA29-06 intersected multiple Fe mineralized intervals from 376.25m to 540.10m, including 65m @ 27% Fe (from 404.05m to 468.10m) and 37.5m @ 31.4% Fe (from 499.6m to 537.10m); Drill hole MA33-05 intersected multiple Fe mineralised zones from 907.50 to 1031.40m with grades ranging from 16.2% to 23.6% Fe. (Fore detail see Tables 5 to 9 in Appendix 1). Sporadic samples were analysed for sulphur (40 out of 583), phosphorus (38 out of 583) and copper (67 out of 583) details are shown in Table 2 - with the drill hole MA20-06 also presenting the most significant intersection of copper mineralisation (5.2 m @ 0.34% Cu). No samples have been assayed for gold or silver. Table 2 Statistics of assays results for sulphur, phosphorus and copper for new drill holes at Mariela Hole Number Sulphur Phosphorus Copper Number of Samples Concentration Ranges (%) Number of Samples Concentration Ranges (%) Number of Samples Concentration Ranges (%) MA20-03 - 2 0.04 0.85 - MA14-06 2 0.01 0.21 5 <0.01 1.97 2 0.03 0.11 MA20-06 12 0.03 1.89 5 <0.01 0.03 28 0.01 0.50 MA29-06 3 0.01 0.10 3 0.01 1.33 14 < 0.01 0.26 MA33-05 23 < 0.001 0.08 23 <0.01 2.58 23 < 0.01 0.02 TGIM has also provided the Company with drilling status update confirming eleven completed drill holes and five additional holes currently being drilled (Table 3 and Figures 2-4). Page 2

Hole Number Table 3 Drill holes completed and underway at the Mariela project. Easting (me PSAD56) Northing (mn PSAD56) R.L. (masl) Azimuth Dip Depth (m) Status MA-02 230064 8107861 847 90º -83 799.05 Completed MA20-03 230446 8107780 847-90 855.50 Completed MA18-04 230370 8107408 847-90 858.00 Completed MA14-06 230370 8107411 847 60º -70 611.45 Completed MA20-06 230224 8107661 850-90 837.5 Completed MA29-06 230050 8108078 844-90 546.80 Completed MA25-05 230201 8107913 845-90 722.40 Completed MA20-04 230154 8107626 851-90 1,200.00 Completed MA29-02 229747 8107966 853-90 973.40 Completed MA33-05 230009 8108276 841-90 1,065.80 Completed MA14-02 230276 8107374-90 1,061.30 Completed MA25-07 230290 8107945-90 1,017.35 Underway MA25-02 229829 8107767 70º -70 843.80 Underway MA37-06 229915 8108455-90 955.25 Underway MA25-16 230928 8108178-90 907.40 Underway MA20-09 230365 8107712-90 618.39 Underway Latin is very pleased to continue receiving such encouraging preliminary results from its exploration partner at Mariela and Managing Director, Mr Chris Gale, commented, We are very pleased with these additional preliminary results which have extended the iron mineralisation zone to over one kilometre of strike confirming that Mariela is an important mineralised system with good Iron grades and suggested potential for associated copper mineralisation. About Mariela: The Mariela project comprises 7 contiguous mining concessions covering 5,200 hectares in the Islay Province of Arequipa in Southern Peru. Figure 1 shows the location and proximity to the paved Panamerican Highway that crosses the concession area. Following up a regional aeromagnetic anomaly, exploration geophysical work by Latin successfully delineated a large and intense coincident magnetic and gravity anomaly. The buried anomaly is interpreted to comprise a central magnetite-rich core (defined by a combined magnetic and gravity anomaly) flanked on both sides to east and west by the adjacent gravity anomalies. Drilling was planned to target primarily the magnetic anomaly for Marcona and Pampa del Pongo style massive magnetite mineralisation. The Marcona iron deposit in south-central Peru contains some 1,900 Mt of ore at 55.4% Fe and 0.12% Cu and is the preeminent central Andean iron oxide deposit (Table 9). Continuing exploration at Pampa Del Pongo looks set to displace Marcona from such pre-eminence. In 2008, Cardero Resources with SRK estimated an inferred resource of 863Mt of ore at 41.3% Fe and 0.10% Cu (Table 4). Cardero finalised the sale of the Pampa de Pongo Deposit to Nanjinzhao Group Co., Ltd in January 2010 for a total final price of US$100M. Since taking control of the project, Nanjinzhao has undertaken extensive exploration and is currently finalising development studies. A recent publication in the proceedings of the XVI Peruvian Geology Congress and Society of Economic Geologists Conference (September 2012) cites the Pampa del Pongo Deposit as having an estimated potential mineralisation of >3,000Mt @ 40%Fe, 0.1% Cu and 0.1 g/t Au 1. 1 Rodríguez, O., Calvo, G., Serrano, M., Tornos, F., Rodríguez, R., Velasco, F., Contreras, M., Ochoa, J., Urbina, M., y Sapacayo, M. (2012) El Skarn Magnésico de Pampa Del Pongo: Un Megayacimiento de Hierro en la Cordillera de la Costa del Sur del Peru. XVI Congreso Peruano de Geología y Conferencia SEG 2012. Page 3

Table 4 Published Resource Estimates for the Marcona and Pampa del Pongo Iron Deposits. Deposit Resource Cut-off grade Tonnes Total Fe (%) Cu (%) Au (g/t) Category (% Total Fe) Marcona 2?? 1,900 Mt 55.4% 0.12% Pampa del Pongo 3 Inferred 15% 863 Mt 41.3% 0.10% 0.07 g/t Pampa del Potential? >3,000 Mt 40% 0.10% 0.1 g/t PongoError! Bookmark defined. not Although covered by Quaternary sands, the Mariela anomaly occupies a similar geological setting to that of the Marcona and Pampa del Pongo deposits being hosted within Jurassic age volcanic arc lithologies, and like other deposits of this style there is also potential for co-incident copper/gold mineralisation, (eg. Mina Justa IOCG deposit, 411Mt @ 0.67%Cu indicated/inferred resource located adjacent to the Marcona deposit and the Tia Maria copper gold prospect, 638Mt @ 0.39% Cu, 0.16g/t Au, located just 25 km WNW of the Mariela Project ). The updated drill hole results provided by TGIM confirm that the magnetic anomaly at Mariela is associated with iron mineralisation. The intersection in Hole Number MA-02 at Mariela (227m @37.2 % Fe, previously reported) was confirmed in Hole Number MA20-06 (49.6m @ 42.0% Fe). Those intersections can be compared favourably to the initial intersections of Iron mineralisation reported by Cardero Resources from their Pampa del Pongo deposit in a similar geological environment some 400 km further north west along the Peruvian Coast. TGIM will continue with the drilling program in order to define Mariela s mineral resources. 2 Chen, H; Clarke, A.H. & Kyser, T.H. (2010) The Marcona Magnetite Deposit, Ica, South Central Peru. Economic Geology v 105 pp1441-1456. Note Hawkes, Clarke & Moody (2002) gave this resource as 1.4Bt @ 54.1% fe and 0.10% Cu. (Marcona and Pampa de Pongo: Giant Mesozoic Fe-(cu-Au) Deposits in the Peruvian Coastal Belt. In Porter T.M. (Ed) Hydrothermal Iron Oxide Copper-Gold and related deposits: A Global Perspective, Vol 2 pp 115 130. 3 SRK Consulting (2008) Pampa de Pongo Iron Project. Preliminary Economic Assessment Technical Report for Cardero Resource Corp dated September 30, 2008. Page 4

Figure 1 Location of the Mariela Project with respect to major Metallogenic Belts of Southern Peru. Note the Project is located on the Panamerican Highway and 60 km north of the Ilo mineral port. PANAMERICAN HIGHWAY Page 5

Figure 2 Drill Holes at Mariela plotted on Residual Gravity Anomaly. Page 6

Figure 3 Drill Holes at Mariela plotted on Reduced to Pole Ground Magnetic Anomaly. Page 7

Figure 4 Drill Holes at Mariela plotted on topography with superimposition of modelled magnetic and gravity bodies at 425m depth. Page 8

For further information please contact: Australia United Kingdom United States Chris Gale Managing Director Latin Resources Limited +61 8 9485 0601 David Tasker PPR +61 8 9388 0944 finncap (Broker) Ben Thompson Elizabeth Johnson +44 20 7220 0500 Allen & Caron Rudy Barrio +1 212 691 8087 About Latin Resources Latin Resources Limited is a mineral exploration company focused on creating shareholder wealth through the identification and definition of mineral resources in Latin America, with a specific focus on Peru. The company has a portfolio of projects in Peru and is actively progressing its two main projects: Guadalupito Iron and Heavy Mineral Sands Projects and the Ilo Iron Ore-Copper-Gold Projects. Competent person statement The information in this report that relates to Geological Data and Exploration Results is based on information provided by Total Genius Iron Mining SAC, Junefield s Peruvian subsidiary and operator of the Mariela project, and subsequently compiled by Mr Andrew Bristow, a full time employee of Latin Resources Limited s Peruvian subsidiary. Mr Bristow is a member of the Australian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralization and the type of deposit under consideration to qualify as a Competent Person as defined in the December 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Bristow consents to the inclusion in this report of the matters based on his information in the form and context in which they appear. info@latinresources.com.au www.latinresources.com.au Page 9

APPENDIX 1 Summary Tables of New results from Mariela. Table 5 Intersections compiled from preliminary results of incomplete sampling of the drill hole MA20-03 at Mariela (15% Total Iron cut-off). Hole number From (m) To (m) Intersection (m) Total Fe (%) MA20-03 0 294.00 294.00 No Assays MA20-03 294.00 294.50 0.50 35.8 MA20-03 294.50 377.70 83.20 No Assays MA20-03 377.70 379.40 1.70 45.0 MA20-03 379.40 489.60 110.20 No Assays MA20-03 489.60 491.10 1.50 17.5 MA20-03 491.10 541.90 50.80 No Assays MA20-03 541.90 543.20 1.30 23.5 MA20-03 543.20 547.80 4.60 No Assays MA20-03 547.80 552.30 4.50 24.9 MA20-03 552.30 572.50 20.20 No Assays MA20-03 572.50 577.20 4.70 28.9 MA20-03 577.20 628.70 51.50 No Assays MA20-03 628.70 630.50 1.80 16.3 MA20-03 630.50 631.80 1.30 No Assays MA20-03 633.00 698.70 65.70 No Assays MA20-03 698.70 699.40 0.70 27.5 MA20-03 699.40 725.50 26.10 No Assays MA20-03 725.50 726.20 0.70 18.7 MA20-03 726.20 764.20 38.00 No Assays MA20-03 764.20 765.65 1.45 27.3 MA20-03 765.65 778.80 13.15 No Assays MA20-03 778.80 780.60 1.80 22.8 MA20-03 780.60 791.15 10.55 No Assays MA20-03 791.15 798.20 eoh 7.05 Fe < 15% Table 6 Intersections compiled from preliminary results of incomplete sampling of the drill hole MA14-06 at Mariela (15% Total Iron cut-off). Hole number From (m) To (m) Intersection (m) Total Fe (%) MA14-06 0.00 90.60 90.60 No Assays MA14-06 90.60 92.60 2.00 30.4 MA14-06 92.60 102.80 12.20 23.2 MA14-06 102.80 141.25 38.45 No Assays MA14-06 141.25 142.10 0.85 22.5 MA14-06 142.10 158.80 16.70 No Assays MA14-06 158.80 159.35 0.55 25.2 MA14-06 159.35 164.30 4.95 No Assays MA14-06 164.30 164.80 0.50 22.9 MA14-06 164.80 168.50 3.70 No Assays MA14-06 168.50 173.75 5.25 20.6 MA14-06 173.75 175.70 1.95 No Assays MA14-06 175.70 177.60 1.90 48.7 Page 10

MA14-06 177.60 180.60 3.00 No Assays MA14-06 180.60 181.20 0.60 27.6 MA14-06 181.20 182.05 0.85 No Assays MA14-06 182.05 182.70 0.65 19.2 MA14-06 182.70 197.00 14.30 No Assays MA14-06 197.00 197.85 0.85 29.6 MA14-06 197.85 204.60 6.75 No Assays MA14-06 204.60 206.40 1.80 22.8 MA14-06 206.40 217.10 10.70 No Assays MA14-06 217.10 217.60 0.50 17.0 MA14-06 217.60 230.40 12.80 No Assays MA14-06 230.40 230.75 0.35 21.8 MA14-06 230.75 231.20 0.45 No Assays MA14-06 231.20 232.65 1.45 37.5 MA14-06 232.65 233.40 0.75 No Assays MA14-06 233.40 233.85 0.45 27.6 MA14-06 233.85 249.15 15.30 No Assays MA14-06 249.15 254.30 5.15 28.4 MA14-06 254.30 257.50 3.20 No Assays MA14-06 257.50 258.00 0.50 21.5 MA14-06 258.00 261.00 3.00 No Assays MA14-06 261.00 262.90 1.90 38.8 MA14-06 262.90 310.60 47.70 No Assays MA14-06 310.60 311.40 0.80 29.4 MA14-06 311.40 313.10 1.70 No Assays MA14-06 313.10 313.55 0.45 20.5 MA14-06 313.55 314.15 0.60 No Assays MA14-06 314.15 319.20 5.05 24.9 MA14-06 319.20 321.55 2.35 No Assays MA14-06 321.55 323.10 1.55 22.6 MA14-06 323.10 324.80 1.70 No Assays MA14-06 324.80 326.30 1.50 16.1 MA14-06 326.30 341.00 14.70 No Assays MA14-06 341.00 341.70 0.70 40.4 MA14-06 341.70 343.70 2.00 No Assays MA14-06 343.70 346.50 2.80 44.0 MA14-06 346.50 348.50 2.00 No Assays MA14-06 348.50 350.50 2.00 20.6 MA14-06 350.50 350.80 0.30 No Assays MA14-06 350.80 351.30 0.50 31.9 MA14-06 351.30 389.60 38.30 No Assays MA14-06 389.60 390.90 1.30 27.0 MA14-06 390.90 403.38 12.48 No Assays MA14-06 403.38 403.73 0.35 22.0 MA14-06 403.73 423.35 19.62 No Assays MA14-06 423.35 425.05 1.70 27.8 MA14-06 425.05 468.25 43.20 No Assays MA14-06 468.25 470.50 2.25 28.6 MA14-06 470.50 470.90 0.40 No Assays MA14-06 470.90 473.40 2.50 40.5 Page 11

MA14-06 473.40 478.78 5.38 No Assays MA14-06 478.78 479.85 1.07 30.0 MA14-06 479.85 480.05 0.20 No Assays MA14-06 480.05 480.55 0.50 21.4 MA14-06 480.55 503.35 22.80 No Assays MA14-06 503.35 503.82 0.47 47.3 MA14-06 503.82 507.25 3.43 No Assays MA14-06 507.25 507.94 0.69 45.1 MA14-06 507.94 509.25 1.31 No Assays MA14-06 509.25 509.92 0.67 31.8 MA14-06 509.92 511.28 1.36 No Assays MA14-06 511.28 511.90 0.62 34.9 MA14-06 511.90 527.80 15.90 No Assays MA14-06 527.80 531.53 3.73 28.9 MA14-06 531.53 535.11 3.58 No Assays MA14-06 535.11 535.75 0.64 36.1 MA14-06 535.75 536.42 0.67 No Assays MA14-06 536.42 537.25 0.83 38.0 MA14-06 537.25 559.90 22.65 No Assays MA14-06 559.90 561.10 eoh 1.20 35.1 Table 7 Intersections compiled from preliminary results of incomplete sampling of the drill hole MA20-06 at Mariela (15% Total Iron cut-off). Hole number From (m) To (m) Intersection (m) Total Fe (%) MA20-06 0.00 256.05 256.05 No Assays MA20-06 256.60 301.80 45.20 No Assays MA20-06 304.80 318.50 13.70 No Assays MA20-06 321.15 321.45 0.30 34.7 MA20-06 323.00 341.15 18.15 No Assays MA20-06 341.15 341.55 0.40 17.7 MA20-06 341.55 374.80 33.25 No Assays MA20-06 374.80 375.95 1.15 25.5 MA20-06 375.95 412.66 36.71 No Assays MA20-06 412.66 414.43 1.77 36.5 MA20-06 414.43 428.45 14.02 No Assays MA20-06 428.45 432.72 4.27 48.8 MA20-06 432.72 440.15 7.43 No Assays MA20-06 440.15 440.78 0.63 35.6 MA20-06 440.78 450.60 9.82 No Assays MA20-06 450.60 453.30 2.70 37.6 MA20-06 453.30 455.85 2.55 No Assays MA20-06 455.85 464.55 8.70 39.3 MA20-06 464.55 465.17 0.62 No Assays MA20-06 465.17 514.80 49.63 42.0 MA20-06 514.80 515.60 0.80 No Assays MA20-06 515.60 517.04 1.44 32.1 MA20-06 517.04 526.80 9.76 No Assays MA20-06 526.80 529.00 2.20 41.6 Page 12

MA20-06 529.00 538.90 9.90 No Assays MA20-06 538.90 556.36 17.46 34.5 MA20-06 556.36 557.45 1.09 No Assays MA20-06 557.45 558.20 0.75 38.8 MA20-06 558.20 559.94 1.74 No Assays MA20-06 # 559.94 614.00 54.06 19.33 MA20-06 614.00 628.30 14.30 No Assays MA20-06 629.80 646.65 16.85 No Assays MA20-06 646.65 650.00 3.35 19.0 MA20-06 650.00 656.30 6.30 No Assays MA20-06 656.30 658.70 2.40 25.9 MA20-06 658.70 659.15 0.45 No Assays MA20-06 659.15 659.45 0.30 35.9 MA20-06 659.45 660.00 0.55 No Assays MA20-06 660.00 661.30 1.30 21.1 MA20-06 661.30 664.70 3.40 No Assays MA20-06 664.70 665.30 0.60 18.7 MA20-06 665.30 679.15 13.85 No Assays MA20-06 680.15 681.30 1.15 29.5 MA20-06 681.30 681.70 0.40 No Assays MA20-06 681.70 682.15 0.45 42.5 MA20-06 682.15 710.10 27.95 No Assays MA20-06 710.10 711.90 1.80 26.9 MA20-06 714.50 716.00 1.50 No Assays MA20-06 717.50 722.70 5.20 No Assays MA20-06 722.70 724.75 2.05 22.9 MA20-06 724.75 725.40 0.65 No Assays MA20-06 725.40 726.65 1.25 22.8 MA20-06 726.65 735.90 9.25 No Assays MA20-06 735.90 736.25 0.35 18.7 MA20-06 736.25 772.00 35.75 No Assays MA20-06 772.00 782.10 10.10 26.3 MA20-06 782.10 785.60 3.50 No Assays MA20-06 787.75 801.50 13.75 No Assays MA20-06 801.50 803.00 1.50 18.4 MA20-06 805.20 807.58 2.38 24.7 MA20-06 807.58 824.40 16.82 No Assays MA20-06 824.40 825.13 0.73 28.7 MA20-06 826.75 827.86 eoh 1.11 29.4 # at 15% Fe cut-off, intersection includes twelve intervals of internal waste with Fe ranging from 9.9% to 14.9%. Table 8 Intersections compiled from preliminary results of incomplete sampling of the drill hole MA29-06 at Mariela (15% Total Iron cut-off). Hole number From (m) To (m) Intersection (m) Total Fe (%) MA29-06 0.00 376.25 376.25 No Assays MA29-06 376.25 384.10 7.85 32.8 MA29-06 384.10 385.10 1.00 No Assays Page 13

MA29-06 a 385.10 395.45 10.35 28.9 MA29-06 395.45 398.60 3.15 No Assays MA29-06 398.60 399.75 1.15 21.7 MA29-06 399.75 403.05 3.30 No Assays MA29-06 b 403.05 468.10 65.05 27.0 MA29-06 472.30 499.60 27.30 No Assays MA29-06 c 499.60 537.10 37.50 31.4 MA29-06 537.10 540.10 eoh 3.00 Fe < 15% a) intersection includes one interval of internal waste: 386.10 to 388.45 (2.35m@13.4%Fe), b) intersection includes seven intervals of internal waste with Fe ranging from 8.1% to 14.9%, c) intersection includes three intervals of internal waste with Fe ranging from 12.9% to 13.8%. Table 9 Intersections compiled from preliminary results of incomplete sampling of the drill hole MA33-05 at Mariela (15% Total Iron cut-off). Hole number From (m) To (m) Intersection Total Fe (%) (m) MA33-05 0.00 907.50 907.50 No Assays MA33-05 907.50 908.50 1.00 22.28 MA33-05 908.50 910.00 1.50 No Assays MA33-05 910.00 910.50 0.50 22.78 MA33-05 910.50 912.00 1.50 No Assays MA33-05 912.00 912.80 0.80 17.22 MA33-05 912.80 914.00 1.20 No Assays MA33-05 914.00 917.00 3.00 19.56 MA33-05 918.70 928.15 9.45 No Assays MA33-05 928.15 928.85 0.70 19.72 MA33-05 929.95 934.65 4.70 21.52 MA33-05 934.65 957.80 23.15 No Assays MA33-05 961.50 965.50 4.00 21.25 MA33-05 969.50 996.85 27.35 No Assays MA33-05 996.85 998.80 1.95 23.63 MA33-05 998.80 1,004.25 5.45 No Assays MA33-05 1,007.45 1,008.30 0.85 16.22 MA33-05 1,008.30 1,009.80 1.50 No Assays MA33-05 1,010.40 1,031.00 20.60 No Assays MA33-05 1,031.00 1,031.40 eoh 0.40 Fe < 15% Page 14

APPENDIX 2 Letter from Total Genius Iron Mining SAC Page 15