OT EQUATOR CASTABLE Single Attachment for Overdentures

Similar documents
Attachments and Pre-fabricated Castable Components

INSTRUCTIONS FOR THE DENTIST. synocta impression procedure, Screw-retained and Snap-on. Screw-retained (Open tray) Snap-on (Closed tray)

Implant Phase Flow Chart

Part 2: Internal Tri-Channel Connection. Nobel Biocare Compatible Components. Tri-Channel Internal Connection Implants

UDELL DENTAL LABORATORY Instructions for Use PREAT Precision Attachments

Preci Clix Instructions for Ball Retained Overdenture Attachments

Universal Plunger Loc Attachment

Treatment Options for Restoring Edentulous Jaws using One- and Two-Piece Implants from Implant Direct Int l

Restoring Straumann implants. with Locator abutments.

Legacy Prosthetic Catalog

SS Implant System 2013 PROSTHETIC PROCEDURE

The LOCATOR concept. Simplicity and versatility for prosthesis fixation

Components for fixed prosthesis

Preci Clix Instructions for Ball Retained Overdenture Attachments

SimpleLine II Surgical / Prosthesis Manual

How something small, can make such a big difference!! Your best choice in overdenture

NEW. The SmartFix Concept Prosthetic solution on tilted implants. SmartFix

IMPRESSION PROCEDURES TRAINING MANUAL

OT Equator Biological Attachment

Height* FC width Prep depth RC width 4.0mm+ 4.3mm N/A 6.3mm

verification jig fabrication

UDELL DENTAL LABORATORY Instructions for Use AND ERA-RV

UDELL DENTAL LABORATORY Instructions for Use

NARROW DIAMETER implant

Hex-Lock Abutment System. Restorative Manual

Abutment level impression Ⅰ. Combi abutment/dual abutment Multi units

US Implant System 2013 PROSTHETIC PROCEDURE

Straight Octagon Abutment for Tissue Level Implant

INTRODUCTION. Why Choose Cortex Prosthetics?

For the oral rehabilitation

Blue Sky Bio Multi unit Abutments BIO Multi-Units are available for all our Bone Level Implants

ESTHETIC LINE implant

FR Attachment Instructions Removable Partial Dentures

cement-retained single crowns using cementable abutments

SwissPlant Prosthetic Catalog. SwissPlant

INDEX. Pag. 12. Pag. 05. Pag. 06. Pag. 13. Pag. 06. Pag. 14. Pag. 15. Pag. 15. Pag. 15. Pag. 15. Pag. 08. Pag. 16. Pag. 09. Pag.

PRODUCT CATALOG. Since 1985» Simple. Predictable. Profitable.

External Hex 4.1 & 5.0 platform

LOCATOR ROOT ATTACHMENT SYSTEM

synocta Meso abutment for cement-retained restorations PROSTHETICS Step-by-step instructions

N E W S M I L E S E V E R Y D AY

- RESTORATIVE PRODUCT CATALOG

Smarter Thinking. Simpler Design. TiLobe Prosthetic Manual for PrimaConnex & Genesis implants

ball abutment overdenture: chairside pick-up using existing denture

Very small abutment head easy and secure handling. Ankylos. The SmartFix concept. Prosthetic solution on angled implants

Product Catalog. Since 1985» Simple. Predictable. Profitable.

IMPRESSION-TAKING, BITE REGISTRATION, AND TEMPORARY RESTORATION ON CAMLOG IMPLANTS. a perfect fit

MiNi Overdenture Fixture

B&B DENTAL. implant company PROSTHETIC PROCEDURES BASIC INFO DURAVIT IMPLANT LINES 3P - EVOLUTION - WIDE

TS Implant System 2013 PROSTHETIC PROCEDURE

. Simplification. High Performance. Safety and Longevity. The fundamental goal is to restore the quality of life of patients.

4766 Research Dr. San Antonio, TX insightdentalsystems.com

OD Secure chairside pick-up using existing denture

Prosthodontic Procedure

SuperLine & Implantium Surgical / Prosthesis Manual

Multi-unit abutment bar overdenture

Step-by-Step Cemented Bridge Using Using CPK Abutments. Internal Hex. Implant System

SuperLine & Implantium Surgical / Prosthesis Manual

RePlant System Prosthetic Catalog

prosthetic technique manual

Element-Z Screw-Retained Hybrid

Ankylos. Product Catalog

CATALOG. Since 1985» Simple. Predictable. Profitable.

Real World Implant Prosthetics: Fixed and Removable Samuel M. Strong, DDS

The Multi-unit Abutments of the CE-Series are indicated for Nobel Biocare / NobelReplace Tapered. The current implant diameters have to be attended.

cement-retained crown using the Laser-Lok Easy Ti temp abutment and PEEK plastic sleeves

Leading material offering and application range. Straumann CARES CADCAM

SwishPlant. SwishPlant System Catalog. 4.8mmD mmD. 4.8mmD mmD. 3.7mmD mmD. 6.5mmD

Dowel restorations Treatment with a post and core

PROSTHETIC PROCEDURES

Type 1. Type 2. Straumann Bone Level. The L-Series abutments are compatible with» L-SERIES «

Construction of Removable Partial Denture

HEXAGON Implant System

LOCATOR abutment and collar for VARIOmulti

Removable Partial Dentures

BONE LEVEL ABUTMENTS. on4. multi-unit

Surveying. 3rd year / College of Dentistry/University of Baghdad ( ) Page 1

Multi-Unit Abutment Guide

CHECK-UP Determination of Impression type & Method after implant placement

SIMPLE INSERTION, NATURAL STABILITY. Self-cutting capacity in both directions Makes it possible to achieve high primary stability with low torque

Multi-unit abutment hybrid or fixed-detachable screw-retained restoration

Prosthodontic Procedure

EXTERNAL HEX INTERNAL HEX NTERNAL. ENDOPORE Product Catalog

Guide to the sequence of use of prosthetic components

Multi-unit abutment open tray technique using the direct pick-up coping

contents the smarter case approach reasons to choose simplyintegrated 5 system overview 6 ordering 7 mount-free implants 8-9

PROSTHETIC PROCEDURE for TS & GS Implant System

Prosthodontic Procedure

Type 1. Type 2. Straumann Tissue Level. The N-Series abutments are compatible with» N-SERIES «

IMPRESSION TECHNIQUE AND MATERIALS

Quick start Prosthetics

The number of totally edentulous

Legacy TM. System Catalog. Legacy TM 1 Legacy TM 2 Legacy TM 3 Legacy TM 4

QZ-Implant TRINON. Bone level implant with hexagonal internal cone connection

Bridge. For more detailed information, please check the Immediate Smile bridge guidelines.

A Clinician s Guide to Restoring Conus

GINGIVAL LEVEL implant

screw-retained crown using the Laser-Lok Easy Ti temp abutment

Z5mlc (Locator *) Implants

Product Ordering Information

Transcription:

OT EQUATOR CASTABLE Single Attachment for Overdentures pick-up impression OT EQUATOR PROFILE CASTABLE MALE ATTACHMENT individual tray RETENTIVE CAPS OT EQUATOR HOUSING VIOLET CAP RIGID RETENTION (2.7Kg) ANALOG FOR PLASTER MODEL CLEAR CAP STANDARD RETENTION (1.8Kg) PINK CAP SOFT RETENTION (1.2Kg) RETENTIVE CAP INSERTION TOOL NORMAL SIZE AND FOR SEEGER RINGS YELLOW CAP EXTRA-SOFT RETENTION (0.6Kg) BLACK CAP PROCESSING PARALLELOMETER MANDREL 4.4 mm 2.1 mm 3.3 mm 2.1 mm SEvERE DivERgENCY MaY REQuiRE THE OT EQUATOR in CoMBiNaTioN with a CaSTaBLE ucla if additional ional retention is needed to securee the prosthesis, ot Cap Normal retentive caps and metal housings can be placed over any ot Equator profile spheres. s. The prosthesis will be retained in the same way and the connection will be more rigid. only the dimension of the attachment will be changed. 6 Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS

Technical Procedure OT EQUATOR CASTABLE = SINGLE CASTING use separating material on the stone model in the prepared areas to receive the castable posts. use longer castable posts in the root channels for easy removal. Reline with castable resin, for higher accuracy. place posts and finish margins with composite material. once resin is cured, cut posts to the required length at root level. position ot Equator on the occlusal surface with the paralleling key and continue waxing technique. ot Equator in the final position. The wax-up has been completed. for the best results, create the casting with an alloy that has a vickers hardness of 220 or greater. BUILD UP THE FRAME DIRECTLY ON MASTER MODEL The plaster model with the ot Equator analog in position. The stainless steel housing and black processing cap are also visible. apply a thin layer (.5mm) of wax to the model. fill the undercuts on the stainless steel housing and attach the connectors. Connect the parts using a castable resin. Be sure to cover the stainless steel housing. add sprues to the framework and remove it from the model. Be sure that the stainless steel housing does not remain inside. The framework is now ready to be invested. Cast the metal frame and verify the position on the model. use composite to bond the stainless steel housing to the frame. The metal frame with the stainless steel housing in place. The finished prosthesis on metal frame. after processing, the black caps are replaced with pink caps. Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS 7

OT EQUATOR FOR IMPLANTS Low Profile Titanium Abutment OT EQUATOR PROFILE TITANIUM + TIN ATTACHMENT RETENTIVE CAPS OT EQUATOR HOUSING (pick-up impression) VIOLET CAP RIGID RETENTION (2.7Kg) WHITE CAP STANDARD RETENTION (1.8Kg) (individual tray) PINK CAP SOFT RETENTION (1.2Kg) YELLOW CAP EXTRA-SOFT RETENTION (0.6Kg) BLACK CAP PROCESSING ANALOG FOR PLASTER MODEL SQUARE SCREWDRIVER 1.25 MM for implant abutment INSERTION TOOL FOR RETENTIVE CAPS Normal size and for Seeger Rings SQUARE DRIVER CONNECTOR 1.25 MM for contra angle torque controller PARALLELOMETER KEY EXTRACTOR TOOL FOR RETENTIVE CAPS The unique design and exceptionally low 2.1mm profile of the ot Equator 4 in 1 System provides exceptional stability and superior retention when compared with other attachment systems. Due to its lower radius, ot Equator is indicated to correct divergence up to 28 degrees between implants without affecting the functionally of the elastic nylon cap. Caps are available in a wide variety of retention levels. attention; where implant divergence exceed the maximum 28 degrees, Sphero Block and Sphero flex are recommended case plan options. See Sphero Block and Sphero flex page 40-41 8 Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS

Technical Procedure ATTACHING THE CAPS IN CLINIC Select the ot Equator with the appropriate cuff height. Screw the ot Equator into the implant. place the protective disk over the ot Equator. Then, place the stainless steel housing with cap on the attachment. verify the positioning of the prosthesis before bonding the stainless steel housing. on the prosthesis, fill the implant sites with a self curing resin and insert into the patient s mouth. Remove the prosthesis and verify that the positions of the attachments are correct. Remove the protective disks. Carefully trim away the excess resin. The completed prosthesis. place the implression coping on the ot Equator. The impression coping picked up in the impression. insert the analog into the impression coping and pour the master model. Master model with analog in position. BUILD UP THE FRAME DIRECTLY ON MASTER MODEL Master model with ot Equator analog in position. also pictured is the stainless steel housing with black processing cap. apply a thin layer (.5mm) of wax on the model. fill the undercuts on the stainless steel housing with wax and attach the connectors. attach the parts using a castable resin. Be sure to cover the stainless steel housing. add sprues to the framework and remove it from the model. Be sure that the stainless steel housing does not remain inside. finish the metal frame and verify the position on the model. use composite to bond the stainless steel housing to the frame. The metal frame with stainless steel housings bonded in place. The finished prosthesis on metal frame. after processing, the black caps are replaced with pink caps. Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS 9

ELASTIC SEEGER Passive bar connection T SECTION OF SEEGER INSERTION TITANIUM SEALING LID ELASTIC SEEGER RED PLASTIC SEEGER FOR LAB CASTABLE CONTAINER CYLINDER FOR SEEGER OT EQUATOR PROFILE TITANIUM + TIN ATTACHMENT THE ELASTIC SEEGER IS MANUFACTURED FROM A SPECIAL HARD PLASTIC WITH A CONICAL DE- SIGN. THE LOWER PART OF THE RING IS THINNER ADAPTING TO THE DESIGN OF THE ATTACHMENT. HEX SCREWDRIVER 1.3 MM for screwing attachments into implants UNIVERSAL HANDLE curved for seeger inclusion OT EQUATOR castable attachments for direct overdentures on endodontically treated roots ANALOG for plaster model The purpose of the ot Equator seeger system is to create a passive connection for implant supported bars. The elastic seeger will correct small imperfections created by the chairside impression technique or laboratory casting process. This reduces the risk of the implant bar not seating passively. OT EQUATOR castable attachments are placed on the connecting bar creating a balance with the removable prosthesis. alloys with a vickers Hardness of 240 or greater are recommended for casting. 10 Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS

Technical Procedure POSITIONING SYSTEM WITH BAR ELASTIC SEEGER ot Equator titanium attachments screwed into the implants. The elastic seeger system will be used to position the bar. The cast bar in position. insert the white elastic seeger ring into the cylindrical space. using the insertion tool, push down on the white elastic seeger ring until it is fully seated. a click will be heard once the seeger ring is seated over the ot Equator attachment. Remove any excess material to avoid creating a gap during the casting procedure. after the elastic seeger ring has been inserted, lock the bar into place using the titanium screw cap and the appropriate key. when the screw cap is tightened, the elastic ring is compressed which prevents unscrewing. The finished bar secured in the mouth. a passive connection has been achieved due to the elastic seeger rings. The completed prosthesis. for best results a reinforced superstructure is always recommended. WAX-UP OF THE BAR DIRECTLY ON MODEL MASTER Screw the ot Equator attachments into the implant analogs. position the seeger castable cylinders, followed by the red plastic seeger for laboratory use on the attachments. Screw the titanium sealing lid into position. Do not overtighten. Connect the castable abutments with wax or resin. Before casting, remove the red plastic seeger ring. The cast bar in position on the model. The cast framework in position. undercuts on the stainless steel housing can be blocked out using composite material to maintain a passive connection. fit and stability of the prosthesis can be regulated using nylon caps.various levels of retention are available. The final prosthesis. Technical Manual - PREFABRICATED CASTABLE ATTACHMENTS AND IMPLANT COMPONENTS 11