abcdefghijklmnopqrstu

Similar documents
abcdefghijklmnopqrstu

NHS: 2002 PCA(O)6 abcdefghijklm

Dear Colleague GENERAL OPHTHALMIC SERVICES OPTOMETRY INDEPENDENT PRESCRIBING. Summary

NHS: PCA(D)(2015)7. Dear Colleague STRATEGIC VISION FOR E-DENTISTRY. Summary

NHS Circular: PCA(M)(2011)4 abcdefghijklmnopqrstu TREATMENT OF ERECTILE DYSFUNCTION: PATIENTS WITH SEVERE DISTRESS. Summary

NHS:PCA(D)(2014)6. Dear Colleague ROLL OUT OF DEFIBRILLATORS TO INDEPENDENT DENTAL PRACTICES PROVIDING NHS GENERAL DENTAL SERVICES (GDS) Summary

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu

abcde abc a Dear Colleague GENERAL DENTAL SERVICES

abcdefghijklmnopqrstu

URGENT UPDATED ADVICE ON DOSAGE OF OSELTAMIVIR IN CHILDREN UNDER ONE YEAR OF AGE WITH SWINE FLU

NHS: 2004 PCA(D)9 abcdefghijklm

NHS: 2003 PCA(D)12 abcdefghijklm

NHS: 2005 PCA(D)11 abcdefghijklm

NHS: 2002 PCA(D)6 abcdefghijklm

NHS: PCA(D)(2018)4. Dear Colleague. Yours sincerely. MARGIE TAYLOR Chief Dental Officer

NHS: 2002 PCA(D)2 abcdefghijklm

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu

abcdefghijkm abcde abc a Health Department Workforce Directorate NHS Circular: PCS(DD)2006/5 Dear Colleague

abcdefghijklmnopqrstu

2. NHS Boards and Practitioner Services are asked to note the amendments to the SDR which are included in the Memorandum to this letter.

The Future of Optometric Services in Primary Care in Wales

Information Governance

Dear Colleague. DL (2017) June Additional Funding for CGMs and Adult Insulin Pumps Summary

The free NHS eye examination

OS Activity Report: January 2019

Optos: The design challenges and business tribulations

ACCESS TO MEDICINES FOR END-OF-LIFE AND VERY RARE CONDITIONS: TRANSITION FROM IPTR TO PACS

pí=^åçêéïûë=eçìëé= = iéïáë=j~åççå~äç=jpm= ACTION PLAN FOR IMPROVING ORAL HEALTH AND MODERNISING NHS DENTAL SERVICES

CALL FOR WRITTEN EVIDENCE ON THE FINANCIAL MEMORANDUMS TO THE PALLIATIVE CARE (SCOTLAND) BILL

NES/15/100. This update paper highlights the main areas of work within the Directorate and shows the direction of travel.

Vision and eye healthcare study in residential aged care facilities

DL (2018) 14. Dear Colleague UK INFECTED BLOOD INQUIRY RETENTION OF RECORDS

NHS: 2001 PCA(D)8 abcdefghijklm

= eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=mêáã~êó=`~êé=~åç=`çããìåáíó=`~êé= = mêáã~êó=`~êé=aáîáëáçå=

Waverley Gate 2-4 Waterloo Place Edinburgh. Date 16/12/11 Your Ref Our Ref. Enquiries to Richard Mutch

Glaucoma Care Pathway

KEY QUESTIONS What outcome do you want to achieve for mental health in Scotland? What specific steps can be taken to achieve change?

PRESENT. Ms N C F McElvanney (Chair) IN ATTENDANCE

Information Governance

1. NHS (GENERAL DENTAL SERVICES) (SCOTLAND) AMENDMENT REGULATIONS AMENDMENT NO 136 TO THE STATEMENT OF DENTAL REMUNERATION

Activity Report April 2013 March 2014

abcdefghijklm abcde abc a eé~äíü=aéé~êíãéåí= cêçã=íüé= `ÜáÉÑ=jÉÇáÅ~ä= lññáåéê= = aê=e~êêó=_ìêåë=jme=co`pedä~ëf= co`mebçf=ccme= Dear Colleague

Mental Health Collaborative. Dementia Summary of Activity. April 2010

Optometric Cataract Refined Referral

ongoing development of governance and leadership to support improvement ongoing national roll out of the electronic palliative care summary (epcs)

GOVERNING BODY MEETING in Public 22 February 2017 Agenda Item 3.4

SMOKING OUTSIDE HOSPITALS: AN OPPORTUNITY TO COMMENT ON PROPOSALS

Subject: Recommendation:

ME-CFS and Fibromyalgia Task and Finish Group Recommendations Implementation Action Plan Update May 2017

NES/12/90. This update paper highlights the main areas of work within the Directorate and shows the direction of travel.

Self-assessment in Community Planning Partnerships. Project Evaluation Report

IMMEDIATE DICLOFENAC NEW CONTRAINDICATIONS AND WARNINGS AFTER A EUROPE-WIDE REVIEW OF CARDIOVASCULAR SAFETY

MINUTE OF MEETING HELD ON 3 NOVEMBER 2008, ST ANDREW S HOUSE, EDINBURGH

I write in response to your request for information in relation to physiotherapy services within NHS Lothian.

FREEDOM OF INFORMATION CHRONIC FATIGUE CLINIC

What are our Commissioning aims?

From the Permanent Secretary and HSC Chief Executive

amendments to the NHS (General Ophthalmic Services) (Scotland) Regulations 2006 ( the 2006 Regulations ); and

abcdefghijklmnopqrstu

CANCER IN SCOTLAND: ACTION FOR CHANGE The structure, functions and working relationships of Regional Cancer Advisory Groups

Suicide Prevention Strategy Theme A: Responding to people in distress. Distress Brief Intervention description and proposed specification

Community alcohol detoxification in primary care

Dumfries and Galloway Alcohol and Drug Partnership. Strategy

AND THE COMMUNITY HEALTH PARTNERSHIP INCLUDING THE HEALTH IMPROVEMENT STANDING GROUP. DATE Paper 3.7

Diabetes Annual Report. Betsi Cadwaladr University Health Board. January 2015

CORPORATE REPORT Communication strategy

National Group for Volunteering in NHS Scotland

Activity Report April 2012 March 2013

Information Governance

SCOTTISH DENTAL NEWS Issue 2

RECERTIFICATION PROGRAMME FOR CONTINUING PROFESSIONAL DEVELOPMENT OF OPTOMETRISTS

Activity Report March 2013 February 2014

Glaucoma Care Pathway

LOCSU Community Services

The Chair welcomed everyone to the meeting and introductions were made.

Strategic Plan

6.1.2 Other multi-agency groups which feed into the ADP and support the on-going work includes:

Your letter posed five questions for the Group. The questions are repeated below (in italics) along with our answers:

Improving Eye Health. Cardiff and Vale University Health Board

Activity Report April 2013 March 2014

The Scottish Government Riaghaltas na h-alba

RECERTIFICATION PROGRAMME FOR CONTINUING PROFESSIONAL DEVELOPMENT OF OPTOMETRISTS

NHS GRAMPIAN. NHS Grampian Dental Plan 2020 and the Current Challenges within Grampian

Engaging People Strategy

Cancer Improvement Plan Update. September 2014

Volunteering Strategy

Date 18/02/13 Our Ref I write in response to your request for information in relation to NHS Lothian s Formulary

Richard Watson, Chief Transformation Officer. Dr P Holloway, GP Clinical Lead for Cancer Lisa Parrish, Senior Transformation Lead

Sandwell Safeguarding Adults Board. ANNUAL REPORT 2016/2017 Executive Summary

A range of issues were explored during these evidence sessions including: The equity of access to fertility treatment across NHS boards.

Dear Colleague. 29 August 2017 COMMUNITY PHARMACY PUBLIC HEALTH SERVICE SMOKING CESSATION SERVICE REVISED SERVICE SPECIFICATION. Summary.

Safeguarding Business Plan

Driving Improvement in Healthcare Our Strategy

Report on the Health & Homelessness survey

SCAN Skin Group Friday 1 st November 2013

Transcription:

NHS: PCA(O)(2011)2 Health and Social Care Integration Directorate Primary Care Division abcdefghijklmnopqrstu Dear Colleague GENERAL OPHTHALMIC SERVICES EYECARE INTEGRATION Summary 1. The attached letter updates optometrists and ophthalmic medical practitioners on the eyecare integration project which the Scottish Government is taking forward with the eye care professions in Scotland and NHS Boards and informs them of the next steps. A survey to gauge current optometry IT accessibility is also being undertaken. Action 2. NHS Boards are asked to copy and issue by 22 July 2011 the attached letter and the Optometry Information Technology (IT) questionnaire (link attached) to all optometrists and ophthalmic medical practitioners on NHS Board lists. Link: http://www.psd.scot.nhs.uk/professionals/ophthalmic/optometry_it_sur vey.pdf 19 July 2011 Addresses For action Chief Executives, NHS Boards For information Chief Executive, NHS National Services Scotland Director, Practitioner Services Enquiries to: Lynne Morrison Primary Care Division 1st Floor East Rear St Andrew s House EDINBURGH EH1 3DG Tel: 0131-244 2466 Fax: 0131-244 2326 Yours sincerely FRANK STRANG Deputy Director St Andrew s House, Regent Road, Edinburgh EH1 3DG www.scotland.gov.uk abcde abc a

Health and Social Care Integration Directorate Primary Care Division T: 0131-244 2467 F: 0131-244 2326 E: frank.strang@scotland.gsi.gov.uk abcdefghijklmnopqrstu To: All Optometrists and Ophthalmic Medical Practitioners Our ref: PCA(O)(2011)2 July 2011 Dear Colleague EYECARE INTEGRATION 1. This letter updates you on progress on the eye care integration project which the Scottish Government is taking forward with the eye care professions in Scotland and NHS Boards, and informs you on the next steps. Background 2. With the improved levels of equipment and technology in community optometry practices, new treatments available in ophthalmology, and rising numbers of elderly patients, huge benefits can be gained by improving the information flow between optometry and ophthalmology and visa versa. Some NHS Boards have already made significant headway on integrating eye care, and this has led to improvements, for example in Fife and Grampian. While these improvements are to a large extent the fruit of local innovation and drive, they also reflect national level investment in the free eye examination and increased utilisation of optometry services. There remains real potential to deliver reduced costs, better patient outcomes and a model on which we can build in other areas. 3. We are now at the stage of moving this to the next phase, and rolling progress out nationally. Many of the essential ingredients are already in place, including enthusiasm across the profession (please see at annex A the vision for success drawn up by the steering group, of which Optometry Scotland are key members); the level of investment made over recent years in optometry services; and approval last autumn by our ehealth Programme Board of an IT connectivity project which is a key element in the business change we are seeking to achieve.

4. The IT connectivity project is a step-by-step IT enabled change in clinical practice which is aimed at delivering accessible, responsive, appropriate and integrated Eyecare services throughout Scotland. This will be achieved by facilitating direct referrals, preferably electronically wherever possible and appropriate, from optometrists to ophthalmologists. In other words, the IT linkage is, above all, an enabler to allow us to realise key benefits such as: reductions in the time from referral to treatment allocation of patient to correct clinic at first hospital visit reductions in unscheduled attendances identification of patients suitable for community care reconfiguration of hospital eye service capacity receipt and feedback on referral from hospital to optometry. 5. Another element of the project will be provision to enable payment claims to be submitted electronically by optometrists to Practitioner Services Division (PSD). 6. Clearly if we are to deliver the benefits stated at paragraph 4, then it is vital that this is driven by and bought into by NHS Boards. Firstly, it will be for Boards to determine within the context of their own IT and other arrangements exactly how the IT connections are to be implemented in their business areas; note however that the Eyecare Integration Steering Group strongly advocates that this is done by integration into Boards existing referral processes. Secondly, it will be for Boards to develop their own plans for delivering the business change required in close consultation with optometrists and ophthalmologists in their area and reflecting local priorities. This will include consideration of the ongoing dialogue required to make integration work (including timely feedback from hospital eye services to optometrists), ensuring there is adequate training, and ensuring lessons are learned from referral patterns. 7. The basic high-level requirements which Boards are being asked to sign-up to are that by April 2014: 95% of referrals from optometrists to hospital eye services will be done electronically with the necessary business changes in place; & 95% of all optometry claims will be made electronically. Different Boards will articulate different trajectories depending on local priorities and preparedness, but we would typically expect that within 4 months of connectivity having been established, 30% of referrals and payments will be done electronically. Boards are being asked to report initial progress to us by 15 September. Next steps 8. The active engagement of optometrists, others within practices, and ophthalmologists will be vital to the success of this project. I therefore encourage you to take up forthcoming opportunities to be involved with the process and with local plans.

9. To support this whole process we are working with the professions to define much greater consistency across the country on referral data and a referral template. We expect to finalise this aspect of the project by September. We also need to survey all optometry practices to gauge current IT accessibility; an Optometry IT Questionnaire accompanies this letter and explains the action required in each practice. By completing the survey, you will greatly assist us in moving forward. Plans are also being made to stage a national event in September to promote these important developments. This event will showcase the opportunities which the project opens up and facilitate discussions on implementation, challenges, and so on. Local events for practitioners may follow, subject to decisions taken by Boards on next steps. 10. I hope this information is helpful as a means of keeping you in the loop. If you have questions on any aspect of the project, please contact your NHS Board in the first instance. Yours sincerely FRANK STRANG Deputy Director, Primary Care Division

EYECARE INTEGRATION INITIAL SUCCESS FACTORS ANNEX A Where Will We Be In 3 Years? At the end of 3 years we will have achieved radical improvements in the integration of eye care throughout Scotland, with consistently high quality communications and referral practice. We will have an all-inclusive referral system whereby: in all parts of Scotland standard practice is that optometrists, rather than GPs, are the first point of call for eye problems; all optometrists in Scotland electronically refer patients with the necessary information and appropriate images to their local eye department; all eye departments are equipped to deal effectively with such referrals using a locally agreed interface; and there is effective dissemination and adoption of best practice.. The method of referral will be user friendly, sufficiently uniform throughout Scotland to allow locums and peripatetic staff to refer without retraining and able to provide a robust audit trail and effective feedback to referrers. As a result of these changes:. there will be less avoidable sight loss; there will be reductions in waiting times (in particular for treatable macular degeneration), new patients, emergency admissions and did not attends; Scotland will be better able to meet the challenge of demographic change, with a greater proportion of eye care provided closer to home or in a homely setting; eye care in Scotland will be the envy of the United Kingdom and beyond, with this project seen as an example of how IT-enabled change can benefit patients and improve the integration of care.

The Eyecare Integration Steering Group has set itself the following success factors for this project: 1. Electronic referral Following the establishment of electronic referrals, 30% of referrals from optometrists to hospital eye services should be electronic within four months, with in all cases 95% by April 2014. 2. Reduction in waiting times Once electronic referrals are established, waiting times should reduce so that all patients are seen and treated within 18 weeks and urgent patients (in particular treatable macular degeneration) have a response within 1 week. 3. Quality of referrals The proportion of referrals from optometrists to consultant led care which are accepted as complete will be at least 80%. 4. Reduction in unscheduled attendances Once waiting times are significantly reduced and capacity within HES increases with seeing fewer new patients, unscheduled attendances should reduce by 20%. This applies particularly to sight threatening diseases such as macular degeneration, glaucoma and vascular conditions. 5. Did not attends Reduction in Did not attend attendances by at least 10%..6. Payment claims 95% of payment claims should be sent electronically by 1 April 2014.