APPENDIX ONE. 1 st Appointment (Non-admitted) recovery trajectories

Similar documents
18 Week 92% Open Pathway Recovery Plan and Backlog Clearance

RTT Exception Report

DEMAND AND CAPACITY MODELLING

Trust Board of Directors Public. Denise Gale. For Assurance and Information NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE

Brighton and Sussex University Hospitals NHS Trust Board of Directors. Mark Smith Chief Operating Officer

WELCOME AND INTRODUCTIONS. Sarah Tedford Chief Operating Officer Barking, Havering and Redbridge University Hospitals NHS Trust (BHRUT)

18 WEEK RTT RECOVERY PLAN. April 2015

Ayrshire and Arran NHS Board

Breast Test Wales Screening Division Public Health Wales

Consultant-led Referral to Treatment (RTT) waiting times collection timetable: outcome of consultation

South West Cancer Alliances Rapid Diagnostic Pathway for Lung Cancer Project Evaluation

Enc 9 Appendix 5 RTT Recovery Plan June 2015 PROGRESS UPDATE MANAGE R LEAD RISKS TO DELIVERY OF ACTION COMPLETION ON DATE NUMBER ACTION EXEC LEAD

NORTHERN HEALTH AND SOCIAL CARE TRUST. Waiting Times Summary Report

Trust Board Meeting in Public: Wednesday 11 July 2018 TB

East London Community Kidney Service

IAPT Performance Workshop

Referral to treatment (RTT) waiting times statistics for consultant-led elective care 2014 Annual Report

FFT and Patient Insight for Improvement. Marie Allen Head of Service User and Carer Experience

KPI s September Megan Boivin Operations Manager 15 October KPI s HAC report 18/10/2007 Operations Manager : Megan Boivin

From Analytics to Action

Date : September Permit/License or Registration Application. Permit/License/ Notification/ Registration Description. Remark

Statistical Press Notice NHS referral to treatment (RTT) waiting times data November 2016

FGSZ Zrt. from 28 February 2019 till 29 February 2020 AUCTION CALENDAR: YEARLY YEARLY BUNDLED AT CROSS BORDER POINTS

Report. Page 113 of 220. NHS South Cheshire CCG and NHS Vale Royal CCG Joint Governing Body. Report To (committee):

Aneurin Bevan Health Board Access 2009 Performance Report

Statistical Press Notice NHS referral to treatment (RTT) waiting times data July 2017

McLean ebasis plus TM

Analysis of Meter Reading Validation Tolerances proposed by Project Nexus

The Greater Manchester Stroke Operational Delivery Network

Statistical Press Notice NHS referral to treatment (RTT) waiting times data July 2018

Cincinnati Children s Hospital Medical Center PHO/OVPCA Constipation Initiative Monthly Report February 2018

Seasonality of influenza activity in Hong Kong and its association with meteorological variations

South Norfolk CCG Dementia Strategy and Action Plan Dr Tony Palframan, SNCCG Governing Body Member

Emergency Department Boarding of Psychiatric Patients in Oregon

Has the UK had a double epidemic?

Faster Cancer Treatment: Using a health target as the platform for delivering sustainable system changes

Dementia Content Report May Produced By The NHS Choices Reporting Team

Trust Board meeting in Public: Wednesday 14 November 2018 TB

Statistical Press Notice NHS referral to treatment (RTT) waiting times data August 2017

One Palliative Care Annual Report

Parity: Innovation in Practice

Tri-County Opioid Safety Coalition Data Brief December 2017 Clackamas, Multnomah, and Washington Counties

Cancer Services Position & Recovery Plan June 2015

FAQs about Provider Profiles on Breast Cancer Screenings (Mammography) Q: Who receives a profile on breast cancer screenings (mammograms)?

AHP Musculoskeletal Service Redesign. Judith Reid MSc MMACP Consultant Physiotherapist in MSK NHS Ayrshire and Arran

Overview of the Radiation Exposure Doses of the Workers at Fukushima Daiichi Nuclear Power Station

BREATH AND BLOOD ALCOHOL STATISTICS

Magellan s Transport Route Lead Monitoring Program

What Computer Tools to Use for Your Quality and Safety Program

Sleep Market Panel. Results for June 2015

Flu Watch. MMWR Week 3: January 14 to January 20, and Deaths. Virologic Surveillance. Influenza-Like Illness Surveillance

Mid Essex CCG Performance Dashboard September 2013

An Updated Approach to Colon Cancer Screening and Prevention

Flu Watch. MMWR Week 4: January 21 to January 27, and Deaths. Virologic Surveillance. Influenza-Like Illness Surveillance

Dementia Content Report January Produced By The NHS Choices Reporting Team

Hand, Foot, and Mouth Disease Situation Update. Hand, Foot, and Mouth Disease surveillance summary

Vision for quality: A framework for action - technical document

Quality & Safety Committee Date: 22 June 2016 Agenda item: 4.4

TRUST BOARD SUBMISSION TEMPLATE MEETING Trust Board - Public Ref No. 6.1

Curators of the University of Missouri - Combined January 1, 2016 through December 31, 2016

From postseason injury analysis through pre-season screening risk management in the team setting

March 2012: Next Review September 2012

BIOL1. (JUN13BIOL101) WMP/Jun13/BIOL1. General Certificate of Education Advanced Subsidiary Examination June Unit 1 Biology and disease

Insulin Administration Errors in Adult Community Nursing. Hedy Lehman Assistant Director of Professional Standards, Adult Community Nursing

Clostridium difficile (C. difficile) and Staphylococcus aureus bacteraemia (MRSA and MSSA) Bi-annual Report. Surveillance: Report:

Pre-hospital thrombolysis (PHT) Clinical Audit Report 30 th November 2007

IMPLEMENTING RECOVERY ORIENTED CLINICAL SERVICES IN OPIOID TREATMENT PROGRAMS PILOT UPDATE. A Clinical Quality Improvement Program

HIV POSITIVE YOUTH: LINKAGE & RETENTION IN CARE

Cost projections a single antiretroviral co-payment scheme for people with HIV in NSW. March 2013

TRANSFORMING STROKE CARE IN THE CAPITAL: THE LONDON STROKE STRATEGY

Crisis Connections Crisis Line Phone Worker Training (Online/Onsite) Winter 2019

Designing a complex needs service

th Medical Group Report Card

FIRST IN SERVICE BEST IN PRACTICE WEAVING A BOLD TAPESTRY OF HEALTH JUSTICE

Home sampling for STI tests in Greenwich: evaluation highlights. David Pinson Public Health & Well-Being Royal Borough of Greenwich

Quit Rates of New York State Smokers

Curators of the University of Missouri - Combined January 01, 2013 through December 31, 2013 Cost Management Report

Referral to treatment consultant-led waiting times

National Data Analysis

STATISTICAL PRESS NOTICE NHS REFERRAL TO TREATMENT (RTT) WAITING TIMES DATA JANUARY 2013

Sexual Health Content Report June Produced By The NHS Choices Reporting Team

What is risk management?

Durham Region Influenza Bulletin: 2017/18 Influenza Season

The Infection Control Doctor and Clostridium difficile infection. Dr David R Jenkins University Hospitals of Leicester NHS Trust, England

Kansas EMS Naloxone (Narcan) Administration

NORTHERN HEALTH AND SOCIAL CARE TRUST

Successful Falls Prevention in Aged Persons Mental Health. Reducing the risk and decreasing severity of outcome

Health impact assessment of particulate matter exposure in Pearl River Delta (PRD), China

NHS WALES PRIMARY CARE PRESCRIBING ANALYSIS FOR TRAMADOL DATA TO SEPTEMBER 2014

National Xpert MTB/RIF Programme

TRUST BOARD MEETING - 26 JUNE 2013 Mortality Report. To provide the Trust Board with an update on mortality. Senior Information & Research Analyst

Implementation of an Interprofessional Team to Prevent Inpatient Hypoglycemic Events. September 13, 2016

Dialectical Behaviour Therapy in Secure Services Calverton Hill & Priory Hospital East Midlands Priory Group

Understanding the Role of Palliative Care in the Treatment of Cancer Patients

Hospital Norovirus Outbreak Reporting

Cancer Immunotherapy Pilot Program/ Patents 4 Patients. USPTO BCP Customer Partnership Meeting Alexandria, VA August 2, 2017

Surgical Site Infection (SSI) Surveillance Update (with special reference to Colorectal Surgeries)

COURSE LISTING. Courses Listed. Training for Cloud with SAP Hybris in Service Cloud (C4C) 23 August 2018 (06:31 BST) Fortgeschrittene.

Supplementary Online Content

Transcription:

APPENDIX ONE 1 st Appointment (Non-admitted) recovery trajectories The following trajectories show reductions in total waiting list sizes for first appointments. It is difficult for any organisation to give an accurate trajectory for non-admitted percentage performance. As a result the Trust has worked with IMAS on identifying sustainable waiting list sizes for key stages of 18 week pathways, for example first appointment and has developed plans to achieve these. In turn this progress with allow non-admitted performance to improve. TLEC RTT Update Appendix One version 1 190314 Page 1

Orthopaedics Scenario One: Do nothing. Scenario Two: Provide extra outpatient capacity and outsource patients It is anticipated non-admitted performance e will improve and reach a sustainable level for orthopaedics by May 2014. This trajectory shows the impact on the waiting list for first appointments to reach a sustainable waiting list size in line with delivering 18 weeks RTT performance. TLEC RTT Update Appendix One version 1 190314 Page 2

ENT 4000 Actual Activity Against Plan 3500 3000 2500 2000 1500 1000 500 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Scenario One: Provide extra outpatient capacity and outsource patients. Scenario Two: Do nothing It is anticipated non-admitted performance will improve and reach a sustainable level for ENT by October 2014. This graphs shows the impact on the waiting list for first appointments to reach a sustainable waiting list size in line with delivering 18 weeks RTT performance. TLEC RTT Update Appendix One version 1 190314 Page 3

Pain Scenario One: Do nothing. Scenario Two: Provide extra outpatient capacity and outsource patients It is anticipated non-admitted performance e will improve and reach a sustainable level for pain by December 2014. This graphs shows the impact on the waiting list for first appointments to reach a sustainable waiting list size in line with delivering 18 weeks RTT performance. TLEC RTT Update Appendix One version 1 190314 Page 4

Ophthalmology 1600 Actual Activity Against Plan 1400 1200 1000 800 600 400 200 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Scenario One: Provide extra outpatient capacity and outsource patients Scenario Two: Do nothing It is anticipated non-admitted performance will improve and reach a sustainable level for ophthalmology by October 2014. This graphs shows the impact on the waiting list for first appointments to reach a sustainable waiting list size in line with delivering 18 weeks RTT performance. TLEC RTT Update Appendix One version 1 190314 Page 5

Admitted Recovery Trajectories The following trajectories show the changes in RTT admitted performance and waiting list sizes over time. The trajectories also take in to account the outsourcing of patients as part of the backlog clearance and also the knock-on effect of any additional outpatient work/conversions to surgery. The Trust is currently working on securing a number of outsourcing opportunities locally so there is an anticipation the timelines will come forward along with performance. The Trust must stress the trajectories against the 90% admitted standard are illustrative and theoretical guides only. It is hard to accurately measure the conversions from extra outpatient activity to admissions and to estimate where along the 18 week pathway patients will eventually be outsourced. During the recovery programme the Trust will strive to recover and consistently achieve aggregate performance from May-June 2014 onwards. This will be whilst working to mitigate the risks with clearing backlogs of patients in high volume surgical specialities. TLEC RTT Update Appendix One version 1 190314 Page 6

Orthopaedics 2500 Actual Activity Against Plan 2000 1500 PTL Size 1000 500 0 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Week Scenario One: Provide internal extra surgical capacity and outsource cases. Scenario Two: Do nothing TLEC RTT Update Appendix One version 1 190314 Page 7

Orthopaedics 100.00% 90.00% 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% 05-Feb 05-Mar 05-Apr 05-May 05-Jun 05-Jul 05-Aug 05-Sep 05-Oct 05-Nov 05-Dec The Trust anticipates the admitted waiting list reducing to a sustainable level capable of delivering 18 weeks RTT standards by December 2014. Performance will dip whilst the backlog of patients is treated and outsourced. Performance will recover but this will take a longer period of time. This is because of the small number of clinically complex breach patients where capacity is limited internally and externally, which will result in a longer timescale to clear the overall backlog of patients over 18 weeks. TLEC RTT Update Appendix One version 1 190314 Page 8

ENT 800 Actual Activity Against Plan 700 600 500 PTL Size 400 300 200 100 0 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Week Scenario One: Provide internal extra surgical capacity and outsource cases. Scenario Two: Do nothing TLEC RTT Update Appendix One version 1 190314 Page 9

100.0% ENT 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% The Trust anticipates a number of patients to convert from the extra outpatient clinics being run for ENT on to the surgical list and for the backlog to grow in the first instance. The admitted waiting list will then be cleared to a sustainable level through internal and outsourcing surgical cases coming to a sustainable level capable of delivering 18 weeks by July 2014. TLEC RTT Update Appendix One version 1 190314 Page 10

Pain 250 Actual Activity Against Plan 200 150 PTL Size 100 50 0 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Week Scenario One: Do nothing. Scenario Two: Provide internal extra surgical capacity to meet extra outpatient activity/conversions. TLEC RTT Update Appendix One version 1 190314 Page 11

100.0% Pain 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% The Trust anticipates a number of patients to convert from the extra outpatient clinics being run for pain on to the surgical list and for the backlog not to reduce in the first instance. This will be managed over the months by scheduling extra surgical lists to treat patients converting to the admitted waiting list. It is envisaged the admitted waiting list will then be cleared to a sustainable level through internal and outsourcing surgical cases by June 2014. TLEC RTT Update Appendix One version 1 190314 Page 12

Ophthalmology 450 Actual Activity Against Plan 400 350 300 PTL Size 250 200 150 100 50 0 Scenario 1 Plan Scenario 2 Plan Lower Target PTL Upper Target PTL Actual PTL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Week Scenario One: Provide internal extra surgical capacity to meet extra outpatient activity/conversions. Scenario Two: Do nothing TLEC RTT Update Appendix One version 1 190314 Page 13

100.0% Ophthalmology 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 05-Feb 12-Feb 19-Feb 26-Feb 05-Mar 12-Mar 19-Mar 26-Mar 02-Apr 09-Apr 16-Apr 23-Apr 30-Apr 07-May 14-May 21-May 28-May 04-Jun 11-Jun 18-Jun 25-Jun 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Aug 13-Aug 20-Aug 27-Aug 03-Sep 10-Sep 17-Sep 24-Sep 01-Oct 08-Oct 15-Oct 22-Oct 29-Oct The Trust anticipates a number of patients to convert from the extra outpatient clinics being run for ophthalmology on to the surgical list and for the backlog not to reduce in the first instance. This will be managed over the months by scheduling extra surgical lists and continuing to outsource patients through existing arrangements. It is envisaged the admitted waiting list will then be cleared to a sustainable level through internal and outsourcing surgical cases to deliver 90% by September 2014. TLEC RTT Update Appendix One version 1 190314 Page 14

APPENDIX TWO Example of Draft Speciality Level KPI Dashboard TLEC RTT Update Appendix One version 1 190314 Page 15