American Society of Highway Engineers (ASHE) Beardsley Connector Project Gary Fromm, PE Design Manager Jacobs Jacob Dean Project Manager Haydon Building Corp.
Thinking Outside the Box: Why Go In Circles?
Beardsley Road Connector: y Arizona s First Texas U
Agenda History Project Description U-Turn Configuration Construction of the Project Question & Answer Session
2000: Maricopa County Department of Transportation (MCDOT) Northwest Valley Transportation Study History October 2002: North Central Peoria / Northwest Glendale Circulation Study 2004 and 2005: Six Public meetings in Peoria and Glendale July 2006: Design Concept Report Completed (www.peoriaaz.gov/building peoria) Split the project and add Union Hills TI Widening May 2009: ARRA funding allocated for project November 2009: Construction began
High Volume at 101 Interchanges: 75 th Ave and Union Hills Extend Beardsley to the 101. Build Interchange where NEVER planned! Build Interchange In a Curve!?! Challenge All in another jurisdiction (Glendale) with Peoria Designing g a Freeway Interchange that ADOT has never built!!!
Conventional Diamond TI Depressed Mainline Elevated Fly Over Braided Ramps Pre-Signal U-Turn Alternatives Evaluated
Selected Alternative 101 Frontage Road: At Grade Union Hills & 75 th : Interchange Ramps Modifications o U-Turn Bridge Union Hills: Interchange Widening
Additional Project Enhancements Roundabout at 81 st Avenue and Beardsley Speed Cushions on 81 st Ave North/South of Beardsley Free right turn lane at 83 rd Avenue Di t A t NB Direct Access to NB SR 101L from Beardsley from the U- Turn Structure
Typical Texas U-Turn Configuration Turning radius: commercial truck Seperated from crossroad with curbed island Departure merges with ramp/frontage road
Beardsley U-Turn Configuration Crossroad / ramp separation barrier Approach separated from frontage 950 prior to intersection Departure separate entrance to freeway
Beardsley U-Turn Configuration Turning radius WB-67 Di bl d hi l Disabled vehicle bypass
Union Hills Interchange Widening
Differences Between Texas U-Turn and Beardsley U-Turn Physical separation between the U-Turn and adjoining roadways Reduced interaction between U-Turn and adjoining roadway traffic Increased capacity of the facility Use of emergency shoulder Possible Over Design?
Results Amazingly it fit! Frontage Road? Limited Access Collector Distributor? Only one street Arizona U-Turn?
Beardsley Road Connector & Southbound Frontage Road Click a car to view an animation of that route, or a camera to view an image of that location. 75 TH Ave to southbound SR101 75 TH Ave 83 RD Ave SR101 to Frontage Road to 83 RD Ave & Beardsley 83 RD Ave & Beardsley to eastbound SR101 New River Bridge Union Hills to SR101, exiting at 75 TH Ave Union Hills U-Turn Ramp
One Contractor vs. Two Contractors Coordination between Projects Agency Coordination Maintaining i i Traffic Union Hills Ramp Closures Working with Agencies Specifications Milestone Dates MAG Specifications ca converted ed to ADOT Construction
Plan vs. Construction Construction Sequncing Completing Work within Construction Windows Coordination of Crews between both Projects Weather Impacts on a Calendar Day Project Consistently tl Updating Schedule for Changing Conditions
Union Hills Widening And U-Turn Bridge
Pier Construction
Pier Construction
Pier Construction
Pier Construction
Pier Construction
Pier Construction
Abutment Construction
Abutment Construction
Abutment Construction
Retaining Walls
Retaining Wall
Retaining Wall
Retaining Wall
Retaining Wall
New River Bridge Construction
Working in a River
Working in a River
Working in a River
Working in a River
Abutment Construction
Abutment Construction
Abutment Construction
Pier Construction
Pier Construction
Pier Construction
Pier Construction