Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge

Similar documents
ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE REPLACEMENT

Modified Sheet Pile Abutment for Low-Volume Road Bridge

Ahmed Mongi, M.S., P.E. Engineering Division

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure

Four simply supported steel plate girders (appear to be an old railcar).

Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report

OVER US 6 LATERAL BRIDGE SLIDE: I-75

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue

Emergency Bridge Stabilization at Mile Watrous Subdivision

CORRIENTE RESOURCES INC.

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and

1 Study the drawings and the installation. 2 Ensure that you have the correct components. 3 Follow the manufacturer s instructions

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

2011 BRIDGE INSPECTION REPORT

\\H\15\ PH9 Inspection Photos

Conditional assessment of Kiri Bridge in Shkoder, Albania

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report

Appendix C Guidelines for Design of Integral Abutments March 3, 2003

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014

Integral Abutment Bridge Design with Soil Structure Interaction

APPENDIX A INTEGRAL ABUTMENTS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015

IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse)

AIR COOLED CONDENSERS

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

Rahvusvaheline puitarhitektuuri konverents

Shifting the Canning Bus Bridge Sideways

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY

Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass

Geosynthetic-reinforced soil bridge abutments

1 Exam Prep. SMACNA Architectural Sheet Metal Questions

Fort Goff Creek Bridge R04 ABC Project. Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015

Modified Sheet Pile Abutments for Low-Volume Road Bridges

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39

Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures

DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE

2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency

Precast Concrete Elements for Accelerated Bridge Construction

Let the Functional Training Revolution Begin! The TuffStuff CT Fitness Training System ignites a revolution in functional training!

Sign Retroreflectivity A Minnesota Toolkit

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY

Architect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on

Aerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements

Ashton Avenue Integral Bridge

Figure 3: Analytic procedure

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Novel treatment technique

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price.

Appendix B. Shallow Foundations Report

PENNDOT e-notification

WEIGHT SYSTEM EXERCISER User s Manual

TUFFSTUFF FITNESS INTERNATIONAL

Signage and Wayfinding Plan

Blue Sky Bio Multi unit Abutments BIO Multi-Units are available for all our Bone Level Implants

Integral Abutment Bridges Australian and US Practice

46" 3- Tier Dumbbell / Accessory Rack

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CR

Geotechnical Issues Associated With the Design and Construction of the Middle River Bridge

Instrumentation and Monitoring of Precast Bridge Approach Tied to an Integral Abutment Bridge in Bremer County

Wick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012

Innovative Use of Flowable Fill for Short-Span Bridge Rehabilitation

Concrete Doesn t Just Come In Vanilla Anymore

BEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE

Dry Fire Hydrant Designs. GBW Wall-Mounted Deployable DFH Phoenix, Maryland August 2011

Pro-XL Sports Performance Rack Systems

Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection

Adjustable Dumbbells selection

EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE

The barbell is the basic tool of

ACFT EQUIPMENT LIST (1 X LANE REQUIREMENT)

EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures

Monitoring and Evaluation of Alabama s First Geosynthetic Reinforced Soil- Integrated Bridge System

American Society of Highway. Beardsley Connector Project. Jacob Dean

CE 332 Construction Engineering and Management. MS Project - Recitation

DeKalb County Government Public Meetings & Agendas

CHAPTER 5 MODELING OF THE BRIDGE

COIL PROCESSING SOLUTIONS

UNIVERSITY OF OKLAHOMA GRADUATE COLLEGE FEASIBILITY STUDY OF GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMS (GRS-IBS) IN OKLAHOMA A THESIS

INSTALLATION INSTRUCTIONS

USER S MANUAL QUESTIONS? CAUTION. Visit our website at Class HC Fitness Product. Model No. WEEVBE70330 Serial No.

SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION

Transcription:

Modular Steel Bridges Stark County Fischer Bridge Bottineau County Oak Creek Bridge

This John Deere grain hauler was too heavy for the bridge. OOPS!

An excavator and tow truck are needed to remove the grain hauler from the collapsed bridge.

Fischer Bridge Stark County, ND The ND Bridge inventory #45-150.01 with a HL-93 rating 21 wide x 28 long bridge, 3 modules, standard guardrails included The road and bridge were ready to be traveled on three days after delivery of the modular steel bridge. The actual road opening was delayed until the additional guardrails were installed. NDDOT required an additional 50 approach guardrail to be installed on all corners of the bridge (four sections) Stark County re-used the existing wooden bridge abutments The road surface on the bridge deck was configured to accept gravel, no blade runners, 6 to 8 of gravel was placed on the galvanized deck. The Stark County road crew executed the bridge installation

Stark County is re-using the existing wood bridge abutments. They had a couple steel I-beams in their scrap pile at their Richardton shop location that worked well for a steel cap over the wood abutments.

Stark County highway superintendent Al Heiser and his crew are preparing to set the center bridge module. Stark County had a crane on site to set the modules.

Setting the center bridge module.

Setting the west bridge module.

Setting the east bridge module.

All three bridge modules are set and the Stark County crew is beginning to bolt the modular sections together.

Bolting together the bridge modules continues.

There are a few bolts on the underside of the modules, but most of the bolting is done on the top side of the modules. To this point of installation, the Stark County crew has about 4 hours invested.

The back wall of the modular bridge is shown here, this is corrugated steel with a black epoxy paint applied finish. The existing wooden wings are also being re-used.

Gravel is being applied to the bridge Deck. The decks are 8 to 12 gauge galvanized steel, roll formed to a 12 x 4-1/2 corrugation. These decks can be overlaid with gravel, asphalt, or concrete.

Graveling process continues.

More gravel work.

At the end of Day 3, the modular bridge is installed and the road is ready for traffic. The road opening is delayed for the addition of guardrail extensions.

Guardrail extensions; the weathering steel guardrails, that came with the modular bridge, were added on to with galvanized steel guardrails.

The road is open to traffic with a new modular bridge and guardrail extensions.

Oak Creek Bridge Bottineau County Bridge location is at 90 th Street NE, Bottineau,ND 24 wide x 43 long bridge, 3 modules, standard guardrails included The existing abutments were re-used with a steel cap applied. The Bottineau County road crew along with a Mikkelsen Aggregate operator, worked together to set the bridge modules using two excavators. The original bridge deck was removed on a Tuesday. Placement of the new bridge deck began Wednesday morning and the bridge was re-opened to traffic by noon on Friday of the same week. The road surface on the bridge deck was configured to accept gravel, this deck has blade runners, 6 to 8 of gravel was placed on the galvanized deck. The Bottineau County road crew executed the bridge installation.

Removal of the old bridge deck and placement of rock rip rap. Bottineau County will be re-using the existing bridge abutments.

A welder is preparing a steel cap over the existing wood bridge abutment. The cap is fabricated from 5/8 steel plate.

Fabrication and welding continues on the steel cap. The original bridge used a center span support piling. This also will be re-used, however, the center support is not required as our modular bridges will clear span up to 150.

Welding continues with a closer view of the cap design used by Bottineau County.

Here is Stark Counties abutment cap for comparison to Bottineau Counties. The designs are different, the results are the same. The counties saved county funds by re-using the existing abutments.

Bottineau County used two excavators to set the bridge modules on to the abutments.

The two excavators work together to set the east side module.

Setting the east side module.

Stark County set the center module first, Bottineau set the east module first. Either is good, the key is to line up the plate markings, S4 to S4 and so on.

Continue to set the bridge modules.

Bottineau Counties excavator is on the north side of Oak Creek and a local contractor, Mikkelsen Aggregates, is on the south side of the creek as they work together to set the bridge modules.

The Bottineau County crew is bolting the modules together as they proceed on. This bridge deck is equipped with 3 x 3 square tubular blade runners. These protect the deck from contact with a road maintainers blade.

Setting the west module and final module. Only four hours up to this point after starting to set the modules.

Note the orange color between the washer and the nut, the orange coloring leaks out once the nut has been tightened down to the required pounds of tork.

More bolting

East looking, west view of the modular bridge.

The bridge modules are all in place and securely bolted. The crew is ready to install the green treated back wall they will use on this bridge.

Guardrail attachments on the underside of the modular steel bridge.

An underside view showing the existing wood abutment, the steel abutment caps, and the bridge girders.

Bottineau Counties Oak Creek Bridge completed. Installation started Tuesday morning and the road was opened to traffic by noon Friday of the same week.

Bottineau County Oak Creek Bridge

Bottineau County Oak Creek Bridge

Richland County 97 th Street SE Bridge Bridge location is at 97 th Street SE & 176 th Avenue SE 24 wide x 30 long bridge, 3 modules, standard guardrails included The existing abutments were removed and a steel H beam pile driven abutment system was put in place. The bridge installation contractor was Industrial Builders of Fargo, ND with the assistance from Richland County Highway Department. They had this completed in approximately one week. The road surface on the bridge deck was configured to accept gravel, this deck has blade runners, 6 to 8 of gravel was placed on the galvanized deck.

Richland County Modular Steel Bridge, the complete old bridge was removed and steel pile abutments are set.

SETTING DECK PANELS Setting the first modular steel bridge module with a crane, onto the steel piling abutment.

Modular steel bridge deck is set on the new steel piling bridge abutments.

Richland County completed modular steel bridge. Wood bridge timbers were used for the back and wing walls.

More Abutments There are many options for abutments used around the country. Following are a few examples.

A poured in place concrete bridge abutment.

8 concrete block, to produce a (GRS) geosynthetic reinforced soil abutment.

Poured solid concrete Sil abutment, used on compacted soil or hard surface.

Modular Steel Bridge sitting on a SuperSill abutment system. This bridge has timber guardrails.

A trademark SuperSil as provided by TrueNorth Steel. These are delivered to the bridge location as a box and filled with concrete on site.

A trademark SuperSil being set down, concrete filled, visible steel attachment plates, and bridge module being set.