Gas Engineering Recommendation GER1 Issue A GUIDE FOR GAS METER OPERATIVES ON REPORTING AND ACTING ON ASSET CONDITION ISSUES

Similar documents
Gas Engineering Recommendation GER1 Issue A GUIDE FOR GAS METER OPERATIVES ON REPORTING AND ACTING ON ASSET CONDITION ISSUES

Gas Engineering Recommendation GER1 Issue A GUIDE FOR GAS METER OPERATIVES ON REPORTING AND ACTING ON ASSET CONDITION ISSUES

Gas Engineering Recommendation GER1 Issue A GUIDE FOR GAS METER OPERATIVES ON REPORTING AND ACTING ON ASSET CONDITION ISSUES

Completing the NPA online Patient Safety Incident Report form: 2016

Indirect Sales. Proof Policy. Indirect Channel. Version May Author: Credit Risk & Fraud. External version

This standard operating procedure applies to stop smoking services provided by North 51.

PROCEDURAL SAFEGUARDS NOTICE PARENTAL RIGHTS FOR PRIVATE SCHOOL SPECIAL EDUCATION STUDENTS

GUIDANCE DOCUMENT FOR ENROLLING SUBJECTS WHO DO NOT SPEAK ENGLISH

CONSENT FOR KYBELLA INJECTABLE FAT REDUCTION

Coding. Training Guide

Injury, Incident & Illness Procedure

Recommendations for Risk Management at Swine Exhibitions and for Show Pigs August 2012

Cancer Association of South Africa (CANSA)

SUFFOLK COUNTY COUNCIL. Anti- Social Behaviour Act Penalty Notice. Code of conduct

Corporate Governance Code for Funds: What Will it Mean?

Code of employment practice on infant feeding

A Phase I Study of CEP-701 in Patients with Refractory Neuroblastoma NANT (01-03) A New Approaches to Neuroblastoma Therapy (NANT) treatment protocol.

SCALES NW HEARING PROTECTION PROGRAM

How to become an AME Online

Assessment Field Activity Collaborative Assessment, Planning, and Support: Safety and Risk in Teams

Ill Health. Unit reference number: L/616/7295 Level: 3. Credit value: 3 Guided learning hours: 16. Unit summary

P02-03 CALA Program Description Proficiency Testing Policy for Accreditation Revision 1.9 July 26, 2017

Immunisation and Disease Prevention Policy

Bariatric Surgery FAQs for Employees in the GRMC Group Health Plan

Administrstrative Procedure

A fake medicine that passes itself off as a real, authorised medicine. (1)

Dear Student, IMMUNIZATION RECORD INSTRUCTIONS

Rate Lock Policy. Contents

FDA Dietary Supplement cgmp

S.K.J Construction Ltd Groundwork & Civil Engineering

Using the RC View DAT App

Memory Care Community Standards

INSTALLATION AND OPERATING INSTRUCTIONS YD30 COBALT

A pre-conference should include the following: an introduction, a discussion based on the review of lesson materials, and a summary of next steps.

(Please text me on once you have submitted your request online and the cell number you used)

TABLE OF CONTENTS Glossary of terms Code Pad Diagram 3. Understanding the Code Pad lights.4.

2017 CMS Web Interface

University College Hospital. Pump school Starting on an insulin pump. Children and Young People s Diabetes Service

Record of Revisions to Patient Tracking Spreadsheet Template

Structured Assessment using Multiple Patient. Scenarios (StAMPS) Exam Information

NATIONAL WEEK OF DEAF PEOPLE 19 th 25 th October 2013 EVENT QUIDELINES. Equality for Deaf People

UNIT 6. DEVELOPING THREAT/HAZARD-SPECIFIC ANNEXES

DATA RELEASE: UPDATED PRELIMINARY ANALYSIS ON 2016 HEALTH & LIFESTYLE SURVEY ELECTRONIC CIGARETTE QUESTIONS

2017 CMS Web Interface

Obesity/Morbid Obesity/BMI

Alcohol & Substance Misuse Policy. St Mary s CE Academy Trading Company. Date: Spring 2017 Date of Next Review: Summer 2018

Improving Surveillance and Monitoring of Self-harm in Irish Prisons

SCHOOL DISTRICT 308 RETURN TO LEARN (RTL) and RETURN TO PLAY (RTP) PROTOCOL FOR CONCUSSION

2017 CMS Web Interface

Human papillomavirus (HPV) refers to a group of more than 150 related viruses.

WHAT IS HEAD AND NECK CANCER FACT SHEET

NIA Magellan 1 Spine Care Program Interventional Pain Management Frequently Asked Questions (FAQs) For Medicare Advantage HMO and PPO

Podcast Transcript Title: Common Miscoding of LARC Services Impacting Revenue Speaker Name: Ann Finn Duration: 00:16:10

Annual Principal Investigator Worksheet About Local Context

Annex III. Amendments to relevant sections of the Product Information

EMDR EUROPE ACCREDITED PRACTITIONER COMPETENCY BASED FRAMEWORK

National Imaging Associates, Inc. (NIA) Frequently Asked Questions (FAQs) For Managed Health Services (MHS)

ALCAT FREQUENTLY ASKED QUESTIONS

National Imaging Associates, Inc. (NIA) Frequently Asked Questions (FAQ s) For PA Health & Wellness Providers

A Unified Approach to Conflict Mineral Compliance for the Tungsten Industry. The Westin, Sydney, 23 September 2013

The ECG app is not intended for use by people under 22 years old.

2017 PEPFAR Data and Systems Applied Learning Summit Day 2: MER Analytics/Available Visualizations, Clinical Cascade Breakout Session TB/HIV EXERCISE

International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant

AUTHORISED BY: CEO. Introduction. Whistle Blowing

Section 6 Students School District No. 71 (Comox Valley)

Who is eligible for LifeCare? What services are available?

British Sign Language (BSL) Plan October 2018 Scottish Charity Regulator

National Imaging Associates, Inc. (NIA) Frequently Asked Questions (FAQs) For Louisiana Healthcare Connections Providers

World Confederation for Physical Therapy Congress , May Singapore

FOLLOW-UP IN-DEPTH INTERVIEW GUIDELINES

Dental Benefits. Under the TeamstersCare Plan, you and your eligible dependents have three basic options when you need dental care.

LOCKOUT/TAGOUT ALL HSE PRC 179. Approved By: Manager, HSE Performance Assurance. Table of Contents

Hearing Conservation Program

Swindon Joint Strategic Needs Assessment Bulletin

EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without notice.

Imaging tests allow the cancer care team to check for cancer and other problems inside the body.

1100 Marie Mount Hall College Park, Maryland Tel: (301) Fax: (301)

Health for Life Chiropractic At Cloverdale Mall Unit # The East Mall Etobicoke, ON, M9B 3Y

Instruction Manual IC ACCESS CONTROL

Percutaneous Nephrolithotomy (PCNL)

Lower Extremity Amputation (LEA) Considerations / Issues

CHEAC Summary. BMCR Medical Cannabis Regulations. Distribution, Transportation and Dispensaries

Tick fever is a cattle disease caused by any one of the following blood parasites:

2018 CMS Web Interface

QP Energy Services LLC Hearing Conservation Program HSE Manual Section 7 Effective Date: 5/30/15 Revision #:

Breast Cancer Awareness Month 2018 Key Messages (as of June 6, 2018)

The estimator, X, is unbiased and, if one assumes that the variance of X7 is constant from week to week, then the variance of X7 is given by

Meaningful Use Roadmap Stage Edition Eligible Hospitals

PSYCHOSEXUAL ASSESSMENTS for Children and Adolescents with Problematic Sexual Behavior. Who is qualified to conduct a psychosexual evaluation?

Success Criteria: Extend your thinking:

Building Code 101 OWMC November 20, Ministry of Municipal Affairs and Housing

Oral Surgery (Facial Pain) Service Specification

Lee County Florida Income Guideline Chart

Appendix C. Master of Public Health. Practicum Guidelines

ACSQHC National Consensus Statement: Essential Elements for High Quality End-oflife Care in Acute Hospitals.

2018 Medical Association Poster Symposium Guidelines

BRCA1 and BRCA2 Mutations

NHAIS SIS Communication

2018 CMS Web Interface

CSHCN Services Program Benefits to Change for Outpatient Behavioral Health Services Information posted November 10, 2009

Transcription:

Gas Engineering Recmmendatin GER1 Issue 3 2014 A GUIDE FOR GAS METER OPERATIVES ON REPORTING AND ACTING ON ASSET CONDITION ISSUES 1

2013 Energy Netwrks Assciatin All rights reserved. N part f this publicatin may be reprduced, stred in a retrieval system r transmitted in any frm r by any means, electrnic, mechanical, phtcpying, recrding r therwise, withut the prir written cnsent f Energy Netwrks Assciatin. Specific enquiries cncerning this dcument shuld be addressed t: Operatins Directrate Energy Netwrks Assciatin 6 th Flr, Dean Bradley Huse 52 Hrseferry Rd Lndn SW1P 2AF In the event that there is any cnflict r cntradictin between this Guide and gverning industry dcuments referenced in this Guide, the terms f the referenced dcuments will prevail. These include inter alia relevant gas Regulatins, British Standards, Institutin f Gas Engineers and Managers (IGEM) standards and Gas Safe Register Technical Bulletins, and the Gas Industry Unsafe Situatin Prcedures (Current editin). The infrmatin cntained in this Guidance dcument is prvided fr general infrmatin purpses nly. Whilst its authrs and ENA have taken every care t ensure the accuracy and quality f the infrmatin prvided in this Guidance dcument, the authrs and/r ENA can accept n respnsibility in respect f any lss r damage f any kind whatsever which may arise frm reliance n infrmatin cntained in this Guidance dcument regardless f whether such infrmatin riginates frm the authrs, ENA, its sharehlders, crrespndents r ther cntributrs. The authrs and/r ENA accept n respnsibility fr the cntents f any ther reference, circular r guideline referred t in this Guidance dcument. As stated abve, the cntents f this Guidance dcument are fr infrmatin purpses nly. First published, Octber 2013 Amendments since publicatin Issue Date Amendment Issue 1 Nvember 2013 In Appendix Reference 3, the wrding was expanded t include Inaccessible Issue 2 June 2014 Amendments t A02, A03, A05, and Appendix reference 8. General changes f reference t Gas Industry Unsafe Situatins Prcedures (Current editin) Issue 3 Nvember 14 Varius amendments t all categries as a result f feedback frm industry grups 2

Cntents Acrnyms... 5 Intrductin... 6 List f Asset Cnditin Cdes... 9 Guidance Sheet s... 10 A01 Gas Escape: visible signs / smell f gas that have nt been identified dwnstream f the Emergency Cntrl Valve A02 Suspected presence f Carbn Mnxide 12 A03 Old uncapped STEEL pipe f unknwn type at existing meter psitin 13 A04 A05 Medium Pressure (MP) r Intermediate Pressure (IP) gas service internal t dmestic premises r plyethylene Lw Pressure (LP) built ver services Emergency Cntrl Valve inperable r faulty (including failed let by test) A06 Incrrect gas pressure t inlet f appliances caused by the distributin 16 netwrk A07 Emergency Cntrl Valve falls t pen psitin, e.g. handle fitted 17 incrrectly B01 Service pipe shws signs f damage frm severe crrsin 18 C01 Cpper services 19 C02 Visible r expsed Plyethylene service pipe 20 C03 Service in cavity (Permali meter bx) 21 C04 Additinal live service discvered in dmestic prperty 22 11 14 15 C05 Third party damage t gas service, e.g. signs f vandalism, evidence f theft frm distributin netwrk r ther external factrs 23 C06 Service pipe shws signs f minr crrsin 24 Reference 1 Reference 2 Appendix Items - Fr Infrmatin Only Suspected vltage n service pipe fllwing initial check with apprpriate vltage indicatr Blcked Medium Pressure regulatr vent pipe r inapprpriately installed vent pipe, e.g. pipe end submerged 25 26 3

Reference 3 Meter r Emergency Cntrl Valve psitin enclsed and installer is unable t carry ut wrk 27 Reference 4 Unable t wrk n r replace meter due t insufficient space r psitining f meter 28 Reference 5 Missing Emergency Cntrl Valve handle 29 Reference 6 Crssed meters, i.e. flat envirnments 30 Reference 7 Gas meter installatin in unacceptable clse prximity t electricity 31 supply r meter Reference 8 Meter banks (cmmunal psitins) with nly ne escape rute 32 Reference 9 Damage t meter bx 33 Reference 10 Risk t the general public r custmer due t meter bx psitin, e.g. semi cncealed in public ftpath 34 Reference 11 N visible evidence f equiptential bnding at gas meter installatin 35 Reference 12 Reference13 Reference 14 Reference 15 Adverse envirnment fr the lcatin f the gas meter installatin, e.g. t ht, cld, wet, etc Meter Installatin believed t be at high risk f physical damage Vegetatin grwth affecting access t the meter Electrical Insulatin jint fitted in the wrng place, i.e. after Emergency Cntrl Valve 36 37 38 39 Reference 16 Old style nn typical ECV is encuntered that is nt t current British standard (BS746 r BS21) 40 Reference 17 Medium Pressure ECV 41 4

Acrnyms BS CO ENA GDN GIRS GT IGE IGEM IP igt MO MP MPRN OAMI PE UIP British Standards Carbn Mnxide Energy Netwrks Assciatin Gas Distributin Netwrk Gas Industry Registratin Scheme Gas Transprter Institutin f Gas Engineers Institutin f Gas Engineers and Managers (frmerly the IGE) Intermediate Pressure Independent Gas Transprter Meter Operative Medium Pressure Meter Pint Reference Number Ofgem Apprved Meter Installer Plyethylene Utility Infrastructure Prvider 5

Intrductin What is the aim f this Guide and wh is it fr? A number f rganisatins reviewed the business prcesses fr reprting issues assciated with gas service terminatin assets, recgnising that there will be increased activity at service psitins during the smart meter rll-ut. They identified a series f defects that yu, as a Meter Operative, might cme acrss, and gave each ne a unique cde ( asset cnditin cde ) fr reprting purpses. Yu may well cme acrss these issues (i.e. defects) when installing smart meters, r undertaking ther wrk at gas service psitins. This Guide is intended t supprt yu t make a crrect diagnsis and give directin n the actins yu shuld take. Meter Operatives are the primary audience fr this Guide, hwever, it is als intended t assist Meter Operative managers and trainers. Frmat and Structure f the Guide The Guide cntains: A list f the asset cnditin cdes. A guidance sheet fr each f the asset cnditin cdes, cntaining: The cde and descriptin; Guidance details, which clearly state the actins yu must take and the dcuments yu shuld refer t. An appendix f ther nn GDN r igt issues that may be identified during meterwrk. The cdes are categrised as fllws: A. Emergency Cdes Fllwing cntact with the Natinal Gas Emergency Service, yu must risk assess the situatin and decide if yu can cntinue with the Smart Meter installatin B. Remedial Wrk Cdes yu must stp wrk, risk assess the installatin and take apprpriate actin t reslve. The guidance sheet give references t apprpriate industry dcuments, and advises yu n whether GDN actin is required. GDN s can be cntacted via their custmer enquiry lines as per the table belw: SGN 0800 912 1700 Natinal Grid Gas 0845 835 1111 WWU 0800 9122 999 NGN 0845 634 0508 6

C. Ptential Asset Management Infrmatin Cdes yu can carry n with yur wrk, but must reprt these issues t the GDN r igt using the apprpriate Netwrks enquiry line number, fllwing cmpletin f a smart meter exchange, if relevant. D. Appendix Items Ptential Issues fr cnsideratin that d nt need GDN r igt Interventin. Clur cding helps t distinguish these categries red fr emergency, amber fr remedial wrk, green fr asset cnditin issues and Blue fr nn GDN / igt related issues. Finding yur way arund the Guide There is a list f cdes, which is a quick reference fr all f the cdes. Alternatively yu may just want t flick thrugh the dcument; the guidance sheets are presented in the rder f the cdes, frm A t C. In additin, an appendix has been included which identifies ther ptential issues during the wrks n a metering installatin. These have been included fr cmpleteness. Hwever, there is n GDN r igt actin r interventin required against these issues. Principles f reprting General principles f reprting the cdes presented in this Guide include: Only reprt ne cde per MPRN. Where there are multiple defects at ne MPRN, reprt nly the mst serius ne. Ensure that safety and ther issues are prperly reslved. Yu must seek t reslve all prblems within yur remit. The GDN r igt will reslve all issues relating t Gas Transprter equipment nly at site during their attendance, r manage the reslutin f remaining issues thrugh subsequent visits. Nte that the cdes nly apply t Gas Transprter (GDN r igt) equipment. If an issue relates t supplier r custmer equipment, yu must fllw yur wn rganisatin s prcedures fr managing such ccurrences (such as issues identified in the appendix). Defects must be reprted t the GDN r igt as they arise; they shall nt be stred up and reprted in batches. When reprting a categry A defect by phne, yu will always be asked t prvide the fllwing infrmatin: Yur full name; Yur cntact telephne number; The categry f defect being reprted; Lcatin f defect, i.e. address including pstcde; 7

Meter Pint Reference Number (MPRN); Wh yu are wrking fr; and The registered supplier. Develpments There are cntinuus develpments in industry, with areas f regulatin and guidance evlving. Yu will see in this dcument that reprts are nt expected under sme cdes. In ther instances, it will becme apparent that mre cdes are required, in rder t capture netwrk issues that are nt adequately cvered by this set f cdes. Gvernance This dcument has been develped and is maintained by the ENA and its members. Dcument references Dcuments that yu, and ther parties, shuld reference are identified in each Guidance Sheet. 8

Categry A - Emergency List f Asset Cnditin Cdes Cde A01 A02 A03 A04 A05 A06 A07 Descriptin Gas Escape: visible signs / smell f gas that have nt been identified dwnstream f the Emergency Cntrl Valve Suspected presence f Carbn Mnxide Old uncapped STEEL pipe f unknwn type at existing meter psitin Medium Pressure (MP) r Intermediate Pressure (IP) gas service internal t dmestic premises r plyethylene Lw Pressure (LP) built ver services Emergency Cntrl Valve inperable r faulty (including failed let by test) Incrrect gas pressure t inlet f appliances caused by the distributin netwrk Emergency Cntrl Valve falls t pen psitin, e.g. handle fitted incrrectly Categry B - Remedial wrk Cde B01 Descriptin Service pipe shws signs f damage frm severe crrsin Categry C Ptential Asset Management Infrmatin Cde C01 C02 C03 C04 C05 C06 Descriptin Cpper services Visible r expsed Plyethylene service pipe Service in cavity (Permali meter bx) Additinal live service discvered in dmestic prperty Third party damage t gas service, e.g. signs f vandalism, evidence f theft frm distributin netwrk r ther external factrs Service pipe shws sign f minr crrsin 9

Guidance Sheets 10

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Safety Actin cde A01 Gas Escape: visible signs / smell f gas that have nt been identified dwnstream f the Emergency Cntrl Valve. Where yu are infrmed f and/r yu detect an unexpected smell f gas, which has nt been identified dwnstream f the Emergency Cntrl Valve (e.g. the installatin passes a tightness test but there is a detectable smell f gas): Cntact the GDN via the Gas Emergency Service t attend site and investigate within Emergency Respnse Standards f Service reprt cde A01. Fllw yur rganisatin s gas safe instructins but as a minimum yu shuld initiate safety actins n site, e.g. turn ff gas and ventilate the prperty. Remain n site if there is an immediate risk and the installatin cannt be made safe and secure. Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) GDN: Gas Safety (Management) Regulatins 1996 Gas (Standards f Perfrmance) Regulatins 2005 IGEM/SR/29 (Institutin f Gas Engineers and Managers, Safety Regulatins) Dealing with gas escapes 11

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A02 Suspected presence f Carbn Mnxide Where there are visual signs f spillage r leakage f prducts f cmbustin frm an appliance this shuld be dealt with in accrdance with the Gas Industry Unsafe Situatins Prcedures (Current editin). As lng as n ne has received medical attentin r appears t be suffering frm the symptms f expsure t CO (see belw), meter wrk can cntinue. If anyne has received medical attentin r appears t be unwell with symptms that might be caused by expsure t Carbn Mnxide (CO): Advise that immediate medical attentin is sught and make the gas installatin safe, ventilate the prperty and infrm the Gas Emergency Service. D nt enter cellars Cntact the GDN via the Gas Emergency Service reprt cde A02. When requested by an Ofgem Apprved Meter Installer, the GDN (via Gas Emergency Service) will attend site and investigate within Emergency Respnse Standards f Service t make safe. D Nt carry ut any wrk n the meter installatin, including the regulatr, as this culd disturb evidence required in any subsequent RIDDOR incident investigatin. Remain n site, in a safe area if there is an immediate risk and the installatin cannt be made safe and secure. Where smene has received medical attentin, any subsequent meter wrk activity shuld nly be carried ut after first cntacting the HSE fr advice. Dcument reference: General: OAMI: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 Gas Industry Unsafe Situatin Prcedures (Current editin) IGEM IGE/GL/8 Reprting and Investigating f Gas related incidents Guidance: What is Carbn Mnxide Carbn Mnxide (CO) is a clurless, durless, tasteless gas which can be emitted by faulty appliances pwered by any fuel that burns. Signs f Carbn Mnxide Lk ut fr gas appliance burning with a yellw / range flame that is nrmally blue, extra cndensatin, pilt lights blwing ut, sting and / r yellw stains rund appliances. - flu-like symptms - chest r stmach pains - erratic behaviur - nausea and / r vmiting - breathlessness - feeling tired r drwsy - giddiness / headaches - visual prblems 12

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A03 Old uncapped STEEL pipe f unknwn type at existing meter psitin Cntact the GDN via the Gas Emergency Service t attend site and make safe as necessary reprt cde A03. Classificatin f activity wuld be a Check fr Safety request with a respnse within 4 hurs. Dcument reference: GDN: IGE/TD/4 (Institutin f Gas Engineers, Transmissin and Distributin) PE and steel gas services and service pipewrk 13

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A04 Medium Pressure (MP) r Intermediate Pressure (IP) gas service internal t dmestic premises r plyethylene Lw Pressure (LP) built ver services Cntact the GDN via the Gas Emergency Service t attend site and investigate reprt cde A04. Classificatin f activity wuld be a Check fr Safety request with a respnse within 4 hurs fr MP and IP services. Fr LP plyethylene service that have been built ver, ntify the GDN r igt. The GDN r igt will carry ut further investigatins within 28 days f the reprt being made. Yu may r may nt stay n site fllw yur rganisatin s gas safe instructins. Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) Gas Safe Register, Technical Bulletin 003 Built ver plyethylene (PE) Lw and Medium pressure natural gas services Safety cncern GDN: IGE/TD/4 (Institutin f Gas Engineers, Transmissin and Distributin) PE and steel gas services and service pipewrk 14

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A05 Emergency Cntrl Valve inperable r faulty (including failed let by test) Where yu identify an Emergency Cntrl Valve is at risk, ask the GDN (via the Gas Emergency Service) t attend site and investigate within Emergency Respnse Standards reprt cde A05. Classificatin f activity wuld be a Check fr Safety request with a respnse within 4 hurs. If the ECV is inaccessible, refer t Appendix Reference 3 and fllw the actins described in that sectin Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) IGE/UP/1B editin 3 (Institutin f Gas Engineers, Utilisatin) - Tightness testing and direct purging f small Liquefied Petrleum Gas/Air, Natural Gas and Liquefied Petrleum Gas installatins 15

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A06 Incrrect gas pressure t inlet f appliances caused by the distributin netwrk Given that the ther elements f the installatin are wrking crrectly such as the meter, the meter regulatr and the internal pipe: Where the incrrect pressure affects the safe peratin f any appliance, e.g. cmbustin and / r flame stability, and the cause is knwn nt t be the installatin pipewrk, meter and / r regulatr, cntact the GDN r igt via the Gas Emergency Service t attend site and investigate within Emergency Respnse Standards f Service reprt cde A06. Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) Gas Safe Register, Technical Bulletin 071 Checking the perating pressure f the meter regulatr Natural gas 16

Categry A- Emergency Immediately reprt t the Gas Emergency Service by telephne (0800 111 999) Asset Cnditin Cde A07 Emergency Cntrl Valve falls t pen psitin, e.g. handle fitted incrrectly If the nly actin required in rder t reslve the issue is fr yu t re-fit the meter handle, then cmplete the activity. Where yu identify that the Emergency Cntrl Valve is at risk, in accrdance with the Gas Industry Unsafe Situatin Prcedures (Current editin), ask the GDN (via the Gas Emergency Service) t attend the site and investigate within Emergency Respnse Standards reprt cde A07. Classificatin f activity wuld be a Check fr Safety request with a respnse within 4 hurs. Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures(Current editin) 17

Categry B - Remedial Wrk Actin may be required befre yu can cmplete yur wrk Asset Cnditin Cde B01 Service pipe shws signs f damage frm severe crrsin GDNs are interested in situatins where the gas service pipe and / r fittings shw physical signs f crrsin. The detail prvided belw gives examples f different cnditins that may be bserved when undertaking meter wrk n r arund the gas service pipe r terminatin. What signs f crrsin are there n the service Pipe wrk? Severe evidence f crrsin and examples Ntify GDN r igt - reprt cde B01 Where pitting f pipe appears visually t be deeper than just pwdery rust it may be necessary t assess the remaining pipe wall thickness, particularly at areas where water can cllect and react with unprtected metal. Lk fr evidence f flaking r lse pipe wrapping and signs f lcalised pitting. NOTE D nt rub any live severely crrded pipes. In these circumstances the GDN r igt shuld be infrmed f the situatin as they will need t undertake a risk assessment prir t any meter wrks being undertaken. Minr evidence f crrsin In these circumstances the GDN r igt shuld be infrmed f the situatin as they will need t undertake remedial wrks. This des nt need t be cmpleted prir t any meter wrks being undertaken. Ntify the GDN r igt reprt cde C06 (Minr crrsin evidence). 18

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C01 Cpper services Ntify the GDN r igt f the presence f cpper service nly reprt cde C01. There is n requirement fr the service t be replaced prir t metering wrks. 19

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C02 Visible r expsed Plyethylene service pipe Ntify the GDN r igt - reprt cde C02. There is n requirement fr GDN r igt wrks prir t cmpleting yur metering wrk. 20

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C03 Rising service pipe lcated within a cavity wall Fr Permali meter bx situatins fllw guidance in the Gas Safe Bulletin TB136. Ntify the GDN r igt in all ther instances. The GDN needs t knw abut any situatins where a service pipe rises in a cavity wall t a meter psitin/ecv. Usually this ccurs when an uter skin has been added t what was a single skinned prperty r when ther building wrks have been undertaken at the premises. The GDN des nt need t be infrmed f situatins where the service pipe runs thrugh a cavity wall taking the shrtest pssible rute r rises up thrugh a slid flr. If the issue is with the installatin pipe then make reference t the GIUSP. Fr assessment f Permali type husings then yu must make reference t Gas Safe TB136 t identify the cnfiguratin nsite and determine whether meterwrk can be undertaken. 21

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C04 Additinal live service discvered in dmestic prperty Ntify the GDN r igt reprt cde C04. N further actin required. 22

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C05 Third-party damage t gas service, e.g. signs f vandalism, r ther external factrs. Ntify GDN r igt reprt cde C05 If smell f gas r signs f a gas escape fllw guidance n Guidance Sheet A01. Yu may r may nt stay n site fllw yur rganisatin s gas safe instructins. Dcument reference: GDN: Gas (Standards f Perfrmance) Regulatins 2005 IGEM/SR/29 (Institutin f Gas Managers and Engineers, Safety Regulatins) Dealing with gas escapes 23

Categry C- Asset Cnditin Ntificatin Cntinue with yur wrk and subsequently reprt the issue Asset Cnditin Cde C06 Service pipe shws signs f minr crrsin GDNs are interested in situatins where the gas service pipe and / r fittings shw physical signs f crrsin. The detail prvided n Guidance Sheet B01 f this dcument prvides examples f different cnditins that may be bserved when undertaking meterwrk n r arund the gas service pipe r terminatin. Fr Minr Evidence Althugh indicating signs f deteriratin, ften nly the surface f the pipe is affected withut cmprmising the verall pipe integrity. This may be able t be rectified by applying a fresh prtective wrapping / paint. In these circumstances the GDN r igt shuld be infrmed f the situatin as they may wish t undertake remedial wrks. This des nt need t be cmpleted prir t any meter wrks. 24

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 1 Suspected vltage n service pipe fllwing initial check with apprpriate vltage indicatr This is nt a GDN r igt Issue N GDN r igt actin required. Advise the custmer t cntact an electrician t investigate. Dcument reference: General: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) Nte: The abve dcuments cver crss-bnding issues. 25

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 2 Blcked medium pressure regulatr vent pipe r inapprpriately installed vent pipe, e.g. pipe end submerged. This is nt a GDN r igt Issue Fr medium pressure regulatrs that are part f the meter installatin, it is the Supplier s and / r their Meter Asset Manager s respnsibility t rectify the situatin. A ptential slutin wuld be t cnsider mving the vent and / r meter installatin. An alternative slutin wuld be a service alteratin, which is cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). Dcument reference: OAMI: BS 6400-2:2006 - Specificatin fr installatin, exchange, relcatin and remval f gas meters with a maximum capacity nt exceeding 6 m 3 /h, Part 2 Medium pressure (2nd family gases) Gas Industry Unsafe Situatin Prcedures (Current editin) 26

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 3 Meter r Emergency Cntrl Valves psitin enclsed and installer is unable t carry ut wrk This is nt a GDN r igt Issue Fllw Gas Industry unsafe situatin Prcedures (Current editin). The custmer r landlrd may need t request a service pipe alteratin t reslve this issue - these are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). Dcument reference: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 27

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 4 Unable t wrk n r replace meter due t insufficient space r psitining f meter This is nt a GDN r igt Issue Actins This is nt a GDN r igt issue. The custmer r landlrd may need t request a service pipe alteratin t reslve this issue - these are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). After cnsultatin with the Meter Asset Manager, cnsider the ptin f extending the meter inlet t allw relcatin f the meter Dcument reference: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 28

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 5 Missing Emergency Cntrl Valve handle This is nt a GDN r igt Issue N cntact needed with the GDN r igt. Fit a replacement handle. Dcument reference: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 Assciatin f Meter Operatrs Guidance Dcument Prtcl fr Emergency Cntrl Valve prvisin by GDN t MAMs dated 24 th April 2012. 29

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 6 Crssed meters, i.e. flat envirnments This is nt a GDN r igt Issue Supplier(s) t reslve. N GDN r igt actin required. Nte: An administrative prcess, initiated by the Supplier, will fllw the identificatin f a crssed meter t address the custmer s ptential billing issues that may arise. Dcument reference: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011 30

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 7 Gas meter installatin in unacceptable clse prximity t electricity supply r meter (150mm minimum clearance) This is nt a GDN r igt Issue As specified in BS 6400 (part 1), ensure that a suitable insulating material is placed between the gas meter and the electricity service r electricity meter. N ntificatin required t the GDN r igt. Dcument reference: Gas Safety (Installatin and Use) Regulatins 1998 L56 Apprved Cdes f Practice May 2011, Regulatin 12(3) OAMI: BS 6400 - Specificatin fr installatin, exchange, relcatin and remval f gas meters with a maximum capacity nt exceeding 6 m 3 /h 31

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 8 Meter banks (cmmunal psitins) with nly ne escape rute This is nt a GDN r igt Issue Fr meter replacement during Smart Metering Rll-ut Prgramme, replace the meter with n further actin required Reference L56 ACOP 12(1)-(2) An alternative slutin t the abve guidance r relcating metering installatins wuld be a service alteratin, which is cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). 32

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 9 Damage t meter bx This is nt a GDN r igt Issue This is a matter fr the Supplier r custmer t reslve. N cntact with the GDN r igt is required. The Supplier r custmer may need t request a service pipe alteratin t allw the damaged meter bx t be replaced, e.g. inset meter bx damage expsing cavity in wall service alteratins are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). 33

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 10 Risk t the general public r custmer due t meter bx psitin, e.g. semi cncealed in public ftpath This is nt a GDN r igt Issue The Supplier r custmer shall reslve as necessary. The Supplier r custmer may need t request a service pipe alteratin t allw the meter bx t be repsitined these are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). 34

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 11 N visible evidence f equiptential bnding at gas meter installatin This is nt a GDN r igt Issue This is nt a GDN r igt issue. Fllw the prcedure in the Gas Industry Unsafe Situatin Prcedures (Current editin). Dcument reference: OAMI: Gas Industry Unsafe Situatin Prcedures (Current editin) 35

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 12 Adverse envirnment fr the lcatin f the gas meter installatin, e.g. t ht, cld, wet, etc. This is nt a GDN r igt Issue This is a matter fr the Supplier t reslve. The Supplier r custmer may need t request a service pipe alteratin t allw the meter installatin t be repsitined - service alteratins are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP (Utility Infrastructure Prvider). 36

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 13 Meter Installatin believed t be at high risk f physical damage This is nt a GDN r igt Issue This is a matter fr the Supplier t reslve. The Supplier r custmer may need t request a service pipe alteratin t allw the meter installatin t be repsitined - service alteratins are cntestable wrks. Fr gas service pipe alteratins cntact the GDN, igt r a suitable Gas Industry Registratin Scheme (GIRS) Registered UIP fr service alteratin services. 37

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 14 Vegetatin grwth affecting access t the meter This is nt a GDN r igt Issue This is a matter fr the Supplier r custmer t reslve. 38

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 15 Electrical Insulatin jint fitted in the wrng place, i.e. after Emergency Cntrl Valve This is nt a GDN r igt Issue Fllw Gas Safe advice regarding wrking within bnd area when undertaking meter wrk. 39

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 16 Old style nn typical ECV is encuntered that is nt t current British standard (BS746 r BS21) This is nt a GDN r igt Issue There are many types f ECV currently in peratin which are different in style t the current British Standards BS21 and BS746. One example is shwn in the pictures belw. Pictures abve shw an example f an ECV which will require an adaptr the ECV des nt require changing if it is fully functinal and nt leaking Prvided that these ECV s are nt letting by, leaking r inperable (i.e. they can be turned n and ff) they are acceptable and d nt require exchanging. Suppliers and installers need t carry the apprpriate adaptrs t allw them t make cnnectins t these ECV s. In mst instances it will nt be necessary t exchange the ECV Picture abve shw an example f tw types f ECV adaptr t allw the meter install t take place bth with a BS746 utlet thread and 22mm capillary the ECV des nt require changing if it is fully functinal and nt leaking 40

Appendix item Fr infrmatin N GDN r igt actin r interventin is necessary Reference 17 Medium Pressure ECV This is nt a GDN r igt Issue There are many gas services perating at medium pressure terminating with an apprpriate ECV. Prvided that these ECV s are nt letting by, leaking r inperable (i.e. they can be turned n and ff) they are acceptable and d nt require exchanging. Suppliers and installers need t carry the apprpriate adaptrs t allw them t make cnnectins t these ECV s. In mst instances it will nt be necessary t exchange the ECV 41