G2 Calculation of Supplier Demand for EMR Charging

Similar documents
BSC Committee updates on EMR

Guidance. Credit Assessment Load Factors (CALF) Summary

A New Participant s Guide to CVA Qualification

XOSERVE LIMITED SERVICES SCHEDULE FOR THE PROVISION OF NON-CODE USER PAYS SERVICES (REFERENCE NUMBER XNCUP(SS)06) DATED 20 INTRODUCTION

Excess BTM Production. Issue Paper

GENERAL TERMS AND CONDITIONS WCO PUBLICATIONS

These Rules of Membership apply in respect of all Products purchased by a Member from Sigma (and any Program Partner) on or after 1 February 2017.

PGE Energy Imbalance Market (PGE EIM BP)

EBS IT Meeting September 2016

On an hour by hour basis, the Actual load is subtracted from the Adjusted CBL to obtain the hour by hour Demand Response performance.

Unofficial translation /Ministry of Social Affairs and Health. No. 548/2008. Government Decree on Narcotics Control

Joint Office of Gas Transporters 0209: URolling AQ

North America Cardiac Rhythm Management (CRM) Procedures Outlook to 2021

IAF Mandatory Document. Requirements for the Migration to ISO 45001:2018 from OHSAS 18001:2007 (IAF MD 21:2018)

ORDER of the Minister of Health No. 269/2017 of 14 March 2017 on mandatory provision of medicinal product adequate and continuous supplies

Mexico Milling Machine for Dental Clinics Industry 2016 Market Research Report

Global Standard Radiography Film X-Ray Film Printer Market Research Report 2016

CITY OF VALLEJO HIDDENBROOKE IMPROVEMENT DISTRICT NO IMPROVEMENT LEVY ADMINISTRATION REPORT FISCAL YEAR

Global Magnetic Resonance Imaging (MRI) Systems Market Research Report 2016

United States Tuberculosis Vaccine Industry 2016 Market Research Report

EFET. European Federation of Energy Traders. Amstelveenseweg 998 / 1081 JS Amsterdam Tel:

FURNITURE TERMS / POLICIES. TERMS OF FURNITURE SALE [agreement is required with all orders] FURNITURE ORDERS

RULES. on Selection and Sale of Tobacco and Trade Terms with Suppliers CHAPTER I

China Silymarin Industry Overview,

Russia Cardiac Assist Devices Market Outlook to 2021

Global Otoscopes Market Professional Survey Report 2016

Pennsylvania s Medical Marijuana Program

Alcohol and Tobacco Available for Consumption: Year ended December 2009

Global Oil Softgel Capsules Market Research Report 2016

Tamsulosin Hydrochloride 0.4 mg Capsule

Investor Presentation

Section Processing

CANNABIS MANAGEMENT CORPORATION REGULATIONS

Details of Authorised Personnel

Business Requirements Definition. Project Nexus

Global Vitamin Market Professional Survey Report 2016

General Terms and Conditions

Europe Tooth Shade Scanners Industry 2016 Market Research Report

Western Area Power Administration, Conditional Firm Transmission Service Business Practice

Carbon Reduction Scheme Governance Structure

Guideline on Health Food Exportation to China

ALCOHOL ETC. (SCOTLAND) ACT 2010 GUIDANCE FOR LICENSING BOARDS


NEPHROCHECK Calibration Verification Kit Package Insert

Europe Ginseng Market Report 2016

Brisa Concessão Rodoviária. 1Q 2017 Traffic Update

NA-019 Level 3 Qualification Recognition for EN 4179 / NAS 410 and AS3669

Please find enclosed Dosimetry Service Licence No which replaces Dosimetry Service Licence No

LIFEPROOF LIMITED WARRANTY TOTAL WATER PROTECTION PROGRAM TERMS AND CONDITIONS

Chemotherapy Induced Peripheral Neuropathy Global Clinical Trials Review, H1, 2016

British American Tobacco Snus Marketing Standards

Seasonal Flu Vaccine Offers

STAFF REPORT City of Lancaster NB 2

NA LEVEL 3 TECHNICAL QUALIFICATION RECOGNITION

Seal of Approval Guidelines. The Approval Program

Alcohol Delivery Services

LIFEPROOF LIMITED WARRANTY TOTAL WATER PROTECTION PROGRAM TERMS AND CONDITIONS

Q4 Report Webcast February 7, 2019 Presenters: Renée Aguiar-Lucander, CEO Fredrik Johansson, CFO

SPECIAL DISCLAIMER FOR INTERPRETING SERVICES INVOLVING CALLS TO EMERGENCY SERVICE PROVIDERS (911/E911), OR LEGAL, MEDICAL OR MENTAL HEALTH ISSUES

Dravet Syndrome (Severe Myoclonic Epilepsy of Infancy) Global Clinical Trials Review, H2, 2015

2019 COLLECTION TYPE: MIPS CLINICAL QUALITY MEASURES (CQMS) MEASURE TYPE: Outcome High Priority

IAASB Main Agenda (February 2007) Page Agenda Item PROPOSED INTERNATIONAL STANDARD ON AUDITING 530 (REDRAFTED)

Submission to the Senate Community Affairs Legislation Committee inquiry into the Therapeutic Goods Amendment (2016 Measures No.

PUBLIC SERVICE COMMISSION OF THE DISTRICT OF COLUMBIA 1325 G STREET N.W., SUITE 800 WASHINGTON, D.C ORDER

Annual Electric Balancing Authority Area and Planning Area Report

PLEO-CMT Top-line Results. Presentation October 16, 2018

NA-019 LEVEL 3 QUALIFICATION RECOGNITION FOR AS3669 AND EN 4179 / NAS 410

Application for Client Registration for an Individual/Sole Trader

Financial Administration and Control of Research and Special Funds


Leveraging Technology for the Canadian Private Target Mergers & Acquisitions Deal Points Study

Employment Contract. This sample employment contract is from Self-Employment vs. Employment Status, CDHA (no date available)

Align your brand with one of education s most highly respected and experienced organizations.

Approved by the State Duma on December 17, 1998 Approved by the Federation Council on December 23, 1998

United States Antimony Tin Oxide Nanoparticles Market Report 2016

Global Chymosin Market Research Report 2016

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003

General Practice Extraction Service (GPES)

Global In-Vitro-Fertilization Market: Trends and Opportunities ( )

Seasonal Flu Vaccine Offers

Non Alcoholic Fatty Liver Disease (NAFLD) - Global API Manufacturers, Marketed and Phase III Drugs Landscape, 2018

For personal use only

MEMORANDUM OF UNDERSTANDING

ACE Diversity Interchange White Paper

TARGET Instant Payment Settlement TIPS. Connectivity Guide 1.0. Version 1.0 Date 08/12/2017. All rights reserved.

ONR GUIDE. The Role of the UK National Coordinators for International Operating Experience Report Systems. ONR-OPEX-GD-003 Revision 3

Sukhjit Starch And Chemicals Ltd - Company Capsule

EIF PROGRAMME REPORT TODDLER-PARENT PSYCHOTHERAPY JULY 2016 FOUNDATIONS FOR LIFE

Approved by the State Duma on December 17, 1998 Approved by the Federation Council on December 23, 1998

October 25, UM 1856 PGE's Plan to Advancing its Energy Storage Modeling Capability

Data Sheet of SAW Components

Hamilton City Council BYLAWS HAMILTON ALCOHOL CONTROL BYLAW 2015

United States NDT System Market Report 2016

Recall Guidelines. for Chinese Medicine Products

Importance of Cell Stock Concentration for Accurate Target Cell Recovery

EY 2017 NJ RPS Compliance Coordination Meeting

Data Sheet of SAW Components

APPENDIX A SERVICE SPECIFICATION

Transcription:

G2 Calculation of Supplier Demand for EMR Charging EMRS Guidance Public Version: 5.0 Date: 01 March 2018

Table of Contents Change Amendment Record 3 1. Introduction 4 2. Purpose 4 3. Who is this document for? 4 4. Associated Documents 4 5. What and how is the data received to perform these calculations? 5 6. Calculation of Supplier Demand for CFD and CM Charging 5 6.1 What is Gross Demand and why is it used in CFD and CM charging? 5 6.2 Which BM Units will be used in CFD and CM charging? 6 6.3 How can Supplier verify the calculation of Gross Demand? 7 6.4 What will be the treatment of electricity imported by power stations? 7 6.5 What does an example of this calculation look like 7 7. Calculation of Supplier Demand for CM Charging up to and including the 2017/18 Financial and Delivery Years 8 7.1 What is Net Demand and why is it used in CM charging? 8 7.2 Which BM Units will be used in CM charging? 8 7.3 Is Transmission Loss Multiplier applied for CM charging? 9 7.4 How can Suppliers verify the calculation of Net Demand? 9 7.5 What does an example of the calculation look like? 9 8. Need more information? 9 9. Acronyms and Definitions 9 10. Appendix 1 Example of CFD and CM Charging 10 10.1 Calculation of Gross Demand for CFD and CM 10 10.2 Calculation of Net Demand 11 Disclaimer: Please note that whilst this document has been prepared with due care by EMR Settlement Limited on behalf of the Low Carbon Contract Company and the Electricity Settlement Company Limited, EMR Settlement Limited, Low Carbon Contract Company and Electricity Settlement Company Limited do not make any representation, warranty or undertaking, express or implied, in relation to the completeness and or accuracy of information contained in this document, and accordingly EMR Settlement Limited, Low Carbon Contract Company and Electricity Settlement Company Limited shall not be liable for any damages resulting from the use of this information or action taken in reliance on it.

Change Amendment Record Version Date Description 1.0 06 August 2015 Go-Live Version 2.0 12 October 2015 Housekeeping - updated to include Guidance number 3.0 21 March 2017 4.0 01 August 2017 Transfer to new template New CCC I.D s added to Table 1 following BSC Change P339 Introduction of new Consumption Component Classes for Measurement Classes E-G 5.0 01 March 2018 CM to start using Gross Demand data from Delivery Year 2018 onwards V5.0 Page 3 of 13

1. Introduction This guidance document is to provide Suppliers with an understanding of how their charges for both Contracts for Difference (CFD) and the Capacity Market (CM) are calculated. Charges for both schemes are based on the volume of electricity supplied. On behalf of the Low Carbon Contracts Company (LCCC) and Electricity Settlement Company (ESC), EMR Settlement Limited (EMRS) calculates Suppliers charges payable under The Contracts for Difference (Electricity Supplier Obligations) Regulation 2014 1 (as amended) and The Electricity Capacity (Supplier Payment) Regulations 2014 2 (as amended) as determined by these Regulations. In accordance with the Regulations, these charges are calculated from demand data that is provided to EMRS by BSCCo at the BM Unit level, and then summed by EMRS to calculate the total demand for each Supplier for each scheme. 2. Purpose The purpose of this document is to answer the following questions: What and how is the data received to perform these calculations? What is Gross Demand and why is it used in CFD and CM charging? How can Supplier verify the calculation of Gross Demand? Which BM Units will be used in CFD and CM charging? How can Supplier verify the calculation of Gross Demand? What is Net Demand and why is it used in CM charging? Which BM Units will be used in CM charging? Is Transmission Loss Multiplier applied for CM charging? How can Suppliers verify the calculation of Net Demand? What will be the treatment of electricity imported by power stations? What does an example of this calculation look like? 3. Who is this document for? This document is for all electricity Suppliers. 4. Associated Documents This document should be read in conjunction with: WP5 Supplier Capacity Market Demand Forecast G5 Supplier CFD Credit Cover G12 Supplier Capacity Market Demand Forecast G14 Supplier CM Credit Cover G15 Capacity Market Supplier Payments G16 Supplier Contracts for Difference 1 http://www.legislation.gov.uk/uksi/2014/2014/contents/made 2 http://www.legislation.gov.uk/uksi/2014/3354/contents/made V5.0 Page 4 of 13

5. What and how is the data received to perform these calculations? The data used in the calculations is known as metered data which consists of Profile Data and Half Hourly Metered Consumption Data for Suppliers. EMRS receives metered data via the BSCCo in Data Flows 3 SAA-I014 Settlement Report and SAA-I042 BM Unit Gross Demand Report. Delivery Years and Financial Years from the 1 January 2018 onwards, only the SAA- I042 BM Unit Gross Demand Report shall be used for both CM and CFD schemes. The below figure illustrates how this data is received by EMRS. i CFD and CM charging uses the metered data contained within the SAA-I042 (output) BM Unit Gross Demand Report. Figure 1: Metered data flows received by EMRS for Suppliers 6. Calculation of Supplier Demand for CFD and CM Charging 6.1 What is Gross Demand and why is it used in CFD and CM charging? The Contracts for Difference Regulations 2014 require Suppliers CFD charges and Credit Cover requirements to be determined based on the amount they have supplied to premises in Great Britain. Therefore, the BSC systems were amended to report Gross Demand to the EMR Settlement Service Provider. Gross Demand is the volume of Active Import (i.e. electrical energy entering premises from the licensed distribution or transmission network), with no adjustment made for any Active Export (i.e. electrical energy generated on the premises and exported onto the licensed distribution or transmission network). 3 These data flows are available on the ELEXON website in the Interface Definition Documents in the NETA Interface Definition and Design: Part 2 - Interfaces to other Service Providers. V5.0 Page 5 of 13

The Electricity Supplier Obligations (Amendment & Excluded Electricity) Regulations 2015 4 will require Energy Intensive Industries (EII) and Green Excluded Electricity to be excluded from the calculation of Gross Demand for purposes of CFD charging. These requirements are outside the scope of this guidance. Similarly, The Electricity Capacity (Amendment) Regulations 2017 5 use the Gross Demand methodology 6 for the calculations in the CM. Within the CM scheme, it is only periods of high demand that is used in the calculations. This is defined in the Regulations as 4pm to 7pm on any working day between November and February. EMRS use the metered volumes supplied during the specified period in the calculations. 6.2 Which BM Units will be used in CFD and CM charging? In most cases, a Supplier s EMR charges will only be calculated using data for those BM Units for which the Supplier is the Lead Party (i.e. where the legal entity holding the supply license has registered the BM Unit under the BSC). There are certain exceptions to this where (due to the history of the site or the supply license) the legal entity supplying the premises is not the Lead Party, but EMRS will discuss such exceptions with the parties involved. Where a Supplier is responsible for a BM Unit (either by being the Lead Party, or through one of the exceptions referred to above), the Gross Demand for that BM Unit will potentially be used in CFD and CM charging, depending on the BM Unit Type. This is set out in Table 1 below. Table 1: BM Units used in CFD and CM Gross Demand Calculation BM Unit Type Supplier BM Unit (type G or S ) Gross Demand Used in CFD/CM Charging? Yes How is Gross Demand Calculated? Aggregated values for Active Import Consumption Component Classes only (i.e. excluding Active Export), adjusted by GSP Group Correction Factor, Line Loss Factor and Transmission Loss Multiplier. Note that the Active Import (AI) Consumption Component Classes are CCCs 1-5, 9-13, 17-23, 25-26, 28, 30-31, 42-47, and 54-59. Embedded (type E ) Transmissionconnected (type T ) Interconnector (type I ) Yes, unless the BM Unit is at premises occupied for the purposes of operating a Licensable Generating Plant. Yes, unless the BM Unit is at premises occupied for the purposes of operating a Licensable Generating Plant. No Negative values of BM Unit Metered Volume adjusted for Transmission Loss Multiplier. Positive values of BM Unit Metered Volume will not be used in the calculation. Negative values of BM Unit Metered Volume adjusted for Transmission Loss Multiplier. Positive values of BM Unit Metered Volume will not be used in the calculation. Not Applicable 4 http://www.legislation.gov.uk/uksi/2015/721/contents/made 5 http://www.legislation.gov.uk/uksi/2017/1053/contents/made 6 Methodology used for Financial Years and Delivery Years 2018/19 onwards V5.0 Page 6 of 13

6.3 How can Supplier verify the calculation of Gross Demand? The process for calculating Gross Demand differs depending on whether the BM Unit is a Supplier BM Unit (type G or S ), or a CVA BM Unit (type E or T ). Gross Demand for a Supplier BM Unit can be calculated by: Summing Corrected BM Unit Energy (J1638) and Corrected BM Unit Line Losses (J1639) (for Active Import CCCs only) from group SE1 of the D0296 Data Flow; and Applying the relevant Transmission Loss Multiplier (TLMij). Gross Demand for a CVA BM Unit can be calculated by: Summing negative values of BM Unit Metered Volume (QMij); and i In the D0296 Data Flow, group SE1 includes the Corrected BM Unit Energy (J1638) and Corrected BM Unit Line Losses (J1639) Applying the relevant Transmission Loss Multiplier (TLMij). The Transmission Loss Multiplier (TLM) is the factor applied to BM Unit in each Settlement Period in order to adjust for Transmission Losses. The relevant TLM will be applied to Gross Demand in BSC systems for both CFD and CM metered volumes because the BSCCo adjust the metered volumes for transmission losses. This is to ensure it is consistent with BSC Configurable Items which require the Settlement Administration Agent (SAA) to provide the CFD Settlements Service Provider with a report of TLM-adjust Gross Demand. 6.4 What will be the treatment of electricity imported by power stations? Where the Lead Party of the BM Unit(s) holds both supply and generation licenses and has registered a BM Unit that records electricity imported to a premise occupied for purposes of operating a Licensable power station, the import in the calculation of that Suppliers demand would not be included. This is because it would not constitute supply for the purposes of the Regulations. However where a Lead Party has registered a BM Unit that records electricity imported to a premise occupied for purposes of operating an Exemptible power station, the import of the calculation will be included of that Suppliers demand. This is because it would constitute supply for the purposes of the Regulations. 6.5 What does an example of this calculation look like To validate your understanding an example of how this calculation works can be located within Appendix 1. V5.0 Page 7 of 13

7. Calculation of Supplier Demand for CM Charging up to and including the 2017/18 Financial and Delivery Years Financial Year and Delivery Year 2018/19 onwards use the Supplier Demand methodology described in section 7. This section describes how a Suppliers demand will be calculated for CM charging up to and including the 2017/18 Delivery Year and Financial Year. 7.1 What is Net Demand and why is it used in CM charging? The Electricity Capacity (Supplier Payment etc.) Regulations 2014 7 define Net Demand for calculating CM charges as set out in Table 2 below. Table 2: Definition of Net Demand for calculating CM charges Definitions within the Regulations 2(3) In these Regulations net demand, in relation to an electricity Supplier ( S ), means the difference (expressed in MWh) between (a) the amount of electricity supplied by S to premises in Great Britain, and (b) the amount of generated electricity for which S is responsible. except that where that difference is a negative amount the net demand is zero. 2(4) For the purposes of paragraph (3), S is responsible for an amount of generated electricity if (a) S is responsible for the export of that electricity, for the purposes of Section K of the Balancing and Settlement Code as it was in force on 8th September 2014, by virtue of paragraph 1.2.2(a)(ii) of that Section (Export from Exemptible Generating Plant); and. (b) the electricity so exported is generated by a plant that is not directly connected to the GB transmission system. Within the CM scheme, it is only periods of high demand that is used in the calculations. This is defined in the Regulations as 4pm to 7pm on any working day between November and February. EMRS use the metered volumes supplied during the specified period in the calculations. 7.2 Which BM Units will be used in CM charging? The BM Units used for CM charging are the same as those used in CFD charging (see section 7 above). But the calculation differs, because CM charging is based on Net Demand: Table 3: BM Units used in CM Net Demand Calculation BM Unit Type Supplier BM Unit (type G or S ) Embedded (type E ) Net Demand used in CM Charging? Yes Yes, unless the BM Unit is at premises occupied for the purposes of operating a How is Net Demand Calculated? BM Unit Metered Volumes. Both positive and negative values of BM Unit Metered Volumes will be used in the calculation, adjusted by GSP Group Correction Factor, Line Loss Factor and Transmission Loss Multiplier will not be applied. BM Unit Metered Volume. Both positive and negative values of the BM Unit Metered Volume will be used in the calculation, and Transmission Loss Multiplier will not be applied. 7 http://www.legislation.gov.uk/uksi/2014/3354/made V5.0 Page 8 of 13

BM Unit Type Transmissionconnected (type T ) Interconnector (type I ) Net Demand used in CM Charging? Licensable Generating Plant. Yes, unless the BM Unit is at premises occupied for the purposes of operating a Licensable Generating Plant. No How is Net Demand Calculated? Negative values of BM Unit Metered Volume. Positive values of BM Unit Metered Volume will not be used in the calculation, and Transmission Loss Multiplier will not be applied. Not Applicable 7.3 Is Transmission Loss Multiplier applied for CM charging? TLM is not applied to the Net Demand for CM charging. 7.4 How can Suppliers verify the calculation of Net Demand? Net Demand can be calculated from BM Unit Metered Volume: For Supplier BM Units (type G or S ) and Embedded BM Units (type E ), all values of BM Unit Metered Volume contribute to Net Demand; but For Transmission-connected BM Units (type T ), only negative values of BM Unit Metered Volume contribute to Net Demand. 7.5 What does an example of the calculation look like? To validate your understanding an example of how this calculation works can be located within Appendix 1. 8. Need more information? For more information, please visit our website www.emrsettlement.co.uk or email us at contact@emrsettlement.co.uk. 9. Acronyms and Definitions A list of acronyms and definitions can be found in the Acronyms and Definition document on our website 8. 8 https://www.emrsettlement.co.uk/documentstore/publications/acronyms-definitions.pdf V5.0 Page 9 of 13

10. Appendix 1 Example of CFD and CM Charging To validate your understanding here is an example of how to calculate your demand for EMR charging. Consider a hypothetical Supplier with four BM Units 9 as follows: BM Unit 1 (id 2 AXXXX000 ) is a Supplier BM Unit containing a number of customers (i.e. demand only); BM Unit 2 ((id 2 BXXXX000 ) is a Supplier BM Unit containing both customers and Embedded Generation; BM Unit 3 (id E_XXXX-1 ) is an embedded licence exempt power station; and BM Unit 4 (id T_XXXX-2 ) is a directly-connected exempt export power station. 10.1 Calculation of Gross Demand for CFD and CM 10 BM Units 1 and 2 are Supplier BM Units, and the calculation of Gross Demand therefore takes into account only those Consumption Component Classes (CCC) related to Active Import. For example, suppose that the D0296 11 data flow shows the following consumption data (in a given Settlement Period): Table 4: CCC related to the BM Units 1 and 2 CCC ID CCC Description Corrected Energy for BM Unit 1 1 Active Import (Half Hourly metered) 4 Active Import Losses (Half Hourly metered) (from data item J1638 or J1639 12 ) Corrected Energy for BM Unit 2 (from data item J1638 or J1639 13 ) 3,125.4273 MWh 478.1983 MWh 287.3191 MWh 32.6712 MWh 6 Active Export (Half Hourly metered) 8 Active Export Losses (Half Hourly metered) 18 Active Import (NHH profiled) 21 Active Import Losses (NHH profiled) 0 983.9812 MWh 0 75.3165 MWh 4,871.9513 MWh 393.8712 MWh 492.7134 MWh 40.6143 MWh Gross Demand is calculated by summing those CCCs corresponding to Active Import, which in this example is CCCs 1, 4, 18 and 21: BM Unit 1 (id 2 AXXXX000 ) is a Supplier BM Unit containing a number of customers (i.e. demand only); BM Unit 2 ((id 2 BXXXX000 ) is a Supplier BM Unit containing both customers and Embedded Generation; 9 Every Supplier is required to have at least fourteen Base BM Units (one per GSP Group). But to keep the example simple we only consider two Base BM Units. 10 CM charging for Financial Year and Delivery Year 2018/19 onwards uses Gross Demand. 11 https://dtc.mrasco.com/dataflow.aspx?flowcounter=0296&flowvers=1&searchmockflows=false 12 https://dtc.mrasco.com/searchflowsbydataitems.aspx 13 https://dtc.mrasco.com/searchflowsbydataitems.aspx V5.0 Page 10 of 13

BM Units 3 and 4 are CVA BM Units (and are not at premises occupied for the purposes of operating a Licensable Generating Plant), so their Gross Demand is calculated from any negative values of BM Unit Metered Volume (QMij). Any positive values represent generation, and are not included in the calculation. For example, suppose the BM Unit Metered Volumes are as stated in Table 5 below: Table 5: Metered Volumes for BM Units 3 and 4 BM Unit E_XXXX-1 T_XXXX-2 Metered Volume (QMij) 312.412 MWh -11.612 MWh The BM Unit Metered Volume for E_XXXX-1 is positive, representing generation, and is therefore not relevant to the calculation of Gross Demand. The BM Unit Metered Volume for T_XXXX-2 is negative, representing demand, and therefore this 11.612 MWh must be added in to the calculation. The final step of the Gross Demand calculation is to adjust all of the demand values for transmission losses, by applying the appropriate Transmission Loss Multiplier. For example, suppose that BM Units 1 to 3 are in off taking Trading Units (and the off taking TLM was calculated to be 1.0106512 in this half hour) 14 ; and BM Unit 4 is in a delivering Trading Unit (and was calculated to be 0.9901318 in this half hour). The value of Gross Demand for the Supplier in this half hour would be 9,837.8227 MWh, calculated as demonstrated in Table 6: Table 6: Illustrates the Gross Demand for the Supplier calculation BM Unit Demand (calculated as described above) TLM Loss-adjusted demand 2 AXXXX000 8777.4111 1.0106512 8870.9011 2 BXXXX000 945.355 1.0106512 955.4242 E_XXXX-1 0 1.0106512 0 T_XXXX-2 11.612 0.9901318 11.4974 GROSS DEMAND FOR SUPPLIER 9837.8227 MWh 10.2 Calculation of Net Demand 15 The Net Demand calculation differs from the Gross Demand calculation in two key respects: Any Active Export from Embedded Generation (but not transmission-connected generation) is netted off the demand (subject to a constraint that the Supplier s overall demand in the half hour cannot become negative); and Transmission losses are not applied. In the example given above, this means that CCCs 6 and 8 should be netted off the demand: For BM Unit 1: 3125.4273 + 287.3191 + 4,871.9513 + 492.7134 = 8777.4111 MWh For BM Unit 2: 478.1983 + 32.6712 983.9812 75.3165 + 393.8712 + 40.6143 = - 113.9427 MWh 14 In each half hour there are two values of TLM: one for BM Units in off taking Trading Units, and one for BM Units in delivering Trading Units. The SAA-I014 settlement report shows the relevant value for each BM Unit. 15 CM charging for Financial Year and Delivery Year 2017/18 and prior years uses Net Demand. Also, reconciliation invoices from settlement dates relating to prior Delivery Years continue to use Net Demand. V5.0 Page 11 of 13

However, in practice a Supplier would not need to calculate these values from the CCC data in the D0296 data flow, because central systems already do the calculation, and report the values as the BM Unit Metered Volume on the settlement report. For example, the BM Unit Metered Volume for BM Unit 1 (2 AXXXX000) would be -8777.411 MWh. For the CVA BM Units, both the 312.412 MWh of Active Export on E_XXXX-1 and the 11.612 MWh of Active Import on T_XXXX-2 are taken into account in the calculation. The net demand for the Supplier is therefore 8,362.668 MWh, calculated as follows: Table 7: Illustrates the Net Demand for the Supplier calculation for CM BM Unit QMij Demand 2 AXXXX000-8777.411 8777.411 2 BXXXX000 113.9427-113.943 E_XXXX-1 312.412-312.412 T_XXXX-2-11.612 11.612 NET DEMAND FOR SUPPLIER 8362.668 MWh Note however that if the metered volume for T_XXXX-2 had been positive, it would not have been taken into account (because the BM Unit is Transmission-connected). Lastly, Net Demand is capped at zero. In this example, if the Supplier was no longer the Lead Party on BM Unit 1 but retained BM Unit 2 it would led to an overall negative Net Demand value of - 414.743 but this would be set to 0. V5.0 Page 12 of 13