BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

RE: Docket No. UM 1953 In the Matter of PORTLAND GENERAL ELECTRIC COMPANY, Investigation into Proposed Green Tariff.


October 25, UM 1856 PGE's Plan to Advancing its Energy Storage Modeling Capability

Attention Filing Center:

In the Matter of Portland General Electric Company 2016 Integrated Resource Plan Docket LC 66

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Portland General Electric Company ) Docket No.

Net Variable Power Cost

UE 335 Net Variable Power Costs

Planning for Demand Response in PGE s IRP

May 12, In the Matter of Portland General Electric Co Integrated Resource Plan Docket No. LC 66

Excess BTM Production. Issue Paper

October 16, UM 1885 Osprey Solar LLC, Complainant vs. Portland General Electric Company, Defendant

October 16, UM 1886 Wapiti Solar LLC, Complainant vs. Portland General Electric Company, Defendant

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE 335 ) ) ) ) ) ) ) I. INTRODUCTION

Annual Electric Balancing Authority Area and Planning Area Report

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1832

EIM Tariff Changes Round 2

Comparative Analysis of Western EIM and NWPP MC Intra-Hour Energy Market Options

Attachment B Utilities and Transportation Commission Comments on Puget Sound Energy s Colstrip Study Docket UE

Operational Flexibility

UE 283 General Rate Case Filing For Prices Effective January 1, 2015

PGE Energy Imbalance Market (PGE EIM BP)

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE230 DISPOSITION: REQUEST ALLOWED WITH CONDITIONS

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

Puget Sound Energy s

BEFORE THE COUNCIL OF THE CITY OF NEW ORLEANS

ETON IRRIGATOR ADVISORY COMMITTEE

SUBMITTED VIA E-TARIFF FILING. March 1, 2017

Excise and Licenses Hearing Changes and Updates. Public Informational Meeting September 17, 2018

PUBLIC SERVICE COMMISSION OF THE DISTRICT OF COLUMBIA 1325 G STREET N.W., SUITE 800 WASHINGTON, D.C ORDER

Portland General Electric Request for Information (RFI): Providers of Utility Operable Energy Storage Systems

QUALITY REVIEW PROGRAM REVIEW OF FORENSIC ACCOUNTING ENGAGEMENT QUESTIONNAIRE

Proposed Amendment of 10A NCAC 26E.0603 Requirements for Transmission of Data

The AUC approval process for solar facilities in Alberta. Solar West 2017 Conference May 10, 2017 JP Mousseau, AUC Counsel

Citizens Utility Board of Oregon

September audit deficiency trends. acuitas, inc. concluding thoughts. pcaob s audit deficiencies by audit standard.

The National Deliberative Poll in Japan, August 4-5, 2012 on Energy and Environmental Policy Options

UE 335 Marginal Cost of Service

Regional Transmission Resources

Costing report: Lipid modification Implementing the NICE guideline on lipid modification (CG181)

Port of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter

Carbon Reduction Scheme Governance Structure

May 7, Dear Mr. Landa:

AUG Expert responses to issues raised by British Gas during the query period for the first draft 2017/18 AUG Statement, 14 March 2017.

Open Season Questions and Answers. Posted: November 26, 2013

Request for Proposals

AGREEMENT ON COMMON PRINCIPLES AND RULES OF CIRCULATION OF MEDICINAL PRODUCTS WITHIN THE EURASIAN ECONOMIC UNION. (Moscow, 23 December 2014)

MARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT

ISA 540, Auditing Accounting Estimates, Including Fair Value Accounting Estimates, and Related Disclosures Issues and Task Force Recommendations

NATIONAL INSTITUTE FOR HEALTH AND CLINICAL EXCELLENCE

December 4, 2017 VIA ELECTRONIC SUBMISSION

I. Introduction. A. My name is Scott Russell. I am a Specialist with the Structuring and Origination

CORINNE R. CLARK, Petitioner, THE INDUSTRIAL COMMISSION OF ARIZONA, Respondent, FRY S FOOD AND DRUG STORES OF ARIZONA, INC., Respondent Employer,

Noninvasive Glucose Monitors Devices, Technologies, Players and Prospects

Exhibit 2 RFQ Engagement Letter

Canadian Grain Commission

Statement from International Transfusion Medicines Experts

BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 283. Production O&M PORTLAND GENERAL ELECTRIC COMPANY. Direct Testimony and Exhibits of

The role of theory in construction management: a call for debate

OREGON PUBLIC UTILITY COMMISSION ANNUAL PERFORMANCE REPORT INTRODUCTION LETTER January 16, 2004

Before the Federal Communications Commission Washington, D.C

Company Overview February 26, 2019

UE 215 General Rate Case Filing For Prices Effective January 1, 2011

The Cigarette Market in Netherlands

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

DW PENNICHUCK EAST UTILITY, INC. Petition for Franchise Approval and Rates. Order Nisi Approving Franchise and Rate Petition

October 24, In the Matter of PORTLAND GENERAL ELECTRIC COMPANY s Request for a General Rate Revision Docket No. UE 197

UE 335 Revenue Requirement

Maria Teresa Scardigli Executive Director International Stevia Council. Stevia 2012 Conference 12 April 2012, London - UK

The Nutrition (Amendment) (EU Exit) Regulations 2018

Western Area Power Administration, Conditional Firm Transmission Service Business Practice

WISCONSIN ASSOCIATION FOR IDENTIFICATION NEWSLETTER

The pro bono work of solicitors. PC Holder Survey 2014

Alcohol & Drug Practice

European Stability Mechanism Guideline on Precautionary Financial Assistance

The Global Fund to Fight AIDS, Tuberculosis and Malaria Seventh Board Meeting Geneva, March 2004

EUROPEAN PARLIAMENT. Committee on Petitions NOTICE TO MEMBERS

BENCHMARKING REPORT. Read the results of a survey on cardiac CT angiography privileging. Help us to help you. The mission.

How to Conduct an Unemployment Benefits Hearing

Medicare Physician Fee Schedule Final Rule for CY 2018 Appropriate Use Criteria for Advanced Diagnostic Imaging Services Summary

Technology appraisal guidance Published: 28 September 2016 nice.org.uk/guidance/ta411

State of Rhode Island. Medicaid Dental Review. October 2010

SB365: Autism Health Insurance Reform

Building on Our Strengths

XXII: CTP Summarizes Scientific Case for Limiting Nicotine in Cigarettes. Company Update October 15, 2018 Industrial & Consumer Technology

Noninvasive Glucose Monitors to 2022

Business Impact Analysis

Measles Containing Vaccines. UNICEF Supply Division Industry Consultation Meeting January 2012

Physiotherapy Tender Questions and Answers

NSP 2016 WIND RFP QUESTIONS (UPDATED OCTOBER 21, 2016)

Structure and Practices of the Video Relay Service Program; Telecommunications Relay Services and

WCO Guidelines for the recognition of University Customs Curricula (2018)

An Overview of The CA Whole House Home Energy Rating System (HERS II) Presented by CalCERTS, Inc.

Interstate Interfacility Transport of a Patient with

Agency Information Collection Activities; Submission for Office of Management and Budget

NHS BEXLEY CLINICAL COMMISSIONING GROUP GOVERNING BODY FORMAL MEETING 25 th October 2012

Background EVM. FAO/WHO technical workshop on nutrient risk assessment, Geneva, May 2005, published 2006.

BSLBT RESPONSE TO OFCOM REVIEW OF SIGNING ARRANGEMENTS FOR RELEVANT TV CHANNELS

Transcription:

UM / PGE 00 Goodspeed - Jordan / Table of Contents I Introduction and Summary... II Response to OPUC Commission s Staff Comments... III Response to Renewable Northwest s Comments... IV. OSEIA s Comments and testimony related to Oregon s RVOS rate....

UM / PGE 00 Goodspeed - Jordan / I Introduction and Summary Q. Please State your name(s) and position with Portland General Electric ( PGE ) 0 0 A. My name is Jacob Goodspeed. I am a senior analyst in Pricing and Tariffs for PGE. My qualifications appear in the original testimony for the Resource Value of Solar in section PGE/00. My name is Tess Jordan. I am a senior analyst in Financial Forecasting and Economic Analysis for PGE. My qualifications appear in the original testimony for the Resource Value of Solar in section PGE/00. My name is Brett Sims. My position at PGE is Director of Strategy Integration and Planning My qualifications appear in the original testimony for the Resource Value of Solar in section PGE/00. My name is Darren Murtaugh. I am the Manager of Transmission and Distribution (T&D) Planning and Project Management at PGE. My qualifications appear in the original testimony for the Resource Value of Solar in section PGE/00. Q. What is the purpose of your testimony? A. Our testimony is in response to the testimony of Commission Staff (Ms. Andrus) as well as the witness from Renewable Northwest (RNW), Mr. Michael O Brien, and the testimony of the witness, Mr. R. Thomas Beach, representing Oregon Solar Energy Industries Association (OSEIA) in Docket No. UM. Docket No. UM has been established to determine the methodologies and processes to determine the Resource Value of Solar (RVOS) that PGE will calculate annually going forward. Our testimony will articulate the Company s response to the criticisms leveled against PGE s methods by

UM / PGE 00 Goodspeed - Jordan / 0 0 Staff and the other witnesses as well as offer further clarification related to PGE s proposed calculations to determine its RVOS going forward. Q. Please provide background and context for your testimony. A. The UM Docket was opened in December of 0 in response to Order No. - of Docket No. UM. Order No. - largely adopted the RVOS methodology proposed by Energy + Environmental Economics (E) to produce a -year marginal, levelized value for a generic small scale solar resource installed in 0. Order No. - also began Phase II of the RVOS process by establishing individual dockets for each utility (PGE, PacifiCorp and Idaho Power), to engage in developing their own RVOS rates and directed each utility to establish a utility specific RVOS rate. Docket No. UM outlines the specific attributes of PGE s calculations and methodologies used to create PGE s RVOS rate. Q. How is your testimony organized? A. We will first address the suggestions and criticisms of PGE s //0 testimony made by Commission Staff. After which, we will then take a look at the suggestions and criticisms made by RNW s Michael O Brien and finally, comment on the testimony submitted by Dr. R. Thomas Beach on behalf of OSEIA. Q. Can you please summarize your testimony as it relates to the criticisms directed against PGE s methodologies and calculations related to the RVOS rate PGE developed? A. Yes, please see below:

UM / PGE 00 Goodspeed - Jordan / Staff was critical of PGE s treatment of hydro variability averaging in the energy component of RVOS and requested that we develop separate variable integration costs for renewable wind and solar resources we model. Mr. Obrien from RNW is recommending that we add additional value to the capacity component during the utility s sufficiency periods. PGE takes exception to the methodologies employed by Mr. Beach in OSEIA s reply testimony.

UM / PGE 00 Goodspeed - Jordan/ II Response to OPUC Commission s Staff Comments 0 0 Q: Can you give a general overview of Staff s evaluation of the eleven elements of RVOS that PGE presented in direct testimony filed on December,, 0? A. Yes. Overall, Staff s feedback was constructive and supportive of the work done by PGE to develop RVOS. Of the eleven elements, Staff only had critical feedback on two issues; the hydro variability calculation in the energy component of RVOS, and requesting that PGE break out solar and wind as separate components of renewable integration costs. For the other nine elements, Staff was generally supportive of PGE s calculations and methods. Q: Can you describe how PGE approaches modeling for hydro variability in the energy component of the RVOS pricing model? A. In valuing energy, PGE modeled hydro variability consistent with its IRP. For PGE resources, PGE used the average generation across a -year hydro study to determine the simple average annual hydro conditions to be used to forecast hydro conditions going forward. For non-pge hydro resources, the variability within the Western Energy Coordinating Council is based on an average of U.S. Energy Information Administration (EIA) data that covers years of hydro conditions. PGE used the AURORAxmp model to develop energy prices given these and many other inputs. PGE did not utilize additional sampling techniques, or the creation of confidence intervals around the unweighted average. Q. How does Staff interpret the requirement that average energy price be represented under PGE s hydro conditions assumptions?

UM / PGE 00 Goodspeed - Jordan / 0 0 A. Staff asserts in its testimony that in the Pacific Northwest hydro conditions are a fundamental market driver of the value of energy. Staff also states that, there are complex interactions between hydro conditions and market prices. In order to capture the complex relationships, market price should be calculated separately under random sampling of hydro conditions. Staff also contends that with a random sample of hydro conditions, the average of the resulting market prices should provide an approximation of average market price under the entire distribution of hydro conditions. Q. Does PGE agree with Staff regarding this interpretation? A. Not entirely. PGE agrees with Staff that Pacific Northwest hydro conditions are one of many key drivers that determine the value of energy in the Pacific Northwest. However, PGE finds that Staff s proposal is not supported as providing improved accuracy of pricing and is not consistent with the methodology used in other dockets. Q: What reasons does PGE have to support using the simple average to model hydro variability? A. PGE does not agree that a random sampling of hydro conditions would produce a more meaningful approximation of the average energy price than using PGE s proposal. PGE finds that: Staff did not provide data supporting the claim that their proposal improved the accuracy of the pricing. Further, PGE notes that there are many elements that contribute to the forecast of energy prices, some of which are correlated. Simply sampling hydro conditions while holding other inputs frozen (regardless of their relationship to hydro Staff Exhibit 00/Andrus / Ibid

UM / PGE 00 Goodspeed - Jordan / 0 0 conditions) may serve to produce a less meaningful approximation of average energy prices. PGE notes that other key inputs to the AURORAxmp model assume average conditions. Staff s proposal for the treatment of hydro in developing average energy prices for RVOS differs from the treatment in other dockets such as the IRP and avoided cost. PGE proposes that the methodology of examining hydro conditions when developing energy prices should align with those already employed in the IRP and avoided cost. For these reasons, PGE recommends that Staff s proposal not be adopted. Q. In its reply testimony, OPUC Commission Staff was also critical that the variable integration costs that PGE included in the RVOS model. Can you please address why PGE used these costs? A. Yes. PGE used the integration costs found in the Company s most recently acknowledged IRP. The Variable Energy Resource (VER) study produced a combined wind and solar integration cost of $0./MWh (0$). As the most recently completed study, this was determined to be the best information available. Q. Staff believes PGE should develop a method for allocating VER integration costs to specific variable resource types. Will PGE be developing VER integration costs capable of modeling only solar resources in the near future? A. Yes. PGE is currently developing an integration cost study that will address both incremental solar and incremental wind resources separately. PGE intends to include this study in the 0 IRP

III Response to Renewable Northwest s Comments UM / PGE 00 Goodspeed - Jordan/ 0 Q. Did the witness for RNW take exception to PGE s methodology for any of the ten elements that were presented in PGE s RVOS testimony? A. Yes, Mr. Obrien (RNW/00, O Brien/) disagreed with PGE s modeling decision to assign no value to capacity during the sufficiency period stating As I testified in UM, a capacity value of zero would undervalue the RVOS during the sufficiency period because solar systems provide a Generation Capacity benefit even in years when they may not help displace the procurement of a capacity resource. Q. Did the Commission provide specific instructions regarding how to calculate the avoided cost of capacity during the sufficiency period? A. Yes. In Order No. -, the Commission directed the utilities to provide capacity value and timing (deficiency date) in line with their current approved standard nonrenewable Qualified Facilities (QF), Schedule 0 avoided cost capacity value. For PGE s Tariffed Schedule 0 Standard Non-Renewable Avoided Cost rates, the Commission determined that PGE s sufficiency period for capacity resources extends through 00. Given this, no value was assigned to capacity as outlined in the current approved standard. UM RNW/00, O Brien/, //0 Order No., pg.

UM / PGE 00 Goodspeed - Jordan / IV. OSEIA s Comments and testimony related to Oregon s RVOS rate. 0 Q. Do you have any comments on the testimony and recommendations that Mr. Beach made on behalf of OSEIA? A. Yes. The OSEIA testimony recommends real levelized RVOS values in Table ES- that are twice the values that the utilities derived individually. It appears that Mr. Beach arrives at these inflated calculations for RVOS by applying a single utility s value to the other utilities, regardless of applicability. He employs methodologies that utilities do not employ, and that are not considered best practice, such as calculating the hedge value of avoided fuel costs for a gas turbine for a full -year period to estimate the avoided hedge value of solar. Q. How did Mr. Beach arrive at such high values for RVOS? A. Depending on the factor, it appears that Mr. Beach used either the highest individual factor amount that a utility used to calculate its own RVOS or brought additional elements into the calculation that would increase the factor s value. It appears he did not take into consideration the unique aspects of each utility. Below is a list of each RVOS factor and how OSEIA inflated each value. 0 Avoided Energy: OSEIA picked PAC s approach, which shapes hourly prices using the regional Energy Imbalance Market. This does not make sense for PGE due to two distinct reasons; ) PGE does not use the EIM for large amounts of energy trades, and ) PGE typically uses EIM trades for shorter-term imbalance issues (primarily and UM OSEIA/00, Beach / pg. i

UM / PGE 00 Goodspeed - Jordan/ 0 0 0 -minute markets). EIM does not accurately represent PGE s hourly energy avoided costs. Generation Capacity: OSEIA advanced the resource balance year by four years prior to when each of the IOU s will need capacity. This modification over-compensates for the distributed generation asset s capacity contribution, and does not adhere to Order No. -, as discussed above. Avoided T&D: OSEIA chose to adopt PGE s methodology, without exploring why IPC and PAC developed different methods, and applied it across all three utilities because it, again, created the highest value of RVOS. Avoided Line Losses: OSEIA used marginal line losses as opposed to average line loss factors for all of the utilities. To compensate for the difference in methodology, Mr. Beach increased the line loss factor by 0%. We find this adjustment unreasonable and unjustified. There is no calculation to support a 0% line loss adjustment as it relates to PGE. Administration Charges: Without considering that each utility has a different way of allocating administration charges, OCEIA used PAC s administration factor as it was the smallest of the three ($.0). This is less than half of what PGE calculated ($.) and does not consider that system costs are unique to each utility. Again, the OSEIA method simply applies these lower costs to all three utilities which is inappropriate and arbitrary. Integration: Mr. Beach accepted the IOU s integration charges so we do not have a comment on this.

UM / PGE 00 Goodspeed - Jordan / Market Price Response: OSEIA accepts PGE s calculations for this factor and applies it to all of the utilities, even though we are all operating with different amounts of solar penetration and have different capacity factors in our respective market areas. OSEIA cites that the PGE benefit amount is close to the MPR in the New England Independent System Operators Market. Although we accept that the value that we use is acceptable to OSEIA, we do not agree that it is appropriate to use the market price response values of PGE in PAC or Idaho s markets. 0 Hedge Value: The factor that the utilities were told to use by the OPUC was a % factor. OSEIA used a hedging value that was developed for the Maine Public Utilities Commission that hedged a natural gas turbine for a full years of operation. The hedge was not for a more typical one or four-year term. A -year term has a very large risk premium associated with it, as not many traders take a -year position on a standard commodity hedge. Because of this non-standard approach, the hedge value is exaggerated. Environmental Compliance: Again, without concern for the different state environmental laws or potential rules faced by the three IOU s operating in different states, OSEIA took the highest value for environmental compliance and applied it to all three utilities. 0 Q. Does this conclude your testimony? A. Yes.