THE UNIVERSITY OF ALABAMA FUME HOOD MANAGEMENT PLAN

Similar documents
Laboratory Ventilation Policy

STANDARD OPERATING PROCEDURES (SOP) FOR CARCINOGENS

Personal Protective Equipment:

No. GA Page 1 of 7 Effective Date: 03/04/ CFR (c), ANSI/ISEA Z TITLE: Chancellor Date: 03/04/16

2016 EHS Annual review

LEAD SAFETY PROGRAM. Purpose. Scope. Responsibilities. Southern Heat Exchanger Services Safety Program

Environmental Health and Safety. Hearing Conservation Program

Laboratory Orientation and Safety

HEARING CONSERVATION PROGRAM

ADMINISTRATIVE SERVICES MANUAL

Environmental Health & Safety Policy Manual

OKLAHOMA STATE UNIVERSITY X-RAY MACHINE PROGRAM AND PI HANDBOOK For easy navigation, please use Adobe s bookmark feature.

Environmental Health & Safety Policy Manual

Hearing Conservation Plan

Hearing Conservation Program

Carcinogens STANDARD OPERATING PROCEDURE (SOP) Click here to enter a date. REQUIRED - Insert Preparer's Name CLSC SOP Task Force

In this issue of the Environmental Health and Safety (EHS) Listserv, January 16, 2014:

Hearing Conservation Plan

Occupational Health & Safety in the Animal Care and Use Program

Hearing Conservation Program. Santa Clara University 500 El Camino Real Santa Clara, CA 95053

Radiation Safety Refresher Training for Prepared by Sue Dupre Radiation Safety Officer

Safety Committee Prototypical Safety Program Manual

HEARING CONSERVATION PROCEDURE

Report on Exposure to Animal Allergens in the Biomedical Research Facility March 21, 2003

SOUTHERN UTAH UNIVERSITY S WRITTEN HEARING CONSERVATION PROGRAM December 2017

HEARING CONSERVATION PROGRAM

RADIATION MANAGEMENT PLAN EXPLANATORY NOTE

SUBJECT: Management of Human Body Fluids/Waste (Bloodborne Pathogens)

Hearing Conservation Program

Procedure Number 310 TVA Safety Procedure Page 1 of 6 Hearing Conservation Revision 0 January 6, 2003

Safety Training Topic ASBESTOS SAFETY

AMENDATORY SECTION (Amending WSR , filed 10/10/95, effective 11/10/95)

Quality Assurance and Radiation Protection Manual for Non-Human Use Radiation Generating Equipment

Center for Vaccine Biology and Immunology. Cell Sorting Facility Laboratory Safety Manual. Updated: January 25, 2012

Hearing Conservation Program April 27, 2018

Radiation Safety for Safety Wardens

This program is designed to prevent hearing loss for students, staff and employees while engaged in universitysponsored

LEAD PAINT AWARENESS FOR THE DIVISION OF OPERATIONS AND FACILITIES. February 23 & 24, 2010

IARC - International Agency for Research on Cancer - Classifies carcinogens in the following manner:

Lab-Specific Standard Operating Procedure (LSOP)- Picric Acid (2,4,6-Trinitrophenol) and Solutions Containing Picric Acid

Administrative Procedure

Biosafety Level 2 Standard Practices and Containment Office of Research Safety Affairs

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HEARING CONSERVATION PROGRAM

Hearing Conservation Program

Eyewash & Emergency Shower Equipment (Plumbed) Academic Affairs Laboratories of Ferris State University

TIP NO AEROSOLIZED DRUGS TECHNICAL INFORMATION PAPER NO PURPOSE.

Eyewash and Safety Showers HM 20 Page 1

Section 7 ALARA Program

Harvard University Exposure Control Plan

Vision Painting Inc. Safety Management System

Lean and Environment Training Modules Version 1.0 January 2006

Hearing Conservation Program Evaluation Checklist

Intel Supplier EHS Performance Requirements

Bloodborne Pathogens Training (OHS_BIO500) Course Material

San Diego Community College OSHA Standards

MILLENIUM SCIENCE COMPLEX

Delaware State University

Occupational Exposures to Bloodborne Pathogen (BBP) Training

Hearing Conservation Program

Hearing Conservation Program Regulations and Recommendations Summary

HEARING CONSERVATION PURPOSE

NOISE & HEARING CONSERVATION PROGRAM YALE UNIVERSITY

Hearing Conservation Program Table of Contents

HEARING LOSS PREVENTION PROGRAM AND PROCEDURES

Workplace Noise and Vibration Risk Management

ASTRAZENECA SAFETY, HEALTH AND ENVIRONMENT (SHE) GLOBAL STANDARD Workplace Noise and Vibration Risk Management

Preventing Slips, Trips, and Falls at Allegheny Valley School

Best Practices for Lab Specific Chemical Hygiene Training Refresher

East Carolina University

Drew University Bloodborne Pathogens Exposure Control Plan and Procedures

AMBULANCE DECONTAMINATION GUIDELINES SUSPECTED INFLUENZA PATIENT

Santa Clarita Community College District HEARING CONSERVATION PROGRAM. Revised

Use of Controlled Substances in Research.

Hearing Conservation Program

Biosafety Level 3 (BL3)

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

NANDTB-F012 Rev 0 Audit Checklist

Pursuant to section 24 of the Nuclear Safety and Control Act, this licence is issued to:

Hearing Conservation Program

Laboratory Animal Allergen (LAA) Exposure Control Program

NC Employees Workplace Program Requirements for Safety and Health. Hearing Conservation

Bloodborne Pathogens Exposure Control Plan

Environmental Health & Safety

OH 102. Communication Training. Pickle Research Campus CEER, Building 133 Labs: 1.502A&B, 1.504, 1.704

ENVIRONMENTAL AND OCCUPATIONAL HEALTH AND SAFETY SERVICES

Hearing Conservation Program

ARKANSAS STATE UNIVERSITY GOVERNING PRINCIPLES FOR THE USE OF CONTROLLED SUBSTANCES IN RESEARCH

(cf / / Exposure Control Plan for Bloodborne Pathogens)

Infection Control Manual Residential Care Part 2 Infection Control Program Guidelines IC3: CCHSA Standards

Radiation Safety Guide. Analytical X-Ray Equipment

Effective Airflow Visualization Studies. Gordon Farquharson, July 2017

UCSD HEARING CONSERVATION PROGRAM Environment, Health & Safety (EH&S) and Center for Occupational & Environmental Medicine (COEM) 2017

EHS Guide: Laboratory Trash Removal

Naval Support Activity Monterey / Naval Postgraduate School

ISOFLURANE SAFETY GUIDELINES

Asbestos Awareness Training Environmental Health and Safety. Home Page

North Dakota State University Noise/Hearing Conservation

Hearing Conservation Program

UC Merced Hearing Conservation Program

Radiation Safety Refresher Training for 2017 PREPARED BY SUE DUPRÉ RADIATION SAFETY OFFICER

Transcription:

THE UNIVERSITY OF ALABAMA FUME HOOD MANAGEMENT PLAN ENVIRONMENTAL HEALTH AND SAFETY 410 CAMPUS DRIVE EAST BOX 870178 TUSCALOOSA, ALABAMA 35487 (205)348-5905

Table of Contents 1. Scope...3 2. Purpose.3 3. Principle Investigator (PI) Responsibilities. 3 4. Laboratory Personnel 4 5. Environmental Health & Safety Office...5 6. Chemical fume hood surveys 5 7. Use of chemical fume hoods.6 8. Removing chemical fume hoods from service..7 9. Roof work where chemical fume hoods are located.7 10. Chemical fume hood system malfunction.8 11. Hood system design, selection and installation 8 12. Air flow indicator device calibration 9 13. Chemical fume hood hibernation.9 A. Appendix A Fume Hood Warning Sign..10 2

1. SCOPE 1.1 The Chemical Fume Hood Plan applies to all chemical fume hoods located at The University of Alabama. It does not apply to biological safety cabinets, snorkels, canopy hoods or other laboratory ventilation devices. 2. PURPOSE 2.1 Chemical fume hoods are critical pieces of safety equipment used to protect laboratory personnel throughout UA. When properly installed, maintained and used, chemical fume hoods can provide protection from hazardous fume associated with chemical use. When not properly installed, maintained and/or used, the health and safety of laboratory personnel, maintenance personnel, and university personnel in general can be severely compromised and research efforts can be hindered. 2.1.1. Fume hoods for new construction are installed according to construction specifications and tested based on manufacturer s recommendations and the current (at time of construction) ASHRAE 110: Method of Testing Performance of Laboratory Fume Hoods standard as part of building commissioning. EHS will take responsibility for routine fume hood certification after The University of Alabama assumes ownership of the fume hood. 2.1.2. Fume hoods are sometimes installed in existing construction during remodeling or renovation activities. These are to be installed according to construction specifications and tested based on manufacturer s specs and the current (at time of construction) ASHRAE 110: Method of Testing Performance of Laboratory Fume Hoods standard as part of building commissioning. EHS will take responsibility for routine fume hood certification after The University of Alabama assumes ownership of the fume hood. 3. PRINCIPLE INVESTIGATOR (PI) RESPONSIBILITIES 3.1. Principle Investigators (PIs) are responsible for the spaces designated for them or their lab groups. 3.1.1. Ensure that personnel in your lab have been trained on how to properly use chemical fume hoods safely and effectively (see section 5). 3.1.2. Ensure that personnel in your lab know how to respond in the event that chemical fume hood air flow has been compromised (see section 10). 3.1.3. Ensure that personnel in your lab have access to proper personnel protective equipment. 3.1.4. Ensure that chemical fume hoods have been appropriately cleaned and decontaminated prior to requesting a fume hood be removed from service or prior to relinquishing lab space. This process must be approved by EHS per the UA Decommissioning Guidelines. 3

3.1.5. Contact EHS if chemical fume hoods are going to be taken out of service for any reason. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 3.1.6. Ensure that personnel in your lab are not using chemical fume hoods that are not functioning properly. 3.1.7. Ensure that chemical fume hoods are not being used for excessive storage of Hazardous or Unwanted Chemicals. These items should be stored in an approved cabinet or location designated for the collection of unwanted materials. 3.1.8. Ensure that any airflow indicating devices on the chemical fume hoods are working properly. 3.1.9. Ensure that EHS is contacted if a chemical fume hood is not working or not functioning properly. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 4. LABORATORY PERSONNEL 4.1 Laboratory Personnel includes anyone who works in the lab regardless of employment classification or university association (student, visitor, etc.) 4.1.1 Report all chemical fume hood deficiencies to your supervisor and to EHS immediately upon identification. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 4.1.2. Utilize proper and safe work practices as related to chemical fume hoods. 4.1.3. Do not use chemical fume hoods when posted with a danger magnet. (See Appendix A). 4.1.4. Do not use chemical fume hoods for storage of Hazardous or Unwanted Chemicals unless approved by EHS. 4.1.4. Wear research appropriate personal protective equipment. 4.1.6. Environmental Health and Safety-Contact: Marcy Huey 205-561-4789 Andrea Davidson 205-361-0079 Mitch Yerby 205-331-1069 4.1.7. Communicate pertinent information to all affected lab personnel and EHS employees related to compromised airflow or work on chemical fume hoods. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 4.1.8. Before using any chemical fume hoods that have been previously submitted for repair, ensure that work required to correct chemical fume hood deficiencies is completed. 4.1.9. If scheduling any routine maintenance work, schedule in a manner which is least disruptive to building occupants. Contact EHS if work involves changes to the mechanical systems or controls. 4

4.1.10. Notify EHS when a chemical fume hood has been repaired so that the chemical fume hood can be recertified for operation. 4.1.11 EHS will assess any reported issues and coordinate with a Facilities representative whenever assistance is required 5. ENVIRONMENTAL HEALTH & SAFETY OFFICE 5.1. EHS personnel are responsible for checking and certifying that chemical fume hoods are functioning according to manufacturer specifications and installation certification. 5.1.1. Ensure that chemical fume hoods are checked according to the most current version of ASHRAE 110: Method of Testing Performance of Laboratory Fume Hoods on an annual basis. 5.1.2 Post a magnet found in Appendix A for all chemical fume hoods that do not have adequate airflow. 5.1.3. Monitor the chemical fume hood program to ensure compliance with this plan and that the appropriate procedures are being performed. 5.1.4. Provide training on the proper use of chemical fume hoods and the different chemical fume hoods systems in use. 5.1.5. Review all requests to hibernate a fume hood when it will be out of use for more than 90 days. Coordinate systems review with other UA personnel to determine if these requests can be approved. 5.1.6. Review and revise this plan when necessary. 5.1.7. Maintain a database of chemical fume hoods, lab contacts, and Principle Investigators. 5.1.8. Maintain a database of all testing results and repair requests for all fume hoods. 5.1.9. All hazard control ventilation system plans/blueprints/change orders are reviewed by EHS to ensure the safety of these systems. 6. CHEMICAL FUME HOOD SURVEYS 6.1. All chemical fume hoods will be surveyed by EHS personnel on an annual basis to ensure that adequate airflow is being provided and to ensure that the chemical fume hoods are being properly used. 5

6.1.1. Fume hood testing procedures will be based on the most recent version of ASHRAE 110: Method of Testing Performance of Laboratory Fume Hoods. Pass or Fail criteria will be based on the guidelines provided by the NIH guidelines for Fume Hood Requirements and Testing. 6.1.2. This survey will be conducted by EHS personnel in all UA buildings. 6.1.3. Traditionally, chemical fume hoods have been required to have a face velocity of 100 feet per minute (fpm) with an acceptable range of 80 120 fpm. High Efficiency hoods can range from 50-100 fpm, depending on calibration settings and configuration. Regardless of type, each hood is calibrated and tested for optimal performance. 6.1.4. EHS will perform a radiation survey on chemical fume hoods used for radioactive materials annually and prior to the chemical fume hoods removal from the lab. 6.1.5. During annual surveys, a risk assessment will be performed on any hood that fails certification testing. If the hood is not being used for hazardous materials and can safely be used for the materials involved (heat generation, odoriferous but not dangerous items, etc.), then the fume hood will remain in service. Lab personnel are responsible for notifying EHS if the intended use of this hood changes, so the risk assessment can be repeated to determine if the hood must be taken out of service for further assessment or repairs. 6.1.6 Where surveys show that a chemical fume hood is deficient in a manner which could compromise the safety of the occupants of the lab, EHS personnel will notify the PI and/or the laboratory occupants immediately. A danger magnet will be posted on these hoods (See Appendix A) until repairs can be completed and the hood successfully passes certification. 6.1.7. During annual surveys, any chemical fume hood found in a lab that is not in use will not be surveyed. This hood will be secured and EHS should be contacted before the lab is occupied. A survey will be conducted before new occupants being work in the lab space. 6.1.8. Any hood that cannot be repaired or brought into acceptable certification parameters will be secured and marked as out of service. At this point, EHS will contact UA personnel to assess alternatives for work involving the chemical fume hood. 7. USE OF CHEMICAL FUME HOODS 7.1. Chemical fume hoods shall be used in a safe manner, in accordance with standard safe work practices and manufacturers recommendations. Safe work practices include but are not limited to the following: 7.1.1. Wear appropriate personal protective equipment when working with chemicals such as eye protection, gloves, closed toe shoes and lab coats. 7.1.2. Always make sure that the chemical fume hood is functioning properly prior to use. Verify the controls are not in alarm or there are no alerts on control panels (if provided). 6

7.1.3. Keep sash height at the designated position of 18 inches or lower while working in the hood. When working in a hood with sliding panels make sure to slide panels in front of your torso and work with your arms around the panels to increase personal safety. 7.1.4. Do not use chemical fume hoods for excessive storage of Hazardous or Unwanted Chemicals unless approved by EHS. 7.1.5. Keep items in chemical fume hood at least six inches from the front of hood (sill) to ensure that contaminants are captured. 7.1.6. Do not place or store large pieces of equipment or supplies in chemical fume hoods when working with hazardous chemicals. This equipment can cause disruptions in air flow compromising the effectiveness of the chemical fume hood. 7.1.7. If equipment is to be placed in chemical fume hood, place it on a stand which allows air to flow under the equipment. 7.1.8. Do not use chemical fume hoods to evaporate unwanted solvents or spills. This act is potentially an EPA violation. This material should be cleaned up and disposed of properly through the unwanted chemical pick up via the Environmental Health & Safety office. 7.1.9. Doors and windows should remain closed at all times in rooms with chemical fume hoods to reduce air turbulence and maintain proper air pressure differences. 8. REMOVING CHEMICAL FUME HOODS FROM SERVICE 8.1. When a chemical fume hood is going to be taken out of service, the Principle Investigator must first ensure that all hazardous agents have been removed and the hood has been properly cleaned, disinfected, and decommissioned per UA Decommissioning Guidelines. Once the fume hood is decommissioned please notify EHS. 8.1.1 If radioactive materials have been utilized in the chemical fume hood, it must be surveyed for radioactive material by the Principle Investigator and by the RSO to ensure that the chemical fume hood has not been contaminated by radioactive material. Once EHS releases the chemical fume hood, it can be removed. 9. ROOF WORK WHERE CHEMICAL FUME HOODS ARE LOCATED 9.1. In the event that UA employees need to conduct work activities on the roof of any building containing chemical fume hood exhaust(s), these employees will notify all contacts for affected areas to inform them of the time frame of the work to be conducted. 9.1.1. The individuals completing the work will then post all chemical fume hoods that lead to all risers producing airstreams through which they may pass while completing the work. The sign to be utilized can be found in Appendix A. 7

9.1.2. Work should not be performed on the roof of any building containing chemical fume hood exhaust(s) without occupant coordination and EHS notification. This ensures that acutely hazardous materials will not be part of the exhaust stream during the duration of work. 9.1.3. UA personnel should not interrupt air exhaust for chemical fume hoods without first notifying the occupants and determining the time needed to shut down any experiments occurring in the hoods. This protects the laboratory personnel from chemical contamination caused by a lack of ventilation or carried on airflow disruptions back into the lab room. 10. CHEMICAL FUME HOOD SYSTEM MALFUNCTION 10.1. In the event of a chemical fume hood malfunction, the person first recognizing this problem must contact EHS immediately. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 10.1.1. EHS must treat these concerns as high priority. 10.1.2 When EHS is notified of a deficient chemical fume hood, EHS will visit the reported fume hood to inspect the reason or reasons for the malfunction and take the appropriate actions to return the fume hood to proper functioning. 10.1.3. It is imperative that the necessary information be communicated to EHS personnel about activities or observations that might have impacted the hood performance. In the event that the airflow of any chemical fume hood must be further disrupted or compromised, it is imperative that EHS personnel communicate with the lab occupants and anyone else who might be impacted. 10.1.4. Prior to any repairs being conducted, the EHS employee performing the work will contact the lab to notify lab personnel of work and to post signage regarding the state of the chemical fume hood. If no lab personnel are available, these signs will be posted on the fume hood of the affected lab. The sign to be utilized can be found in Appendix A. 10.1.5. Once repairs or maintenance has been completed, the EHS employee who posted this information will remove these signs. 10.1.6. EHS will test the chemical fume hood to ensure they meet current ASHRAE 110 standard. 10.1.7. If approved, EHS will notify Lab personnel that the chemical fume hood may be utilized. 11. HOOD SYSTEM DESIGN, SELECTION, AND INSTALLATION 11.1. Facilities Maintenance and/or Construction Administration must notify EHS of any changes to be made in any hazard control ventilation systems including chemical fume hoods. 11.1.1. The proper type of chemical fume hood must be selected to protect laboratory occupants from the hazards associated with their research. 8

11.1.2. Chemical fume hoods must always be installed per lab design guidelines and tested according to ASHRAE 110 standards. 12. AIR FLOW INDICATOR DEVICE CALIBRATION 12.1. Many chemical fume hoods are equipped with air flow indicator devices, as well as audible and/or visual alarms to indicate airflow disruptions. 12.1.1. Chemical fume hoods monitors are checked by EHS for air flow calibration accuracy and adjusted as needed. 12.1.2. Alarms on air flow indicator devices indicate a disruption in the fume hood s ability to capture and contain potential contaminants. These should be reported to EHS (see section 10 of this document). 13. CHEMICAL FUME HOOD HIBERNATION 13.1. If a fume hood in a laboratory is not being used, the PI can contact EHS to request that the fume hood be hibernated. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. 13.1.1. Hibernation requests will be assessed by EHS personnel, in connection with Facilities (HVAC and Energy Management) as well as Construction Administration (Mechanical Engineering). 13.1.2. Hibernation requests must be for a period of more than 90 days to be considered. 13.1.3. Approval of hibernation requests is based upon the systems and engineering controls within each building. Not all hoods are candidates for hibernation. 13.1.4. If a hibernation request is approved, the hood will be closed and secured and building controls will be adjusted in such a way to allow minimal or zero airflow through the fume hood while maintaining required building balance and pressurization. 13.1.5. EHS will maintain a log of all hibernation requests and their status. 13.1.6. Anyone wishing to begin work in a hibernated hood should contact EHS. Fume Hood Service Requests can be submitted on the EHS webpage, ehs.ua.edu. EHS will coordinate with Facilities (HVAC and Energy Management) as well as Construction Administration (Mechanical Engineering) to return the hood to service. EHS will survey the hood to certify that it is functioning in an acceptable manner. 13.1.7. Once a hood is released from hibernation, the PI will be contacted and allowed to begin regular hood use. 9

APPENDIX A. 10