SMIP Effective Switching. 3 January 2013

Similar documents
igt RPC Invoice Template Document

igt RPC Invoice Template Document

XOSERVE LIMITED SERVICES SCHEDULE FOR THE PROVISION OF NON-CODE USER PAYS SERVICES (REFERENCE NUMBER XNCUP(SS)06) DATED 20 INTRODUCTION

igt s New Connections Domestic Sites Only January 2017 Version 1.2

Joint Office of Gas Transporters 0209: URolling AQ

Project Nexus Workgroup Outstanding Areas Log - Closed

Business Requirements Definition. Project Nexus

IGT UNC Modification Workstream Meeting 18-06

DSC Delivery Sub-Group 08/05/2018

Annual Quantity (AQ) & Read processes. Lee Jackson / John Harris / Rachel Hinsley

UNC Unidentified Gas (UIG) Workgroup 28th January Xoserve UIG Task Force recommendations and discussion of next steps

AUG Expert responses to issues raised by British Gas during the query period for the first draft 2017/18 AUG Statement, 14 March 2017.

Project Nexus Workgroup AQ calculation. 7 th April 2015

Reconciliation by Difference (RbD) - Initial thoughts

BREEAM In-Use International 2015 Client User Guide

A New Participant s Guide to CVA Qualification

Project Nexus Market Trials Regression Test Approach

Autocount GIRO plugin enable you to upload your E-banking payment instruction in a

BSC Committee updates on EMR

What are WAR bands? How and when are they derived? How can they be challenged? Page 1

2017 FDA Food Code. FDA/CFSAN Retail Food Policy Team

Consob Net Short Positions ( NSP ) Notification System. User Manual

UNC Unidentified Gas (UIG) Workgroup Minutes Tuesday 28 August 2018 at Radcliffe House, Blenheim Court, Warwick Road, Solihull B91 2AA

PERFORMANCE CRITERIA FOR ACCESSIBLE COMMUNICATIONS ENTRY SYSTEMS

Intel Supplier EHS Performance Requirements

Analysis of Meter Reading Validation Tolerances proposed by Project Nexus

TARGET Instant Payment Settlement TIPS. Connectivity Guide 1.0. Version 1.0 Date 08/12/2017. All rights reserved.

ONR GUIDE. The Role of the UK National Coordinators for International Operating Experience Report Systems. ONR-OPEX-GD-003 Revision 3

Implementation Guide for the DoseControl Dosimetry System

G2 Calculation of Supplier Demand for EMR Charging

1. PERSON-CENTRED ASSESSMENT AND PLANNING

REFERENCE CP_TSSPEC_273 0 DATE: OCTOBER 2018 PAGE: 1 OF 33 SPECIFICATION FOR PROTECTIVE LABORATORY PPE TABLE OF CONTENTS

WFS. User Guide. thinkwhere Glendevon House Castle Business Park Stirling FK9 4TZ Tel +44 (0) Fax +44 (0)

UPPER MISSOURI DISTRICT HEALTH UNIT REGULATIONS FOR TANNING FACILITIES

Control of Substances Hazardous to Health (COSHH) Regulations 2002

Generic Drug User Fee Amendments of 2012; Regulatory Science Initiatives; Public Hearing;

Feidhmeannacht na Seirbhíse Sláinte

TARGET Instant Payment Settlement TIPS. Connectivity Guide 0.9. Version 0.9 Date 06/10/2017. All rights reserved.

2014 New York City Construction Codes. January 20, 2015

Monitoring PEPFAR Program Expenditures

Epilepsy Sensor Transmitter

AudioConsole. User Guide. Doc. No EN/01 Part No EN

Graphical User Interface for Windows for MCM Module

HEARING CONSERVATION PROCEDURE

OBLIGATIONS OF AIRPORTS TO PROVIDE COMMUNICATION ACCESSIBILITY TO DEAF AND HARD OF HEARING PERSONS

Increasing the supply of Reseller Identification Codes (RIDs) A statement on ensuring there are sufficient RID administrative codes

How to use AutoFit (IMC2) How to use AutoFit (IMC2)

Product Model #: Digital Portable Radio XTS 5000 (Std / Rugged / Secure / Type )

Scientific Working Group on Digital Evidence

IRMER Ionising Radiation Medical Exposure Regulations

IT and Information Acceptable Use Policy

PHM-100 PORTABLE HANDHELD TRANSDUCER INDICATOR OPERATORS MANUAL. Transducer Techniques R

HEARING CONSERVATION PURPOSE

Meeting of the EU GLP Working Group, February GLP requirements in EU legislation and guidance medical devices

EHR Developer Code of Conduct Frequently Asked Questions

BEST PRACTICE CHANGE CONTROL : DECIDING WHEN TO SUBMIT A 510(K) FOR A DEVICE CHANGE. Yuan Xu 18- JAN- 2018

TARGET Instant Payment Settlement

AUTOMATIONWORX. User Manual. UM EN IBS SRE 1A Order No.: INTERBUS Register Expansion Chip IBS SRE 1A

Survey questionnaire on STI. surveillance, care and prevention. in European countries SAMPLE APPENDIX

ISA 540, Auditing Accounting Estimates, Including Fair Value Accounting Estimates, and Related Disclosures Issues and Task Force Recommendations

Medical - Combined Medical Devices Guideline

Eyewash and Safety Showers HM 20 Page 1

WHO Prequalification of In Vitro Diagnostics PUBLIC REPORT. Product: OraQuick HIV Self-Test WHO reference number: PQDx

DTERM SP30 and SP350. Not applicable

Data Management, Data Management PLUS User Guide

ISO and the Delivery of Competent NDT Services

User Guide. For Jacoti Hearing Center Version 1.1. Manufacture Year 2016

ALL INDIA INSTITUTE OF SPEECH AND HEARING, MYSURU E-PROCUREMENT NOTIFICATION FOR SUPPLY OF

REQUIREMENTS SPECIFICATION

Software Version 2.0. User s Guide

WHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA. In Aurora

HEALTH MANAGEMENT SYSTEM NUTRITION MODULE TABLE OF CONTENTS

LabVIEW PROFIBUS VISA Driver DP-Master

26 October 2000 DAT REPORT Page : 1/8

Page 1 of 7 ADDENDUM NO. 2. September 19, Provision of Blood Glucose Monitors and Consumables RFP # H General

Hearing Conservation Program

Cerus P-Series General Specifications Section 15172

Key Performance Indicators to Direct Audit Plans

CHAPTER 7 SECTION 24.1 PHASE I, PHASE II, AND PHASE III CANCER CLINICAL TRIALS TRICARE POLICY MANUAL M, AUGUST 1, 2002 MEDICINE

SW Advanced Speech Time Control Module. SW 6000 Conference Management Software, Version 6.3

WELSH INFORMATION GOVERNANCE & STANDARDS BOARD

DTSS Online Application Suite User Manual. Version 1.2

IONISING RADIATIONS REGULATIONS 2017 REGULATIONS 5, 6, AND 7. NOTIFICATION, REGISTRATION AND CONSENT

Reliability. Scale: Empathy

UK National Aerospace NDT Board

CLASSIFICATION OF AEROSOLS FOR COMAH APPLICATION

Gesture Recognition using Marathi/Hindi Alphabet

XRDUG Session II Edward Laitila 2/7/2009

Feidhmeannacht na Seirbhíse Sláinte

Dental Intraoral X-ray Systems

Global Harmonization Task Force SG3 Comments and Recommendations ISO/DIS 9001: 2000 and ISO/DIS 9000: 2000 And Revision of ISO and 13488

Chapter 18 Section 2. EXPIRED - Department Of Defense (DoD) Cancer Prevention And Treatment Clinical Trials Demonstration

NEBO SCHOOL DISTRICT BOARD OF EDUCATION POLICIES AND PROCEDURES

Policy Options for the Regulation of Electronic Cigarettes

Summary Table Voluntary Product Accessibility Template

No An act relating to health insurance coverage for early childhood developmental disorders, including autism spectrum disorders. (S.

NSP selection process. xxxxxxxxxxxxxxx. Current status. TCCG 4 December 2018 ECB, Frankfurt am Main

11/19/2013. Cardiac Rehabilitation Coverage and Documentation Requirements. Phases of Cardiac Rehabilitation. Phase II

Transcription:

SMIP Effective Switching 3 January 2013 1

Effective Switching Stage High Level Requirements 2 Provision of Data for CoS Shippers require enquiry or reporting access to determine per MPRN Meter Mech Code Value Installing Supplier Shippers would like a long term solution which includes the data items on recognised industry file flows. Data Capture Meter Mech Codes provided by shipper/supplier Smart Metering Equipment Technical Specification SMETS1 and 2 (AVs: S1; S2) Or not SMETS Compliant (AV: NS). Installing supplier derived by Xoserve systems i.e For Meter Mech Codes NS, S1, S2 record the supplier on the date that the corresponding meter was installed. Xoserve stores these values against the affected MPRNs Data Enquiry Service will be enabled to view these data items Xoserve will store these data items on behalf of igts

Meter Mechanism Additional Allowable Values 3 Meter Mechanism Code Amendment required to allow additional allowable values Sample: DEFINITION: The coded value of the description of the Meter Mechanism. ALLOWABLE VALUES: CR -Credit, MT -Mechanical Token, ET - Electronic Token, CM -Coin, PP -Prepayment, TH -Thrift, U - Unknown. ADDITIONAL ALLOWABLE VALUES: NS Non SMETS Smart Meter, S1 SMETS 1 Smart Meter, S2 SMETS 2 Smart Meter Systems will be configured to allow up to S9 as allowable values once formally introduced as an allowable value.

Meter Mechanism User to Transporter Notification 4 Meter Mechanism Code Input Flows Amendment required to allow additional allowable values in RGMA METER Dataset Allowable on ONJOB and ONUPD flows Will be used to derive Installing Supplier Payment Method Code in ASSET dataset SPAA change proposes change to this Will remain as GTX i.e. Transporters shall not record this data

Meter Mechanism Transporter to User Notification 5 Meter Mechanism Code Input Flows Longer term aspiration to incorporate into recognised industry flows Meter_Mechanism field is present in a number of different records: S75 U06 / N90 M03 These records are provided in a number of different contexts: S75 NMR, CFR, TRF U06 / N90 MRI / PAC M03 MBR NB: Detailed analysis phase has not concluded additional flows may be identified

Installing Supplier 6 Installing Supplier (IS) Will be derived based on Installation Date ONJOB Notification of Physical Asset Work ONUPD Update flows*** *** Use of this flow to derive this data MAY result in incorrect Installing Supplier derivation where actual IS has failed to update this data correctly No manual exception / update process is proposed Installing Supplier will not be reset if Meter Mech code changes to a dumb code. Installing Supplier will only reset when a meter is removed or exchanged

Changes to Data Enquiry 7 Meter Mechanism New AVs only proposed to be visible in DE Community View Existing Meter_Mechanism Values will NOT be visible Does this need to be protected in the same manner as Current and Previous Supplier e.g. tick box Installing Supplier (IS) Will be displayed on Community View as derived Does this need to be protected? e.g. tick box

Effective Switching - Approval 8 UKLC Approval was discussed for: Meter Mech Codes Input Use RGMA flows Output Update existing flows where Meter Mech is visible e.g. U06/N90, S75, M03 Display on DE Community View and only SMART Data Items (i.e. non SMART MME Codes will not be displayed), protected by tick box Installing Supplier Approach and derivation Display on DE Community View, protected by tick box Red text denotes indicative views from UKLC

Effective Switching - Implementation 9 UKLC were not able to define an implementation date, and requested guidance from UNC Modification 430 Development Workgroup Views?