Quality improvement of the viral load programme in Mopani District, Limpopo Province

Similar documents
STRENGTHENING THE COORDINATION, DELIVERY AND MONITORING OF HIV AND AIDS SERVICES IN MALAWI THROUGH FAITH-BASED INSTITUTIONS.

South Africa Country Report FY14

KidzAlive Model: Best practice in providing holistic HIV testing, disclosure, care and support for children and their families.

Safe Generations Harnessing Implementation Science to Assess the Impact of Option B+ in Swaziland

Monitoring of HIV positive mothers and HIV exposed infants in context of Option B+ implementation

Integrated VL/EID& TB Data Review Meeting 23/3/2018 PIATO

Strengthening Health Systems for an AIDS-Free Generation 4th Annual IAS/IAC Pre-conference Meeting WASHINGTON, DC JULY 20-21, 2012

Quality Improvement of HIV and AIDS programs: experiences from South Africa ( )

The CQUIN Learning Network

HIV POSITIVE YOUTH: LINKAGE & RETENTION IN CARE

Factors associated with unsuppressed viral load in HIV-1 infected patients on 1 st line antiretroviral therapy in South Africa

The CQUIN Learning Network Annual Meeting

PEPFAR Malawi Baobab Health Trust EMRS

National Xpert MTB/RIF Programme

Intensified TB Case Finding using a TB screening tool integrated into an HIV clinical record: Experiences from the Eastern Cape Province

Using Data from Electronic HIV Case Management Systems to Improve HIV Services in Central Asia

Progress Report March 2016

CARE FOR HIV PATIENTS IN RURAL SOUTH AFRICA

Global Perspectives on Treat All for Children and Adolescents with HIV. PATA Global Summit Shaffiq Essajee

The CQUIN Learning Network

TECHNICAL ASSISTANCE TO EXPAND HIV PREVENTION, CARE, AND TREATMENT IN NAMPULA, MOZAMBIQUE

Quality improvement efforts in Nigerian public health facilities

The CIDRZ Experience: use of data to understand patient outcomes and guide program implementation 07 January 2010

PEPFAR and Treatment 2.0

NACP/JICA Project for Institutional Capacity Strengthening for HIV Prevention focusing on STI and VCT Services

From HIV Rapid Scale up to a Sustainable HIV Program: Strengthening Health Care Delivery Systems and Human Resources for Health in Ethiopia

Differentiated Care for Antiretroviral Therapy for Key Populations: Case Examples from the LINKAGES Project

DEPARTMENT OF HEALTH RESPONSE TO KEY POPULATIONS

Direct Clinical Services

COMMUNITY SYSTEMS TOOLBOX COMMUNITY SYSTEMS STRENGTHENING. Increasing access to quality health and social services. Building strong communities.

How we monitor the Programme

Effectiveness of an integrated chronic disease management model in improving patients health outcomes in rural South Africa

Improving care of HIV-infected breastfeeding

Applying Improvement to Keep HIV+ Mothers and Exposed Infants in Care. Anisa Ismail Improvement Advisor University Research Co.

Bukoba Combination Prevention Evaluation: Effective Approaches to Linking People Living with HIV to Care and Treatment Services in Tanzania

Increasing the Proportion of ART Patients Receiving CD4 Testing 6 Months After Initiation on Treatment:

Positive Living Conference

South Africa s National HIV Programme. Dr Zuki Pinini HIV and AIDS and STIs Cluster NDOH. 23 October 2018

Differentiated Care Improving Engagement and Retention in HIV Care. Meg Doherty, MD PhD MPH World Health Organization

CASE STUDY Improving the quality of VMMC services at Mangochi, Mzimba North, and Nkhotakota District Hospitals in Malawi

The CQUIN Learning Network. Adolescents Living with HIV: Legal framework for testing, treatment, and transition, Challenges and Priorities: Uganda

ADOLESCENTS AND HIV:

Overview November 2017

Update on Community-based harm reduction services in Nelson Mandela Bay 25/10/2018

PROGRESS ON IMPLEMENTATION OF THE 3Is IN SOUTH AFRICA. Yogan Pillay Deputy Director General Strategic Health Programmes South Africa

FGSZ Zrt. from 28 February 2019 till 29 February 2020 AUCTION CALENDAR: YEARLY YEARLY BUNDLED AT CROSS BORDER POINTS

Surge plan, current capacities & challenges reaching full capacity Dr Sergio Carmona

Applying Continuous Quality Improvement (CQI) in Voluntary Medical Male Circumcision (VMMC) in South Africa

Scaling up priority HIV/AIDS interventions in the health sector

The Unfinished Business Project in South West Uganda Closing the Adult- Pediatric Treatment Gap

Finding the missing children: Proven Strategies for Increasing Identification of HIV+ Children. October 2017

Why are the targets a game-changer? What is the Fast-Track Cities Initiative and its connection to ?

PERFORMANCE INDICATOR REFERENCE SHEETS FOR KEY POPULATIONS

PROJECT HEART END-OF-PROJECT REPORT

Early Infant Diagnosis-Malawi Experience. P.N.Kazembe

Utilizing CQI to Improve the Health of Supportive Housing Residents The North American Housing and HIV/AIDS Research Summit VII September 25-27, 2013

HIV Drug Resistance South Africa, How to address the increasing need? 14 Apr. 2016

Fit to play but goalless: Labour market outcomes in a cohort of public sector ART patients in Free State province, South Africa

Financial Resources for HIV: PEPFAR s Contributions to the Global Scale-up of Treatment

Ensure access to and compliance with treatment for low-income uninsured Virginia residents living with HIV/AIDS

Technical Guidance Note for Round 11 Global Fund HIV Proposals

ICAP Journal Club. Article. Study Summary

The Global Partnership for HIV-Free Survival (PHFS): Quality Improvement and Breastfeeding / ART compliance

Strengthening Laboratory Systems for HIV Differentiated Service Delivery

Program to control HIV/AIDS

Using Routine Health Information to Improve Voluntary Counseling and Testing in Cote d Ivoire

South African goals and national policy

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

Monitoring, Evaluation, and Reporting (MER) Guidance (v2.3): PMTCT. Presenter: Jenny Albertini, S/GAC Date: October 2018

Implementation of Collaborative TB/HIV Activities by ICAP: Success and Challenges

The CQUIN Learning Network The Science & Practice of Scale Up

PEPFAR MER 2.0 Reference App for South Africa. 1. Goals/Scope. 2. Background

The Nexus Between 90/90/90 and Epidemic Control. Ambassador Deborah Birx IAS July 2018

Implementation Status & Results India India: Third National HIV/AIDS Control Project (P078538)

FFT and Patient Insight for Improvement. Marie Allen Head of Service User and Carer Experience

MANITOBA HIV REPORT 2015

Challenges in the ART program and some solutions. Dr Francesca Conradie Southern African HIV Clinicians Society.

Key Strategic Decisions Common Options Country Examples

STOP HIV/AIDS Semi-Annual Monitoring Report

Community Client Tracing Through Mentor Mothers in the Democratic Republic of the Congo

END TERM REVIEW OF THE IMPLEMENTATION OF THE PLAN FOR THE NATIONWIDE ROLLOUT OF ANTIRETROVIRAL THERAPY IN ZIMBABWE

The Undetectables Viral Load Suppression (VLS) Project

Updated Resource Requirements for Sustainable Financing of the HIV Response in Indonesia

A smart and doable investment

ASEAN Declaration of Commitment on HIV and AIDS: Fast-Tracking and Sustaining HIV and AIDS Responses To End the AIDS Epidemic by 2030

Ensure access to and compliance with treatment for low-income uninsured Virginia residents living with HIV/AIDS

TUBERCULOSIS AND HIV/AIDS: A STRATEGY FOR THE CONTROL OF A DUAL EPIDEMIC IN THE WHO AFRICAN REGION. Report of the Regional Director.

Global Fund Round 9 Grant HIV and HSS UNDP-Belize. 14 June, 2011

ON THE FAST-TRACK TO ACCELERATE THE FIGHT AGAINST HIV AND TO END THE AIDS EPIDEMIC BY 2030

Innovative Approaches for Eliminating Mother-to-Child Transmission of HIV

IPT BOTSWANA EXPERIENCE

APPROACH TO GEOGRPAPHIC AND/OR POPULATION FOCUS:

Cote d Ivoire Country Report FY15

8 th South African Aids Conference 2017

OUR YOUTH - OUR FUTURE : STREN

Ensure access to and compliance with treatment for low-income uninsured Virginia residents living with HIV/AIDS

Global Trends in Early Infant Diagnosis of HIV

HIV Drug Resistance (HIVDR)

TERMS OF REFERENCE Review of the National South African Sex Worker HIV Plan

Transcription:

Quality improvement of the viral load programme in Mopani District, Limpopo Province Maidi M Kekana, DPH, RN Susannah Cole-Hamilton MW Mongwe 2 Jean Railton, MB ChB, FCFP, MMed, DMH, Dip HIV Med R P H Peters, AMD, PhD, DLSHTM, Dip HIV Man (SA) Anova Health Institute, Johannesburg, South Africa 2 Department of Health, Mopani District, Limpopo Province, South Africa Towards the HIV 90-90-90 target: A simple and low-cost intervention to improve viral load completion The aim of initiating HIV-positive patients onto antiretroviral therapy (ART) is to have a durable viral load (VL) suppression leading to improved health outcomes. In 205/206, the US President s Emergency Plan for AIDS Relief (PEPFAR) adopted the Joint United Nations Programme on HIV/AIDS Fast- Track strategy and 90-90-90 targets for 2020. These targets are to ensure that 9 of all people living with HIV know their HIV status; 9 of all people with diagnosed HIV infection receive sustained ART; and 9 of all people receiving ART have viral suppression. When this three-part target is achieved, at least 73% of all people living with HIV worldwide will be virally suppressed. This is compared to the estimated 57% based on projections using current VL completion (VLC) rates. [] To meet the 90-90-90 target, every person starting HIV treatment will need to have access to VL monitoring, which requires improved access and efficiency in VL testing. According to the 205 ART guidelines, patients receiving ART should be monitored for VL at 6 months, 2 months and yearly while on treatment. Methods Setting Anova Health Institute (Anova), a partner to Mopani District Department of Health (DoH) in Limpopo Province, is providing support to, and working with primary health care (PHC) facilities in the district to reach the VL suppression targets using simple interventions to improve VLC. An evaluation of VL testing of patients (adults) was conducted in all facilities in Mopani District between January and March 204, prior to the introduction of nurse-initiated management of antiretroviral therapy (NIMART) mentorship. An ART file review tool was developed and utilised when conducting the audit and the main focus was on clinical management of patients. The aim was to evaluate the status of the facilities, specifically: the availability of HIV/ ART/sexually transmitted infection (STI)/ tuberculosis (TB) guidelines, identi fying skills gaps; and the clinical management HIV Nursing Matters December 206 page 35

Number of files with VLC 9 8 7 6 5 4 3 2 0 8 9 8 8 7 7 7 7 7 7 6 5 5 5 5 5 4 4 4 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 PHC facilities, Greater Letaba sub-district VL 6 months VL 2 months Figure : Number of files with VLC at 6 and 2 months after ART initiation for the 202 cohort in Greater Letaba sub-district. of patients on ART through file audits. Statistics showed that of the 50 298 patients on treatment, only 20 886 (4.5%) had VL testing within the preceding 2 months. [2] VL testing within the cohort was defined as one month before, the month due and one month after; i.e. a 3-month grace period. This is accepted for clinical management of patients by the DoH in Mopani District. VL suppression was considered achieved with a VL <400 copies/ml. For the pilot project, data directly from the file audits were used. For the evaluation of the roll-out of the project, all data used were sourced from Tier. net. [2] Findings from file audits in one of the sub-districts, Greater Letaba, with 2 primary health care (PHC) facilities, revealed that of the files reviewed, of patients had VL testing in the 6-month period and 34% of patients within the 2-month period. In response to this evaluation, the nurse mentors undertook a quality improvement (QI) evaluation process. Using the fishbone tool, Anova analysed the skills audits completed Table. Identified contributors to low VLC in 2 PHC facilities Mopani District, 204 Patient factors Relatives collecting treatment Clients uninformed of importance of VL monitoring Low socio-economic status clients missing appointments Systems Courier challenges on weekends Lack of communication between clinics and observations made during support visits at each of the 2 facilities. From this process, challenges were identified as contributing to low VLC (Table ). The answer to What change can we make that will result in improvement? led to the development of the sticker project as a cross-cutting resolution to many of the challenges. Sticker pilot project Keeping track of the month in which the patient is due to have a VL test was one of the main problems. Twelve colours were identified and each allocated to a month in the calendar year to allow for easy identification. Each colour Staff factors Missed opportunities Data not captured Clinical stationery not fully utilised Clinical notes, not communicating to self or others Operations and equipment Lab consumables not ordered or a shortage thereof represents an ART-start month, which is also a blood-monitoring month. The sticker was placed on each file and a copy of the coded chart was placed in each consultation room. Patient education on the importance of VL testing was then conducted. It was decided to pilot this project in the two worst-performing PHC facilities (4 and 2) in Greater Letaba sub-district for a 3-month period from January to March 205. A series of steps was followed to implement the project:. Secure buy-in: meet facility staff, provide feedback on the baseline assessment and explain the importance of the project HIV Nursing Matters December 206 page 36

2. Reference chart: place sticker chart on the notice board in all consultation rooms 3. Work with data capture; sorting files (removing inactive files) and identifying defaulters 4. Put VL month stickers on files accord ing to start month and audit files for clinical management 5. Feedback report to the clinic staff with improvement plan: VL recording and capturing according to SOPs Ease of implementation of the sticker project The sticker project can be introduced anywhere utilising the 2 colour stickers representing each calendar month. It can be applied to other chronic clients to identify their review months. Each facility needed only 2 differently coloured sticker boxes. The process can easily be incorporated into the daily activities and routine of existing staff; therefore, no extra personnel are needed. Analysis The sticker project was rolled out from June 205. From July 204 to June 205 (pre-intervention), the VLC within 2 months increased by 2.% and within the cohort grace period by 6%. From June 205 to March 206 (pilot and implementation), the VLC within 2 months increased by 5.9% and within the cohort grace period by 20.5%, showing an improvement in quality of VLC. Figure 2: (a) Monthly colour-coded VL sticker chart; (b) patient charts with stickers (patient details removed). defaulter tracing identify and discuss challenges in-service training as required mentoring plan monthly support visits to each facility. Pilot project results There was a significant improvement in both the 6- and 2-month cohorts as illustrated in Figure 3. Based on the initial results and feedback from clinic staff and nurse mentors, the decision was taken to roll out the sticker project to all PHC facilities in Mopani District. By June 205, the sticker project had been cascaded out to 88 PHC facilities in Mopani District, and by May 206, 0 of the PHC facilities had introduced the project. Percentage of VL completed 7 6 3 3 3 6-month PHC 4 59% 2-month PHC 4 6-month PHC 2 Clinic and cohort 2-month PHC 2 Figure 3: VLC for the 6- and 2-month cohorts pre and post sticker pilot project roll-out in clinic 4 and 2. 56% pre-pilot post-pilot HIV Nursing Matters December 206 page 37

0 9 8 7 6 3 Pre-intervention Pilot Implementation of intervention 7% 65% 53% 58% 53% 55% 45% 39% 32% 3% 4% 23% 9% 7% % Jul-4 Oct-4 Dec-4 Mar-5 Jun-5 Sep-5 Dec-5 Mar-6 Within cohort grace period Within 2 months of VL month due Figure 4: Mopani District VLC for all cohorts, July 204 to March 206. 0 Pre-intervention Pilot Implementation of intervention % active patients with VL done within grace period 9 8 7 6 3 Apr 204 Jul 204 Oct 204 Jan 205 Apr 205 Jul 205 Oct 205 Jan 206 First month of reporting quarter 6 months 2 months 24 months 36 months Figure 5: VLC within grace period by cohort for Mopani District. HIV Nursing Matters December 206 page 38

Table 2: VL suppression for Mopani District, January to March 206 [2] Remaining in care 3/03/206 Unsuppressed VL Suppressed VL All VL done within year % performance % from target (9) 67 054 9 37 42 839 5 976 82% 92% Figure 5 illustrates the trend of improvement in cohort VL monitoring in Mopani District with the introduction of the sticker project. Viral suppression The improvement in VLC is reflected in the Mopani District VL suppression rate of 82%, which is 92% of the target of 9. Of the 67 054 patients remaining in care, 22.5% are not having VL testing. Balancing measures A number of additional positive spin-offs were observed from the sticker project: Mentors extracted all files and removed old files, creating more space for filing Enhanced PHC re-engineering/ facility collaboration as community health workers were tracing defaulters and clients who had missed appointments Tracing of clients was more effective leading to a greater number of clients returning for treatment Increased number of clients who were virally suppressed, and who were easily enrolled into ART adherence clubs Nurse mentors established clinical issues that were specific to each facility and are addressing these challenges. Limitations Change as a result of the project was more difficult to assess with the long rollout period. There was no transport to laboratories on weekends, resulting in facilities not taking VL blood samples on Fridays, Saturdays and Sundays (which affects the VLC rate). Conclusion Only one PHC facility, of the in the district, has not introduced the project since its roll-out in June 205. This project can make a significant difference in any PHC facility as it requires minimal expenditure and training and does not require additional personnel. This process can readily be applied to any chronic disease management programme. Its simplicity and low cost ensures its sustainability. If the picture continues to improve at the same pace, Mopani District will achieve 9 VLC before the target date of 207. The sticker project is a simple and easyto-implement system that significantly improved our VL programme. Acknowledgements: Department of Health, Mopani District; US President s Emergency Plan for AIDS Relief (PEPFAR); Grace Segage, Anova Health Institute; Anova Health Institute staff. References. UNAIDS. 90-90-90: An Ambitious Treatment Target to Help End the AIDS Epidemic. UNAIDS, 204. http://www.unaids.org/ en/resources/documents/204/90-90-90 2. University of Cape Town. Tier.net version.9.2.0. 206. HIV Nursing Matters December 206 page 39