A mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room.

Similar documents
Request for Proposals. Enhancing and Updating the Canadian Evaluation Society Sanctioned. Logic Model Workshop. Canadian Evaluation Society

TOBACCO CONTROL PROGRAM COMMUNITY GRANT. REQUEST FOR PROPOSALS- Release Date: October 2, 2018 Application Deadline: October 19, 2018 at 5:00 PM

Request for Proposal. PA ACT 139 Naloxone Purchase

ADDENDUM #1 CITY OF SUISUN CITY RFQ FOR CITY ENGINEER CONSULTANT SERVICES

Request for Proposals

STATE OF NEW JERSEY Division of Gaming Enforcement CASINO HOTEL ALCOHOLIC BEVERAGE MERCHANDISING PERMIT APPLICATION

ANNEXURE A SUPPLIER DECLARATION FORM P a g e

Consultancy Support Services for the Procurement of LEU for the establishment of the IAEA LEU Bank

Z E N I T H M E D I C A L P R O V I D E R N E T W O R K P O L I C Y Title: Provider Appeal of Network Exclusion Policy

National Deaf Children s Society (NDCS) Social care mapping survey

Request For Proposal: RFP #

MEMBERSHIP APPLICATION INSTRUCTIONS

THE IBECA SHOW PRESENTS HOW TO WIN! July Park Place Hotel, Traverse City, MI

Mississippi Public Health Institute. Request for Proposals for Comprehensive Communications Campaign and Planning RFP2017-1

City of Carson 701 E. Carson St., Carson, CA Telephone: (310) ; ci.carson.ca.us

FACILITATOR TRAINING. TO REGISTER See pages 2-7 for more information and to register

RFQ:-HPCSA 03/2017 REQUEST FOR QUOTATION FOR OCCUPATIONAL HEALTH SERVICE ON BEHALF OF THE HEALTH PROFESSIONS COUNCIL OF SOUTH AFRICA

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER

VITAL SIGNS EMS CONFERENCE 2017 EXHIBITOR APPLICATION FORM

Lake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015

(City, State, Zip Code)

DIVISION OF PUBLIC & BEHAVIORAL HEALTH BUREAU OF HEALTH CARE QUALITY AND COMPLIANCE LCB File No. R Informational Statement per NRS 233B.

Dear Prospective Volunteers,

1 st Thursday Participation Benefits

FOR SHORETEL CHANNEL PARTNERS ShoreTel MDF Program ELIGIBLE ACTIVITIES

MEMORANDUM OF UNDERSTANDING

Exhibitors and Sponsors Information and Forms. Texas Aquatic Plant Management Society 2015 Annual Conference Tapatio Springs October 12-14, 2015

Quotations invited for Interior Designing and Set up of Corporate Office of AMH SSC

APPLICATION FOR EMPLOYMENT-Non Salaried Position CITY OF RALSTON, NEBRASKA EQUAL OPPORTUNITY EMPLOYER

When replying please quote document no: Application ID: DSN17/44711; LUC18/47193

Sale of Decommissioned Street Name Signs

NOTICE TO BIDDERS: HONDA PIPELINE PHASE 1, Owner: THE WATER WORKS AND SEWER BOARD OF THE CITY OF ANNISTON, CALHOUN COUNTY, ALABAMA.

Due Process Hearing Request Information Sheet and Model Form

PLEASE COMPLETE ALL RELEVANT SECTIONS OF THIS FORM

STATE OF ARKANSAS OFFICE OF STATE PROCUREMENT 1509 West 7th Street, Room 300 Little Rock, Arkansas BID RESPONSE PACKET

Employment Application

Completed applications can be submitted either by mail or to:

The Courageous Leadership Conference

County Department of Social Services. Wilson. Submitted By. Candice Rountree. Program Manager. Address. 100 NE Gold St Wilson, NC United States

COAHOMA COUNTY SCHOOL DISTRICT Application for Interim Superintendent of Schools

Request for Proposals (RFP) for School-Based Screening, Brief Intervention, and Referral to Treatment (SBIRT) Services

Recruited by: Information for Payment by Credit Card

Overview. Provider Enrollment Requirements Member Eligibility Hearing Services Authorization and Billing Additional Information

Request for Proposals for a Clean Syringe Exchange Program

DELTA DENTAL PREMIER

NYPWA 149 th Annual Winter Conference

APPLICATION INSTRUCTIONS

City of Central Falls. Bid Number REQUEST FOR DESIGN-BUILD RESPONSES FOR INSTALLATION OF LIGHTING IN CITY PARKS.

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Invitation to submit a tender for providing stationery

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 11, REQUEST FOR APPROVAL OF SINGLE SOURCE PURCHASES OF FITNESS EQUIPMENT

Peer Mentor Program Application

New York Certified Peer Specialist

Lakewood Ranch CDD Supervisor Orientation. January 10, :00 p.m.

Exhibition Curator Brief

MUNICIPAL ALCOHOL POLICY (Recreation & Civic)

Neighborhood Organization Information please confirm

Training Meeting on Networking Educational Networks

PROSPECTUS C7-RAF Regional (AFRA) Training Course on NDT Level 3, Training, Examination and Certification

Speed & Agility, Track & Field and Strength Training

(4) Be as detailed as necessary to provide history of work performed; and:

Article XIX DENTAL HYGIENIST COLLABORATIVE CARE PROGRAM

PARKS, RECREATION AND WATERFRONT ADVISORY COMMITTEE T.B. Costain/SC Johnson Community Centre 5:00 p.m., January 19, 2010

Answers to Questions for RFP American Sign Language Interpreter

FROM: Quinn Korbulic, IT Manager, Regional Services, Technology Services

,f : Amanda M The Arc. Mercer County

Fifth Judicial District Veterans Treatment Court

Integrated Healthcare Association 2016 IHA Stakeholders Meeting

Marijuana Licensing Information

INITIAL PRACTICE PERIOD FORMS

PUBLIC SERVICE COMMISSION OF THE DISTRICT OF COLUMBIA 1325 G STREET N.W., SUITE 800 WASHINGTON, D.C ORDER

STAFF REPORT City of Lancaster NB 2

CITY OF VALLEJO HIDDENBROOKE IMPROVEMENT DISTRICT NO IMPROVEMENT LEVY ADMINISTRATION REPORT FISCAL YEAR

Certificate IV in Mental Health Peer Work (CHC43515) Program - Elsternwick

This license is required for any businesses offering tobacco products for sale.

SPONSORSHIP AND EXHIBIT OPPORTUNITIES

CLIENT PROCEDURE FOR ANNUAL APPROVAL OF SHIP REPAIR COMPANIES

STATE OF NEW JERSEY DEPARTMENT OF CORRECTIONS. Medication Assisted Treatment For Substance Use Disorder In the New Jersey County Jails

CONFERENCE ROOM AND FACILITIES POLICY

HEARING NOTICE LAND USE REQUEST AFFECTING THIS AREA

Alcohol, Drug Addiction & Mental Health Services (ADAMHS) Board of Cuyahoga County Transitional Youth Housing Pilot

भ रत य व म नपत तन प र ध करण

Cardiovascular Sonography Application Requirements (Certificate)

GENERAL INFORMATION AND INSTRUCTIONS

DeKalb County Government Public Meetings & Agendas. May 21 24, 2018 Monday 5/21 Tuesday 5/22 Wednesday 5/23 Thursday 5/24

Vermont Recovery Network

APPLICATION FOR CHILD SUPPORT SERVICES NON PUBLIC ASSISTANCE APPLICANT/RECIPIENT

Preparing for an Oral Hearing: Taxi, Limousine or other PDV Applications

Honorable Mayor and Members of the City Council. Mitigation Agreement with Safeway for Expansion at 6310 College Avenue, Oakland

CHILD AND ADULT CARE FOOD PROGRAM ADMINISTRATIVE REVIEW PROCEDURES

MD SHRM STATE CONFERENCE

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF THE ENVIRONMENT

Section Processing

Set Up: Sunday, April 23, 3:00-5:00 pm. Breakdown: Tuesday, April 25 at 3:30 pm. Be back in your office first thing Wednesday morning.

ORDER of the Minister of Health No. 269/2017 of 14 March 2017 on mandatory provision of medicinal product adequate and continuous supplies

HILLSBOROUGH COUNTY AVIATION AUTHORITY AIRPORT BOARD OF ADJUSTMENT RULES OF PROCEDURE

Request for Proposals for Riley County Fair Food Stand Manager

Stallings, Kristy. Kristy,

2014 Progress Report. Multi-Year Accessibility Plan

Criteria and Application for Men

Transcription:

INVITATION FOR REQUEST FOR PROPOSAL CLOCK TOWER RENOVATIONS GREEN RIVER, WYOMING Notice is hereby given that the City of Green River through the coordination of Green River URA/Main Street Agency (hereafter the Green River URA/MSA) will receive proposals for professional design services relating to the design of proposed renovations of the Clock Tower Plaza located on Flaming Gorge Way in Green River, Wyoming. Work under this RFP includes, but not limited to, Architecture/Engineering design, electrical design, grading and drainage design, in coordination with the Green River URA/MSA Director and Board of Directors, the City of Green River City Administrator and Governing Body. The above Project will be constructed utilizing the Design-Build delivery model. The selected professional firm is to provide design professional services for the project renovations to include but not limited to provide planning, prioritizing of project(s), scheduling of the project, informational support to the Green River URA/MSA and the City of Green River with regard to the project, design, plan and specification preparation, bidding documents, construction contract administration, project close-out and warranty acquisition. A mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room. RFP packets for this project or additional information are available from the Purchasing Office at City Hall or by calling 307-872-6123. RFP packets are also available from the City of Green River website at http://www.cityofgreenriver.org/index.aspx?nid=8. Proposals will be received up to 5:00 P.M. Mountain Standard Time, Wednesday, July 24, 2013 by the Purchasing Division, City of Green River, City Hall, located at 50 East 2 nd North, Green River, Wyoming, 82935. Faxed and emailed copies of proposals will not be accepted. Dated this 24 th day of June 2013. /s/ Martin Black, AICP, ICMA-CM City Administrator, City of Green River Publish: June 26; July 3, 2013 1

General Information Introduction Notice is hereby given that the City of Green River through the coordination of Green River URA/Main Street Agency (hereafter the Green River URA/MSA) will receive proposals for professional design services relating to the design of proposed renovations of the Clock Tower Plaza located on Flaming Gorge Way in Green River, Wyoming. Work under this RFP includes, but not limited to, Architecture/Engineering design, electrical design, grading and drainage design, in coordination with the Green River URA/MSA Director and Board of Directors, the City of Green River City Administrator and Governing Body. The above Project will be constructed utilizing the Design-Build delivery model. The selected professional firm is to provide design professional services for the project renovations to include but not limited to provide planning, prioritizing of project(s), scheduling of the project, informational support to the Green River URA/MSA and the City of Green River with regard to the project, design, plan and specification preparation, bidding documents, construction contract administration, project close-out and warranty acquisition RFP packets for this project or additional information are available from the Purchasing Office at City Hall or by calling 307-872-6123. RFP packets are also available from the City of Green River website at http://www.cityofgreenriver.org/index.aspx?nid=8. A mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room. The project will consist of the design of renovations to the existing Clock Tower Plaza including, but not limited to, Architecture/Engineering design, electrical layout and design, grading, drainage, and cost estimating. A conceptual plan has been developed by the Green River URA/MSA and the selected Design Build Firm or Team will be expected to meet with the Green River URA/MSA Board and Director, coordinate design efforts with the Green River URA/MSA Director, and incorporate this conceptual design plan into the final design plans. An area map and aerial map, of the Clock Tower Plaza is shown on the attached map marked as Exhibit A and Exhibit B, respectfully. The conceptual design plan completed by the Green River URA/MSA Board and Director is on the attachment marked Exhibit C. Proposals will be limited to twenty (20) pages, excluding proposal cover and cover letter. Proposals are to include the price to complete work as defined in the Scope of Work section of this document. The time to complete the work as defined in the Scope of Work section of this document is 3 months following the acceptance of a Contract for Service between the Consultant and the City of Green River. A Contract for Service is to be provided with the submitted proposal to allow legal review before acceptance. Inquiries regarding this project should be directed to Rod Ness, Green River URA/MSA Director at 307-872- 6141. Written request for information is preferred; fax number 307-872-0510 or emailed to rness@cityofgreenriver.org. The City of Green River reserves the right to reject any or all proposals or to accept the proposal deemed to be in the best interest of the GR URA/MSA. The City of Green River reserves the right to waive any abnormality in the submissions. 2

Request for Proposal Schedule Proposals will be received up to 5:00 P.M. Mountain Standard Time, Wednesday, July 24, 2013 by the Purchasing Division, City of Green River, City Hall, located at 50 East 2 nd North, Green River, Wyoming, 82935. Faxed and emailed copies of proposals will not be accepted. It is expected that the City of Green River will award a contract to the Selected Consultant at the Tuesday, August 6, 2013 City Council Meeting. All work is to be completed the agreed upon timeline. Bid Release June 20, 2013 Pre-Bid Meeting July 9, 2013 Bid Due July 24, 2013 Bid Selection July 25, 2013 Council Approve Bid August 6, 2013 Contract Signed August 15, 2013 Selection Process The Green River URA/MSA Board of Directors will review the Proposals and select the preferred Firm or Team. The City of Green River will enter into a Contract for Service to complete the desired work by the selected Firm or Team. The selected Firm or Team is required to supply the following documentation within 15 calendar days of the Award and prior to commencement of work: proof of Comprehensive General Liability Insurance in the amount of $1 million, Certificate of Good Standing from Wyoming Department of Employment Workers Safety and Compensation Division, Certification of Good Standing with the Wyoming Unemployment Tax Division for Unemployment Insurance, and a valid City of Green River business license to conduct business of this nature within the City. All work must be completed using appropriate traffic control as required to complete the project. All traffic control, signage, and safety are the responsibility of the selected Design-Build Firm or Team. Selection criteria will be based on the proven ability to undertake work of this nature as assessed by the review references, proven service quality as assessed by review references, safety work practices records as assessed by review of references, proximity of firm s or team s location to Green River, and price. The submittals are to include a list of similar projects by the Design-Build Firm or Team within the last five years along with references for each of those projects including current addresses and telephone numbers. Project descriptions should clearly explain what role the Firm or Team performed on the project. The Firm or Team is to provide a description of expertise with similar projects and public participation required for those projects. Evaluation of Proposals received will be based on the following weighted criteria: Proven ability to undertake work of this nature (15%) Proven quality of service as assessed by review of references (15%) Safety work records (10%) Similar project experience and qualifications (25%) Proximity of Consultant firm s office to the City of Green River (10%) Price (15%) State of Wyoming Procurement Standards inclusive of W.S. 15-1-113 and W.S. 16-6-101, et. seq.(10%) 3

The selection committee for evaluating proposals will be the Green River URA/MSA Board, Green River URA/MS Director and City of Green River Parks and Recreation Director. The selection committee will review and evaluate the Proposals as delivered and accepted. Consultants may be requested to make a presentation showing their expertise. Payment for services for this Contract will follow the standard City of Green River s Purchasing Policy practices. Payment will be made monthly with 10% of each monthly payment being retained until the project is complete. Budget The proposed budget for the project is $325,000. Preliminary Project Schedule Start Construction September 2, 2013 Winter Shut-down October 31, 2013 Spring Re-start April 1, 2014 Construction Competed July 15, 2014 Site Information The City of Green River and Green River URA/MSA has identified the renovations of the existing Clock Tower Plaza as a high priority project within the Green River Main Street District. The existing Clock Tower Plaza s construction and layout is dated and its use to the general public has been limited. The Green River URA/MSA has planned renovations of the Clock Tower Plaza with the desire to enhance the Plaza s function as a gathering place within Green River s Main Street District. In addition, the current Clock Tower Plaza is difficult to identify by vehicles along Flaming Gorge Way and pedestrian traffic due to its high and obstructing walls and hidden features. Additional known concerns with the existing Clock Tower Plaza site are concrete pavement heaving/settlement, inadequate electrical outlets, and fall protection along walls. Site Description The project area is defined as the Clock Tower Plaza, Parcel Number 1807-22-1-14-009-01. The parcel is owned and maintained by the City of Green River. Topographical and Boundary Exhibit A: Park Boundary Area Exhibit B: Park Arial Map Soil Investigation N/A Utility Information Exhibit C: Marked Utilities and Locates Covenants and Restrictions on Property N/A 4

Projects Requirements Program Summary The purpose of this project is to provide Architecture/Engineering construction drawings for the proposed renovation of the Clock Tower Plaza. The selected Firm or Team is to provide construction drawings for the proposed renovations addressing grading, drainage, existing wall alterations, proposed wall construction, electrical upgrades, and construction cost estimating. The Green River URA/MSA conceptual plan will be used as a basis for project design, demolition, renovation and construction Functional Requirements The nature of this work is to provide construction documents for the renovation of the Clock Tower Plaza including the following: A. Construction Plans and Specifications The selected Firm or Team will provide construction drawings and specifications for the proposed renovations. These drawings will be based on the conceptual plan developed by the Green River URA/ Main Street Agency. Proposed renovations include grading, drainage, existing wall modifications, and electrical upgrades. The selected Firm or Team will be required to design any and all renovations in accordance with the American with Disabilities Act (ADA). B. Cost Estimates The selected Firm or Team will provide detailed construction cost estimates for each phase of the proposed renovations. C. Coordination with Pertinent Agencies The selected Firm or Team will meet and coordinate the renovation design with the Green River URA/MSA Board and Director (up to three meetings), Green River Parks and Recreation Department (up to two meetings) and a Green River Mayor and Council Workshop presentation. The selected Design-Build Firm or Team will be responsible for incorporating comments from each of the entities listed above into the renovation design. D. City Council Presentation Upon completion of the Clock Tower Plaza s renovation design, the selected Consultant will present the design, including construction cost estimates and proposed project phasing to City Council during a meeting for final agreement. E. Construction Phase Services The selected Firm or Team will be responsible for performing construction phase services including construction contract administration, supervise the construction of the project, project close-out and warranty acquisition. General Physical Characteristics The Green River URA/MSA has developed a conceptual plan of potential renovations to the Clock Tower Plaza with the purpose of visually opening this area to the travelling public along Flaming Gorge Way and to alter the internal layout to promote a better atmosphere for the public to gather. The primary design elements in the project will include a xeriscape design, a water feature, performance stage, and natural spectator seating. The design should offer the option for phased construction, if required. 5

Performance Specification After completion and City of Green River final Acceptance, project firm or team will warranty workmanship and material for 1 year. Code and Standards All Work will be performed to I-Code 2012 codes and standards. Conceptual Layout Exhibit D: Conceptual Park Design Design Build Contract Requirements The bid proposal must include a Design Build contract addressing the following components: 1. Design Responsibilities 2. Construction Responsibilities 3. Responsibilities of Owner 4. General Conditions Requirements for Proposal A. Construction Documents include drawings plans, specifications, and construction contract documents for the renovation of the Clock Tower Plaza. All construction documents are required to be sealed by a Wyoming Professional Engineer or Architect. B. Price Proposal including Construction Cost Estimates for the total cost of construction and for each identified phase of construction and schedule. C. Digital files Design documents and Build Specifications in AutoCAD format, 2010 version or later, and MS office format. D. Design Build Contract as designated. 6

Exhibit A: Park Boundary Area 7

Exhibit B: Park Arial Map 8

Exhibit C: Marked Utilities and Locates 9

Exhibit D: Conceptual Park Design 10