ACE DIVERSITY INTERCHANGE

Size: px
Start display at page:

Download "ACE DIVERSITY INTERCHANGE"

Transcription

1 ACE DIVERSITY INTERCHANGE O P E R A T I O N A L E F F I C I E N C Y A C H I E V E D T H R O U G H C O O R D I N A T I O N A M O N G B A L A N C I N G A U T H O R I T I E S

2 WHAT IS IT? ADI stands for Area Control Error (ACE) Diversity Interchange. ADI pools the momentary imbalance (ACE) among Balancing Authorities to reduce control burden; reduce generation movement; reduce sensitivity to non-dispatchable resource output; and, improve control performance. ADI adjustments do not involve schedules or transmission; they are modeled as actual interchange (pseudo-tie) in the ACE equation. ADI adjustments are not monetized.

3 THE HISTORY ADI has been used in various regions in North America since the mid-1980s (MAPP). ADI has been used by the Northeast Power Coordinating Council, MISO and, SPP. ADI was introduced into the WECC in 2006, designed by BC Hydro, Idaho Power Company, NorthWestern Energy and, PacifiCorp. Currently, there are eight (8) ADI Participants: Arizona Public Service Company; BPA; BC Hydro; GWA (Glacier); Idaho Power; NorthWestern Energy; Puget Sound Energy; and, Salt River Project.

4 THE DESIGN Check for diversity among Participants ACEs (both over-generation and under-generation during ACE cycles, e.g., 4-second cycles). If there is diversity, apply equal share adjustments: PCA Raw ACE Adjustment Adj. ACE A -26 MW +26 MW 0 MW B -20 MW +20 MW 0 MW C +30 MW - 24 MW + 6 MW D +27 MW - 24 MW + 3 MW Net + 9 MW +9 MW

5 GEOGRAPHIC SCOPE Western Interconnection Single bubble configuration (default) Direct and/or permitted connectivity Separate bubbles NWPP (northern bubble) WestConnect (southern bubble) Trigger for separate bubbles Concerns about transmission NWPP and SWRSG Reserve sharing events Single bubble configuration requires full support

6 THE LIMITS Adjustments < 30 MW. Accumulated adjustments < 60 MW-hours. The Host is the system of record for the adjustments. The ADI adjustments are reported to WIT as ADI interchange ; the common ADI BA is GWA; WIT accounting is managed by CECD. The Participants suspend the ADI tool if concerned about reliability (e.g., transmission overloads, AGC paused, frequency deviation). ADI is suspended during contingency events.

7 AGREEMENT Minimum structure necessary to enable implementation. ADI is a reliability tool; a transmission function activity. ADI does not change or impact system operations or control area functions. ADI Host and Participating Control Areas are Parties. Start-up costs were paid for by initial four Participants expenses $24,000/ Balancing Authority Criteria to allow additional Participants: A BA located in Western Interconnection Adjacent to one or more ADI Participants or to a BA that supports ADI operations Execute Exhibit E to the ADI Agreement Execute Exhibit B to the Versify License Agreement (optional)

8 GOVERNANCE Agreement Group Approves budget Interprets agreement Establishes management procedures Resolves disputes 2/3 vote required for decisions Operating Group Establish, implement and modify Implementation Protocols, operating parameters, suspension protocols, etc.; majority rules among members.

9 DOCUMENTATION Introduction Participation in the Western Interconnection The ADI Tool ADI Versify Tool ADI in the Area Control Error Equation ADI and NERC Standards Normal ADI Operations The ADI Algorithm Parameters Balancing Authority Operations Suspension Protocols Participant ADI Implementation Application Test Procedures References Revision Log

10 OVERSIGHT TOOL 10

11 SAMPLE REPORT 11

12 BENEFITS Captures momentary diversity Avoids generator movement (relaxed control) Reduces regulation requirements Enhances ability to absorb intermittent output Improves control performance + 10 MW valued at $25/MWh ($2.1 million/year)

13 PHILOSOPHY Straight-forward Agreement Governance by two committees Cost-sharing for start-up and annual expenses Early conversation with FERC Early conversation with WECC Leverage existing infrastructure Dedicated Remote Interface Gateway (RIG) Equal share logic avoided unnecessary complications WECC Operating Network (WON) WECC Interchange Tool (WIT) Design decisions ensure that all Participants are either held harmless or better off. Operational improvement rather than commercial activity. Low cost to operate.

ACE Diversity Interchange White Paper

ACE Diversity Interchange White Paper ACE Diversity Interchange White Paper Authored by: The NERC ACE Diversity Interchange Task Force March 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table

More information

Annual Electric Balancing Authority Area and Planning Area Report

Annual Electric Balancing Authority Area and Planning Area Report Part I - Schedule 1. Identification and Certification Form Approved OMB Numbers: 1902-0140 (Expires 05/31/2016) 1. Respondent Identification: Code: Name: 3. Respondent Mailing Address: Chris Robinson P.O.

More information

Applicability: Balancing Authorities (BAs) Transmission Operators (TOPs) Reliability Coordinators (RCs)

Applicability: Balancing Authorities (BAs) Transmission Operators (TOPs) Reliability Coordinators (RCs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Reliability Guideline: Reliability Coordinator Balancing Authorities Transmission Operators Communication:

More information

Regional Transmission Resources

Regional Transmission Resources I 2017 PSE Integrated Resource Plan Regional Transmission Resources This appendix reviews current regional transmission issues and efforts to address those issues. Contents 1. OVERVIEW I-2 2. THE PACIFIC

More information

EIM Tariff Changes Round 2

EIM Tariff Changes Round 2 EIM Tariff Changes Round 2 #1 #2 Southern Intertie (Attachment O) LAP Pricing for Losses on Southern Interie (Schedule 12A) Powerex Powerex In its responses to stakeholders comments on the first round

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Portland General Electric Company ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Portland General Electric Company ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Portland General Electric Company ) Docket No. ER17-1075-000 MOTION TO INTERVENE AND COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM

More information

Operational Flexibility

Operational Flexibility H 2017 PSE Integrated Resource Plan Operational Flexibility This appendix summarizes the operational flexibility study performed for PSE by E3 Consulting for the 2017 IRP. Contents 1. OVERVIEW H-2 2. SYSTEM

More information

Comparative Analysis of Western EIM and NWPP MC Intra-Hour Energy Market Options

Comparative Analysis of Western EIM and NWPP MC Intra-Hour Energy Market Options Comparative Analysis of Western EIM and NWPP MC Intra-Hour Energy Market Options Table of Contents I Executive Summary... 1 1 Introduction... 2 1.1 Background... 4 2 Overview of Western EIM and NWPP MC

More information

Alberta - US Comparator: Standard-Making and Enforcement Functions

Alberta - US Comparator: Standard-Making and Enforcement Functions Alberta - US Comparator: Standard-Making and Enforcement Functions Current Reliability Standards Below is a link to current reliability standards in Alberta: http://www.aeso.ca/rulesprocedures/17006.html

More information

Methods for Establishing IROLs

Methods for Establishing IROLs Methods for Establishing IROLs Informational Webinar NERC Methods for Establishing IROLs Task Force (MEITF) January 25, 2019 Logistics This is an informational webinar to describe the efforts of the NERC

More information

Standards of Conduct for Transmission Providers

Standards of Conduct for Transmission Providers Standards of Conduct for Transmission Providers Posted and Effective as of December 30, 2016 Puget Sound Energy ( PSE ) is a public utility that owns, operates, and controls facilities used for the transmission

More information

Determining the Vulnerabilities of the Power Transmission System

Determining the Vulnerabilities of the Power Transmission System Determining the Vulnerabilities of the Power Transmission System B. A. Carreras D. E. Newman I. Dobson Depart. Fisica Universidad Carlos III Madrid, Spain Physics Dept. University of Alaska Fairbanks AK

More information

PGE Energy Imbalance Market (PGE EIM BP)

PGE Energy Imbalance Market (PGE EIM BP) Business Practice: PGE Energy Imbalance Market (PGE EIM BP) Posted: September 30, 2017 Effective: October 1, 2017 Revision No.: 0 Table of Contents 1. Introduction... 3 2. Communication with the PGE EIM

More information

NERC Voltage Ride-through Follow-up Activities

NERC Voltage Ride-through Follow-up Activities NERC Voltage Ride-through Follow-up Activities Robert W. Cummings Senior Director of Engineering and Reliability Initiatives MRO Reliability Conference May 24, 2017 Early JUNE Publish Inverter Task Force

More information

UE 335 Net Variable Power Costs

UE 335 Net Variable Power Costs UE / PGE / 00 Niman Kim Batzler BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE Net Variable Power Costs PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of Mike Niman Cathy

More information

Meeting Summary ACE Diversity Interchange Task Force

Meeting Summary ACE Diversity Interchange Task Force Meeting Summary ACE Diversity Interchange Task Force October 28, 2010 1 p.m. 5 p.m., EDT Followed the NERC Resources Subcommittee Meeting PJM Interconnection L.L.C. Philadelphia, PA 19153 The North American

More information

Net Variable Power Cost

Net Variable Power Cost Niman Peschka Hager BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE Net Variable Power Cost PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of Michael Niman Terry Peschka

More information

Discussion of Technical Issues Required to Implement a Frequency Response Standard

Discussion of Technical Issues Required to Implement a Frequency Response Standard Reference 1 Discussion of Technical Issues Required to Implement a Frequency Response Standard Howard F. Illian Abstract NERC is investigating the implementation of a Frequency Response Standard on the

More information

ROLE OF PROTECTION SYSTEMS IN CATASTROPHIC FAILURES IN POWER SYSTEMS. A. G. Phadke

ROLE OF PROTECTION SYSTEMS IN CATASTROPHIC FAILURES IN POWER SYSTEMS. A. G. Phadke ROLE OF PROTECTION SYSTEMS IN CATASTROPHIC FAILURES IN POWER SYSTEMS A. G. Phadke Presentation outline: Some past blackouts in North America Why do blackouts occur? Defensive strategies Impact of evolving

More information

October 25, UM 1856 PGE's Plan to Advancing its Energy Storage Modeling Capability

October 25, UM 1856 PGE's Plan to Advancing its Energy Storage Modeling Capability Portland General Electric 121 SW Salmon Street Portland, Ore. 97204 PortlandGeneral.com October 25, 2018 Public Utility Commission of Oregon Attn: Filing Center 201 High Street, S.E. P.O. Box 1088 Salem,

More information

SUBMITTED VIA E-TARIFF FILING. March 1, 2017

SUBMITTED VIA E-TARIFF FILING. March 1, 2017 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax Gary D. Bachman (202) 298-1880 gdb@vnf.com SUBMITTED VIA E-TARIFF FILING March 1, 2017 The Honorable

More information

UE / PGE / 100 TOOMAN TINKER SCHUE BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON Power Costs PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of L. Alex Tooman- Jay Tinker

More information

Interpretype Video Remote Interpreting (VRI) Subscription Service White Paper September 2010

Interpretype Video Remote Interpreting (VRI) Subscription Service White Paper September 2010 Interpretype Video Remote Interpreting (VRI) Subscription Service White Paper September 2010 Overview: Interpretype Video Remote Interpreting (VRI) Subscription Service is a revolutionary method of scheduling,

More information

This Available Transfer Capability Implementation Document (ATCID) contains the required information as specified in NERC MOD-001-1a, R3.

This Available Transfer Capability Implementation Document (ATCID) contains the required information as specified in NERC MOD-001-1a, R3. Puget Sound Energy Transmission Available Transfer Capability Implementation Document Version Posted: February 14, 2014 Version Effective: February 14, 2014 Revision No.: 0.4 Section 1 Purpose: This Available

More information

Power Blackouts and the Domino Effect: Real-Life examples and Modeling

Power Blackouts and the Domino Effect: Real-Life examples and Modeling Power Blackouts and the Domino Effect: Real-Life examples and Modeling Ingve Simonsen Dep. of Physics, NTNU (Trondheim) Collaborators: Lubos Buzna, Zilina Karsten Peters, Dresden Stefan Bornholdt, Bremen

More information

PRINCE GEORGE S COUNTY PUBLIC SCHOOLS Board of Education Upper Marlboro, Maryland Policy No. BOARD OF EDUCATION POLICY

PRINCE GEORGE S COUNTY PUBLIC SCHOOLS Board of Education Upper Marlboro, Maryland Policy No. BOARD OF EDUCATION POLICY PRINCE GEORGE S COUNTY PUBLIC SCHOOLS Board of Education Upper Marlboro, Maryland BOARD OF EDUCATION POLICY 4200 Policy No. PERSONNEL Employee and 4-205 Appeals Before the Board of Education I. Purpose

More information

Z E N I T H M E D I C A L P R O V I D E R N E T W O R K P O L I C Y Title: Provider Appeal of Network Exclusion Policy

Z E N I T H M E D I C A L P R O V I D E R N E T W O R K P O L I C Y Title: Provider Appeal of Network Exclusion Policy TheZenith's Z E N I T H M E D I C A L P R O V I D E R N E T W O R K P O L I C Y Title: Provider Appeal of Network Exclusion Policy Application: Zenith Insurance Company and Wholly Owned Subsidiaries Policy

More information

Excess BTM Production. Issue Paper

Excess BTM Production. Issue Paper Excess BTM Production Issue Paper Date paper published: June 28, 2018 Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 4 4. Scope... 5 5. Clarification

More information

Pacific Southwest Blackout on September 8, 2011 at 15:27

Pacific Southwest Blackout on September 8, 2011 at 15:27 PES GM 2013, Vancouver, Canada July 24, 2013 1 Pacific Southwest Blackout on September 8, 2011 at 15:27 Canada, July 24 th, 2013 Dr. Milorad Papic mpapic@idahopower.com 2 Outline 1. Generic Scenario for

More information

Planning Document NPA 418 Numbering Relief

Planning Document NPA 418 Numbering Relief Planning Document NPA 418 Numbering Relief Version 1.0 July 11, 2007 Canadian Numbering Administrator (CNA) Suresh Khare 613-563-7242-315 60 Queen Street, Suite 1516 Ottawa, Ontario K1P 5Y7 khares@saiccanada.com

More information

Addressing a New Interconnection Reliability Operating Limit

Addressing a New Interconnection Reliability Operating Limit Addressing a New Interconnection Reliability Operating Limit Phil O Donnell Manager, Operations and Planning Audits What is an Interconnection Reliability Operating Limit (IROL)? 2 NERC definition Development

More information

Configure Geolocation and Location Conveyance

Configure Geolocation and Location Conveyance Geolocation and Location Conveyance Overview, page 1 Geolocation and Location Conveyance Task Flow, page 1 Geolocation and Location Conveyance Overview Use Geolocations to define the geographical location

More information

Open Season Questions and Answers. Posted: November 26, 2013

Open Season Questions and Answers. Posted: November 26, 2013 Portland General Electric Transmission & Reliability Services Open Season Questions and Answers Posted: November 26, 2013 1. What Transmission and Ancillary Services would apply to the transmission awarded

More information

Table of Contents. UM 1912 / PGE 600 Goodspeed - Jordan / 1. UM 1912 Resource Value of Solar Reply Testimony

Table of Contents. UM 1912 / PGE 600 Goodspeed - Jordan / 1. UM 1912 Resource Value of Solar Reply Testimony UM / PGE 00 Goodspeed - Jordan / Table of Contents I Introduction and Summary... II Response to OPUC Commission s Staff Comments... III Response to Renewable Northwest s Comments... IV. OSEIA s Comments

More information

Rationales for FAC August 2018

Rationales for FAC August 2018 Rationales for FAC-014-3 August 2018 Requirement R1 Each Reliability Coordinator shall establish Interconnection Reliability Operating Limits (IROLs) for its Reliability Coordinator Area in accordance

More information

Supporting Reference for Indentification of Interconnection Reliability Operating Limits

Supporting Reference for Indentification of Interconnection Reliability Operating Limits Purpose Planning Authorities (PAs), Transmission Planners (TPs), and Reliability Authorities (RAs) identify System Operating Limits (SOLs) via various planning and operating studies and real-time experience.

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON ORDER NO. 00-391 ENTERED JUL 20 2000 This is an electronic copy. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE 112 In the Matter of Portland General Electric Company s Advice

More information

Is Energize Eastside needed?

Is Energize Eastside needed? Is Energize Eastside needed? Questioning PSEs Motive and Proof By: J. Richard Lauckhart Energy Consultant, Davis, Ca lauckjr@hotmail.com Former VP at Puget 1 Why am I involved? I now live in California

More information

Balancing Authority ACE Limit

Balancing Authority ACE Limit Balancing Authority ACE Limit Proof-of-Concept of Field Trial Project 2010-14 WECC Update Discussion November 30, 2010 DISCUSSION STARTING AT 3:30 30 PM EDT Doug Hils Duke Energy Balancing Authority Reliability-based

More information

MAIN Investigation Report on the Level 5 TLR Event Stiles to Amberg for the outage of Morgan to Plains Flowgate 3525 April 1 through April 3, 2001

MAIN Investigation Report on the Level 5 TLR Event Stiles to Amberg for the outage of Morgan to Plains Flowgate 3525 April 1 through April 3, 2001 MAIN Investigation Report on the Level 5 TLR Event Stiles to Amberg for the outage of Morgan to Plains Flowgate 3525 April 1 through April 3, 2001 May 15, 2001 This report is submitted in accordance with

More information

SPECIAL DISCLAIMER FOR INTERPRETING SERVICES INVOLVING CALLS TO EMERGENCY SERVICE PROVIDERS (911/E911), OR LEGAL, MEDICAL OR MENTAL HEALTH ISSUES

SPECIAL DISCLAIMER FOR INTERPRETING SERVICES INVOLVING CALLS TO EMERGENCY SERVICE PROVIDERS (911/E911), OR LEGAL, MEDICAL OR MENTAL HEALTH ISSUES SPECIAL DISCLAIMER FOR INTERPRETING SERVICES INVOLVING CALLS TO EMERGENCY SERVICE PROVIDERS (911/E911), OR LEGAL, MEDICAL OR MENTAL HEALTH ISSUES Governing Language. The English language version of this

More information

Purpose: Policy: The Fair Hearing Plan is not applicable to mid-level providers. Grounds for a Hearing

Purpose: Policy: The Fair Hearing Plan is not applicable to mid-level providers. Grounds for a Hearing Subject: Fair Hearing Plan Policy #: CR-16 Department: Credentialing Approvals: Credentialing Committee QM Committee Original Effective Date: 5/00 Revised Effective Date: 1/03, 2/04, 1/05, 11/06, 12/06,

More information

Setting the Record Straight on Energize Eastside s Technical Facts

Setting the Record Straight on Energize Eastside s Technical Facts 1 Setting the Record Straight on Energize Eastside s Technical Facts From: Rich Lauckhart To: city council and staff Executive Summary The most important aspect of any major transmission project is the

More information

REGIONAL SPECIALIZED GERIATRIC SERVICES GOVERNANCE AUTHORITY. Call for Expressions of Interest from Seniors Advocate/Public Member

REGIONAL SPECIALIZED GERIATRIC SERVICES GOVERNANCE AUTHORITY. Call for Expressions of Interest from Seniors Advocate/Public Member REGIONAL SPECIALIZED GERIATRIC SERVICES GOVERNANCE AUTHORITY Call for Expressions of Interest from Seniors Advocate/Public Member A. BACKGROUND Specialized Geriatric Services (SGS) provide a range of services

More information

ANNUAL REPORT

ANNUAL REPORT Surgical Hearing Implant Program Otolaryngology ANNUAL REPORT 2012-2013 Department Name 1 Executive Summary Vision To enrich communication and quality of life for Manitobans by delivering safe, accessible

More information

Modeling Notification Recommended Practices for Modeling Momentary Cessation Distribution: April 2018

Modeling Notification Recommended Practices for Modeling Momentary Cessation Distribution: April 2018 Modeling Notification Recommended Practices for Modeling Momentary Cessation Distribution: April 2018 This Modeling Notification provides Generator Owners who own inverter-based resources, particularly

More information

North Simcoe Muskoka Specialized Geriatric Services Program ACCOUNTABILITY & AUTHORITY FRAMEWORK

North Simcoe Muskoka Specialized Geriatric Services Program ACCOUNTABILITY & AUTHORITY FRAMEWORK North Simcoe Muskoka Specialized Geriatric Services Program ACCOUNTABILITY & AUTHORITY FRAMEWORK February 4, 2016 March 31, 2018 SPECIALIZED GERIATRIC SERVICES PROGRAM ACCOUNTABILITY & AUTHORITY FRAMEWORK

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS UNEP/MC/COP.2/INF/7 Distr.: General 15 November 2018 English only MC United Nations Environment Programme Conference of the Parties to the Minamata Convention on Mercury Second meeting Geneva,

More information

Western Area Power Administration, Conditional Firm Transmission Service Business Practice

Western Area Power Administration, Conditional Firm Transmission Service Business Practice Western Area Power Administration Conditional Firm Transmission Service Business Practice Background: In Order No. 890, dated February 16, 2007, the Federal Energy Regulatory Commission ( FERC or Commission

More information

MOVEMBER FUNDED MEN S HEALTH INFORMATION RESOURCES EVALUATION BRIEF. 1 P age

MOVEMBER FUNDED MEN S HEALTH INFORMATION RESOURCES EVALUATION BRIEF. 1 P age MOVEMBER FUNDED MEN S HEALTH INFORMATION RESOURCES EVALUATION BRIEF 1 P age Contents 1. Purpose... 3 2. Background... 3 3. beyondblue, the national depression and anxiety initiative... 4 4. Movember funded

More information

ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2017

ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2017 ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2017 The ASCAP Screen Music Awards will be held on May 16, 2017. These Official Rules and Regulations (the Rules ) govern the ASCAP Screen Music

More information

TERMINATION OF EMPLOYMENT HEARINGS BEFORE HEARING EXAMINER

TERMINATION OF EMPLOYMENT HEARINGS BEFORE HEARING EXAMINER Applicability This hearing process applies only if an employee requests a hearing after receiving notice of a proposed decision to: 1. Terminate a continuing contract at any time, except as provided below;

More information

EBS IT Meeting September 2016

EBS IT Meeting September 2016 EBS IT Meeting 19 14 September 2016 Conference Call Details Conference call: UK Numbers Tel: 0808 238 9819 or Tel: 0207 950 1251 Participant code: 4834 7876... Join online meeting https://meet.nationalgrid.com/antonio.delcastillozas/n8hp8j80

More information

Review of National Disability Insurance Scheme Decisions Practice Direction

Review of National Disability Insurance Scheme Decisions Practice Direction Review of National Disability Insurance Scheme Decisions Practice Direction 1 July 2013 This Practice Direction explains what we will do when we review a decision made by the National Disability Insurance

More information

Standard FAC Establish and Communicate System Operating Limits

Standard FAC Establish and Communicate System Operating Limits A. Introduction 1. Title: Establish and Communicate System Operating Limits 2. Number: FAC-014-2 3. Purpose: To ensure that System Operating Limits (SOLs) used in the reliable planning and operation of

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 1 1 1 COALITION OF EASTSIDE NEIGHBORHOODS FOR SENSIBLE ENERGY (CENSE), a nonprofit Washington corporation; CITIZENS FOR SANE EASTSIDE ENERGY

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1832

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1832 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1832 Served electronically at Salem, Oregon, 4/28/17, to: Respondent's Attorney Denise Saunders Portland General Electric Company 121 SW Salmon Street

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 5.d Meeting Date: June 19, 2017 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: City Manager s Office Prepared by: Andrew Hening, Director of Homeless Planning & Outreach City Manager

More information

Primary Health Networks

Primary Health Networks Primary Health Networks Drug and Alcohol Treatment Activity Work Plan 2016-17 to 2018-19 Drug and Alcohol Treatment Budget Gippsland When submitting this Activity Work Plan 2016-2018 to the Department

More information

Golden Spike Athletic Club of the Deaf. Compiled & Written by Jodi B. Kinner Edited by Valerie G. Kinney

Golden Spike Athletic Club of the Deaf. Compiled & Written by Jodi B. Kinner Edited by Valerie G. Kinney Golden Spike Athletic Club of the Deaf Compiled & Written by Jodi B. Kinner Edited by Valerie G. Kinney 2014 Note This Golden Spike Athletic Club of the Deaf article is quoted directly from the Tenth Anniversary

More information

WORLD FEDERATION OF ENGINEERING ORGANIZATIONS

WORLD FEDERATION OF ENGINEERING ORGANIZATIONS DRAFT World Federation of Engineering Organizations Committee on Engineering and the Environment Teleconference Meeting #4 July 5, 2011 Meeting Summary 1. WELCOME AND INTRODUCTIONS The following persons

More information

University of Northern Iowa Dance Marathon Constitution Last Updated: August 21, 2016

University of Northern Iowa Dance Marathon Constitution Last Updated: August 21, 2016 University of Northern Iowa Dance Marathon Constitution Last Updated: August 21, 2016 ARTICLE I Name The name of this organization shall be University of Northern Iowa Dance Marathon hereafter referred

More information

Israeli Medical Association

Israeli Medical Association Israeli Medical Association What physicians can do to address SDOH in their role as commissioners, managers and employers Adv. Leah Wapner Secretary-General IMA 25.03.2015 Israel s economy at a Glance

More information

Setting the scene Background of the Radiation Protection Culture initiative

Setting the scene Background of the Radiation Protection Culture initiative IRPA IOMP WHO Workshop Radiation Protection Culture in Medicine Geneva, 30.11. 02.11.2015 Setting the scene Background of the Radiation Protection Culture initiative Bernard Le Guen, IRPA Executive Officer

More information

Errol Davis Director of Research and Development Sound Linked Data Inc. Erik Arisholm Lead Engineer Sound Linked Data Inc.

Errol Davis Director of Research and Development Sound Linked Data Inc. Erik Arisholm Lead Engineer Sound Linked Data Inc. An Advanced Pseudo-Random Data Generator that improves data representations and reduces errors in pattern recognition in a Numeric Knowledge Modeling System Errol Davis Director of Research and Development

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 283. Production O&M PORTLAND GENERAL ELECTRIC COMPANY. Direct Testimony and Exhibits of

BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 283. Production O&M PORTLAND GENERAL ELECTRIC COMPANY. Direct Testimony and Exhibits of Quennoz Weitzel BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE Production O&M PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of Stephen Quennoz David Weitzel February,

More information

PROBABILISTIC SECURITY ASSESSMENT FOR POWER SYSTEM OPERATIONS

PROBABILISTIC SECURITY ASSESSMENT FOR POWER SYSTEM OPERATIONS PROBABILISTIC SECURITY ASSESSMENT FOR POWER SYSTEM OPERATIONS Prepared by the Task Force on Probabilistic Aspects of Reliability Criteria of the IEEE PES Reliability, Risk, and Probability Applications

More information

Exhibit 2 RFQ Engagement Letter

Exhibit 2 RFQ Engagement Letter Exhibit 2 RFQ 17-25 Engagement Letter The attached includes the 6 page proposed engagement letter to be used by HCC. ENGAGEMENT LETTER Dear: [Lead Counsel/Partner] We are pleased to inform you that your

More information

BEFORE THE COUNCIL OF THE CITY OF NEW ORLEANS

BEFORE THE COUNCIL OF THE CITY OF NEW ORLEANS BEFORE THE COUNCIL OF THE CITY OF NEW ORLEANS IN RE: APPLICATION OF ENTERGY NEW ) ORLEANS, INC. FOR APPROVAL TO ) CONSTRUCT NEW ORLEANS POWER ) DOCKET NO. UD--0 STATION AND REQUEST FOR COST RECOVERY )

More information

Request for Proposals. Enhancing and Updating the Canadian Evaluation Society Sanctioned. Logic Model Workshop. Canadian Evaluation Society

Request for Proposals. Enhancing and Updating the Canadian Evaluation Society Sanctioned. Logic Model Workshop. Canadian Evaluation Society Request for Proposals Enhancing and Updating the Canadian Evaluation Society Sanctioned Logic Model Workshop Canadian Evaluation Society March 2011 Contents 1.0 Proposal Content and Requirements... 1 2.0

More information

May 12, In the Matter of Portland General Electric Co Integrated Resource Plan Docket No. LC 66

May 12, In the Matter of Portland General Electric Co Integrated Resource Plan Docket No. LC 66 STEPHEN C. HALL 503.290.2336 telephone stephen.hall@troutmansanders.com TROUTMAN SANDERS LLP Attorneys at Law 100 SW Main St., Suite 1000 Portland, Oregon 97204 503.290.2400 telephone troutmansanders.com

More information

Qualitative versus Quantitative?

Qualitative versus Quantitative? Research Methods for Political Science Qualitative versus Quantitative? Dr. Thomas Chadefaux Assistant Professor in Political Science Thomas.chadefaux@tcd.ie 1 Research design the plan of a study that

More information

3. TLR levels, timing, and relief requested amounts. TLRs levels, timing and relief requested amounts are shown on pages 2 and 3.

3. TLR levels, timing, and relief requested amounts. TLRs levels, timing and relief requested amounts are shown on pages 2 and 3. ICTE TLR 5 Investigation Report Flowgate 16445 (West Memphis - Bh Steel 500 kv for the loss of Sanssouci - Shelby 500 kv) TLR Level 5: July 30, 2010 Report Issued: 1. Description of purpose/cause of hold/curtailment.

More information

(City, State, Zip Code)

(City, State, Zip Code) This Partner Agency Agreement, dated this day of, 2015, is between COMMUNITY FOOD SHARE, INC. (CFS), whose address is 650 South Taylor Avenue, Louisville, CO 80027, and (Partner Agency) whose address is

More information

PROPOSED WORK PROGRAMME FOR THE CLEARING-HOUSE MECHANISM IN SUPPORT OF THE STRATEGIC PLAN FOR BIODIVERSITY Note by the Executive Secretary

PROPOSED WORK PROGRAMME FOR THE CLEARING-HOUSE MECHANISM IN SUPPORT OF THE STRATEGIC PLAN FOR BIODIVERSITY Note by the Executive Secretary CBD Distr. GENERAL UNEP/CBD/COP/11/31 30 July 2012 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Eleventh meeting Hyderabad, India, 8 19 October 2012 Item 3.2 of

More information

OREGON Food & Beverage Opportunity. Oregon Food & Beverage Leadership Council

OREGON Food & Beverage Opportunity. Oregon Food & Beverage Leadership Council OREGON Food & Beverage Opportunity Oregon Food & Beverage Leadership Council Development of Oregon s food and beverage industry, in particular the manufacture of value-added, traded-sector branded food

More information

Background. Recommendation 1

Background. Recommendation 1 TABLED DOCUMENT 222-18(3) TABLED ON OCTOBER 11, 2018 GOVERNMENT OF THE NORTHWEST TERRITORIES RESPONSE TO COMMITTEE REPORT 7-18(3): REPORT ON THE REVIEW OF BILL 6: CANNABIS LEGALIZATION AND REGULATION IMPLEMENTATION

More information

INACTIVE/SUSPENDED/EXPELLED SORORS. Inactive Sorors. The purpose of this document is to expand and clarify existing bylaws and policies already

INACTIVE/SUSPENDED/EXPELLED SORORS. Inactive Sorors. The purpose of this document is to expand and clarify existing bylaws and policies already INACTIVE/SUSPENDED/EXPELLED SORORS Inactive Sorors The purpose of this document is to expand and clarify existing bylaws and policies already adopted by this sorority which govern the actions and activities

More information

PROTECTING THE SPORT: GUIDE TO FEDERATION RULE ENFORCEMENT AND HEARING PROCESS

PROTECTING THE SPORT: GUIDE TO FEDERATION RULE ENFORCEMENT AND HEARING PROCESS PROTECTING THE SPORT: GUIDE TO FEDERATION RULE ENFORCEMENT AND HEARING PROCESS COVER PHOTO:SHAWN MCMILLEN INTRODUCTION This pamphlet has been drafted to provide general information and to help you understand

More information

4. The time limit, not less than thirty (30) calendar days, for requesting a Hearing in writing.

4. The time limit, not less than thirty (30) calendar days, for requesting a Hearing in writing. SUBJECT: SECTION: CREDENTIALING POLICY NUMBER: CR-05B EFFECTIVE DATE: 04/13 Applies to all products administered by The Plan except when changed by contract Application When the Corporate Credentialing

More information

The mission of AIGA is to advance designing as a professional craft, strategic tool and vital cultural force. Mission statement

The mission of AIGA is to advance designing as a professional craft, strategic tool and vital cultural force. Mission statement How AIGA is organized AIGA is a nonprofit professional membership organization founded in 1914, incorporated in the state of New York and headquartered in New York City. It is a volunteer membership organization

More information

A Comparative Analysis of Fertility Plateau In Egypt, Syria and Jordan: Policy Implications

A Comparative Analysis of Fertility Plateau In Egypt, Syria and Jordan: Policy Implications A Comparative Analysis of Fertility Plateau In Egypt, Syria and Jordan: Policy Implications Executive Summary by Hoda Rashad and Hassan Zaky Social Research Center The American University in Cairo March

More information

Sound Quality Evaluation of Hermetic Compressors Using Artificial Neural Networks

Sound Quality Evaluation of Hermetic Compressors Using Artificial Neural Networks Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2006 Sound Quality Evaluation of Hermetic Compressors Using Artificial Neural Networks Claudio

More information

Dental Therapists: Increasing Access to Dental Care. Kristen R. Boilini Pivotal Policy Consulting. Dental Care for AZ. Dental Care for AZ

Dental Therapists: Increasing Access to Dental Care. Kristen R. Boilini Pivotal Policy Consulting. Dental Care for AZ. Dental Care for AZ Dental Therapists: Increasing Access to Dental Care Kristen R. Boilini Pivotal Policy Consulting July 14, 2017 Why Dental Therapy? Vast rural areas and Tribal reservations 2.3 million Arizonans lack access

More information

Graduate Student Academic Grievance Hearing Procedures. For the College of Education

Graduate Student Academic Grievance Hearing Procedures. For the College of Education Graduate Student Academic Grievance Hearing Procedures For the College of Education The Michigan State University Student Rights and Responsibilities (SRR) and the Graduate Student Rights and Responsibilities

More information

Remote Centralized Interpreting

Remote Centralized Interpreting Remote Centralized Interpreting October 2012 Background Orange County (Orlando) Population 1.1 Million 54 Judges 6 Magistrates 3 Hearing Officers Osceola County (Kissimmee) Population 267,000 11 Judges

More information

WASHINGTON AREA SECULAR HUMANISTS MEMBERSHIP HANDBOOK

WASHINGTON AREA SECULAR HUMANISTS MEMBERSHIP HANDBOOK WASHINGTON AREA SECULAR HUMANISTS MEMBERSHIP HANDBOOK First Edition February, 2004 TABLE OF CONTENTS INTRODUCTION... 3 WHAT IS WASH?... 4 MEMBERSHIP... 5 LOCAL CHAPTERS... 5 SPECIAL INTEREST GROUPS...

More information

Chiropractic Community Health Alliance. Serving America's Healthcare Safety Net. Guide To Integration

Chiropractic Community Health Alliance. Serving America's Healthcare Safety Net. Guide To Integration Chiropractic Community Health Alliance Serving America's Healthcare Safety Net Guide To Integration Guide to Integration Table of Contents Integrating Chiropractic Care in FQHC P.2 Medicaid Benefits for

More information

1. POSITION TITLE : Technical Advisor, TB and HIV. 2. PERIOD OF PERFORMANCE : Two (2) years, with the possibility of

1. POSITION TITLE : Technical Advisor, TB and HIV. 2. PERIOD OF PERFORMANCE : Two (2) years, with the possibility of VACANCY POSITION GLOBAL FUND COORDINATING UNIT (GFCU) 1. POSITION TITLE : Technical Advisor, TB and HIV 2. PERIOD OF PERFORMANCE : Two (2) years, with the possibility of 3. PLACE OF PERFORMANCE : Maseru,

More information

Guidelines for the selection of NGO under the National Programme for Prevention and control of Deafness

Guidelines for the selection of NGO under the National Programme for Prevention and control of Deafness Guidelines for the selection of NGO under the National Programme for Prevention and control of Deafness Preamble Hearing loss is the most common sensory deficit in humans today. World over, it is the second

More information

ST. JUDE MEDICAL / THORATEC TRANSACTION HIGHLIGHTS July 22, 2015

ST. JUDE MEDICAL / THORATEC TRANSACTION HIGHLIGHTS July 22, 2015 ST. JUDE MEDICAL / THORATEC TRANSACTION HIGHLIGHTS July 22, 2015 1 FORWARD LOOKING STATEMENT This presentation contains forward-looking statements within the meaning of the Private Securities Litigation

More information

Global HPV Vaccine Market: Analysis By End-User (Male, Female), By Age Group (Adolescents, Adults) - By Region, By Country ( )

Global HPV Vaccine Market: Analysis By End-User (Male, Female), By Age Group (Adolescents, Adults) - By Region, By Country ( ) Global HPV Vaccine Market: Analysis By End-User (Male, Female), By Age Group (Adolescents, Adults) - By Region, By Country (2017-2022) By Region- North America, Europe, APAC and RoW By Country - United

More information

Auditorily Impaired / Visually Impaired. Memorandum of Understanding. between the Interagency Council on Early Childhood Intervention (ECI)

Auditorily Impaired / Visually Impaired. Memorandum of Understanding. between the Interagency Council on Early Childhood Intervention (ECI) Auditorily Impaired / Visually Impaired Memorandum of Understanding between the Interagency Council on Early Childhood Intervention (ECI) and the Texas Education Agency (TEA) Table of Contents I. Purpose...

More information

TENANT'S GUIDE. City of Oakland Rent Adjustment Program

TENANT'S GUIDE. City of Oakland Rent Adjustment Program City of Oakland Rent Adjustment Program TENANT'S GUIDE Introduction: The City of Oakland encourages investment in residential housing while also protecting the welfare of residential tenants. The City

More information

Kidney Transplantation

Kidney Transplantation James Lind Alliance Priority Setting Partnership in Kidney Transplantation PROTOCOL Version 1.4 12 th June 2014 Purpose The purpose of this protocol is to set out the aims, objectives and commitments of

More information

ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2018*

ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2018* ASCAP SCREEN MUSIC AWARDS OFFICIAL RULES AND REGULATIONS 2018* The ASCAP Screen Music Awards will be held on May 23, 2018. These Official Rules and Regulations (the Rules ) govern the ASCAP Screen Music

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES SPONSORSHIP OPPORTUNITIES 2014 ANNUAL REPORT Contact: Ilene Goldberg, Manager, Membership and CoP Relations (703) 387-3049 igoldberg@leanconstruction.org SUMMARY IN 2014 the Lean Construction Institute

More information

HEARING CONSERVATION PROCEDURE

HEARING CONSERVATION PROCEDURE HEARING CONSERVATION PROCEDURE 1. PURPOSE The purpose of this procedure is to prevent permanent and temporary occupational hearing loss that may result from impulsive, intermittent or continuous noise

More information

Economic Evaluation. Introduction to Economic Evaluation

Economic Evaluation. Introduction to Economic Evaluation Economic Evaluation Introduction to Economic Evaluation This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike License. Your use of this material constitutes acceptance of

More information

What if someone complains about me? A guide to the complaint process

What if someone complains about me? A guide to the complaint process What if someone complains about me? A guide to the complaint process Introduction The purpose of the licensed building practitioner scheme is to set performance standards for building practitioners and

More information