Update on the Transit Proposals

Similar documents
The Home Stretch: Issues and Areas of Agreement MTTF MEETING #

Michigan Avenue Corridor Study. Joint Policy / Technical Committee Meeting Wednesday, May 11, 2016

DRAFT. Figure 5.15: San Rafael Basin Workers, 2008

Public Workshop. June 5, Halton Region Transportation Master Plan 2031 The Road to Change December 1,

TRANSPORTATION MANAGEMENT ASSOCIATIONS CAN HELP YOU WITH OUTREACH DURING CONSTRUCTION MANAGEMENT

Proposed Foxborough Service Pilot

APRIL 2018 PERFORMANCE REPORT

Public Hearing Summary Report

Who is TOD in Metro Denver? April Employee Survey Report. Appendix C: Responses to Survey Questions by Business Type

Copenhagen Airports Long Term Capacity Plan

RISK ALLOCATION IN TRANSPORTATION INFRASTRUCTURE PROJECTS

City of Mesquite, Texas

Project Background and Need

2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018

American Society of Highway. Beardsley Connector Project. Jacob Dean

PURSUING A WAYNE-WASHTENAW TRANSIT STRATEGY

Most recently amended on January 12, 2010 by resolution 10-R Originally adopted on September 6, 1977, by Resolution No. 77-R-5705.

Proposed Foxborough Service Pilot

CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS

SCOPE OF WORK TASK 1 BASE MAPPING

North Tarrant Express Segments 2-4. Draft List of Facilities

Cotton Belt Regional Rail Corridor Project

Congestion Management Process 2013 Update

HIGH SCHOOL BOUNDARY ADJUSTMENT. April 19, 2018 Board Workshop

DULLES CONNCECTOR ROAD SOUND WALL PROJECT FUNDAMENTALS OF TRAFFIC NOISE AND RESULTS. Paul M. Kohler Noise Abatement Program Manager

Comparison of Urban Transit Planning Responses to Pandemic Influenza. Rahul Gupta, MPA David Abramson, PhD MPH

Policy Research CENTER

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

TECHNICAL APPENDIX. E. PMT Meeting #5

Safeguarding Minority Civil Rights and Environmental Justice in Service Delivery and Reductions

Public Health Opportunities for Transit

IH 820 SOUTHEAST CORRIDOR STUDY

Northern Rivers Public Transport Commuter Bus Plan

C/CAG. City/County Association of Governments Annual Report

2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)

Environmental Justice Considerations involving Toll Roads

Metro Police Crime Statistics and Significant Facts

Directional Plan Vision Care Strategy. Central East LHIN Board of Directors December 17, 2014

APPENDIX B TABLE OF ROADWAY PROJECTS AND COSTS (YEAR OF EXPENDITURE COSTS) BOK TOWER IN LAKE LOCATION

ParkScore. Youth Physical Activity. Outdoor Spaces & Buildings

PARSONS PHARMACY REDEVELOPMENT

Phase Three Public Comment Summary Report

Transportation Sustainability Program

American Amateur Karate Federation 2015 Spring NATIONAL SEMINAR April 17-19

Public Outreach and Comments

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE

The Influence of the Built Environment on Obesity in Oregon

TRANSIT AUTHORITY OF NORTHERN KENTUCKY Board of Directors January 10, 2018

Corte Madera Sales Tax Measure B

Tasks 8 and 9 Recommendations and Implementation Plan

Welcome. Getting out and about easily: Developing a Movement and Access Plan for Newcastle

Working Group Meeting #3 DRAFT Summary September 27, 2017

The Proposed Pilot Extension of MBTA Commuter Rail Service to Foxborough Response to Questions Posed by the Fiscal & Management Control Board

Impact of Individual Daily Travel Pattern on Value of Time

A1 in Northumberland Improvements Report on the Public Consultation

WELCOME TO THE ENGINEERING SUCCESS IN THE GREATER TORONTO AREA WEBINAR. Presented by

Information for patients. The Cambridge Heart Clinic. World class private patient cardiology services in partnership with Addenbrooke s Hospital

MEDICAL EDUCATION SEMINAR

MINNESOTA HIGH-SPEED RAIL COMMISSION MEETING GOODHUE COUNTY JUSTICE CENTER, RED WING MAY 3, 2012 MEETING SUMMARY MEMBERS:

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

Customer Service and Operations Committee Board Information Item III-B January 13, 2011 Pay Phone Program

FM 471 FROM SH 211 TO OLD FM 471 MEDINA AND BEXAR COUNTIES. Public Hearing January 22, :00 p.m.

OneHome Asset Map: A Step in Building Regional Partnerships. Metro Denver Homeless Initiative. March 2017

PRI MER * WHERE GA400 EXIT 7 &ROSWELL. GA400 and Holcomb Bridge Road is a major connection of Roswell to other major parts of Atlanta retail

All New, All Cool. The New MIX, Mixed Dentition Orthodontics and Pediatric Dental Seminar. Thursday and Friday with Dr.

Regional Transit Coordination Plan Way-Finding Focus Group Study Final Report. August 2003

A look at the past, present and future of Anderson s Main Street

I am running for City Council in order to bring honor to this community, and to demonstrate that even in the midst of change, our values remain.

PCT 101. A Perceptual Control Theory Primer. Fred Nickols 8/27/2012

CORRIENTE RESOURCES INC.

Impact of Personal Attitudes on Propensity to Use Autonomous Vehicles for Intercity Travel

HEALTH & SAFETY PERFORMANCE GRAPHS

SAN MATEO COUNTY CITY SELECTION COMMITTEE

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa

Annual Spring STD Intensive

WMC DSRIP PPS Project Plans Application Section 4

COUNCIL AGENDA REPORT

Precursor Systems Analyses of Automated Highway Systems. Roadway Deployment Analysis and Impact of AHS. Battelle Task I Page 1

Survey: Metro Detroiters Want Better Transit and Are Willing to Pay for It

Ear, Nose & Throat (ENT) - Head & Neck Surgery. Cholesteatoma

Equity, Opportunity and Good Health: How Transportation affects the Essential Qualities of Life in Metro Vancouver SFU City Program Public Lecture 30

Pro-poor and Green Urban transport in Khulna, Bangladesh Session: Unexplored aspects of transportation in urban resilience

Lesson Week 8 Systems Archetypes: A Practical Tool for Decision Making and Management

FHWA Meetings and Topics Discussed

CAMPO 2040 PLAN PUBLIC INVOLVEMENT REPORT

John F. DeRosier. District Attorney Calcasieu Parish, Lake Charles Louisiana

Safe Mobility at Any Age Policy Forum Series

ReStart3:20 Business Plan

Trauma System Status Report

Pierce Transit. Four-Factor Analysis and Implementation Plan August 2018

PARSONS PHARMACY REDEVELOPMENT

Northern Virginia Homeless Shelter List

Photo courtesy Conrad N. Hilton Foundation. EVALUATION OF THE Conrad N. Hilton Foundation Chronic Homelessness Initiative 2015 REPORT

OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM. TRB Tunnel Workshop. January 11, 2009 Washington, DC

Transportation & Mobility Issues: A Report on the Needs and Barriers of Adults on the Autism Spectrum

Regional Municipality of Halton: Economic Development Strategy Discussion Paper #5

Elite Aquatic Therapy

GARAGE/~ K~ed~z~,~'e~ _

2018 ITS-NY TWENTY-FIFTH ANNUAL MEETING AND TECHNOLOGY EXHIBITION June 14 15, 2018

Transcription:

Update on the Transit Proposals Trent Lethco, Arup MTTF MEETING #9 2013-09-20 1

Agenda Short-Term Transit Proposal Ongoing analyses Recap Feedback Mid/Long-Term Transit Proposal Recap Feedback Next Steps 2

Short-Term Transit Proposal MTTF Meeting #9 2013-09-20 3

Analyses Downtown White Plains Traffic Analysis Nearing completion Meetings to follow Route 59 Traffic Analysis Data collection week of Sept 30 Targeted completion: Mid-October Meetings to follow Travel Time Analysis Ongoing Based on recorded travel speeds and drive-time surveys These tasks are informing the short-term transit proposal. 4

Recap of Short-Term Proposal West-of-Hudson: Hybrid local/express service leveraging strengths of TZx and TOR 59 East-of-Hudson: East/west, north/south BRT routes converging on White Plains 5

West-of-Hudson Routing 6

West-of-Hudson Re-time signals along Route 59 Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements 7

West-of-Hudson Re-time signals along Route 59 Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Included as a post-mttf implementation action. 8

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Revised. 9

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Included as an action for further study. 10

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Removed. 11

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Service to Tarrytown is largely for Metro North access. To boost ridership on TZx, moving the destination to White Plains serves the commute market to White Plains and the transfer to Metro North. 12

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements This can be included as a post-mttf action to study if directed by MTTF. Planning and traffic modeling required to understand impacts. 13

West-of-Hudson Include signal re-timing along Route 59 as an action Access Spring Valley Transit Center Show Piermont ROW as a routing option Remove Esther Gitlow Towers stop Maintain service to Tarrytown Study conversion of I-287 travel lane to HOV Short-term rail service enhancements Already included as a post-mttf implementation action. 14

East-of-Hudson Routing 15

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV 16

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV Yes 17

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV This is being evaluated as part of ongoing traffic analyses and will be discussed with local stakeholders. 18

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV It is presented as its own route. 19

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV Included. 20

East-of-Hudson All bus infrastructure in White Plains should be short-term New routing through White Plains Isolate route from White Plains to Valhalla as own route Add Platinum Mile stops to short-term Study conversion of I-287 travel lane to HOV Yes, this can be included as a post-mttf action to study further. Planning and traffic modeling required to understand impacts. 21

Mid/Long-Term Transit Proposal MTTF Meeting #9 2013-09-20 22

Recap BRT is preferred mode Conversion to LRT in long, long-term should not be precluded CRT in long, long-term not ruled out Monorail ruled out West-of-Hudson rail improvements (including potential new line) to serve NYC market 23

Mid/Long-Term Transit Proposal West-of-Hudson Rail Improvements Gateway Tunnel with Bergen Loop Infill Stations along Proposed BRT Routes BRT Infrastructure TOD HOV / HOT / XB Lanes on I-287 In-line Station at Palisades Center Interchange 10 Reconstruction White Plains Station Improvements White Plains TOD Plan 24

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center 25

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Should this be Included for further study to fully understand costs and benefits? 26

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Phasing must coincide with Thruway plans to upgrade I-287 crossings. Corridor preservation study included as a short term action to ensure I-287 widening possible when bridges are replaced along corridor. 27

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Need direction from MTTF. 28

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Does the MTTF believe this should be included in the final recommendations? 29

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Removed as outside of MTTF scope. Service currently being studied by Metro-North. 30

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Advanced to short-term. 31

Include Interchange 14X Adjust phasing of HOV/HOT/XB lanes on I-287 Include Tarrytown Connector Include ferry service Include service to Stewart Airport Move to short-term: White Plains Station improvements In-line station at Palisades Center Proposal should be studied in the corridor preservation program. Phasing must coincide with widening of I-287. 32

Next Steps MTTF Meeting #9 2013-09-20 33

Next Steps Meetings with City of White Plains / Westchester County Meetings with Rockland County Concept revision/refinement Presentation of final proposal to MTTF Implementation plan 34

Discussion MTTF Meeting #9 2013-09-20 35