Flood Hydrology. for. Michigan Watercourses
|
|
- Clemence Harvey
- 5 years ago
- Views:
Transcription
1 Flood Hydrology for Michigan Watercourses
2 Michigan Hydrologic Methodologies FEMA Flood Insurance Study (FIS) Statistical Analysis of USGS Gage Data (Gage) Statistical Models for Estimating Flow Characteristics of Michigan Streams (Regression) Drainage Area Ratio (DAR) Michigan s Modified SCS Method (SCS) NRCS TR-55 (TR-55) USACE HEC-HMS (HMS)
3 Delineate Watershed Watersheds delineated in GIS PDF map or shapefile provided upon request
4 Select Method
5 Flood Insurance Study Current and historical studies available from FEMA Map Service Center: msc.fema.gov FEMA offers subscription for notification of new/updated studies FIS used when available
6 USGS Gage Analysis 193 continuously-recording gages in Michigan 452 total gages (operating and discontinued) in Michigan Data available at waterdata.usgs.gov Data searchable by various parameters
7 USGS Gage Analysis 30 peaks for statistical analysis 20 peaks sufficient in some cases Longer records preferable Gage extension HEC-FFA used for HSDSU analysis PeakFQ available from USGS
8 Regression Analysis Methodology published in Statistical Models for Estimating Flow Characteristics of Michigan Streams, USGS, 1984 Methodology based on gage analyses Data published for each studied gage Ungaged watersheds with DA>20 square miles Flow adjustment may be applied NSS available free from USGS
9 Regression Analysis Input parameters for Regression method: (Contributing) Drainage Area Slope Channel Swamp Slenderness Ratio Precipitation Soil Characteristics (geology)
10 Drainage Area Ratio Calculate flows based on known location Exponent 0.89 Valid 0.5 to 2.0 times drainage area
11 SCS Analysis Methodology published in Computing Flood Discharges for Small Ungaged Watersheds, MDEQ, rev Applies to watersheds up to 20 square miles Time of concentration >1.0 hour Underlying methodology is rainfall-runoff unit hydrograph methodology Michigan methodology developed using Michigan gages
12 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
13 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
14 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
15 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
16 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
17 SCS Analysis Input parameters for SCS method: (Contributing) Drainage Area (DA) Ponding Adjustment Time of Concentration (Tc) Runoff Curve Number (RCN) Precipitation
18 SCS Analysis
19 SCS Analysis
20 SCS Analysis
21 SCS Analysis
22 TR-55 Analysis Free software available from USDA Used when Tc<1.00 hour State-specific dimensionless unit hydrograph DA, Tc, RCN, rainfall same as SCS input Ponding adjustment applied outside TR-55
23 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
24 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
25 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
26 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
27 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
28 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
29 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
30 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
31 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
32 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
33 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
34 TR-55 Analysis TR-55 Model Components SCS spreadsheet data entry Open WinTR-55 Add/select dimensionless unit hydrograph Enter site information and input values Enter rainfall data Run calculation
35 HEC-HMS Model Software available free from USACE Typical uses: Reservoir routing Combine hydrographs Hydrograph requests Flows from SCS method Use SCS settings for RCN, precipitation Use Clark Transform, adjust storage coefficient
36 Services Hydrographs Matched to estimated peak Typically constructed/estimated Extrapolated from gage data where available Reservoir Routing Typically requested for dams Rating curve must be provided (elevation vs. volume/area vs. flow) Hydrology Review FEMA mapping projects Letters of Map Revision (LOMR)
37 Services Guidance and Training Michigan-specific hydrologic methodologies Appropriate method selection Mapping GIS shapefile or PDF of watershed GIS backup data if already created CSS Open GIS Portal
38
39 Susan E. Greiner, P.E. Environmental Engineer Hydrologic Studies and Dam Safety Unit Water Resources Division Department of Environmental Quality
Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico
Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to
More informationPEACHLAND CREEK WATERSHED (Second Year of Snowline Data)
Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed
More informationUrban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey
Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver
More informationDrainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016
Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)
More informationHYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE
HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0
More informationWhat Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.
What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor
More informationNORTH DAKOTA 2011 FLOOD EVENT
NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River
More informationA Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds
University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics
More informationColorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts
Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly
More informationDynamic Routing Applied to an Urban Subsurface Drainage System
Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview
More informationRTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map
RTKC- East Abutment Extension November 15, 2016 2.1. Figure 1. East Abutment Extension General Vicinity Map WP NATURAL RESOURCE CONSULTING, INC. 4 RTKC- East Abutment Extension November 15, 2016 2.2. Figure
More informationThe New Jersey Nonstructural Strategies Point System (NSPS)
2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)
More informationPEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:
PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE
More informationRevised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts
An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,
More informationFINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN
DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.
More informationLessons learned in multi-objective urban detention basin projects
Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban
More informationDecember 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020
December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,
More informationDRAINAGE ANALYSIS REPORT
DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite
More informationDoug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District
February 4, 2003 MEMORANDUM TO: File FROM: Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District SUBJECT: Proposed minimum
More informationDodge County Drainage Board
Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128
More informationTALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION
TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town
More informationGIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets
GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets Tony Bedogne, GISP GIS Technician Washtenaw County, MI bedognea@ewashtenaw.org
More informationAttachment E, Exhibit 1 Los Vaqueros Reservoir Recreation Model
Attachment E, Exhibit 1 Los Vaqueros Reservoir Recreation Model Proposition 1 February 2018 This page is intentionally left blank. LOS VAQUEROS RESERVOIR EXISTING DAY-USE FACILITIES Parking Equestrian/
More informationScott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office
Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan
More informationAlluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow
Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Mike Harvey Mussetter Engineering, Inc. WORK CONDUCTED FOR: New Mexico
More informationAppendix L. Vermont Stream Geomorphic Assessment. Flood History of Vermont Rivers. Vermont Agency of Natural Resources April, 2004
Vermont Stream Geomorphic Assessment Appendix L Flood History of Vermont Rivers Vermont Agency of Natural Resources April, 24 April, 24 -L- Vermont Agency of Natural Resources Flood History of Vermont
More informationSpatiotemporal Regime of Climate & Streamflow in the US Great Lakes Basin
Spatiotemporal Regime of Climate & Streamflow in the US Great Lakes Basin Boris Shmagin & Carol Johnston, South Dakota State University, Nir Y. Krakauer, City College of New York Introduction http://precedings.nature.com/documents/7/version/
More informationNILE RIVER WATER RESOURCES ANALYSIS
Tenth International Water Technology Conference, IWTC1 26, Alexandria, Egypt 39 NILE RIVER WATER RESOURCES ANALYSIS Medhat Aziz 1 and Sherine Ismail 2 1 Deputy Director, Nile Research Institute (NRI),
More informationARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA
ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS RIVER FLOW MANAGEMENT BY TULSA DISTRICT HYDROLOGY AND HYDRAULICS BRANCH AND LITTLE ROCK DISTRICT HYDROLOGY
More informationPA Water Quality Nontidal Network April 2016 Audit
PA Water Quality Nontidal Network April 2016 Audit findings and study plan design Feb 05, 2018 Overview: Nontidal Water Quality Monitoring For isokinetic sampling average stream velocity must be greater
More informationPlacer County Water Agency
Jnofflclal FERC-Generated PDF of 2589-36 Received by FERC OSEC 8/3/25 in Docket#: P-279- Placer County Water Agency pow~ Sysacm: 24625 Hanison St Mail: PO. Box 667 ~ U, Calffomm 9563 I (53) 367-2291 (5.])
More information2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT
Placer County Water Agency Middle Fork American River Project (FERC Project No. 2079) 2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency 144 Ferguson Road Auburn,
More informationBank Erosion and Bridge Scour
JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP
More informationRed River Valley Association 91st Annual Convention
Red River Valley Association 91st Annual Convention Michael Biggs, P.E., CFM Chief, Hydraulics & Technical Services Branch Little Rock District 18 February 2016 US Army Corps of Engineers Little Rock District
More informationPERFORMANCE OF THOMAS FIERING MODEL FOR GENERATING SYNTHETIC STREAMFLOW OF JAKHAM RIVER
Plant Archives Vol. 18 No. 1, 2018 pp. 325-330 ISSN 0972-5210 PERFORMANCE OF THOMAS FIERING MODEL FOR GENERATING SYNTHETIC STREAMFLOW OF JAKHAM RIVER Priyanka Sharma 1, S. R. Bhakar 2 and P. K. Singh 2
More informationRestoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012
Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals
More informationDevelopment of a Decision-Support Tool for Bridge Infrastructure Adaptation in Response to Climate-Induced Flood Risk. James Carl Banks.
Development of a Decision-Support Tool for Bridge Infrastructure Adaptation in Response to Climate-Induced Flood Risk By James Carl Banks Dissertation Submitted to the Faculty of the Graduate School of
More informationSlope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success.
Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success. By Paulo R.Rogerio,PE,Geotechnical Consulting Engineer Pomerode SC Brazil email: prrog@terra.com.br and Joao
More informationDeKalb County All Hazards Mitigation Plan Annual Evaluation Report
Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a
More informationRecalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation
2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William
More informationWelcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008
Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Cooperating Agencies US Army Corps of Engineers Philadelphia District Delaware River Basin Commission Pennsylvania
More informationFrancis E. Walter Reservoir Recreation Operations Plan for 2019
Revised: 24 October 2018 Francis E. Walter Reservoir Recreation Operations Plan for 2019 Note: This plan will remain the same for the next two years with the exception of dates, please reference Table
More informationFebruary 6, 2018 Boulder, CO James Creek & Left Hand Creek
Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationAPPENDIX A Existing Conditions Map
APPENDIX A Existing Conditions Map APPENDIX B Conceptual Improvements Plans Sheets B-B- APPENDIX C Soil Mapping Hydrologic Soil Group Albany County, New York (McKownville Stormwater Project Soils)
More informationDon Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description
Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID
More informationGetting Results: Measuring Postwildfire. Treatment Effectiveness
Getting Results: Measuring Postwildfire Erosion Control Treatment Effectiveness BAER Burned Area Emergency Response Pete Robichaud, R. Brown, P. Wohlgemuth, J. Wagenbrenner Rocky Mountain and Pacific Southwest
More informationStormwater Mitigation Worksheet
Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:
More informationCITY OF AUBURN, NEW YORK
CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24
More informationNatural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review
Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and
More informationHydrau-Tech, Inc. Engineering & Software
Hydrau-Tech, Inc. Engineering & Software HYDRAU-TECH, INC. H ydrau-tech, Inc. is an engineering consulting firm specializing since 1986 in openchannel hydraulics, watershed, river, and reservoir sedimentation,
More informationDissolved Oxygen Study Report
Dissolved Oxygen Study Report Richland Creek McCabe Park Nashville, Tennessee WATER QUALITY MONITORING PROGRAM 2011 Prepared August 2012 by Monette Rebecca, Executive Director World Wildlife Fund and Tennessee
More informationTwo-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota
Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional
More informationHydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District
Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff
More informationMissouri River Stage Trends Technical Report
Missouri River Stage Trends Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska September 2017 Paragraph MISSOURI
More informationABSCOUR 9 USERS MANUAL
OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as
More informationWALLENPAUPACK. Lake Wallenpaupack Operations during the April 2005 Flood
LAKE WALLENPAUPACK Lake Wallepaupack Operatios durig the April 2005 Flood Lake Performace Summary March-April Storm Evet LAKE WALLENPAUPACK Over 14 BG of water stored betwee March 28 ad April 3 icludig
More informationTechnical Memorandum. Andrew Kopania, EMKO Environmental Karen Spinardi, Spinardi Associates. Prepared by: Nathan Foged, Supervising Engineer
701 Pike Street, Suite 1200 Seattle, WA 98101 Technical Memorandum Phone: 206-624-0100 Fax: 206-749-2200 Prepared for: CEMEX Construction Materials, Inc. Project Title: Eliot Facility Reclamation Plan
More informationTHE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY
THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY NPDES PERMIT NO. AR342 ORIGINAL SUBMISSION DATE: NOVEMBER 16, 215
More informationSAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE
SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: 415-473-7226 lizlewis@marincounty.org SAN ANSELMO TOWN COUNCIL MEETING 9/26/17 SAN ANSELMO FLOOD RISK REDUCTION PROJECT
More informationLITTLE POPO AGIE. Lyons Millard Rogers and Gregg
LITTLE POPO AGIE Lyons Millard Rogers and Gregg DESCRIPTION AND OPERATION MEMORANDUM LYONS DITCH DIVERSION DESCRIPTION One 8' sliding steel gate with screw stem, anchored in concrete headwall. Boulder
More informationMB Drought Plan and Strategies Data, Information and Assessment Needed
MB Drought Plan and Strategies Data, Information and Assessment Needed Abul Kashem P.Eng. Surface Water Management Section Manitoba Water Stewardship EGO- DRI Workshop May 10 to 11, 2010 Outline Drought
More informationF-VC Stream Reach Summary
F-VC Stream Reach Summary Study Reach: F-VC, Vasquez Creek - Denver Water Diversion downstream to confluence of Fraser River. Reach Description: Approximate channel length: 5 ½ miles with an average channel
More informationPrepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates
CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared
More informationCounty of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj
Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 3, 200 by Nadeem Majaj Approximately 575,000 bridges are built over waterways in the US. The most common
More informationCR5 Stream Reach Summary
CR5 Stream Reach Summary Study Reach: CR5, Colorado River - Williams Fork confluence downstream to the KB Ditch. Reach Description: Approximate channel length: 6.75 miles, approximate channel slope 0.3%.
More informationDraft. Not yet Approved. Natural Waterways 2012
Natural Waterways 2012 3.1 General 1 3 5 3.1.1 Scope (2012) 1 3 5 3.1.2 Importance (1992) R(2012) 1 3 5 3.2 Hydrologic Capacity of Waterway Openings1 1 3 5 3.2.1 General (2012) 1 3 5 3.2.2 Drainage Basin
More informationPlano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b
Plano esquemático 1 Estudio de flora y fauna 2 Estudio geotécnico 3 Determinación jurisdiccional de humedales 4 Prospección arqueológica fase 1a-1b 5 Cartas de las agencias 6 Estudio hidrológico e hidráulico
More informationEVALUATION OF ABUTMENT-SCOUR EQUATIONS FROM NCHRP PROJECTS 24-15(2) AND USING LABORATORY AND FIELD DATA NCHRP 24-20(2)
NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM DRAFT FINAL REPORT EVALUATION OF ABUTMENT-SCOUR EQUATIONS FROM NCHRP PROJECTS 24-15(2) AND 24-20 USING LABORATORY AND FIELD DATA NCHRP 24-20(2) Stephen T.
More informationNational Levee Database
National Levee Database NLD/MLI Integration June 2013 US Army Corps of Engineers USACE Levee Safety Program Mission Work with stakeholders to assess, communicate, reduce and then manage the residual risks
More informationJim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006
Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and
More informationWallowa Falls Habitat Modeling Results
Wallowa Falls Habitat Modeling Results Preliminary Results for IFIM Stakeholder Meeting La Grande, OR April 25, 2013 1.0 INTRODUCTION This document provides the results of the instream flow incremental
More informationPermeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies
EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone
More informationAgency: Structure Type: Building Historic Building: No Contact: Tillamook County
Pg 1 of 5 Project Summary: Project Number: Disaster #: Program: Agency: Point of Contact: Address: Email: Comments: Vaughn Collins Phone Number: 206-241-6000 16300 Christensen Rd, Ste 350, Seattle, Washington,
More informationGoing with the Flow Update. An update and comparative analysis of five years of Water Sentinels flow data collection of the Upper Verde River
Going with the Flow Update An update and comparative analysis of five years of Water Sentinels flow data collection of the Upper Verde River Rachel Shultis Intern for Science-Practice Integration Grand
More informationRepairing the Pecos River at Bitter Lake National Wildlife Refuge
Repairing the Pecos River at Bitter Lake National Wildlife Refuge Photo: Ken Stinnett New Mexico Watershed Forum, 2010 Conference Paul Tashjian; Stephen Davenport; Jeff Sanchez US Fish and Wildlife Service
More informationTwo Dimensional Computer Modeling of
\N P? v&cu&ae yoomk Two Dimensional Computer Modeling of Green River at Dinosaur National Monument and Canyonlands National Park For: Water Rights Branch Water Resources Division National Park Service
More informationWelcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010
Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Cooperating Agencies Delaware River Basin Commission Pennsylvania Fish & Boat Commission Pennsylvania
More informationEnvironmental Appeal Board
Environmental Appeal Board Fourth Floor 747 Fort Street Victoria British Columbia Telephone: (250) 387-3464 Facsimile: (250) 356-9923 Mailing Address: PO Box 9425 Stn Prov Govt Victoria BC V8W 9V1 DECISION
More informationSection I: Madison-Missouri River Project 2188 License Article 403 Operations
Hydro Operational Requirements from FERC License Articles and SOP Agreements with Agencies for NWE s 11 Hydropower Dams (3 FERC Licenses) (January 25, 2016) Section I: Madison-Missouri River Project 2188
More informationon the Lehigh River Public Information Workshop
Recreational Enhancements on the Lehigh River Public Information Workshop 16 February 2011 Cooperating Agencies US Army Corps of Engineers Philadelphia l District i Delaware River Basin Commission Pennsylvania
More informationUse of GIS to Evaluate Livestock-Wildlife Interactions Relative to Tuberculosis Spread on Molokai Island, Hawaii
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Michigan Bovine Tuberculosis Bibliography and Database Wildlife Disease and Zoonotics 2000 Use of GIS to Evaluate Livestock-Wildlife
More informationDaily Pollen Levels and. Room Visits/ in California
Daily Pollen Levels and Emergency Room Visits/ Hospitalizations in California Este Geraghty, MD, MS, MPH Collaborators: Peter Franks, MD and David Soule, MS September 30, 2008 2008 ESRI Health GIS Conference
More informationGreensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring
Greensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring November 2017 Chris Nesbit, PE, BCEE, Meredith Miller, PE, CDM Smith and Robbie Bald,
More informationOverview of State and Federal Water Law. Jennifer Gimbel Colorado Water Institute
Overview of State and Federal Water Law Jennifer Gimbel Colorado Water Institute Mormons establish large irrigated network. By 1865, Mormons had dug 1,000 miles of canals in Utah. 1859 Gold Rush in the
More informationUsing Open Data for Spatial Analysis of Dengue Fever Risk in SINGAPORE
Using Open Data for Spatial Analysis of Dengue Fever Risk in SINGAPORE Sarah Welt M.S. Applied Urban Science and Informatics Master of Business Administration PROBLEM Dengue is potentially fatal and global
More informationGeneral Example: Gas Mileage (Stat 5044 Schabenberger & J.P.Morgen)
General Example: Gas Mileage (Stat 5044 Schabenberger & J.P.Morgen) From Motor Trend magazine data were obtained for n=32 cars on the following variables: Y= Gas Mileage (miles per gallon, MPG) X1= Engine
More informationBridge Office Trunk Highway Bridge Flood Response Plan
Bridge Office Trunk Highway Bridge Flood Response Plan Updated 7/18/2012 Purpose Bridges are vulnerable to damage and failure during flooding. Scour may undermine the bridge foundations or remove the protection
More informationQuick detection of QRS complexes and R-waves using a wavelet transform and K-means clustering
Bio-Medical Materials and Engineering 26 (2015) S1059 S1065 DOI 10.3233/BME-151402 IOS Press S1059 Quick detection of QRS complexes and R-waves using a wavelet transform and K-means clustering Yong Xia
More informationEarthquake Hazard Assessment Along Designated Emergency Vehicle Priority Access Routes
Final Report RDT REDT01-009 Earthquake Hazard Assessment Along Designated Emergency Vehicle Priority Access Routes Neil Anderson, Geology and Geophysics, UMR Hal Baker, Geology and Land Survey, MoDNR Genda
More informationTools for Accurate Sewer Metering and Billing
Tools for Accurate Sewer Metering and Billing May 20, 2008 Tim Prince Chief Engineer Oakland County Drain Commissioner O&M Division Robert Czachorski Orchard, Hiltz & McCliment Livonia, Michigan The Clinton-Oakland
More informationWestcott site services
Westcott site services 6 prospect street Waltham ma 2453 781-647-62 westcottsite.com Hillside Center for Sustainable Living Newburyport, Massachusetts STORMWATER REPORT December 28, 215 WESTCOTT SITE SERVICES
More informationOperation Compliance Monitoring Plan (License Article 407) Annual Report for Water Year July 2014 June 2015
Henry M. Jackson Hydroelectric Project (FERC No. 2157) Operation Compliance Monitoring Plan (License Article 407) Annual Report for Water Year July 2014 June 2015 Prepared By: Everett, WA August 2015 Final
More informationIdentifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming
Identifying Number MPC-354 Project Title: Geotechnical Limit to Scour at Spill-through Abutments University: The University of Wyoming Principal Investigators: Robert Ettema PhD, PE College of Engineering
More informationCavitation. Cameron Fritz, John Glover, Maia Griswold
Cavitation Cameron Fritz, John Glover, Maia Griswold CIVE 401, Hydraulic Engineering Dr. P.Y. Julien November 19, 2014 Table of Contents Introduction Page 1 Theory Page 2 Failures Page 5 Prevention Page
More informationUpdates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer
Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Presented by Jim Winterle November 14, 2017 EAA Modeling Team: Angang Al Liu Ned Troshanov Andi Zhang Jim Winterle
More informationMEMORANDUM. Michele DeHart. David A. Benner. DATE: December 9, NWPPC Mainstem Amendment Analysis Review
FISH PASSAGE CENTER 2501 SW First Avenue, Suite 230, Portland, OR 97201-4752 Phone: (503) 230-4099 Fax: (503) 230-7559 http://www.fpc.org e-mail us at fpcstaff@fpc.org MEMORANDUM TO: FROM: Michele DeHart
More informationLANDFILL STABILITY ISSUES
LANDFILL STABILITY ISSUES 1 2006 APWA International Congress & Exposition Kansas City, Missouri Timothy D. Stark, Ph.D., P.E. University of Illinois at Urbana-Champaign OUTLINE 2 Current Situation Liner
More information