1 SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: SAN ANSELMO TOWN COUNCIL MEETING 9/26/17

2 SAN ANSELMO FLOOD RISK REDUCTION PROJECT Agenda 1. San Anselmo Project Nursery 3000 SFD Blvd + Removal of Building at San Anselmo Avenue 2. Hydraulic Modeling Results 3. Project Update including Environmental Review San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 2

3 San Anselmo Flood Risk Reduction Project Flood Diversion 3000 SFD Blvd- Fairfax Removal of Building at 634 San Anselmo Avenue Flood flow barriers Creek enhancement

4 Ross Valley Flood and Watershed Project Timeline Today Corte Madera Creek Flood Risk Management Project (US Army Corps) Corte Madera Creek Flood Risk Management Project Phase 1 San Anselmo Flood Risk Reduction Project Lower Corte Madera Creek Improvements (Phoenix Lake Grant Migration) Azalea Ave. Bridge Madrone Ave. Bridge Nokomis Ave. Bridge Winship Ave. Bridge Projects with Multiple Flood Reduction Elements Bridge Replacements and/or Modifications Environmental Review Complete Bridge Ave & Sycamore Ave./Center Blvd. Bridges

5 Peak Discharges at Ross Creek Gage San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 5

6 Review of Hydraulic Modeling Maps 2 - DIMENSIONAL MODEL SHOWING FLOW IN CREEKS AND FLOODPLAINS

7 10 year flood event video EXISTING CONDITIONS VS WITH PROPOSED PROJECT

8 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 10-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Any Flooding Increase downstream? Area in blue no longer floods during 10-year event Proposed project reduces depth of flooding by up to 2.1 ft. None shown in San Anselmo 8

9 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 25- YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Reduces inundation depth by up to 0.6 ft or 7.2 Any Flooding Increase Downstream? Limited near the Winship Bridge

10 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT+ BRIDGES AND EXISTING CONDITIONS FOR 25-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Any Flooding Increase downstream? Reduces inundation extent by 26% Reduces inundation depth by up to 1.0 ft None

11 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 10-YEAR FLOOD-Lower SAN ANSELMO AREA Summary of Results Nearly eliminates 10-year flooding in downtown San Anselmo None Any Flooding Increase?

12 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 25-YEAR FLOOD-Lower SAN ANSELMO AREA Summary of Results Reduces inundation depth by up to 0.5 ft Any Flooding Increase? Slightly increases flood water elevations in the area between Winship and Barber Bridges

13 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT+ BRIDGES AND EXISTING CONDITIONS FOR 25-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (Lower) Summary of Results Any Flooding Increase? Reduces inundation depth by up to 0.7 ft Limited just downstream of Winship Bridge

14

15

16 634 San Anselmo Avenue-Open for Business UPDATE The Marin County Board of Supervisors approved an option to purchase the building at 634 San Anselmo Avenue for $1.75 million. Option to purchase contingent upon EIR being approved in Spring 2018 Businesses in downtown San Anselmo are operating as normal and will continue to do so for the foreseeable future. If businesses are required to move for the project, the District will provide ongoing financial and advisory assistance to the businesses to help with the move and set up in a new location. Every effort will be made to help those businesses who wish to remain in San Anselmo to find available commercial spaces in the Town - wherever possible. District staff will keep the public and business owners fully informed about the project on a regular basis. San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 16

17

18 San Anselmo Flood Risk Reduction Project Proposed view from corner of Tamalpais and San Anselmo Avenue Blasen Landscape Architecture

19 Oct 2016 San Anselmo Project Timeline Phase 1 Memorandum of Agreement between San Anselmo and District approved to perform CEQA and Feasibility Engineering Apr 20, 2017 Dec 17/Jan 2018 Project EIR Public Scoping Meeting Public Draft EIR Release-45 day review/comment period Apr 2018 Apr 2018 Apr 2018 Jan 2019 Dec 2020 Final Project EIR Public Hearing Final EIR certification at Board of Supervisors meeting (merits project approval meeting) Finalize design work for San Anselmo Project, secure permits, possible property acquisition and business relocation activities. Community outreach continues. Construction begins (planning for construction in either 2019 or 2020). Outreach continues during construction. Construction completed. Community outreach continues

20 Stakeholder and Community Input MEETINGS TO LEARN ABOUT PRELIMINARY DESIGN AND GATHER FEEDBACK Fairfax Town Council September 6 San Anselmo Town Council-Sept. 26 Ross Town Council-Oct 10 Flood Zone 9 Advisory board meeting-dec. 19 Draft EIR Public Hearing Jan San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 20

21 Thank You! Rossvalleywatershed.org

MERA NEXT GEN SYSTEM

MERA NEXT GEN SYSTEM 1 MERA NEXT GEN SYSTEM SUBSEQUENT ENVIRONMENTAL IMPACT REPORT SCOPING MEETING May 31, 2018 2 MERA Member Agencies City of Belvedere Town of Corte Madera Town of Fairfax City of Larkspur City of Mill Valley

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Lake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015

Lake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015 Lake Zumbro Restoration Project Timeline 2005-2015 (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015 2005 3/31/05 Lake Zumbro Improvement Association appointed a Lake Restoration

More information

February 6, 2018 Boulder, CO James Creek & Left Hand Creek

February 6, 2018 Boulder, CO James Creek & Left Hand Creek Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda

More information

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006 Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and

More information

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID

More information

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission Village of Glenview Appearance Commission STAFF REPORT June 13, 2018 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2018-050 LOCATION: PROJECT NAME: 2200 Waukegan

More information

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT STAFF REPORT TO: Members of the Castro Valley Municipal Advisory Council MEETING DATE: September 12, 2016 RE: Draft Medical Cannabis Dispensary

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: Meeting Date: February 18, 2014 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: City Manager s Office Prepared by: Cory Bytof Volunteer & Sustainability Program Coordinator City Manager

More information

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Mike Harvey Mussetter Engineering, Inc. WORK CONDUCTED FOR: New Mexico

More information

Dynamic Routing Applied to an Urban Subsurface Drainage System

Dynamic Routing Applied to an Urban Subsurface Drainage System Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview

More information

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

Consideration of an Ordinance Establishing Regulation of Single Use Carryout Bags

Consideration of an Ordinance Establishing Regulation of Single Use Carryout Bags STAFF REPORT City Council of the City of Sausalito AGENDA TITLE: Consideration of an Ordinance Establishing Regulation of Single Use Carryout Bags RECOMMENDATION: 1. Staff presentation and Council questions

More information

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Presented by Jim Winterle November 14, 2017 EAA Modeling Team: Angang Al Liu Ned Troshanov Andi Zhang Jim Winterle

More information

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 12, 2016 MEETING DATE: October 18, 2016 TO: FROM: SUBJECT: PURPOSE: TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE

More information

What Costs How Much Where in Marin County

What Costs How Much Where in Marin County What Costs How Much Where in Marin County Paragon Real Estate Mid-Year 207 Review of 2 Months Sales Sales Prices by City & Bedroom Count The Median Sales Price is that price at which half the properties

More information

Commercial Cannabis in Los Angeles County

Commercial Cannabis in Los Angeles County Commercial Cannabis in Los Angeles County PRESENTATION TO THE EMPOWERMENT CONGRESS HEALTH SUBCOMMITTEE Joseph M. Nicchitta, Cannabis Management Officer Transitioning Out of an Unregulated Cannabis Industry

More information

City of Santa Rosa Comprehensive Cannabis Ordinance & Program Implementation

City of Santa Rosa Comprehensive Cannabis Ordinance & Program Implementation City of Santa Rosa Comprehensive Cannabis Ordinance & Program Implementation City Council December 12, 2017 Clare Hartman, Deputy Director - Planning Planning and Economic Development 1 Santa Rosa Cannabis

More information

NORTH DAKOTA 2011 FLOOD EVENT

NORTH DAKOTA 2011 FLOOD EVENT NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River

More information

APPENDIX B: REFERENCE LIST

APPENDIX B: REFERENCE LIST APPENDIX B: REFERENCE LIST 1 Arroyo Corte Madera del Presidio Corte Madera Creek Miller Creek Novato Creek Storm Water Pollution Prevention Program (MCSTOPPP) 1999 Ambient Monitoring Program 2 Corte Madera

More information

Lions Gate Secondary Wastewater Treatment Plant

Lions Gate Secondary Wastewater Treatment Plant Lions Gate Secondary Wastewater Treatment Plant Lions Gate Public Advisory Committee June 26, 2012 Orbit 6241100 Lions Gate Secondary Wastewater Treatment Plant Building a working relationship with the

More information

Cycle Elements Amended Goals, Objectives, and Policies ESR (Effective August 13, 2018) County Ordinance No City Ordinance No.

Cycle Elements Amended Goals, Objectives, and Policies ESR (Effective August 13, 2018) County Ordinance No City Ordinance No. Tallahassee-Leon County Comprehensive Plan: Table of Amended Policies, 1991-2018 (in reverse order) Cycle Elements Amended Goals, Objectives, and Policies 2018-2 ESR (Effective August 13, 2018) County

More information

Cotton Belt Regional Rail Corridor Project

Cotton Belt Regional Rail Corridor Project Cotton Belt Regional Rail Corridor Project Public Meeting November 2017 0 Meeting Focus Today s discussion focuses on Impacts & Proposed Mitigation Large volume of material to cover Request that questions

More information

Port of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter

Port of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter Port of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter Charter Purpose The purpose of this charter is to define the role of the Planning Advisory Committee () within

More information

MARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT

MARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT MARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT TO ADDRESS MCE EXPANSION TO CONTRA COSTA COUNTY; THE CITIES OF CONCORD, MARTINEZ,

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Cooperating Agencies US Army Corps of Engineers Philadelphia District Delaware River Basin Commission Pennsylvania

More information

Corte Madera Sales Tax Measure B

Corte Madera Sales Tax Measure B Corte Madera Sales Tax Measure B JANUARY 16, 2018 PRESENTED BY: TODD CUSIMANO, TOWN MANAGER DARIA CARRILLO, FINANCE DIRECTOR PETER BROWN, PUBLIC WORKS DIRECTOR SALES TAX MEASURE BACKGROUND In 2013, the

More information

One Community At A Time

One Community At A Time One Community At A Time Who We Are Kids Central: Building Better Lives Kids Central, Inc. is the nonprofit human service agency selected to be the Community- Based Care Child Welfare Lead Agency for Florida

More information

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 6/05/15

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 6/05/15 TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 6/05/15 6th Annual ENTER RAFFLE TO WIN PRIZES! Presents FREE Community-wide Hands-Only CPR and AED Training (Training is NON-certified) Saturday, June

More information

City of Santa Rosa Comprehensive Cannabis Policy

City of Santa Rosa Comprehensive Cannabis Policy City of Santa Rosa Comprehensive Cannabis Policy Council Policy Subcommittee September 12, 2017 David Guhin, Director Clare Hartman, Deputy Director - Planning Planning and Economic Development 1 Santa

More information

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data)

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed

More information

April 17, 2018 City Council Workshop

April 17, 2018 City Council Workshop April 17, 2018 City Council Workshop Community Engagement Plan 5TH AVENUE DEVELOPMENT COMMUNITY ENGAGEMENT OUTREACH & INPUT OPPORTUNITIES AS OF 12/19 OUTREACH & INPUT OPPORTUNITIES AS OF 4/17 254 ENEWSLETTERS

More information

TECHNICAL APPENDIX. E. PMT Meeting #5

TECHNICAL APPENDIX. E. PMT Meeting #5 TECHNICAL APPENDIX E. PMT Meeting #5 PMT Meeting #5 Agenda INT GLENWOOD ST & STATE ST STUDY, BOISE ITD PN A020(049), Key No. 20049 / ACHD PN 317045 October 26, 2017-10:00 AM to 12:00 PM ITD District 3

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL PROJECT APPROVAL, PRELIMINARY ENGINEERING, AND DESIGN SERVICES FOR CENTRAL MARIN REGIONAL PATHWAYS GAP CLOSURE PROJECT SEPTEMBER 2018 Submit proposal to: R.J. Suokko, Senior Civil

More information

Salinas Valley Water Project Annual Flow Monitoring Report

Salinas Valley Water Project Annual Flow Monitoring Report Salinas Valley Water Project Annual Flow Monitoring Report Operational Season 2013 Monterey County Water Resources Agency 893 Blanco Circle Salinas, CA 93901 April 2014 Revised July 2014 TABLE OF CONTENTS

More information

RA INTERIM FLOW PROGRAM RECOMMENDATIONS: Updated April 12, 2013

RA INTERIM FLOW PROGRAM RECOMMENDATIONS: Updated April 12, 2013 RA INTERIM FLOW PROGRAM RECOMMENDATIONS: Updated April 12, 2013 Background On April 10 I received a new Allocation and Default Flow Schedule (Allocation) from Reclamation that was based on the April 1

More information

Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft

Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft The following is a summary Rationale for Five Agency Alternative BDCP Initial Project

More information

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and

More information

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff

More information

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012 Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals

More information

Community Meeting: Local Cannabis Policy in Oroville

Community Meeting: Local Cannabis Policy in Oroville Community Meeting: Local Cannabis Policy in Oroville May 24, 2018 Presented by: Neil Hall, Cannabis Lead Kyle Tankard, Consultant Agenda Welcome/Introduction Cannabis 101 Presentation Public Comment Period

More information

Merced, California Next Steps and Strategies for Successful Implementation of Cannabis-Related Health and Safety Regulations

Merced, California Next Steps and Strategies for Successful Implementation of Cannabis-Related Health and Safety Regulations Merced, California Next Steps and Strategies for Successful Implementation of Cannabis-Related Health and Safety Regulations Presented by: Neil Hall Arcelia Herrera May 9, 2017 4745 Mangels Blvd, Fairfield,

More information

The Center for Outreach and Community Care

The Center for Outreach and Community Care The Center for Outreach and Community Care Annual Report 2013-2014 P r e p a r e d b y : C h i l d a n d Y o u t h C a r e A p r i l 2 0 1 4 TABLE OF CONTENTS EXECUTIVE SUMMARY 2 i History of the Outreach

More information

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017 Cotton Belt Regional Rail Corridor Project DART Board Committee of the Whole Briefing November 1, 2017 0 Agenda Schedule Project Overview Noise Methodology and Impact Analysis Mitigation and Discussion

More information

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager CARSON CITY FREEWAY April 9, 2014 Nevada Transportation Conference Jeff Lerud, PE, CPM Senior Project Manager Presentation Overview Carson Freeway Overview Construction Phases Schedule Budget Questions

More information

Public Hearing Summary Report

Public Hearing Summary Report Public Hearing Summary Report FM 457 Swingbridge Replacement At Gulf Intracoastal Waterway (GIWW) near Sargent FM 457 Matagorda Co CSJ: 0605-01-060 Alan Migl, Yoakum District TABLE OF CONTENTS Public Hearing

More information

PROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES. United States National Advisory Committee on Oceans And Atmosphere

PROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES. United States National Advisory Committee on Oceans And Atmosphere Accession No.: 93-12 PROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES United States National Advisory Committee on Oceans And Atmosphere U.S. National Advisory Committee on Oceans And Atmosphere

More information

Maywood Chemical Company Superfund Site ADMINISTRATIVE RECORD. Document Number MISS- 127.

Maywood Chemical Company Superfund Site ADMINISTRATIVE RECORD. Document Number MISS- 127. Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Chemical Company Superfund Site ADMINISTRATIVE RECORD Document Number MISS- 127. Cooperative Guidance Group P.O. Box 811 l Maywood. NJ 07607-0811

More information

Sausalito City Council October 30, 2018

Sausalito City Council October 30, 2018 Sausalito City Council October 30, 2018 Interim Urgency Marijuana Ordinance JANUARY 9, 2018 Ordinance Amendment and Extension (10 months and 15 days) Original Urgency Ordinance: Ordinance No. 1248 Ordinance

More information

BLUE UMBRELLA PROJECT: Building a Dementia Friendly Community in Blind River

BLUE UMBRELLA PROJECT: Building a Dementia Friendly Community in Blind River Slide 1 BLUE UMBRELLA PROJECT: Building a Dementia Friendly Community in Blind River Lisa Meschino Dementia Friendly Communities Coordinator Blind River The Alzheimer Society of Sault Ste. Marie launched

More information

Moved by S. Kuperis, seconded by R. Santiago, that the minutes of the Homelessness Action Advisory Committee, held July 16,2015, be adopted.

Moved by S. Kuperis, seconded by R. Santiago, that the minutes of the Homelessness Action Advisory Committee, held July 16,2015, be adopted. September 10, 2015, at 3:02 p.m., in Room 530, located at 32315 South Fraser Way, Abbotsford BC Committee Members Present: Chair - N. McCready; and R. Santiago Councillor D. Loewen ; G. Glaim; S. Kuperis;

More information

Vintage and Nonconforming Amendments to Salt Lake City s Sign Ordinance

Vintage and Nonconforming Amendments to Salt Lake City s Sign Ordinance BRIEFING MEMO PLANNING DIVISION DEPARTMENT of COMMUNITY and NEIGHBORHOODS ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

More information

Progress from the Patient-Centered Outcomes Research Institute (PCORI)

Progress from the Patient-Centered Outcomes Research Institute (PCORI) Progress from the Patient-Centered Outcomes Research Institute (PCORI) Anne Beal, Chief Operating Officer of the Patient-Centered Outcomes Research Institute Sharon-Lise Normand, Vice Chair, Methodology

More information

MARIN COUNTY HAZARDOUS & SOLID WASTE MANAGEMENT JOINT POWERS AUTHORITY

MARIN COUNTY HAZARDOUS & SOLID WASTE MANAGEMENT JOINT POWERS AUTHORITY MARIN COUNTY HAZARDOUS & SOLID WASTE MANAGEMENT JOINT POWERS AUTHORITY Board of Directors Meeting & Public Hearing February 23, 2017 Central Marin Police Authority 250 Doherty Drive, Larkspur, CA 9:00

More information

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 4/07/17

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 4/07/17 TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 4/07/17 awaycomedanceth e n ight 2017 8PM-10PM FREADMISION&REFRESHMENTS FORMOREINFORMATION www.cmparksandrec.org 415-927-5072 cortemaderaparks& recreation

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Cooperating Agencies Delaware River Basin Commission Pennsylvania Fish & Boat Commission Pennsylvania

More information

Recreational Marijuana Town of Mammoth Lakes Proposed implementation of Prop 64 April 26, 2017

Recreational Marijuana Town of Mammoth Lakes Proposed implementation of Prop 64 April 26, 2017 Recreational Marijuana Town of Mammoth Lakes Proposed implementation of Prop 64 April 26, 2017 Workshop summary Personal Use Taxation State licensing requirements for marijuana sales Current Town regulations

More information

A mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room.

A mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room. INVITATION FOR REQUEST FOR PROPOSAL CLOCK TOWER RENOVATIONS GREEN RIVER, WYOMING Notice is hereby given that the City of Green River through the coordination of Green River URA/Main Street Agency (hereafter

More information

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 11/06/15

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 11/06/15 TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 11/06/15 TOWN OF CORTE MADERA PLANNING COMMISSION AGENDA Tuesday, November 10, 2015 Council Chambers, 300 Tamalpais Drive, Corte Madera, California

More information

Sustainable Detrick. Outreach, Partnerships, Transformation and Continuous Improvement. Neighborhood Advisory Council Update

Sustainable Detrick. Outreach, Partnerships, Transformation and Continuous Improvement. Neighborhood Advisory Council Update Sustainable Detrick Outreach, Partnerships, Transformation and Continuous Improvement Neighborhood Advisory Council Update COL Judith D. Robinson Commanding 20 September 2010 Fort Detrick, Maryland Fort

More information

on the Lehigh River Public Information Workshop

on the Lehigh River Public Information Workshop Recreational Enhancements on the Lehigh River Public Information Workshop 16 February 2011 Cooperating Agencies US Army Corps of Engineers Philadelphia l District i Delaware River Basin Commission Pennsylvania

More information

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0

More information

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 9/11/15

TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 9/11/15 TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 9/11/15 AGENDA CORTE MADERA TOWN COUNCIL AND SANITARY DISTRICT NO. 2 BOARD TOWN HALL COUNCIL CHAMBERS 300 TAMALPAIS DRIVE TUESDAY, SEPTEMBER 15, 2015

More information

Guam Early Hearing Detection and Intervention

Guam Early Hearing Detection and Intervention Guam Early Hearing Detection and Intervention Project Riko hi: Reducing Loss to Follow-Up after Failure to Pass Newborn Hearing Screening and at All Levels of the Hearing Continuum Quarterly Meeting, March

More information

Medical Cannabis Uses

Medical Cannabis Uses Medical Cannabis Uses Comprehensive Ordinance Cannabis Policy Subcommittee February 16, 2017 David Guhin, Director Clare Hartman, Deputy Director-Planning Planning and Economic Development 1 City Response

More information

Matrix of Strong Local Smokefree Multi-Unit Housing Ordinances

Matrix of Strong Local Smokefree Multi-Unit Housing Ordinances Matrix of Strong Local Smokefree Multi-Unit Housing Ordinances February 2019 Cities and counties in California have led the way on many secondhand smoke issues throughout the years by passing groundbreaking

More information

Public Workshop Industry Professional Outreach June 5, 2017 Robert J. Cabral Agricultural Center

Public Workshop Industry Professional Outreach June 5, 2017 Robert J. Cabral Agricultural Center Public Workshop Industry Professional Outreach June 5, 2017 Robert J. Cabral Agricultural Center 1 Workshop Agenda u INTRODUCTION u The Cannabis Policy Project u What Can the County Regulate? u Workshop

More information

601 TAMALPAIS DRIVE CORTE MADERA, CA

601 TAMALPAIS DRIVE CORTE MADERA, CA 6,477 SF Retail Available for Lease Conceptual Elevation Existing Stand-Alone Retail Opportunity John Cumbelich & Associates is pleased to present this rare, stand-alone retail opportunity in the heart

More information

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of

More information

Corte Madera Chronicles

Corte Madera Chronicles Corte Madera Chronicles November 17, 2017 IN THIS ISSUE Announcements from CMPA....Pg. 3 PG&E: Know Your Overhead Lines.....Pg. 4 What s Happening in Town this week.......pg. 5 What s Happening in Marin....Pg.

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

NEVADA DISASTER RESPONSE FLOOD JANUARY 2017 NORTHERN NEVADA

NEVADA DISASTER RESPONSE FLOOD JANUARY 2017 NORTHERN NEVADA NEVADA 2-1-1 DISASTER RESPONSE FLOOD JANUARY 2017 NORTHERN NEVADA ACTIVITIES OUTCOMES / RESOLUTION Purpose Objectives January 6, 2017 Nevada 2-1-1 was contacted by Washoe County Emergency Operations Center

More information

CORTE MADERA TOWN COUNCIL STAFF REPORT. Tracy Hegarty, Administrative Analyst, Planning & Building Reviewed by Phil Boyle, Senior Planner

CORTE MADERA TOWN COUNCIL STAFF REPORT. Tracy Hegarty, Administrative Analyst, Planning & Building Reviewed by Phil Boyle, Senior Planner CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 31, 2018 MEETING DATE: November 5, 2018 TO: FROM: Honorable Mayor and Members of the Town Council Tracy Hegarty, Administrative Analyst, Planning

More information

WASHOE COUNTY EMERGENCY MEDICAL SERVICES : Five-Year Strategic Plan

WASHOE COUNTY EMERGENCY MEDICAL SERVICES : Five-Year Strategic Plan WASHOE COUNTY EMERGENCY MEDICAL SERVICES 2017-2021: Five-Year Strategic Plan 2017 W a s h o e C o u n t y E M S O v e r s i g h t P r o g r a m 1 The Washoe County Emergency Medical Services (EMS) Five-

More information

Economic Development. Periodic Report January August Committee Periodic Report

Economic Development. Periodic Report January August Committee Periodic Report Economic Development Periodic Report January August 2015 Presented by Staff and Committee September 15, 2015 1 The Committee Executive Committee Jenelle Osborne, Chair Jeremy Ball Tom Davidson Maria Hall,

More information

Community Health Equity Needs Assessment and Implementation Plan Process

Community Health Equity Needs Assessment and Implementation Plan Process Community Health Equity Needs Assessment and Implementation Plan Process Stephen Wade Health Equity Policy Analyst Washtenaw County Public Health January 2017 History Coalition of HIP Partnership Existed

More information

MRERP EIS Individual Scoping Meeting Summary Bismarck, North Dakota August 18, 2009 October 28, 2009

MRERP EIS Individual Scoping Meeting Summary Bismarck, North Dakota August 18, 2009 October 28, 2009 MRERP EIS Individual Scoping Meeting Summary Bismarck, North Dakota August 18, 2009 October 28, 2009 MEETING OVERVIEW The United States Army Corps of Engineers (USACE) and United States Fish and Wildlife

More information

If you have questions or need additional information, please contact us. Attachment: Prior Lake Outlet Annual Operations Report, Year 2008

If you have questions or need additional information, please contact us. Attachment: Prior Lake Outlet Annual Operations Report, Year 2008 January 16, 2009 Ms. Janell Miersch, Area Hydrologist Metro Region of Waters Department of Natural Resources 1200 Warner Road St. Paul, Minnesota 55106 Prior Lake Outlet Annual Operations Report, Year

More information

Lakewood Ranch CDD Supervisor Orientation. January 10, :00 p.m.

Lakewood Ranch CDD Supervisor Orientation. January 10, :00 p.m. Lakewood Ranch CDD Supervisor Orientation January 10, 2017 2:00 p.m. CDD s in the State of Florida Counties 67 General Purpose Government; Constitutional or Charter Mandated Responsibilities Tax Collection,

More information

County of Santa Clara Department of Agriculture and Environmental Management Integrated Waste Management Division MEMORANDUM

County of Santa Clara Department of Agriculture and Environmental Management Integrated Waste Management Division MEMORANDUM County of Santa Clara Department of Agriculture and Environmental Management Integrated Waste Management Division 1553 Berger Drive, Bldg. #1 San Jose, CA 95112 (408) 282-3180 Fax (408) 282-3188 www.reducewaste.org

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 FM 457 Public Hearing September 1, 2015 Agenda Introductions Project overview Technical overview Environmental overview Right-of-way overview

More information

2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018

2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018 2 Lanes vs. 4 Lanes A Community Information Session About the South Phoenix Light Rail Expansion Saturday, September 15, 2018 2017 Bailey Strategic Innovation Group Over 300 Questions Answered Principles

More information

WHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA. In Aurora

WHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA. In Aurora WHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA In Aurora WWW.AURORAGOV.ORG/AMED LEGALIZING RETAIL MARIJUANA IN COLORADO In 2010, Aurora voters opposed a ballot question that would have allowed medical

More information

CHARLES B. FOSTER, JR COLLECTION

CHARLES B. FOSTER, JR COLLECTION 152 CHARLES B. FOSTER, JR COLLECTION FOLDER DESCRIPTION DATE Letters 1 1 Letter. Geo. R. Wickham, Acting Commissioner, General Land Office, Dept. of Interior to Secretary of the Interior. Re: application

More information

Windsor Solar Project Water Assessment Report APPENDIX A

Windsor Solar Project Water Assessment Report APPENDIX A Windsor Solar Project Water Assessment Report APPENDIX A Supplementary Information APPENDIX A1 Official Plan Mapping DOUGALL AVE HURON CHURCH RD DOMINION BLVD WALKER RD GEORGE AVE OUELLETTE AVE HOWARD

More information

Calaveras County TRL Evaluation Reporting Plan

Calaveras County TRL Evaluation Reporting Plan Calaveras County 07-10 TRL Evaluation Reporting Plan Evaluation Activity Plan (3.2.1) Objective: By June 30, 2010, the City Council of Angels Camp will adopt a tobacco retail licensing policy as a result

More information

1. Reconfirm and approve the goals and objectives for the La Honda Parking and Trailhead Access Feasibility Study project.

1. Reconfirm and approve the goals and objectives for the La Honda Parking and Trailhead Access Feasibility Study project. R-19-39 Meeting 19-09 April 9, 2019 AGENDA ITEM AGENDA ITEM 1 Formation of the La Honda Public Access Working Group GENERAL MANAGER S RECOMMENDATIONS 1. Reconfirm and approve the goals and objectives for

More information

Hydraulic Fracturing Test Site (HFTS)

Hydraulic Fracturing Test Site (HFTS) Hydraulic Fracturing Test Site (HFTS) > July 10, 2013 > Trevor Smith > Gas Technology Institute Hydraulic Fracturing Test Site (HFTS) A field-based hydraulic fracturing research program. 1. Improve cost

More information

How to Integrate Peer Support & Navigation into Care Delivery

How to Integrate Peer Support & Navigation into Care Delivery How to Integrate Peer Support & Navigation into Care Delivery Andrew Bertagnolli, PhD Care Management Institute Why Integrate Peer Support into the Care Delivery Pathway? Improved health Increased feelings

More information

References: 1/18/05 References R-1

References: 1/18/05 References R-1 References: AGRA Infrastructure, 2000, Strategies to Reduce the Cost of Converting Septic Tanks to Community Sewers in Washoe County (Septic to Sewer Conversion Study) final Report, prepared for Washoe

More information

National Levee Database

National Levee Database National Levee Database NLD/MLI Integration June 2013 US Army Corps of Engineers USACE Levee Safety Program Mission Work with stakeholders to assess, communicate, reduce and then manage the residual risks

More information

CITY OF JANESVILLE. City Council Meeting August 10, 2015

CITY OF JANESVILLE. City Council Meeting August 10, 2015 CITY OF JANESVILLE City Council Meeting August 10, 2015 JANESVILLE NOON LIONS CLUB www.janesvillenoonlions.org/ Janesville Noon Lions Lions Club International founded in Chicago in 1917 46,000 local clubs

More information

Nevada County Mental Health Board Minutes

Nevada County Mental Health Board Minutes Nevada County Mental Health Board Minutes Date: November 02, 2018 Time: 9:30 a.m. 12:00 p.m. Place Behavioral Health Department 500 Crown Point Circle, Grass Valley STANDING ORDERS 1. Call to Order Self-introductions

More information

Commercial Vacant Land

Commercial Vacant Land PROPERTY HIGHLIGHTS 2911 Piedmont Rd. Atlanta, GA 30305 $378,000, 2.61 acres Located in Pinnacle Business Center, Norcross, GA Intersection of Beaver Ruin Rd & Pinnacle Way Nearby the newest green space

More information