Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies
|
|
- Kerry Garrett
- 6 years ago
- Views:
Transcription
1 EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone Green vs Gray Economic Factors Construction Cost Site Utilization Marketing/Aesthetics Maintenance/Longevity BMP BMP Impacts on Cost Construction Cost Site Utilization Marketing/ Aesthetics Maintenance/ Longevity Green Roof Permeable Pavers 0/ Bioretention +/ Native Landscapes Natural Drainage Positive Impact, - Negative Impact 1
2 Fox River Water Reclamation District Fox River Water Reclamation District Bioretention Permeable paving Infiltration Trench FRWRD Cost Comparison Gray Infrastructure Asphalt Paving Storm sewer Detention Wetland permitting $153,000 Green Infrastructure Permeable paving Bioretention $140,000 2
3 Carol Stream Park District: LEED Silver Recreation Center Site Objectives Site Plan LEED Sustainable Sites Highest Environmental Performance Reduced Irrigation Increased Longevity Cost Effective 3
4 Integrated Stormwater & Landscape Design Construction 4
5 Life Cycle Cost Analysis West Union Iowa s Green Street Pilot Project Green Pilot Streetscape Project A Sustainable Vision for West Union The City of West Union Main Street West Union Iowa Department of Economic Development 5
6 6
7 7
8 Charles City, Iowa 8
9 Oelwein, Iowa CONSERVATION Portland, Oregon DESIGN FORUM 9
10 Stormwater Materials Street Permeable Paver: Eco Optilock Sidewalk Permeable Paver: Eco Prioria Bioretention Areas Street Section 10
11 11
12 Summary of Results Pre-Project Post-Project % Reduction Threshold Event 0.05" 1" - 2-Year Event (2.91" rain) Runoff Volume (inches) % Peak Flow (cfs) % 10-Year Event (4.31" rain) Runoff Volume (inches) % Peak Flow (cfs) % 100-Year Event (6.36" rain) Runoff Volume (inches) % Peak Flow (cfs) % 12
13 Charles City Permeable Streets Charles City Permeable Streets 13
14 14
15 15
16 Jordan Cove Waterford, Connecticut 16
17 17
18 18
19 TABLE 2: PROTOTYPE MODEL RESULTS Rainfall* Existing Proposed % Reduction 6-Month Event Runoff volume (inches)* % Runoff Rate (cfs)** % 1-Year Event Runoff volume (inches)* % Runoff Rate (cfs)** % 2-Year Event Runoff volume (inches)* % Runoff Rate (cfs)** % 10-Year Event Runoff volume (inches)* % Runoff Rate (cfs)** % 100-Year Event Runoff volume (inches)* % Runoff Rate (cfs)** % * Based on 24-hour rainfall ** Based on critical duration storm Project Costs Remove & replace existing pavement & curbs 17 City Blocks 112,000 square feet Excavation Gravel Base Permeable Paving Water main & services Sanitary sewer services $3.7M construction cost $3.9M construction, engineering, fees 19
20 Carbon Cliff Permeable Streets Questions? 20
21 21
22 2-Year Event STATE STREET 1 st STREET Pond Elevation CFS 17.1 CFS 2.9 CFS 13.0 CFS Permeable Paving Flows Storm Sewer Flows 0.97 CFS 11.1 CFS 0.31 CFS 5.4 CFS 2 nd STREET 3 rd STREET 0.64 CFS 7.4 CFS 4 th STREET 5 th STREET 6 th STREET 22
23 10-Year Event Pond Elevation CFS 45.3 CFS Permeable Paving Flows Storm Sewer Flows 100-Year Event POND ELEVATION CFS CFS Permeable Paving Flows Storm Sewer Flows STATE STREET 13.2 CFS 31.7 CFS STATE STREET 40.2 CFS 79.3 CFS 1 st STREET 6.1 CFS 26.6 CFS 1 st STREET 21.6 CFS 64.4 CFS 2 nd STREET 2 nd STREET 2.3 CFS 12.9 CFS 3 rd STREET 3.9 CFS 17.6 CFS 3.1 CFS 9.3 CFS 3 rd STREET 13.4 CFS 42.3 CFS 4 th STREET 4 th STREET 5 th STREET 5 th STREET 6 th STREET 6 th STREET Street View Character Proposed Alternate 1-48/50/60/66 Right-of-Way Streets Street View Character - 48/50/60/66 Right-of-Way Streets Proposed Alternate 2: perennial edge 23
24 Street View Character - 48/50/60/66 Right-of-Way Streets Proposed Alternate 2: turf edge Phase 1 Complete Phase 2 Complete Phase 3 Pending 24
25 Summary of Results Carbon Cliff Green Streets Phase 2 (10.4 acres) Pre-Project Post-Project % Reduction Threshold Event 0.05" 1.10" - 2-Year Event (2.91" rain) Runoff Volume (inches) % Peak Flow (cfs) % 10-Year Event (4.31" rain) Runoff Volume (inches) % Peak Flow (cfs) % 100-Year Event (6.36" rain) Runoff Volume (inches) % Peak Flow (cfs) % 25
26 Questions? 26
Performance Standards Workshop Midwest Case Studies
Performance Standards Workshop Midwest Case Studies Permeable Paving Permeable Paving Bioretention 1 Bioretention Bioretention Bioretention Bioretention 2 Green Roof Portland Stormwater Management Manual
More informationHIGHLANDS COMMUNITY DEVELOPMENT DISTRICT
SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark
More informationCase To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017
Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:
More informationDRAINAGE ANALYSIS REPORT
DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite
More informationDrainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016
Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)
More informationLessons learned in multi-objective urban detention basin projects
Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban
More informationFEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS
Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR UNITY AVENUE STREET IMPROVEMENTS IMPROVEMENT PROJECT NO. 2011-05 CITY OF BROOKLYN CENTER, MINNESOTA January
More informationRecalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation
2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William
More informationAlvarez Engineers, Inc.
FL Certificate of Authorization No. 7538 10305 NW 41 Street Suite 103 Doral, Florida 33178 Tel. (305) 640-1345 Fax (305) 640-1346 E-Mail: Juan.Alvarez@AlvarezEng.com June 30, 2015 Mr. Neil Kalin District
More informationRestoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012
Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals
More informationScott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office
Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan
More informationThe New Jersey Nonstructural Strategies Point System (NSPS)
2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)
More informationTable 3-1 Summary of Storm Drain Outfalls
Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a
More informationStormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018
Stormwater Report For ACORN PLACE ACORN STREET MILLIS, MA Proposed Senior Residential Community July, PREPARED BY: MERRIKIN ENGINEERING, LLP Consulting Engineers Main Street, Suite C Millis, MA PREPARED
More informationCold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer
Cold In-Place Recycling in Tampa Ken Holton, P.E. Street Maintenance Engineer City of Tampa Stats Tampa has 2,600 lane miles of roadways Tampa uses the MicroPAVER system Currently the City of Tampa s average
More informationRevised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts
An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,
More informationSharon Call, Chairperson Mike Marchbanks, Commissioner Rob Kallas, Commissioner Kathy Moosman, Recorder
The Lindon City held a regularly scheduled meeting on Tuesday, February 13, beginning at 7:00 p.m. at the Lindon City Center, City Council Chambers, 0 North State Street, Lindon, Utah. REGULAR SESSION
More informationWestcott site services
Westcott site services 6 prospect street Waltham ma 2453 781-647-62 westcottsite.com Hillside Center for Sustainable Living Newburyport, Massachusetts STORMWATER REPORT December 28, 215 WESTCOTT SITE SERVICES
More informationCorte Madera Sales Tax Measure B
Corte Madera Sales Tax Measure B JANUARY 16, 2018 PRESENTED BY: TODD CUSIMANO, TOWN MANAGER DARIA CARRILLO, FINANCE DIRECTOR PETER BROWN, PUBLIC WORKS DIRECTOR SALES TAX MEASURE BACKGROUND In 2013, the
More informationA.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING
GRAVEL ACCESS ROAD PUBLIC TOILET /1179358 CURRENT DISPOSAL AREA (INDICATIVE) WEATHER STATION (LOCATION INDICATIVE) 3/819237 (LEASE) MAIN PUBLIC CAR PARKING AREA R5 LARGE LOT RESIDENTIAL ZONE WEST COWRA
More informationProject Cost Estimating System
ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%
More informationCARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager
CARSON CITY FREEWAY April 9, 2014 Nevada Transportation Conference Jeff Lerud, PE, CPM Senior Project Manager Presentation Overview Carson Freeway Overview Construction Phases Schedule Budget Questions
More informationLaws and Incentives for RWH in Texas (and in other states) Dr. Hari J. Krishna Austin, Texas
Laws and Incentives for RWH in Texas (and in other states) Dr. Hari J. Krishna Austin, Texas Laws, regulations and incentives Laws and regulations need not be restrictive or difficult. Appropriate laws
More informationRestoration Ecology(s)
Restoration Ecology(s) integrating human & environmental sciences Kathleen L. Wolf, Ph.D. Research Social Scientist-CFR Social and Cultural Values Across the Landscape Gradient Central city Industrial
More informationCITY OF BUCKLEY, WASHINGTON ORDINANCE NO
CITY OF BUCKLEY, WASHINGTON ORDINANCE NO. 22-15 AN ORDINANCE OF THE CITY OF BUCKLEY, WASHINGTON, AMENDING CHAPTER 19.12 BMC, DEFINITIONS, ADDING CHAPTER 19.35 BMC TO ALLOW FOR MARIJUANA FACILITIES; PROVIDING
More informationTrees Do It All! Nature & Human Health
Trees Do It All! Nature & Human Health Dr. Kathleen Wolf College of Forest Resources University of Washington February 2009 City Trees & Forests Benefits Categories! "environmental! "economic! "psychological!
More informationCOUNCIL AGENDA REPORT
COUNCIL AGENDA REPORT Meeting Date: 8 September 2015 Subject: Boards Routed Through: South Point Commercial and Residential NSPs Municipal Planning Commission Date: 20 August 2015 Issue: Council is being
More informationCITY OF AUBURN, NEW YORK
CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24
More informationTrees for Better Communities: Economics & Livability
Trees for Better Communities: Economics & Livability Dr. Kathleen Wolf College of the Environment University of Washington January 2011 www.naturewithin.info Ecosystem Services! intangible (vs. tangible
More informationMAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES
MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis
More informationFTB TM & Flowable Fill for Trench Backfill
FTB TM & Flowable Fill for Trench Backfill Vermont Green Line Project National Grid April 5, 2016 interra Innovation, Inc. 2016 FTB is a trademark of Geotherm WHAT IS FLUIDIZED THERMAL BACKFILL? Flowable
More informationPEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:
PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE
More informationFANNO CREEK PARK & PLAZA Master Plan. Tigard, Oregon. Final Draft January 29, Prepared by
FANNO CREEK PARK & PLAZA Master Plan Tigard, Oregon Final Draft January 29, 2008 Prepared by Significance of the Master Plan The master plan provides for the restoration of Fanno Creek Park (from Hall
More informationDecember 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020
December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,
More informationPotholes: Prevent Before They Present
: Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationCITY OF SUBIACO PLANNING POLICY 3.14
CITY OF SUBIACO PLANNING POLICY 3.14 LAWLER STREET HERITAGE AREA DRAFT DATE: 5 DECEMBER 2017 AUTHORITY: TOWN PLANNING SCHEME NO.4 PLANNING AND DEVELOPMENT (LOCAL PLANNING SCHEMES) REGULATIONS 2015 STATUTORY
More informationTHE UNIVERSITY OF KANSAS KU RECREATION SERVICES FACILITIES MASTER PLAN
THE UNIVERSITY OF KANSAS KU RECREATION SERVICES FACILITIES MASTER PLAN AUGUST 2, 2018 EXECUTIVE SUMMARY THE UNIVERSITY OF KANSAS RECREATION SERVICES FACILITIES MASTER PLAN KU Recreation Services continues
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town
More informationP.L.A.Y. Feasibility Study Report. May 2007
P.L.A.Y. Feasibility Study Report May 2007 Design Team Treanor Architects, P.A. Green Play LLC Landplan Engineering P.A. Richard Caplan and Associates Leisure Vision/ETC Document Needs Feasibility Study
More informationTHE TOWN OF CINCO BAYOU SIGN ORDINANCES ORDINANCE NO
THE TOWN OF CINCO BAYOU SIGN ORDINANCES ORDINANCE NO. 200 83-7 83-7. Permitted temporary signs. Generally. The town recognizes that, by their nature, some signs are intended from their construction to
More informationProperty Taxes Support:
October 2011 Property Taxes Support: Police Services, Emergency Dispatch, Animal Control and Municipal Court Services Fire, Ambulance and Business Safety Inspection Services Finance, Administration, Human
More informationColorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts
Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly
More informationVACANT LAND REUSE BOOK
VACANT LAND REUSE BOOK WHAT IS IT? The is a component of the Stabilizing MorningSide Plan. The book includes suggestions for using vacant land with cost estimates, materials, plantings and images. They
More informationWhat Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.
What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor
More informationTrees for An Urban Future
Trees for An Urban Future Human Health & Well-Being Creating the Liveable City! Dr. Kathleen Wolf College of Forest Resources, University of Washington September 2008 Global Urbanization 1900-14% of humanity
More informationCITY OF TWINSBURG BOARD OF ZONING APPEALS MINUTES APRIL 8, 2015 CITY OF TWINSBURG BOARD OF BUILDING AND ZONING CODE APPEALS APRIL 8, 2015
BOARD OF BUILDING AND ZONING CODE APPEALS Present: Absent: Also Present: Messrs: Gary Wilner, Ed Kancler, Thomas Brown and Brian Davis Neil Rubin Mr. Russ Rodic, Building Commissioner Mr. Sam Scaffide,
More informationDRAFT County Registration Form Medical Cannabis Cultivation and Future Non-Medical Cannabis Cultivation and Related Operations
Introduction ATTACHMENT 2B DRAFT County Registration Form Medical Cannabis Cultivation and Future Non-Medical Cannabis Cultivation and Related Operations If you are growing cannabis under the personal
More informationSidewalk Crack Vegetation Control Trial
Sidewalk Crack Vegetation Control Trial Introduction One of the maintenance tasks at locations such as highway rest areas is to keep sidewalk and parking lot expansion joints aesthetically pleasing and
More informationSeven Steps of Implementing In- Place Recycling by Public Agencies
Seven Steps of Implementing In- Place Recycling by Public Agencies Midwestern States Regional In-Place Recycling Conference Schaumburg, IL Presented by: Tim Aschenbrener, P.E. Pavement & Materials Engineer
More informationWhat are they? What is the difference between them? Who does what in our community? A short tutorial
PALENCIA S CDD and POA What are they? What is the difference between them? Who does what in our community? A short tutorial jai/9-18 1 A CDD?? WHAT S A CDD?? A CDD or COMMUNITY DEVELOPMENT DISTRICT is
More informationMARITIME TRANSPORTATION RESEARCH AND EDUCATION CENTER TIER 1 UNIVERSITY TRANSPORTATION CENTER U.S. DEPARTMENT OF TRANSPORTATION
MARITIME TRANSPORTATION RESEARCH AND EDUCATION CENTER TIER 1 UNIVERSITY TRANSPORTATION CENTER U.S. DEPARTMENT OF TRANSPORTATION Exploration of novel multifunctional open graded friction courses for in-situ
More informationCity of Canby Park and Recreation Master Plan
Park & Rec Master Plan Table of Contents Chapter 1 City of Canby Park and Recreation Master Plan Introduction Prepared for the City of Canby by: Community Planning Workshop 1209 University of Oregon Eugene,
More informationDLCD ACKNOWLEDGMENT or DEADLINE TO APPEAL: May 18, 2006
Oregon Theodore R. Kulongoski, Governor NOTICE OF ADOPTED AMENDMENT Department of Land Conservation and Development 635 Capitol Street NE, Suite 150 Salem, Oregon 97301-2524 Phone: (503) 373-0050 First
More informationVisual On-land Trash Assessment Protocol for Stormwater
Visual On-land Trash Assessment Protocol for Stormwater Version 1.3 Prepared by: EOA, Inc. 1410 Jackson St. Oakland, CA 94612 April 15, 2015 Visual On-land Trash Assessment Methodology INTRODUCTION This
More informationORDINANCE NUMBER 2381
Ordinance Number 2381 Page 1 ORDINANCE NUMBER 2381 AN ORDINANCE TO FURTHER AMEND THE ZONING ORDINANCE AND THE ZONING MAP OF THE CITY OF VESTAVIA HILLS, ALABAMA, ADOPTED SEPTEMBER 16, 1985, AND AS LAST
More informationVestavia Hills, City of, AL
Vestavia Hills, City of, AL 1 City of Vestavia Hills, Alabama, General Obligation Warrants, Series 2016, $11,810,000, Dated: July 14, 2016 2 City of Vestavia Hills, Alabama, General Obligation Warrants,
More informationAPPENDIX F. El Cerrito Parks and Recreation Facilities Master Plan Opinion of Probable Cost
APPENDIX F El Cerrito Parks and Recreation Facilities Master Plan Opinion of Probable Cost This page is intentionally blank OPINION OF PROBABLE COST ADULT/MULTI-GENERATION PROGRAMMING SPACE 1.0 Permanent
More informationThe compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.
FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY
More informationDodge County Drainage Board
Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128
More informationA Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds
University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics
More informationHow Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions
How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions Webinar In-Place Recycling Workshop Earth Day April 22, 2008 Sohila Bemanian, PE Parsons Transportation Group The Myth! Sustainability
More informationTABLE OF CONTENTS MARIJUANA PRODUCTION, PROCESSING, WHOLESALING, AND RETAILING. (Adopted 01/11/2016) SECTION TITLE PAGE 11.
TABLE OF CONTENTS CHAPTER 11 MARIJUANA PRODUCTION, PROCESSING, WHOLESALING, AND RETAILING (Adopted 01/11/2016) SECTION TITLE PAGE 11.010 PURPOSES 11-2 11.020 APPLICABILITY 11-2 11.030 PROCEDURE 11-2 11.040
More informationDeKalb County All Hazards Mitigation Plan Annual Evaluation Report
Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a
More informationCC032 Techniques for Pavement Rehabilitation
CC032 Techniques for Pavement Rehabilitation H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Pavement rehabilitation is defined as a structural
More informationOREGON SAGE GROUSE FRAMEWORK
OREGON SAGE GROUSE FRAMEWORK Protecting sage grouse habitat from human disturbance 1. Existing Conditions Oregon has effectively protected Greater Sage Grouse core habitat from most human disturbance.
More informationSite Overview ROSEWICK RD, MD -
Site Overview ROSEWICK RD, MD - Location Site Address : ROSEWICK RD, MD Owner Owner Name : AMK LLC Parcel No. (APN) : 06-043046 Owner Address : PO BOX 2680 STAFFORD, VA 22555 Legal Information : 1 AC ON
More informationPerformance of Cold In-place Recycling Technologies in Ontario
Performance of Cold In-place Recycling Technologies in Ontario Becca Lane, P.Eng. Manager, Materials Engineering and Research Office Ontario Outline Ontario experience with: Cold in-place recycling (CIR)
More informationEcosystem Services in the City Urban Greening & Public Health
Ecosystem Services in the City Urban Greening & Public Health Kathleen Wolf, Ph.D. College of the Environment University of Washington ACES :: December 2010 Why are city trees & urban greening important?
More informationSustainable Shoreview Wetlands: Fostering Community Involvement Through Education & Communication
Sustainable Shoreview Wetlands: Fostering Community Involvement Through Education & Communication ESPM 4041W: Problem Solving for Environmental Change Report 2/8 Prepared for the City of Shoreview by:
More informationTown of Sherborn - Board of Health Regulations I SEWAGE DISPOSAL
I SEWAGE DISPOSAL INTRODUCTION These Regulations are adopted in accordance with Title 1, Regulation 2 of the State Environmental Code and Article 1 of the State Sanitary Code and are intended to supplement
More informationSARATOGA CITY COUNCIL
SARATOGA CITY COUNCIL MEETING DATE: April 2, 2014 AGENDA ITEM: DEPARTMENT: City Manager s Office CITY MANAGER: Dave Anderson PREPARED BY: Crystal Bothelio DIRECTOR: Dave Anderson City Clerk SUBJECT: Plastic
More informationCity of Sanibel. Planning Department STAFF REPORT
City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting: July 10, 2012 Planning Commission Agenda Item: No. 6 Application Number: Evaluation & Appraisal of the Sanibel Plan Applicant
More informationUrban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey
Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver
More informationReferences: 1/18/05 References R-1
References: AGRA Infrastructure, 2000, Strategies to Reduce the Cost of Converting Septic Tanks to Community Sewers in Washoe County (Septic to Sewer Conversion Study) final Report, prepared for Washoe
More informationNoise Ordinance Update. Public Services and Infrastructure Committee 2/22/2018
Noise Ordinance Update Public Services and Infrastructure Committee 2/22/2018 1 Why update the Noise Ordinance? Growing mixed use areas Entertainment and culture Noise conflicts in late night/early morning
More informationStormwater Mitigation Worksheet
Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:
More informationTools for Accurate Sewer Metering and Billing
Tools for Accurate Sewer Metering and Billing May 20, 2008 Tim Prince Chief Engineer Oakland County Drain Commissioner O&M Division Robert Czachorski Orchard, Hiltz & McCliment Livonia, Michigan The Clinton-Oakland
More informationSEWERAGE AND WATER BOARD OF NEW ORLEANS
SEWERAGE AND WATER BOARD OF NEW ORLEANS Financial Plan and Rate Study 2011-2020 Updated September 28, 2011 Revised April 30, 2012 TABLE OF CONTENTS 1. Executive Summary...1 1.1 Scope of Report... 1 1.2
More informationWakefield to Woburn Underground Power Cable Project. Town of Wakefield Board of Selectman Meeting November 13, 2017
Wakefield to Woburn Underground Power Cable Project Town of Wakefield Board of Selectman Meeting November 13, 2017 Project Update, DPW Agreement and Franchise Petition ¾ Provide project update to the Town
More informationTHE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO. BY Eng.
THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO BY Eng. Alain NDONA NZEY DR Congo country-wide data * Land area is equal to 2.345.410 square
More informationConstruction Outlook Report Monthly Update 2015 March
5 March Introduction The following summary below outlines the construction projects that were updated since the Outlook report s last projects update in July 4. This report covers the period of March 5.
More informationMINUTES OF MEETING July 11, 2017
Town of Eastover - Tuesday, July 11, 7:00 p.m. Eastover Community Center x Mayor Charles G. McLaurin, Presiding; Council Members: x J. Lawrence Buffaloe, x M. Stan Crumpler, x Cheryl C. Hudson, x Randy
More informationThe key points of the NPA s submission on the draft management plan are:
The Senior Planning Officer Environment and Recreation Parks, Conservation and Lands PO Box 352 CIVIC SQUARE ACT 2608 JERRABOMBERRA WETLANDS NATURE RESERVE The National Parks Association of the ACT (NPA)
More informationNall Corporate Centre I and II SWC of College Boulevard and Nall Avenue
Nall Corporate Centre I and II SWC of College Boulevard and Nall Avenue Presented by: Kenneth G. Block, SIOR, CCIM 816.932.5551 kblock@blockllc.com Hunter Johnson 816.412.5878 hjohnson@blockllc.com Block
More informationStatus of Implementation of Approved Rehabilitation Plans: ARA Sites in Halton Region ( )
ttachment #5 to LPS96-15 Status of Implementation of pproved Rehabilitation Plans: R Sites in Halton Region (2012-2014) Site Name, R Rehabilitation/End-use Description Status of Implementation of pproved
More informationCHARLES B. FOSTER, JR COLLECTION
152 CHARLES B. FOSTER, JR COLLECTION FOLDER DESCRIPTION DATE Letters 1 1 Letter. Geo. R. Wickham, Acting Commissioner, General Land Office, Dept. of Interior to Secretary of the Interior. Re: application
More informationCity of Sioux City Pierce Corridor Façade Improvement Program Guidelines
I. Background City of Sioux City Pierce Corridor Façade Improvement Program Guidelines The Façade Improvement Program is a reimbursement grant program of the City of Sioux City to prevent or eliminate
More informationQuote Name: Weed Control Description: See attached Township Contact: Deb Thompson Contact Phone Number: (609) Fax: (609) Quote
Quote Name: Weed Control Description: See attached Township Contact: Deb Thompson Contact Phone Number: (609) 361-6676 Fax: (609) 494-6454 Quote Number: 19-29 Posted Date: March 4, 2019 Dates Quotes are
More information3 WAYS WEATHER IMPACTS CORPORATE ENVIRONMENTAL HEALTH AND SAFETY
3 WAYS WEATHER IMPACTS CORPORATE ENVIRONMENTAL HEALTH AND SAFETY Environmental health and safety management (EHS) is the key for corporations aspiring to be better environmental stewards. Successful EHS
More information15 Mile Sewer Interceptor. Overview. (All data current as of March 21)
15 Mile Sewer Interceptor (All data current as of March 21) On Dec. 24, 2016, the Macomb Interceptor Drain Drainage District sewer interceptor collapsed along 15 Mile Road, at Eberlein Drive in Fraser,
More informationMost recently amended on January 12, 2010 by resolution 10-R Originally adopted on September 6, 1977, by Resolution No. 77-R-5705.
CIRCULATION Most recently amended on January 12, 2010 by resolution 10-R-12725. Originally adopted on September 6, 1977, by Resolution No. 77-R-5705. Table of Contents Overview... 103... 113 CIR 1 Circulation
More informationCold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa
Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa Michael Heitzman Office of Materials Iowa Department of Transportation 800 Lincoln Way Ames, Iowa 50010 Michael.Heitzman@dot.iowa.gov
More informationSlope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success.
Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success. By Paulo R.Rogerio,PE,Geotechnical Consulting Engineer Pomerode SC Brazil email: prrog@terra.com.br and Joao
More informationTOWN COUNCIL MEETING OCTOBER 17, 2011 AGENDA
Jody L. McLeod MAYOR Bruce Thompson TOWN ATTORNEY Steve Biggs TOWN MANAGER Bob Satterfield Alex Harding R.S. Butch Lawter, Jr. Art Holder COUNCIL MEMBERS Michael Grannis MAYOR PRO TEM TOWN COUNCIL MEETING
More informationFor personal use only
13 February 2018 Creso reports strong progress with construction of its Canadian medicinal cannabis production facility in Nova Scotia Highlights: Site works at Creso s Canadian medicinal cannabis production
More informationProgramme to promote Rainwater Harvesting in the Caribbean
Programme to promote Rainwater Harvesting in the Caribbean Pilot Project funded by The United Nations Environment Programme Executed by The Christopher Cox Programme Director Antigua and Barbuda October
More information