1 American Society of Highway Engineers (ASHE) Beardsley Connector Project Gary Fromm, PE Design Manager Jacobs Jacob Dean Project Manager Haydon Building Corp.

2 Thinking Outside the Box: Why Go In Circles?

3 Beardsley Road Connector: y Arizona s First Texas U

4 Agenda History Project Description U-Turn Configuration Construction of the Project Question & Answer Session

5 2000: Maricopa County Department of Transportation (MCDOT) Northwest Valley Transportation Study History October 2002: North Central Peoria / Northwest Glendale Circulation Study 2004 and 2005: Six Public meetings in Peoria and Glendale July 2006: Design Concept Report Completed ( peoria) Split the project and add Union Hills TI Widening May 2009: ARRA funding allocated for project November 2009: Construction began

6 High Volume at 101 Interchanges: 75 th Ave and Union Hills Extend Beardsley to the 101. Build Interchange where NEVER planned! Build Interchange In a Curve!?! Challenge All in another jurisdiction (Glendale) with Peoria Designing g a Freeway Interchange that ADOT has never built!!!

7 Conventional Diamond TI Depressed Mainline Elevated Fly Over Braided Ramps Pre-Signal U-Turn Alternatives Evaluated

8 Selected Alternative 101 Frontage Road: At Grade Union Hills & 75 th : Interchange Ramps Modifications o U-Turn Bridge Union Hills: Interchange Widening

9 Additional Project Enhancements Roundabout at 81 st Avenue and Beardsley Speed Cushions on 81 st Ave North/South of Beardsley Free right turn lane at 83 rd Avenue Di t A t NB Direct Access to NB SR 101L from Beardsley from the U- Turn Structure

10 Typical Texas U-Turn Configuration Turning radius: commercial truck Seperated from crossroad with curbed island Departure merges with ramp/frontage road

11 Beardsley U-Turn Configuration Crossroad / ramp separation barrier Approach separated from frontage 950 prior to intersection Departure separate entrance to freeway

12 Beardsley U-Turn Configuration Turning radius WB-67 Di bl d hi l Disabled vehicle bypass

13 Union Hills Interchange Widening

14 Differences Between Texas U-Turn and Beardsley U-Turn Physical separation between the U-Turn and adjoining roadways Reduced interaction between U-Turn and adjoining roadway traffic Increased capacity of the facility Use of emergency shoulder Possible Over Design?

15 Results Amazingly it fit! Frontage Road? Limited Access Collector Distributor? Only one street Arizona U-Turn?

16 Beardsley Road Connector & Southbound Frontage Road Click a car to view an animation of that route, or a camera to view an image of that location. 75 TH Ave to southbound SR TH Ave 83 RD Ave SR101 to Frontage Road to 83 RD Ave & Beardsley 83 RD Ave & Beardsley to eastbound SR101 New River Bridge Union Hills to SR101, exiting at 75 TH Ave Union Hills U-Turn Ramp

17 One Contractor vs. Two Contractors Coordination between Projects Agency Coordination Maintaining i i Traffic Union Hills Ramp Closures Working with Agencies Specifications Milestone Dates MAG Specifications ca converted ed to ADOT Construction

18 Plan vs. Construction Construction Sequncing Completing Work within Construction Windows Coordination of Crews between both Projects Weather Impacts on a Calendar Day Project Consistently tl Updating Schedule for Changing Conditions

19 Union Hills Widening And U-Turn Bridge

20 Pier Construction

21 Pier Construction

22 Pier Construction

23 Pier Construction

24 Pier Construction

25 Pier Construction

26 Abutment Construction

27 Abutment Construction

28 Abutment Construction

29 Retaining Walls

30 Retaining Wall

31 Retaining Wall

32 Retaining Wall

33 Retaining Wall

34 New River Bridge Construction

35 Working in a River

36 Working in a River

37 Working in a River

38 Working in a River

39 Abutment Construction

40 Abutment Construction

41 Abutment Construction

42 Pier Construction

43 Pier Construction

44 Pier Construction

45 Pier Construction

Public Hearing Summary Report

Public Hearing Summary Report Public Hearing Summary Report SH 288 Direct Connectors To the Texas Medical Center Area City of Houston Harris County, Texas CSJ: 0598-01-095 Prepared for Texas Department of Transportation- Houston District

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

1.0 Executive Summary Introduction Figure Monroe and North Street Analysis of Traffic Data... 4

1.0 Executive Summary Introduction Figure Monroe and North Street Analysis of Traffic Data... 4 TABLE OF CONTENTS 1.0 Executive Summary... 3 2.0 Introduction... 3 2.1 Figure Monroe and North Street... 3 3.0 Analysis of Traffic Data... 4 3.1 Table Summary of MUTCD Warrants... 5 4.0 Conclusions and

More information

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014 Accent image here Primary Image here Presentation Outline Overview of the Project Scope ABC Project

More information

CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS

CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS Project Number: S11 Newhall Ranch Road from I-5 to Copper Hill Drive. This project will design and construct an extension

More information

North Tarrant Express Segments 2-4. Draft List of Facilities

North Tarrant Express Segments 2-4. Draft List of Facilities MASTER DEVELOPMENT PLAN NORTH TARRANT EXPRESS, SEGMENTS 2-4 North Tarrant Express Segments 2-4 Copyright 2010, NTE Mobility Partners 2-4, LLC Revision: 0 Revisions Effective Date: 3/30/10 Number Date Prepared

More information

Precursor Systems Analyses of Automated Highway Systems. Impact of AHS on Surrounding Non-AHS Roadways. DELCO Task I Page 1 RESOURCE MATERIALS

Precursor Systems Analyses of Automated Highway Systems. Impact of AHS on Surrounding Non-AHS Roadways. DELCO Task I Page 1 RESOURCE MATERIALS DELCO Task I Page 1 Precursor Systems Analyses of Automated Highway Systems RESOURCE MATERIALS Impact of AHS on Surrounding Non-AHS Roadways U.S. Department of Transportation Federal Highway Administration

More information

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2 FOR CROSS STREET DESIGN CRITERI MTRIX NOVEMBER 4, 2016 Segment H NORTHBOUND SOUTHBOUND Road 2G Northbound Mainlanes Southbound N/ TxDOT Rural Freeway 70 Loop 494 C TxDOT Rural Collector 45 WB-50 1 6' 5'

More information

CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL rd Avenue NE, Woodinville, WA Q...,,

CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL rd Avenue NE, Woodinville, WA Q...,, ------ ----- ------------ ~~ ---- ----- --------- r::; ~~ To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update CORRIDOR ANALYSIS AND STRATEGY IDENTIFICATION Corridor Analysis Process The CMP recommends an action of conducting an inventory of the corridor system to identify availability of existing options. To achieve

More information

WCCTAC BOARD September,

WCCTAC BOARD September, WCCTAC BOARD September, 23 2016 I-80 SMART CORRIDOR RIBBON CUTTING SEPTEMBER 19, 2016 1 STATUS AND UPCOMING SCHEDULE Sequenced Activation (Go Live) July 13: Traffic Information Boards - Announcement Message

More information

SUMMERFEST ROCK `N SOLE RUN ROAD CLOSURES & RESTRICTIONS

SUMMERFEST ROCK `N SOLE RUN ROAD CLOSURES & RESTRICTIONS SUMMERFEST ROCK `N SOLE RUN ROAD CLOSURES & RESTRICTIONS The 5 th Annual Summerfest Rock n Sole Run (Half Marathon, Quarter Marathon & The Big Gig 5K) will take place on Saturday, June 13, 2015. The Half

More information

TECHNICAL APPENDIX. E. PMT Meeting #5

TECHNICAL APPENDIX. E. PMT Meeting #5 TECHNICAL APPENDIX E. PMT Meeting #5 PMT Meeting #5 Agenda INT GLENWOOD ST & STATE ST STUDY, BOISE ITD PN A020(049), Key No. 20049 / ACHD PN 317045 October 26, 2017-10:00 AM to 12:00 PM ITD District 3

More information

IH 820 SOUTHEAST CORRIDOR STUDY

IH 820 SOUTHEAST CORRIDOR STUDY IH 820 SOUTHEAST CORRIDOR STUDY IH 820 from IH 20 to Meadowbrook Drive IH 20 from Forest Hill Drive to Kelly Elliott Road US 287 from Bishop Street to Sublett Road February 2017 Project Study Area IH 820

More information

FM 471 FROM SH 211 TO OLD FM 471 MEDINA AND BEXAR COUNTIES. Public Hearing January 22, :00 p.m.

FM 471 FROM SH 211 TO OLD FM 471 MEDINA AND BEXAR COUNTIES. Public Hearing January 22, :00 p.m. FM 471 FROM SH 211 TO OLD FM 471 MEDINA AND BEXAR COUNTIES Public Hearing January 22, 2019 6:00 p.m. John Marshall Harlan High School 14350 Culebra Road San Antonio, TX 78253 "The environmental review,

More information

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee Tim Dennis, P. Eng., Acting Commissioner, Public Works Date: May 21, 2014 Report No. -

More information

Policy Research CENTER

Policy Research CENTER TRANSPORTATION Policy Research CENTER Value of Travel Time Knowingly or not, people generally place economic value on their time. Wage workers are paid a rate per hour, and service providers may charge

More information

2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)

2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP) 2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP) Occasionally, MPO s identify issues and/or initiatives that impact the MTP after the fact. Such is the case here. On Tuesday, November

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

Cotton Belt Regional Rail Corridor Project

Cotton Belt Regional Rail Corridor Project Cotton Belt Regional Rail Corridor Project Public Meeting November 2017 0 Meeting Focus Today s discussion focuses on Impacts & Proposed Mitigation Large volume of material to cover Request that questions

More information

Ahmed Mongi, M.S., P.E. Engineering Division

Ahmed Mongi, M.S., P.E. Engineering Division 1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span

More information

APPENDIX B TABLE OF ROADWAY PROJECTS AND COSTS (YEAR OF EXPENDITURE COSTS) BOK TOWER IN LAKE LOCATION

APPENDIX B TABLE OF ROADWAY PROJECTS AND COSTS (YEAR OF EXPENDITURE COSTS) BOK TOWER IN LAKE LOCATION APPENDIX B TABLE OF ROADWAY PROJECTS AND COSTS (YEAR OF EXPENDITURE COSTS) BOK TOWER IN LAKE LOCATION WALES POLK COUNTY HISTORY CENTER I (Committed) Roadway s and s (Year of Expenditure s) Details PD&E

More information

Precursor Systems Analyses of Automated Highway Systems. Roadway Deployment Analysis and Impact of AHS. Battelle Task I Page 1

Precursor Systems Analyses of Automated Highway Systems. Roadway Deployment Analysis and Impact of AHS. Battelle Task I Page 1 Battelle Task I Page 1 Precursor Systems Analyses of Automated Highway Systems RESOURCE MATERIALS Roadway Deployment Analysis and Impact of AHS U.S. Department of Transportation Federal Highway Administration

More information

Southeast Minnesota TZD Region Crash Data. May 1, 2014

Southeast Minnesota TZD Region Crash Data. May 1, 2014 Southeast Minnesota TZD Region Crash Data May 1, 214 Minnesota Fatalities & Serious Injuries 29-213*** MINNESOTA STATEWIDE 75 1,271 1,191 1,159 1,268 1,217 1,5 Fatalities 5 25 421 411 368 395 388 1, 5

More information

APPENDIX FOR "DRIVING SIMULATOR FOR PERSONS WITH IMPAIRED COGNITION", PI WILLIAM K DURFEE

APPENDIX FOR DRIVING SIMULATOR FOR PERSONS WITH IMPAIRED COGNITION, PI WILLIAM K DURFEE APPENDIX FOR "DRIVING SIMULATOR FOR PERSONS WITH IMPAIRED COGNITION", PI WILLIAM K DURFEE Contents 1. Drive Log (simulation run): Used by researcher to record events that took place during a simulator

More information

Shifting the Canning Bus Bridge Sideways

Shifting the Canning Bus Bridge Sideways Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus

More information

Project Background and Need

Project Background and Need Date: May 31, 2018 To: Robert McHaney, AICP; Susan Maclay, MBA From: Roma Stevens, P.E., PTOE Subject: Operational Analysis for Extending Palomino Lane to Grissom Road Project Background and Need The proposed

More information

2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018

2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018 2 Lanes vs. 4 Lanes A Community Information Session About the South Phoenix Light Rail Expansion Saturday, September 15, 2018 2017 Bailey Strategic Innovation Group Over 300 Questions Answered Principles

More information

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 FM 457 Public Hearing September 1, 2015 Agenda Introductions Project overview Technical overview Environmental overview Right-of-way overview

More information

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager CARSON CITY FREEWAY April 9, 2014 Nevada Transportation Conference Jeff Lerud, PE, CPM Senior Project Manager Presentation Overview Carson Freeway Overview Construction Phases Schedule Budget Questions

More information

Link Crash Analysis. Private Driveways & Alleyways. North Corridor Termini - 5th Ave N University Ave N - 2nd Ave N

Link Crash Analysis. Private Driveways & Alleyways. North Corridor Termini - 5th Ave N University Ave N - 2nd Ave N Link Crash Analysis 43 crashes (62.3% of all link crashes) attributed to access or egress into or out of private driveways or alleyways Corridor Segment Private Driveways & Alleyways Inactive Driveways

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL PROJECT APPROVAL, PRELIMINARY ENGINEERING, AND DESIGN SERVICES FOR CENTRAL MARIN REGIONAL PATHWAYS GAP CLOSURE PROJECT SEPTEMBER 2018 Submit proposal to: R.J. Suokko, Senior Civil

More information

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa Michael Heitzman Office of Materials Iowa Department of Transportation 800 Lincoln Way Ames, Iowa 50010 Michael.Heitzman@dot.iowa.gov

More information

OVER US 6 LATERAL BRIDGE SLIDE: I-75

OVER US 6 LATERAL BRIDGE SLIDE: I-75 LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation, Circulation, and Parking Review

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation, Circulation, and Parking Review Arlington Public Schools Thomas Jefferson Site Evaluation Transportation, Circulation, and Parking Review Thomas Jefferson Working Group Meeting #8 December 15, 2014 1 TJWG Meeting, December 15, 2015 14

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-02/0-4170-1 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle FREEWAY GUIDE SIGNING: REVIEW OF PAST RESEARCH 5. Report Date April 2002 Technical Report

More information

Community Meetings November 10 and 12, 2015

Community Meetings November 10 and 12, 2015 Metro Purple Line Extension Section 1 Community Meetings November 10 and 12, 2015 La Cienega Station Agenda Introduction Meeting Purpose Project toverview & Shdl Schedule Roadway Decking Installation Detour

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

FORT WORTH DISTRICT. I-30/SH 360 Interchange Project. Castillian Condominiums Noise Workshop #2

FORT WORTH DISTRICT. I-30/SH 360 Interchange Project. Castillian Condominiums Noise Workshop #2 FORT WORTH DISTRICT I-30/SH 360 Interchange Project Castillian Condominiums Noise Workshop #2 City of Grand Prairie, Tarrant County, Texas December 21, 2017 Photo by Liam Frederick CSJs: 1068-02-076, -104,

More information

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on

More information

COLLEGE ALGEBRA PREREQUISITE REVIEW NAME: CLASS: DUAL ENROLLMENT MAC 1105 DUE DATE: 08/23/10

COLLEGE ALGEBRA PREREQUISITE REVIEW NAME: CLASS: DUAL ENROLLMENT MAC 1105 DUE DATE: 08/23/10 COLLEGE ALGEBRA PREREQUISITE REVIEW NAME: CLASS: DUAL ENROLLMENT MAC 1105 DUE DATE: 08/2/10 Evaluate the algebraic expression for the given value or values of the variable(s). 1) x2-2(x - y); x = 6 and

More information

THE DIMENSIONS OF DRIVER PERFORMANCE DURING SECONDARY MANUAL TASKS

THE DIMENSIONS OF DRIVER PERFORMANCE DURING SECONDARY MANUAL TASKS THE DIMENSIONS OF DRIVER PERFORMANCE DURING SECONDARY MANUAL TASKS Richard A. Young, Linda S. Angell General Motors Engineering Warren, MI USA 48090-9055 1 INTRODUCTION Drivers manage multiple tasks: Primary

More information

Update on the Transit Proposals

Update on the Transit Proposals Update on the Transit Proposals Trent Lethco, Arup MTTF MEETING #9 2013-09-20 1 Agenda Short-Term Transit Proposal Ongoing analyses Recap Feedback Mid/Long-Term Transit Proposal Recap Feedback Next Steps

More information

Most recently amended on January 12, 2010 by resolution 10-R Originally adopted on September 6, 1977, by Resolution No. 77-R-5705.

Most recently amended on January 12, 2010 by resolution 10-R Originally adopted on September 6, 1977, by Resolution No. 77-R-5705. CIRCULATION Most recently amended on January 12, 2010 by resolution 10-R-12725. Originally adopted on September 6, 1977, by Resolution No. 77-R-5705. Table of Contents Overview... 103... 113 CIR 1 Circulation

More information

The Impact of Economic, Technological and Environmental Changes on Winter Maintenance Operations Plans and Policies: Adapting to the New Normal

The Impact of Economic, Technological and Environmental Changes on Winter Maintenance Operations Plans and Policies: Adapting to the New Normal : Adapting to the New Normal Dave Bergner, M.A., PWLF TRB International Winter Maintenance Conference April, 2016, Ft. Collins, CO TRB 2016 Winter Maintenance Conf. c. MVA, LLC 1 Learning Objectives: Recognize

More information

INTERSECTION SIGHT DISTANCE

INTERSECTION SIGHT DISTANCE prepared for Oregon Department of Transportation Salem, Oregon by the Transportation Research Institute Oregon State University Corvallis, Oregon 97331-4304 February 1997 1 DISCLAIMER This background paper

More information

FOR LEASE WAREHOUSE/OFFICE. Prepared By. 855 Stanton Road Burlingame, CA 94010

FOR LEASE WAREHOUSE/OFFICE. Prepared By. 855 Stanton Road Burlingame, CA 94010 855 Stanton Road Burlingame, CA 94010 WAREHOUSE/OFFICE Approx. 10,100 Sq. Ft. Total Rentable Area 8,900 Warehouse Open Design Approx. with 1,200 Sq. Ft. Office Space Approx. Dock - High Loading Front and

More information

Dallas Police Department Pursuit Overview. Public Safety Committee September 7, 2010

Dallas Police Department Pursuit Overview. Public Safety Committee September 7, 2010 Dallas Police Department Pursuit Overview Public Safety Committee September 7, 2010 Implementation of Current Policy In 2005, retired Chief David Kunkle requested a review of departmental pursuit policy

More information

EMPIRICAL MEASUREMENTS OF TRAVELERS VALUE OF TRAVEL TIME RELIABILITY

EMPIRICAL MEASUREMENTS OF TRAVELERS VALUE OF TRAVEL TIME RELIABILITY EMPIRICAL MEASUREMENTS OF TRAVELERS VALUE OF TRAVEL TIME RELIABILITY A Thesis by SANTOSH RAO DANDA Submitted to the Office of Graduate and Professional Studies of Texas A&M University in partial fulfillment

More information

C/CAG. City/County Association of Governments Annual Report

C/CAG. City/County Association of Governments Annual Report C/CAG City/County Association of Governments of San Mateo County 2006 Annual Report C/CAG CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY Atherton Belmont Brisbane Burlingame Colma Daly City

More information

COUNCIL AGENDA REPORT

COUNCIL AGENDA REPORT COUNCIL AGENDA REPORT Meeting Date: 8 September 2015 Subject: Boards Routed Through: South Point Commercial and Residential NSPs Municipal Planning Commission Date: 20 August 2015 Issue: Council is being

More information

Public Hearing Summary Report

Public Hearing Summary Report Public Hearing Summary Report FM 457 Swingbridge Replacement At Gulf Intracoastal Waterway (GIWW) near Sargent FM 457 Matagorda Co CSJ: 0605-01-060 Alan Migl, Yoakum District TABLE OF CONTENTS Public Hearing

More information

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge Modular Steel Bridges Stark County Fischer Bridge Bottineau County Oak Creek Bridge This John Deere grain hauler was too heavy for the bridge. OOPS! An excavator and tow truck are needed to remove the

More information

Incident Management Monthly Report

Incident Management Monthly Report Period: Event(s) Found: Event ID Range: January 2,500 119,506 to 122,927 Incidents by County, Roadway, Direction, and Traffic Impact Level Incidents Count By Impact Level County Roadway Direction 1 2 3

More information

Annual Spring STD Intensive

Annual Spring STD Intensive Annual Spring STD Intensive Project Red Talon Northwest Portland Area Indian Health Board Please Note Date Change!! 2007 Dates April 26-27th - STD/HIV Peer Education Training Agenda 8:30-4:30 Health Promotion

More information

ACCELERATED BRIDGE REPLACEMENT

ACCELERATED BRIDGE REPLACEMENT Christopher Beck Chief Engineer: Bridge & Structures Northern Indiana Commuter Transportation District 601 North Roeske Avenue Michigan City, IN chris.beck@nictd.com Accelerated Bridge Replacement (ABR)

More information

DRAFT. Figure 5.15: San Rafael Basin Workers, 2008

DRAFT. Figure 5.15: San Rafael Basin Workers, 2008 Figure 5.15: San Rafael Basin Workers, 2008 Central and Southern Marin Transit Study Page 67 of 87 Task 2: Existing Conditions Analysis Report v.7 12/23/08 Figure 5.16: San Rafael Basin Workers, 2018 Central

More information

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross Fully Air Conditioned 44,000 SF Retail/Flex Center ± 2,543 Sq. Ft. Showroom/Warehouse Full Glass Window

More information

Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake

Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake G. Watanabe, K. Iiyama, N. Kawano Tokyo Institute of Technology July 20-21, 2007 Route 116 National

More information

FATIGUE MANAGEMENT Shell Canada Road Transport Forum September 26, 2013

FATIGUE MANAGEMENT Shell Canada Road Transport Forum September 26, 2013 FATIGUE MANAGEMENT Shell Canada Road Transport Forum September 26, 2013 Bruce Adams, Regional Traffic Safety Consultant Alberta Office of Traffic Safety Copyright 2013 Definition The state of feeling very

More information

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis

More information

Driver Alertness Detection Research Using Capacitive Sensor Array

Driver Alertness Detection Research Using Capacitive Sensor Array University of Iowa Iowa Research Online Driving Assessment Conference 2001 Driving Assessment Conference Aug 16th, 12:00 AM Driver Alertness Detection Research Using Capacitive Sensor Array Philp W. Kithil

More information

Chapter 4 NOISE Adopted: May 7, 1996

Chapter 4 NOISE Adopted: May 7, 1996 NOISE Adopted: May 7, 1996 Last Revised: May 7, 1996 (Council Resolution No. 8535, 1996 Series) Please see the next page. Page 4-2 Noise Element CHAPTER 4 NOISE ELEMENT TABLE OF CONTENTS INTRODUCTION...

More information

To: Kris Markarian, City of Santa Clarita Job No

To: Kris Markarian, City of Santa Clarita Job No 803 Camarillo Springs Road, Suite C Camarillo, California 93012 (805) 437-1900 FAX (805) 437 1901 www.impactsciences.com MEMORANDUM To: Kris Markarian, City of Santa Clarita Job No. 1046.003 From: Susan

More information

Cold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer

Cold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer Cold In-Place Recycling in Tampa Ken Holton, P.E. Street Maintenance Engineer City of Tampa Stats Tampa has 2,600 lane miles of roadways Tampa uses the MicroPAVER system Currently the City of Tampa s average

More information

Aerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements

Aerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements Aerial of Conceptual Path and Bridge Barnes & Noble at One Place Project Location Corner Center Proposed Bridge Encore Condominiums Regency Club Condominiums Path continues to Dolley Madison Boulevard

More information

Driving Cessation and HD

Driving Cessation and HD Driving Cessation and HD Arik Johnson, PsyD HDSA Center of Excellence at UCLA August 20, 2013 HDSA Caregivers Corner Webinar Disclaimers The presentation today is for informational use only The recommendations

More information

Sustainable Detrick. Outreach, Partnerships, Transformation and Continuous Improvement. Neighborhood Advisory Council Update

Sustainable Detrick. Outreach, Partnerships, Transformation and Continuous Improvement. Neighborhood Advisory Council Update Sustainable Detrick Outreach, Partnerships, Transformation and Continuous Improvement Neighborhood Advisory Council Update COL Judith D. Robinson Commanding 20 September 2010 Fort Detrick, Maryland Fort

More information

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 12, 2016 MEETING DATE: October 18, 2016 TO: FROM: SUBJECT: PURPOSE: TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE

More information

Critical Incident Reviews

Critical Incident Reviews Critical Incident Reviews Technical Memorandum Prepared as Task Order Authorization 5, Subtask 4 to Districtwide ITS Planning Contract C-8679 FM No 412452 1 12 01 Prepared for: Florida Department of Transportation,

More information

Meeting Minutes Markings Technical Committee National Committee on Uniform Traffic Control Devices January 9-12, 2008 Arlington, VA

Meeting Minutes Markings Technical Committee National Committee on Uniform Traffic Control Devices January 9-12, 2008 Arlington, VA Meeting Minutes Markings Technical Committee National Committee on Uniform Traffic Control Devices January 9-12, 2008 Arlington, VA I. Call to order (Gene Hawkins) A. Self introductions members and visitors

More information

Winona Bridge Visual Quality Review Committee

Winona Bridge Visual Quality Review Committee Winona Bridge Visual Quality Review Committee Summary of Preferred Features October 7, 2014 Creating Bridges As Art 1 Summary of Preferred Features Based on Visual Quality Review Committee Final Design

More information

Travel Time Reliability Summary

Travel Time Reliability Summary 7 Travel Time Reliability Summary RETHINKING I-94 APPENDIX T7 TRAVEL TIME RELIABILITY SUMMARY Background Since 2016, MnDOT has been working with neighborhoods, community groups, district councils, local

More information

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2 OR CROSS STREET DESIGN CRITERI MTRIX DDENDUM #1 JUNE 25, 2015 SEGMENT H NORTHBOUND Turn SOUTHBOUND Road 2G Northbound Mainlanes Southbound N/ TxDOT Rural reeway 70 Loop 494 C TxDOT Rural Collector 45 WB-50

More information

Conditional assessment of Kiri Bridge in Shkoder, Albania

Conditional assessment of Kiri Bridge in Shkoder, Albania Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017 Cotton Belt Regional Rail Corridor Project DART Board Committee of the Whole Briefing November 1, 2017 0 Agenda Schedule Project Overview Noise Methodology and Impact Analysis Mitigation and Discussion

More information

2015 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS

2015 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS 2015 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS -FINAL REPORT- LHSC Project No. 2015-15-11 STATE OF LOUISIANA Bobby Jindal, Governor LOUISIANA HIGHWAY SAFETY COMMISSION John A. LeBlanc,

More information

Sign Retroreflectivity A Minnesota Toolkit

Sign Retroreflectivity A Minnesota Toolkit Sign Retroreflectivity A Minnesota Toolkit Mike Marti, Primary Author SRF Consulting Group June 2010 Research Project Final Report #2010RIC02 VISUAL NIGHTTIME INSPECTION Method Description: The retroreflectivity

More information

2017 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS

2017 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS 2017 LOUISIANA NIGHTTIME ADULT SEAT BELT OBSERVATION SURVEY RESULTS -FINAL REPORT- LHSC Project No. 2017-20-10 STATE OF LOUISIANA John Bel Edwards, Governor September 30, 2017 Prepared for: LOUISIANA HIGHWAY

More information

Charrette Report Appendix

Charrette Report Appendix Charrette Report Appendix Table of Contents PowerPoint Presentation... Pg. 2 Short-Term Concepts... Pg. 55 Mid-Term Concepts... Pg. 57 Public Comments... Pg. 58 Invitations... Pg. 60 Advertising... Pg.

More information

Potholes: Prevent Before They Present

Potholes: Prevent Before They Present : Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.

More information

Halton Region Transportation Master Plan 2031 The Road to Change December 1,

Halton Region Transportation Master Plan 2031 The Road to Change December 1, Halton Region Transportation Master Plan 2031 The Road to Change December 1, 2009 1 1 Public Information Centre No. 1 March 2010 Halton Region Transportation Master Plan 2031 The Road to Change December

More information

The Effectiveness of Deaf-Blind Pedestrians Warning Signage on Drivers Behaviour

The Effectiveness of Deaf-Blind Pedestrians Warning Signage on Drivers Behaviour The Effectiveness of Deaf-Blind Pedestrians Warning Signage on Drivers Behaviour Dona Sauerburger, Eugene Bourquin, and Jomania Sauerburger People with disabilities and their advocates have sometimes requested

More information

Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers

Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers Seyed Tabib, Senior Bituminous Engineer Materials Engineering and Research Office, Ministry of Transportation

More information

City of Johannesburg Johannesburg Roads Agency. 66 Pixley Ka Isaka Seme Street Cnr. Rahima Moosa Street Johannesburg 2001

City of Johannesburg Johannesburg Roads Agency. 66 Pixley Ka Isaka Seme Street Cnr. Rahima Moosa Street Johannesburg 2001 City of Johannesburg Johannesburg Roads Agency 66 Pixley Ka Isaka Seme Street Cnr. Rahima Moosa Street Johannesburg 2001 P/Bag X70 Braamfontein South Africa 2017 Tel +27(0) 11 298 5000 Fax +27(0) 11 298

More information

SCOPE OF WORK TASK 1 BASE MAPPING

SCOPE OF WORK TASK 1 BASE MAPPING SCOPE OF WORK TASK 1 BASE MAPPING Kittelson & Associates, Inc. (KAI) data collection and mapping efforts will be seamlessly linked to the analysis performed in the subsequent tasks. The KAI team will conduct

More information

CHAPTER 6 - SIGNS AND BILLBOARDS (Ordinance #62)

CHAPTER 6 - SIGNS AND BILLBOARDS (Ordinance #62) CHAPTER 6 - SIGNS AND BILLBOARDS (Ordinance #62) SECTION 601. INTENT AND PURPOSE The intent of this section is to regulate the type, number, physical dimensions, erection and placement of signs in Haring

More information

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala

More information

Harpenden Schools Network

Harpenden Schools Network 2012 Harpenden Schools Network UNO Gypsy Moth Avenue, Hatfield, Hertfordshire AL10 9BS 1 Harpenden Schools network Welcome Uno bus currently operate bus 620 between Redbourn and Harpenden which currently

More information

Sight Distance AMRC 2012 MODULE 7 CONTENTS

Sight Distance AMRC 2012 MODULE 7 CONTENTS AMRC 2012 MODULE 7 Sight Distance CONTENTS Overview... 7-1 Objectives... 7-1 Procedures... 7-1 7.1 Introduction... 7-3 7.2 Stopping Sight Distance... 7-5 7.3 Passing Sight Distance... 7-7 7.4 Decision

More information

SAN MATEO COUNTY CITY SELECTION COMMITTEE

SAN MATEO COUNTY CITY SELECTION COMMITTEE SAN MATEO COUNTY CITY SELECTION COMMITTEE Mary Ann Nihart, Chairperson Elizabeth Lewis, Vice Chairperson Mina Lim, Acting Secretary 400 County Center Redwood City, 94063 650-363-4124 TO: FROM: SUBJECT:

More information

Friday, March 2 nd, Puget Sound Educational Service District Conference Center Renton, Washington

Friday, March 2 nd, Puget Sound Educational Service District Conference Center Renton, Washington Friday, March 2 nd, 2018 Puget Sound Educational Service District Conference Center Renton, Washington Proudly presented by Safe Crossings Foundation 1402 3 rd Ave, Suite 1322, Seattle, WA 98101 // 206.652.4723

More information

Tour of AstraZeneca's New Facility at The Cove at Oyster Point

Tour of AstraZeneca's New Facility at The Cove at Oyster Point ISPE San Francisco/Bay Area Chapter http://www.atdevents.net/register.php Announces a Facility Tour for ISPE Members Thursday, June 14th, 2018 3:00-5:00 pm Tour of AstraZeneca's New Facility at The Cove

More information

A look at the past, present and future of Anderson s Main Street

A look at the past, present and future of Anderson s Main Street Beechmont Avenue A look at the past, present and future of Anderson s Main Street Beechmont Avenue near Eight Mile, circa 1912 Main Street USA. The phrase invokes thoughts of a quaint downtown, highlighted

More information

Pennsylvania s Experience with LRFD Implementation. By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation

Pennsylvania s Experience with LRFD Implementation. By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation Pennsylvania s Experience with LRFD Implementation By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation Overview Case History Spread Footing Width and Braking force Approach

More information

Preliminary Event Safety and Welfare Management Plan

Preliminary Event Safety and Welfare Management Plan Preliminary Event Safety and Welfare Management Plan Fleadh TV shows during Fleadh Cheoil na héireann Inis 2017 Friday 18th August: 20.30 23.30 Saturday 19th August: 20.30 23.30 Sunday 20th August: 20.30

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways ANNUAL REPORT FOR FY 2011 ODOT SPR ITEM NUMBER 2228 Submitted to: John Bowman, P.E. Planning and Research

More information

NOISE WORKSHOPS. Let s Talk About That Noise. Date. Date. Footer Text

NOISE WORKSHOPS. Let s Talk About That Noise. Date. Date. Footer Text NOISE WORKSHOPS Let s Talk About That Noise What is a traffic noise workshop? An informal meeting between TxDOT personnel and owners of property adjacent to a proposed noise barrier(s). 2 Traffic Noise

More information