Table 3-1 Summary of Storm Drain Outfalls

Size: px
Start display at page:

Download "Table 3-1 Summary of Storm Drain Outfalls"

Transcription

1 Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a solid waste storage area and the 115 kv switchyard. Drainage is through a grassed swale that receives runoff collected by a culvert and a catch basin prior to being discharged to Bailey Cove. The area is unpaved. This outfall will be removed following decommissioning. 006 The drainage area associated with Outfall 006 receives storm water from material handling, shipping and receiving, and storage areas. It is associated with the loading area of Warehouse 2/3, a portion of the Staff Building parking area, Service Building roof drains, yard drainage in the vicinity of the cooling fans north of the Fuel Building and the north (reserve) transformers. In October 2002 the Outfall 007 drainage area was tied into this system. The subarea includes both paved and unpaved areas and is drained through catch basins and a drainage culvert to a point discharge west of the plant and adjacent to Bailey Cove. This outfall will be removed following decommissioning. 007 The drainage area associated with Outfall 007 receives storm water from the immediate vicinity of the Containment Building. It is comprised of discharges from paved and unpaved areas as well as building roof runoff and groundwater from the vicinity of the Containment Building foundation. The drainage is collected by numerous catch basins and, since October 2002, discharges to Bailey Cove via Outfall 006. Prior to this date, discharges were into the diffuser forebay, which subsequently discharged offshore through a multi-port diffuser into Montsweag Bay. Several of the catch basins and the outfall were abandoned during decommissioning activities. 008 The area associated with Outfall 008 captures drainage from and the area of the plant along the southeastern fence line. Drainage is to a swale and ditch which empties to Montsweag Bay just south of the fence line. 009 The area associated with Outfall 009 captures drainage from the southeast portion of facility paved areas and roof runoff. The area includes a solid waste storage area (not used to date), the former spare transformer, and was an area used for unloading fuel and chemicals during plant operation. Drainage is to catch basins that discharge to a single outfall located south of the former Circulating Water Pumphouse on the shoreline of Montsweag Bay. All but a single catch basin was abandoned during decommissioning activities and, following decommissioning, remaining catch basins will be abandoned and the outfall will be removed. 010 The drainage area associated with Outfall 010 receives storm water from paved and unpaved areas along the east side of the Plant in addition to the former Turbine Hall and the Administrative Building roof drains. Drainage is to catch basins that discharge to a single outfall located north of the former Circulating Water Pumphouse on the shoreline of Montsweag Bay. Located in this area were the main transformers and the security gate, where transport vehicles are held for clearance prior to plant entry. This outfall will be removed following decommissioning. 011 The drainage area associated with Outfall 011 captures drainage from paved roadways leading to the facility northeast of the former Turbine Hall behind the former Information Center. Other drainage includes a groundwater foundation drain and a Staff Building tunnel floor drain. Drainage is to catch basins that discharge to a single outfall located on the shoreline of the Back River. This outfall will be removed following decommissioning. 012 The drainage area associated with Outfall 012 receives storm water from the former Information Center paved parking lot and main access road. Drainage is to catch basins that discharge to a single outfall located on the shoreline of the Back River. N12 Outfall N12 is an earthen swale that receives runoff from a portion of Parking Lot C and the Information Center Parking Lot. 013 The drainage area associated with Outfall 013 captures runoff from the gravel parking lot associated with the public boat launch in the northeast corner of the area. The drainage swale leads to the Back River. 014 Outfall 014 receives drainage water from the ball field area in the northwest corner of the Bailey Point area and drains to Bailey Cove. Page 1 of 2

2 Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 015 Outfall 015 captures drainage water from the area around the ball field and access road near the railroad tracks in the northwest corner of the area and drains to Bailey Cove. 016 Outfall 016 receives drainage water from the wetlands and pond north of the ISFSI and drains to an intertidal area of Bailey Cove west of ISFSI. 017 The drainage area associated with Outfall 017 captures runoff from an area around the ISFSI SOB. Drainage is by a catch basin to a single outfall adjacent to an unnamed drainage swale. The 345 kv Switchyard is located in this area, but its drainage is sheet flow overland to the adjacent environment. 018 The drainage area associated with Outfall 018 receives storm water from the ISFSI. Specifically, draining the area surrounded by the ISFSI berm and future SOB parking area. This area discharges to the intertidal area of Bailey Cove. Page 2 of 2

3 Pre-RFI Selected Explorations Stratigraphy OW Clay Fill OW Clay-Silt OW Sand OW Rock OW Fill OW Clay-Silt OW Sand OW Rock Fill Clay Fill Clay-Silt Sand Rock Fill Clay Fill Clay-Silt Sand Rock Clay-Silt Sand Rock Fill Shot Rock Fill Clay Fill Clay-Silt Sand Clay-Silt Rock Fill Shot Rock Fill Clay Fill Clay-Silt Sand Rock Fill Shot Rock Fill Clay Fill Clay-Silt Rock Fill Page 1 of 11

4 Pre-RFI Selected Explorations Stratigraphy Clay Fill Clay-Silt Sand Rock OW Fill OW Clay Fill OW Fill OW Clay-Silt OW Sand OW Rock B Fill B Rock B Fill B Rock B Fill B Rock B Fill B Rock B Fill B Rock B Clay-Silt B Rock B Fill B Rock B Sand B Rock B Fill B Rock B Clay-Silt B Rock B Clay-Silt B Sand B Rock 21 1 B Clay-Silt B Rock B Clay-Silt B Rock B Fill B Rock B Clay-Silt Page 2 of 11

5 Pre-RFI Selected Explorations Stratigraphy 4 B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Sand B Rock B Fill B Rock B Clay-Silt 23 5 B Rock 5-15 B Clay-Silt B Till B Rock B Fill B Rock B Clay-Silt B Rock B-1E Fill B-1E Rock B Fill B Clay-Silt B Rock B Clay-Silt B Rock B Fill B Clay-Silt B Rock 5-46 B Clay-Silt B Rock B Clay-Silt B Rock B-203A Fill B-203A Clay-Silt B-203A Rock B Clay-Silt B Rock B-204A Fill Page 3 of 11

6 Pre-RFI Selected Explorations Stratigraphy 4 B-204A Rock B Fill B Rock B Clay-Silt B Rock B Fill B Rock B Clay-Silt B Rock B Clay-Silt 18-5 B Rock B Clay-Silt 18-3 B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Fill B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Sand B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Rock B Clay-Silt B Rock B9A Clay-Silt B9A Rock BK Fill Page 4 of 11

7 Pre-RFI Selected Explorations Stratigraphy 4 BK Rock BK Fill BK Clay-Silt 12 1 BK Sand BK Rock BK Fill BK Sand BK Rock BK Fill 21 4 BK Sand BK Rock BP-GPO Clay-Silt BP-GPO Rock BP-GPO Clay-Silt BP-GPO Rock HB Clay-Silt HB Rock K Fill K Clay-Silt K Rock K-2D Fill K-2D Clay-Silt 17-7 K-2D Sand -7-8 K-2D Rock K-3D Fill K-3D Clay-Silt K-3D Sand K-3D Rock K-4D Fill K-4D Clay-Silt 14-1 K-4D Sand -1-2 K-4D Rock P Clay-Silt P Rock P10A Clay-Silt P10A Rock P10B Clay-Silt P10B Rock P-10D Clay-Silt 35-2 P-10D Rock Page 5 of 11

8 Pre-RFI Selected Explorations Stratigraphy 4 P11B Clay-Silt P11B Rock P-11D Clay-Silt P-11D Rock P12B Clay-Silt P12B Rock P-12D Clay-Silt P-12D Rock P-13D Clay-Silt 26-6 P-13D Rock P-14D Clay-Silt P15B Clay-Silt P15B Rock P-15D Clay-Silt P16B Clay-Silt P16B Rock P-16D Clay-Silt P17B Clay-Silt P17B Rock P18B Fill P18B Clay Fill P18B Fill P-18D Fill P-18D Clay Fill 29 8 P-18D Clay-Silt 8-17 P-18D Sand P-18D Rock P Clay-Silt P Rock P19B Clay-Silt P19B Rock P1A Clay-Silt P1A Rock P1B Clay-Silt P1B Rock P-1D Clay-Silt P-1D Rock P Clay-Silt 21-6 P Rock P20B Clay-Silt Page 6 of 11

9 Pre-RFI Selected Explorations Stratigraphy 4 P20B Rock P21B Clay-Silt P21B Rock P22B Clay-Silt P22B Rock P23B Clay-Silt P23B Rock P Clay-Silt P Rock P2A Clay-Silt P2A Rock P2B Clay-Silt P2B Rock P2C Clay-Silt 26 6 P2C Rock P-2D Clay-Silt P-2D Rock P Clay-Silt P Rock P Clay-Silt P Rock P3A Clay-Silt P3A Rock P3C Clay-Silt 23 1 P3C Rock P-3D Clay-Silt 28 9 P-3D Rock P Clay-Silt P Rock P Clay-Silt P Rock P4A Clay-Silt P4A Rock P4B Clay-Silt P4B Rock P4C Clay-Silt P4C Rock P-4D Clay-Silt 25 2 P-4D Rock P Clay-Silt Page 7 of 11

10 Pre-RFI Selected Explorations Stratigraphy 4 P Rock P Clay-Silt P Rock P5A Clay-Silt 21 9 P5A Rock P5C Clay-Silt P5C Rock P-5D Clay-Silt 24-5 P-5D Rock P Clay-Silt P Rock P Fill P Rock P Clay-Silt P Rock P Clay-Silt P Rock P Clay-Silt P Rock P Clay-Silt P Rock P6B Clay-Silt P6B Rock P-6D Clay-Silt P-6D Rock P Clay-Silt P Rock P Clay-Silt P Rock P Clay-Silt P Rock P Clay-Silt P Rock P7A Clay-Silt P7A Rock P7B Clay-Silt P7B Rock P-7D Clay-Silt P-7D Rock P8A Clay-Silt Page 8 of 11

11 Pre-RFI Selected Explorations Stratigraphy 4 P8A Rock P8B Clay-Silt P8B Rock P-8D Clay-Silt 27-1 P-8D Rock P Clay-Silt 21 5 P Rock P9A Clay-Silt P9A Rock P9B Clay-Silt P9B Rock P-9D Clay-Silt P-9D Rock T-28U Clay-Silt T-28U Rock T-29C Clay-Silt T-29C Rock T-45A Clay-Silt 18 7 T-45C Clay-Silt T-45C Rock T-46C Clay-Silt T-46C Rock TB Clay-Silt 21 9 TB Rock TB10B Clay-Silt TB10B Rock TB11A Clay-Silt TB11A Rock TB11B Clay-Silt TB11B Rock TB12A Clay-Silt TB12A Rock TB12B Clay-Silt TB12B Rock TB13A Clay-Silt TB13A Rock TB13B Clay-Silt TB13B Rock TB14A Clay-Silt TB14A Rock Page 9 of 11

12 Pre-RFI Selected Explorations Stratigraphy 4 TB14B Clay-Silt TB14B Rock TB1B Clay-Silt TB1B Rock TB1C Clay-Silt TB1C Rock TB-1D Clay-Silt TB-1D Rock TB Clay-Silt TB Rock TB2B Clay-Silt TB2B Rock TB2C Clay-Silt TB2C Rock TB-2D Clay-Silt TB-2D Rock TB Clay-Silt TB Rock TB3B Clay-Silt TB3B Rock TB3C Clay-Silt TB3C Rock TB-3D Clay-Silt 21-3 TB-3D Rock TB Clay-Silt TB Rock TB4B Clay-Silt TB4B Rock TB4C Clay-Silt TB4C Rock TB-4D Clay-Silt 26 3 TB-4D Rock TB Clay-Silt TB Rock TB5B Clay-Silt TB5B Rock TB5C Clay-Silt TB5C Rock TB-5D Clay-Silt TB-5D Rock Page 10 of 11

13 Pre-RFI Selected Explorations Stratigraphy 4 TB6B Clay-Silt TB6B Rock TB-6D Clay-Silt TB-6D Rock TB7B Clay-Silt TB7B Rock TB8B Clay-Silt TB8B Rock TB9B Clay-Silt TB9B Rock TP-1E Fill TP-1E Rock TP-2E Fill TP-2E Rock Notes: 1. See Table 5-2 in QAPP (Stratex, 2001d) for installation date. Some data from Table 5-2 is corrected here. 2. Northings and Eastings are Maine State Grid Coordinates, East Zone, NAD 1927, in feet. Not all locations were surveyed and coordinates were obtained from scale drawings. 3. All depths in feet below ground surface (bgs). Where rock thickness is defined as 0.1 foot, the original boring log indicated Refusal. 4. Simplified Stratigraphic Descriptions by Robert G. Gerber, C.G. 5. All elevations in feet referenced to NGVD, 1929 Mean Sea Level. Page 11 of 11

14 Table 3-3 Vertical Gradient Direction in Paired Wells Well Number Measured Elevation 1 12/11/01 Direction Movement 12/11/01 Measured Elevation 1 4/01/02 Direction Movement 4/01/02 Measured Elevation 1 9/16/02 Direction Movement 9/16/02 Measured Elevation 1 11/13/02 302A upward upward 302B NM 2 303A NM 303B NM 304A NM 304B NM 305A NM upward upward upward 305B NM 401A NI 3 NI B NI NI A NI NI upward 406B NI NI A NI NI NM B NI NI A NI NI B NI NI A NI NI NI B NI NI NI A NI NI B NI NI A NI NI 29.1 NM 424B NI NI 29.5 NM Direction Movement 11/13/02 upward Notes: 1. Elevations in feet referenced to NGVD 2. NM Water level Not Measured 3. NI Monitoring well Not Installed

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016 Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY

More information

Wick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012

Wick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012 Wick Drains and Piling for Cai Mep Container Port, Vietnam Bengt H. Fellenius Sower's Lecture Atlanta May 8, 2012 1 The Mekong Saigon/HoChiMinhCity The General Area 3 Thi Vai Port Cai Mep Port 4 Artist

More information

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark

More information

FEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT

FEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT SURF CITY AND NORTH TOPSAIL BEACH NORTH CAROLINA Appendix E Sand Compatibility Analysis Appendix E: Sand Compatibility

More information

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone

More information

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map RTKC- East Abutment Extension November 15, 2016 2.1. Figure 1. East Abutment Extension General Vicinity Map WP NATURAL RESOURCE CONSULTING, INC. 4 RTKC- East Abutment Extension November 15, 2016 2.2. Figure

More information

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam.

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot Bengt H. Fellenius Amsterdam May 27, 216 Fellenius, B.H. and Nguyen, M.H., 213. Wick Drains and Piling for

More information

Approved: January 24, 2014 Revised: March 20, 2017 Next Scheduled Review: March 20, 2022

Approved: January 24, 2014 Revised: March 20, 2017 Next Scheduled Review: March 20, 2022 33.04.99.C0.03 Tailgating Approved: January 24, 2014 Revised: March 20, 2017 Next Scheduled Review: March 20, 2022 Procedure Statement Tailgating is defined as a social gathering of any number of people

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

THERMAL ENERGY STORAGE TANK DOWN UNDER

THERMAL ENERGY STORAGE TANK DOWN UNDER THERMAL ENERGY STORAGE TANK DOWN UNDER OWNER ENGINEER TANK BUILDER Thermal Energy Storage Tank Walnut, CA Los Angeles area Community College serving over 50,000 students Host to the 2020 U.S. Olympic Track

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020 December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,

More information

Status of Implementation of Approved Rehabilitation Plans: ARA Sites in Halton Region ( )

Status of Implementation of Approved Rehabilitation Plans: ARA Sites in Halton Region ( ) ttachment #5 to LPS96-15 Status of Implementation of pproved Rehabilitation Plans: R Sites in Halton Region (2012-2014) Site Name, R Rehabilitation/End-use Description Status of Implementation of pproved

More information

CADDO LEVEE DISTRICT

CADDO LEVEE DISTRICT CADDO LEVEE DISTRICT 1320 Grimmett Dr. Shreveport, LA 71107 www.caddolevee.org Phone: (318) 221-2654 2015 ANNUAL REPORT ADMINISTRATOR S LETTER Working for Caddo Levee District and serving the residents

More information

Westcott site services

Westcott site services Westcott site services 6 prospect street Waltham ma 2453 781-647-62 westcottsite.com Hillside Center for Sustainable Living Newburyport, Massachusetts STORMWATER REPORT December 28, 215 WESTCOTT SITE SERVICES

More information

The detection limit for tritium is 300 pci/l

The detection limit for tritium is 300 pci/l New Jersey Department of Environmental Protection - Bureau of Nuclear Engineering (BNE) Investigation of Found in Onsite Vault Background and Installation of Groundwater Monitoring Wells In April of 009,

More information

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:

More information

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the 2 The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the picture in the top left hand corner. Water in this pathway

More information

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY Supporting the Marcellus Shale Boom Marc Reeves, P.G. May 6, 2011 Outline Intro to SAIC Basics on the Marcellus Shale Natural gas demand Nationwide

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO. BY Eng.

THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO. BY Eng. THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO BY Eng. Alain NDONA NZEY DR Congo country-wide data * Land area is equal to 2.345.410 square

More information

Lake George Asian Clam Post-Treatment Survey

Lake George Asian Clam Post-Treatment Survey Lake George Asian Clam Post-Treatment Survey Submitted by Sandra Nierzwicki Bauer & Jeremy Farrell, Darrin Fresh Water Institute (Rensselaer Polytechnic Institute), Bolton Landing, NY Steven C. Resler,

More information

Description Dist S-N Wypt N-S Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River

Description Dist S-N Wypt N-S Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River Description Dist S-N Wypt N-S Jct CR 255 and SE Winquepin St. 2.4 0.0 13-5 192.0 Follow SE Winquepin St. Jct Winquepin St. and CR 53.

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

SELF-IMPLEMENTING PLAN FOR THE REMEDIATION OF PCB-IMPACTED SOILS PURSUANT TO 40 CFR (a)

SELF-IMPLEMENTING PLAN FOR THE REMEDIATION OF PCB-IMPACTED SOILS PURSUANT TO 40 CFR (a) SELF-IMPLEMENTING PLAN FOR THE REMEDIATION OF PCB-IMPACTED SOILS PURSUANT TO 40 CFR 761.61(a) FORMER GRAND RAPIDS METAL PLANT 300 36 th STREET SW WYOMING, MICHIGAN DISCLAIMER: SOME FORMATTING CHANGES MAY

More information

TABLE OF CONTENTS 1.0 INTRODUCTION/INVENTORY OF EXISTING CONDITIONS A. Introduction

TABLE OF CONTENTS 1.0 INTRODUCTION/INVENTORY OF EXISTING CONDITIONS A. Introduction 1.0 INTRODUCTION/INVENTORY OF EXISTING CONDITIONS... 1-1 A. Introduction... 1-1 B. General Information... 1-2 1. Airport Location & Management... 1-2 2 Airport History... 1-5 3. Airport Role... 1-6 C.

More information

Hanson Dam s mysteries solved

Hanson Dam s mysteries solved Hanson Dam s mysteries solved Hanson: Earth dams are expected to leak MIKE ARCHBOLD; STAFF WRITER STAFF WRITER LAST UPDATED: APRIL 27TH, 2011 06:34 AM (PDT) It had the makings of a doomsday scenario. Two

More information

CITY OF AUBURN, NEW YORK

CITY OF AUBURN, NEW YORK CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Architect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on

Architect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on Site visit report Project Title Killamarsh Cycleway (TPBN559 SUSTRANS Connect2 - Halfway to Killamarsh (Phase 1)) Project No. 290390 Site Visited Killamarsh Station Road Date of Visit 25 th November 2011

More information

C/CAG. City/County Association of Governments Annual Report

C/CAG. City/County Association of Governments Annual Report C/CAG City/County Association of Governments of San Mateo County 2006 Annual Report C/CAG CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY Atherton Belmont Brisbane Burlingame Colma Daly City

More information

Locating DNAPLs at Former MGP Site

Locating DNAPLs at Former MGP Site GeoTrax Survey TM Case Study (Page 1 of 5) AC-8 North AC-6 AC-5 AC-9 AC-4 AC-1 AC-3 AC-7 Scale (in feet): 2 B AC-2 AC-11 Legend: AC-1 GeoTrax Survey TM Orientation and Designation Green lines = storm sewer

More information

Menkes Milton Industrial

Menkes Milton Industrial Menkes Milton Industrial Functional Servicing and Stormwater Management Report Prepared for: Menkes Milton Industrial Ltd. Prepared by: Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham,

More information

Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River

Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River Region 6 Eastern Panhandle Winquepin St./CR 255 to Apalachicola River Description Dist S-N Wypt N-S Jct CR 255 and SE Winquepin St. Follow SE Winquepin St. Jct Winquepin St. and CR 53. Follow CR 53. Jct

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price.

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price. Section 02222 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Abandonment in place of existing sewers, junction structures, manholes, and force mains. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment

More information

2. A light fixture mounted above the sign face may be installed with its bottom opening tilted toward the sign face, provided:

2. A light fixture mounted above the sign face may be installed with its bottom opening tilted toward the sign face, provided: Section 20.132.090 Sign illumination. A. General. No temporary sign may be illuminated. No sign located in a residential zone may be illuminated, except that on parcels two (2) acres in size or greater,

More information

ATTACHMENT B8 Incident History

ATTACHMENT B8 Incident History Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...

More information

Performance Standards Workshop Midwest Case Studies

Performance Standards Workshop Midwest Case Studies Performance Standards Workshop Midwest Case Studies Permeable Paving Permeable Paving Bioretention 1 Bioretention Bioretention Bioretention Bioretention 2 Green Roof Portland Stormwater Management Manual

More information

Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No: County of Butte Contract Number: 18050

Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No: County of Butte Contract Number: 18050 10540 White Rock Road, Suite 180 Rancho Cordova, California, 95670 Tel: 916-444-0123 phone Fax: 916-635-8805 fax Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No:

More information

NORTH FORK FEATHER RIVER, CA

NORTH FORK FEATHER RIVER, CA Hydropower Project License Summary NORTH FORK FEATHER RIVER, CA ROCK CREEK CRESTA HYDROELECTRIC PROJECT (P-1962) Kayakers below the Cresta Dam Photo: Hydropower Reform Coalition This summary was produced

More information

A.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING

A.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING GRAVEL ACCESS ROAD PUBLIC TOILET /1179358 CURRENT DISPOSAL AREA (INDICATIVE) WEATHER STATION (LOCATION INDICATIVE) 3/819237 (LEASE) MAIN PUBLIC CAR PARKING AREA R5 LARGE LOT RESIDENTIAL ZONE WEST COWRA

More information

Geotechnical Issues Associated With the Design and Construction of the Middle River Bridge

Geotechnical Issues Associated With the Design and Construction of the Middle River Bridge Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (2013) - Seventh International Conference on Case Histories in Geotechnical

More information

Applicant Submittal. Comprehensive Sign Submittal. BLUHAWK Development. 21 February Development:

Applicant Submittal. Comprehensive Sign Submittal. BLUHAWK Development. 21 February Development: Comprehensive Sign Submittal BLUHAWK Development 21 February 2018 SHEET 100: EXPANDED SIGN IDENTIFICATION PACKAGE SHEET 101: OVERALL SITE SIGNAGE PLAN SHEET 210: HIGHWAY IDENTIFICATION - LOCATION PLAN

More information

Cowtown Model Railroad Club

Cowtown Model Railroad Club Cowtown Model Railroad Club Fort Worth, Texas Volume 5 October 2018 Number 10 General Meeting The October general meeting of the Cowtown Model Railroad Club will be on Monday night October 15 th at 7:00

More information

Engineering Development of the Valley VRI Package Agricultural Equipment Technology Conference

Engineering Development of the Valley VRI Package Agricultural Equipment Technology Conference Engineering Development of the Valley VRI Package 2013 Agricultural Equipment Technology Conference Discuss development of VRI Background Design Process Design Solutions Prescriptions Testing 2 The Ag

More information

Visual On-land Trash Assessment Protocol for Stormwater

Visual On-land Trash Assessment Protocol for Stormwater Visual On-land Trash Assessment Protocol for Stormwater Version 1.3 Prepared by: EOA, Inc. 1410 Jackson St. Oakland, CA 94612 April 15, 2015 Visual On-land Trash Assessment Methodology INTRODUCTION This

More information

Coastal Carolina University Athletic Training Department Policy and Procedure Manual Emergency Action Plan Reviewed/Revised 6/2017

Coastal Carolina University Athletic Training Department Policy and Procedure Manual Emergency Action Plan Reviewed/Revised 6/2017 Coastal Carolina University Athletic Training Department Policy and Procedure Manual Emergency Action Plan Reviewed/Revised 6/2017 Introduction Emergency situations may arise at any time during athletic

More information

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.

More information

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis

More information

CITY OF TWINSBURG BOARD OF ZONING APPEALS MINUTES APRIL 8, 2015 CITY OF TWINSBURG BOARD OF BUILDING AND ZONING CODE APPEALS APRIL 8, 2015

CITY OF TWINSBURG BOARD OF ZONING APPEALS MINUTES APRIL 8, 2015 CITY OF TWINSBURG BOARD OF BUILDING AND ZONING CODE APPEALS APRIL 8, 2015 BOARD OF BUILDING AND ZONING CODE APPEALS Present: Absent: Also Present: Messrs: Gary Wilner, Ed Kancler, Thomas Brown and Brian Davis Neil Rubin Mr. Russ Rodic, Building Commissioner Mr. Sam Scaffide,

More information

Table of Contents. Introductory Command Message & Foreword Table of Contents

Table of Contents. Introductory Command Message & Foreword Table of Contents EP 310-1-6a Introduction Section 1 Introduction Section 2 Principles and Guidelines Section 3 Program Plan and Documentation Section 4 Design Standards Section 5 Identification Signs Introductory Command

More information

MDH GOLD S TANDARD - B UYERS GUIDE

MDH GOLD S TANDARD - B UYERS GUIDE W HAT IS RADON? Radon is a naturally occurring radioactive gas that enters buildings from the surrounding soil. It is colorless, odorless and tasteless. Radon is also the main source of ionizing radiation

More information

Analysis of Brownfields Cleanup Alternatives (ABCA) for Remediation of i Soil, Groundwater, and Building-Related

Analysis of Brownfields Cleanup Alternatives (ABCA) for Remediation of i Soil, Groundwater, and Building-Related Analysis of Brownfields Cleanup Alternatives (ABCA) for Remediation of i Soil, Groundwater, and Building-Related I Contamination during Building Demolition Former Fonda Group Facility St. Albans, Vermont

More information

Quote Name: Weed Control Description: See attached Township Contact: Deb Thompson Contact Phone Number: (609) Fax: (609) Quote

Quote Name: Weed Control Description: See attached Township Contact: Deb Thompson Contact Phone Number: (609) Fax: (609) Quote Quote Name: Weed Control Description: See attached Township Contact: Deb Thompson Contact Phone Number: (609) 361-6676 Fax: (609) 494-6454 Quote Number: 19-29 Posted Date: March 4, 2019 Dates Quotes are

More information

City of Sanibel. Planning Department STAFF REPORT

City of Sanibel. Planning Department STAFF REPORT City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting: July 10, 2012 Planning Commission Agenda Item: No. 6 Application Number: Evaluation & Appraisal of the Sanibel Plan Applicant

More information

1 Exam Prep. SMACNA Architectural Sheet Metal Questions

1 Exam Prep. SMACNA Architectural Sheet Metal Questions 1 Exam Prep SMN rchitectural Sheet Metal Questions 1. Which of the following is not an advantage of terne? Lightweight High expansion rate Low expansion rate urable 2. ownspouts should be constructed with

More information

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS ICCI2004, The First International Conference on Construction IT, Beijing, CHINA, August 12 th - 14 th SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS Cai,

More information

PFAS at Parafield Airport. November 2018

PFAS at Parafield Airport. November 2018 PFAS at Parafield Airport November 2018 2 Summary PFAS has been detected at low levels in groundwater in isolated monitoring wells set up on the southern and western boundary of Parafield Airport. As a

More information

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR UNITY AVENUE STREET IMPROVEMENTS IMPROVEMENT PROJECT NO. 2011-05 CITY OF BROOKLYN CENTER, MINNESOTA January

More information

MEMORANDUM. TO: Peter Ramanauskas REF. NO.: FROM: Glenn Turchan, William K. Steinman, Jacky So/ja/369 DATE: July 21, c.c.

MEMORANDUM. TO: Peter Ramanauskas REF. NO.: FROM: Glenn Turchan, William K. Steinman, Jacky So/ja/369 DATE: July 21, c.c. MEMORANDUM 651 Colby Drive, Waterloo, Ontario, Canada NV 1C Telephone: (519) 884-05 Fax: (519) 884-055 www.craworld.com TO: Peter Ramanauskas REF. NO.: 013968 FROM: Glenn Turchan, William K. Steinman,

More information

LAKE NAIVASHA. A Lake in Trouble. A Possible Solution?

LAKE NAIVASHA. A Lake in Trouble. A Possible Solution? LAKE NAIVASHA A Lake in Trouble A Possible Solution? THE PROBLEM Significant and dangerous reduction in the size of the Lake Naivasha water body and serious degradation of water quality caused by: 1. Large

More information

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018 Stormwater Report For ACORN PLACE ACORN STREET MILLIS, MA Proposed Senior Residential Community July, PREPARED BY: MERRIKIN ENGINEERING, LLP Consulting Engineers Main Street, Suite C Millis, MA PREPARED

More information

Projected and Expended Costs

Projected and Expended Costs Conservation 20/20 Projected and Expended Costs Costs updated as of Funding Year 2013/2014 Aerial Photos for maps from either January 2011 or January 2014 2 Alva Scrub Preserve Acquired: 1999-2012 Land

More information

The New Jersey Nonstructural Strategies Point System (NSPS)

The New Jersey Nonstructural Strategies Point System (NSPS) 2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)

More information

ESM and disposal of PCBs

ESM and disposal of PCBs ESM and disposal of PCBs Regional training workshop Kingston, February 2nd to 5th 2009 What does it mean? ESM stands for Environmentally Sound Management. Here sound means the state-of-the-art. What is

More information

PROPERTY HIGHLIGHTS. Approximately 6,754 SF of Office Space. Extensive Inventory of Cranes & Equipment. $1,400,000 Asking Price

PROPERTY HIGHLIGHTS. Approximately 6,754 SF of Office Space. Extensive Inventory of Cranes & Equipment. $1,400,000 Asking Price OFFERING SUMMARY Sale Price: $1,400,000 Price / SF: $13.94 PROPERTY OVERVIEW This offering is an excellent investment for an owner/user looking to expand operations, or for a new entrant into the Shreveport-Bossier

More information

Missouri River Stage Trends Technical Report

Missouri River Stage Trends Technical Report Missouri River Stage Trends Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska September 2017 Paragraph MISSOURI

More information

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report INITIAL ANNUAL INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION Initial Annual RCRA CCR Unit Inspection Report PRIMARY BASIN NUMBER 2 SURFACE IMPOUNDMENT Submitted

More information

Pole Vault INTRODUCING THE POLE VAULT

Pole Vault INTRODUCING THE POLE VAULT Pole Vault INTRODUCING THE POLE VAULT By Alan Richardson, UKA National Event Coach, Pole Vault Originally published in Athletics Weekly (www.athletics-weekly.com) Pole Vault is known and widely accepted

More information

\\H\15\ PH9 Inspection Photos

\\H\15\ PH9 Inspection Photos SHOP SLIDE Photo 1. at cracking across the footpath at the end of the Hwy 2 EB to Hwy 684 SB off ramp at the 99 Ave. intersection. Drop in asphalt trail (background) has worsened since 2013 and is now

More information

R A DON IS YOUR FAMILY AT RISK?

R A DON IS YOUR FAMILY AT RISK? A Full Service Radon Testing, Mitigation & Remediation Company providing peace of mind from Radon in homes and businesses throughout Southeastern PA and the Tri-State Area. R A DON IS YOUR FAMILY AT RISK?

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation

More information

WETLANDS BOARD. City of Virginia Beach. March 21, :00 AM. City Council Chamber. Jeffrey L. Marks, Chairman, Presiding

WETLANDS BOARD. City of Virginia Beach. March 21, :00 AM. City Council Chamber. Jeffrey L. Marks, Chairman, Presiding WETLANDS BOARD City of Virginia Beach March 21, 2011 10:00 AM City Council Chamber Jeffrey L. Marks, Chairman, Presiding INDEX APPLICANT APPLICATION NUMBER PAGE INDIAN COVE RESORTS, INC. VB08-238 NW 5

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town

More information

Emergency Bridge Stabilization at Mile Watrous Subdivision

Emergency Bridge Stabilization at Mile Watrous Subdivision Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)

More information

WETLANDS BOARD. City of Virginia Beach 10:00 AM. City Council Chamber. April 21, Patrick Shuler, Chairman, Presiding

WETLANDS BOARD. City of Virginia Beach 10:00 AM. City Council Chamber. April 21, Patrick Shuler, Chairman, Presiding WETLANDS BOARD City of Virginia Beach 10:00 AM City Council Chamber April 21, 2014 Patrick Shuler, Chairman, Presiding INDEX APPLICANT APPLICATION NUMBER PAGE MIKE HILLIER VB11-225 SD 5 GARY TUTHILL VB11-022

More information

Planning Section, Community Development Division Development Services Department

Planning Section, Community Development Division Development Services Department AGENDA ITEM: 2. DATE: 02-22-16 STAFF REPORT CONDITIONAL USE PERMIT NO. 15-21 DATE: TO: FROM: APPLICANT: LOCATION: REQUEST: Lancaster Planning Commission Planning Section, Community Development Division

More information

THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY

THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY NPDES PERMIT NO. AR342 ORIGINAL SUBMISSION DATE: NOVEMBER 16, 215

More information

Guideline No.: FH/007supl Issue Date: 31 st October Title: SMOKING GUIDELINES Issued by: Food & Health Department

Guideline No.: FH/007supl Issue Date: 31 st October Title: SMOKING GUIDELINES Issued by: Food & Health Department Guideline No.: FH/007supl Issue Date: 31 st October 2010 Title: SMOKING GUIDELINES Issued by: Food & Health Department 1.0 Introduction The Food & Health Department of Trakhees-Environment, Health & Safety

More information

Cannabis Regulations for Sonoma County Jurisdictions as of March 26, 2018

Cannabis Regulations for Sonoma County Jurisdictions as of March 26, 2018 Jurisdiction County Status License Type: Use Permit Limits on Number of Dispensaries: 9 Limits on Dispensary Size: 1000 sq. ft. Zoning: A medical cannabis dispensary proposed within the sphere of influence

More information

Marijuana Concentrate Processing within EFU or AG/F Districts (February 2018)

Marijuana Concentrate Processing within EFU or AG/F Districts (February 2018) CLACKAMAS COUNTY PLANNING AND ZONING DIVISION DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DEVELOPMENT SERVICES BUILDING 150 BEAVERCREEK ROAD OREGON CITY, OR 97045 503-742-4500 ZONINGINFO@CLACKAMAS.US

More information

Niagara Escarpment Plan Revised Amendment Acton Quarry Extension May 31, 2012

Niagara Escarpment Plan Revised Amendment Acton Quarry Extension May 31, 2012 TAB 1 Niagara Escarpment Plan Revised Amendment Acton Quarry Extension May 31, 2012 The following amendment is proposed to update the Niagara Escarpment Plan Amendment application originally dated March

More information

CITY COUNCIL CITY MANAGER. It is recommended that the City Council:

CITY COUNCIL CITY MANAGER. It is recommended that the City Council: TO: CITY COUNCIL DATE: April 7,2008 THROUGH: PUBLIC SAFETY FROM: CITY MANAGER SUBJECT: RECOMMENDATION: It is recommended that the City Council: 1. Find that the amendments to Chapter 9.36 of the PMC (Noise

More information

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District February 4, 2003 MEMORANDUM TO: File FROM: Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District SUBJECT: Proposed minimum

More information

Summary of Technical Analysis

Summary of Technical Analysis Introduction The following presentation was provided during a public meeting listening session on June 8, 2017 regarding the establishment of a protective elevation for White Bear Lake. This information

More information

SEWERAGE AND WATER BOARD OF NEW ORLEANS

SEWERAGE AND WATER BOARD OF NEW ORLEANS SEWERAGE AND WATER BOARD OF NEW ORLEANS Financial Plan and Rate Study 2011-2020 Updated September 28, 2011 Revised April 30, 2012 TABLE OF CONTENTS 1. Executive Summary...1 1.1 Scope of Report... 1 1.2

More information

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan

More information

Natural Source Exclusion: a Case Study at Santa Monica Pier. Mark Gold UCLA Institute of the Environment and Sustainability

Natural Source Exclusion: a Case Study at Santa Monica Pier. Mark Gold UCLA Institute of the Environment and Sustainability Natural Source Exclusion: a Case Study at Santa Monica Pier Mark Gold UCLA Institute of the Environment and Sustainability Santa Monica Pier Water Quality Ponding Underneath Santa Monica Pier Broken Stormdrain

More information

Potholes: Prevent Before They Present

Potholes: Prevent Before They Present : Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.

More information

Free-Standing Industrial Building for Lease

Free-Standing Industrial Building for Lease 22,860 ± SF AVAILABLE Michael Flitner, Partner Rhonda Deringer, Partner 1355 N Dutton Ave., Santa Rosa, CA 95401 (707) 528-1400 Fax: (707) 524-1419 Lic #: 00840890, 01206401 MFlitner@KeeganCoppin.com,

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information