Design of Picton Railway Overbridge for Mine Subsidence

Size: px
Start display at page:

Download "Design of Picton Railway Overbridge for Mine Subsidence"

Transcription

1 Design of Picton Railway Overbridge for Mine Subsidence Geraint Jones Long Bai Small Bridges Conference 24 November 2015

2 Introduction - Presentation Structure >Project Background >Longwall Mining >Location & Setting >Proposed Works >Stakeholders >Program Milestones >Detailed Design > Mine Subsidence > Articulation > Spherical Bearings > Modular Joint > Maintenance Manual >Conclusions

3 Longwall Mining

4 Location & Setting

5

6 Proposed Works

7 Stakeholders

8 Program Milestones >Oct 2014 >Jan 2015: >Mar 2015: >May 2015: >June 2015 >Nov 2015: >Dec 2015: >Jan 2016: >Mar 2016: Commence Detailed Design Detailed Design Complete Tender Period Award Contract Commence Construction Demolish Existing & Open New Bridge to Traffic Anticipated first impact of Longwall Longwall expected to be directly under the Bridge Longwall expected to be complete

9 Erection of Bridge Girders

10 Demolition of Existing Bridge

11 Bridge Design 1. Design Strategy 2. Bridge Articulation 3. Mining Subsidence Movements 4. Maintenance 5. Conclusion

12 Bridge Geometry

13 Design Strategy >Design Guidance: BD10/97 >Special consideration is required if the displacement between two points exceeds 1/1000 times the distance >Mine subsidence prediction was carried out by Mine Subsidence Engineering Consultants (MSEC) >Not economical to design all the elements and connections to accommodate the worst predicted movement >Key challenge: A economical articulation system that requires minimum intervention and adjustment during or after the mining activities.

14 Mine Subsidence Movement Register >Subsidence Movement Scenario >Potential Response of Overbridge >Potential Impact on Overbridge >Predicted Movement >Design Strategy >Proposed Design Capacity >Subsidence Management Strategy >Trigger Level

15 Mine Subsidence Movement Subsidence movement scenario Closure between abutments Opening between abutments Lateral differential movement between abutments Vertical differential movement between abutments Predicted Movements 1% Probability 0.05% Probability Worst Observed Maximum 80 mm 230 mm 330 mm 500 mm 35 mm 70 mm 80 mm 150 mm 40 mm 80 mm 84 mm 150 mm 50 mm 100 mm 330 mm 400 mm or 10mm/m whichever is greater Uniform lateral tilt Transverse differential tilt (twist) between abutments N/A N/A - 10mm/m mm/m Curvature of ground at abutment transverse to bridge Hogging or sagging curvature of 0.10km -1 Tension strain of ground at abutment transverse to bridge 1.5mm/m 2.9mm/m - - Compression strain of ground at abutment transverse to bridge -3.5mm/m -9.7mm/m - -

16 Articulation Abutment A > Modular Expansion Joint Abutment B > Strip Seal Expansion Joint Girders > Spherical Bearings Traffic Barrier Connector Cover Plate Safety Screen

17 Bearings & Lateral Restraints Abutment A > Free floating bearings under all girders > Later restraint block between two middle girders Abutment B > Free floating bearings under two outer girders > Fixed bearing under middle bearing

18 Articulation Movement Capacity Element Opening Closing Vertical Rotation Modular Expansion Joint (Abutment A) Horizontal Rotation 185 mm 535 mm +/ rad +/ rad Strip Seal Joint (Abutment B) Free Floating Bearing (Abutment A) Free Floating Bearing (Abutment B) 82 mm 43 mm mm 535 mm +/ rad - 28 mm 28 mm +/ rad - Traffic Barrier 120 mm 100 mm - - Connector Cover Plates 100 mm 230 mm - - Safety Screen 55 mm 20 mm - -

19 Closure Between Abutments Predicted conventional closure: 20 mm. 1 in 100: 80 mm 1 in 2000: 230 mm Worst observed: 330 mm Maximum Predicted: 500 mm

20 Opening Between Abutments Predicted conventional opening: 25 mm. 1 in 100: 35 mm 1 in 2000: 70 mm Worst observed: 80 mm Maximum Predicted: 150 mm

21 Lateral Movement Between Abutments 1 in 100: 40 mm 1 in 2000: 80 mm Worst observed: 84 mm Maximum Predicted: 150 mm

22 Vertical Movement Between Abutments Predicted conventional tilt: 2 mm/m. 1 in 100: 50 mm 1 in 2000: 100 mm Worst observed: 330 mm Maximum Predicted: 10 mm/m or 400 mm (whichever is greater)

23 Modular Expansion Joint Picture Courtesy to Mageba

24 Modular Expansion Joint Picture Courtesy to Mageba

25 Modular Expansion Joint Picture Courtesy to Mageba

26 Spherical Bearings 1. Concave lower part 2. Sliding sheet (UHMWPE - ultra-high molecular weight polyethylene) 3. Convex polished chrome surface 4. Sliding sheet (UHMWPE) 5. Sliding plate 6. Guide bars 7. Anchor dowels Picture Courtesy to Mageba

27 Maintenance >Design Life of Bridge Elements >Maintenance Diary of Bridge Elements >Inspection and Maintenance Instructions >Work-As-Executed Drawings Asset element/sub-element Minimum Design life (years) Permanent Structural Elements 100 Spherical Bearings 40 Bridge Joints Joint sealant 15 Bridge Joints Expansion joint rubbers 35 Safety Screens Protective Coating 15 Asphalt Wearing course 40 Traffic Barrier Railings Protective coating 20

28 Conclusion The design for this single span bridge of modest dimensions was relatively complex due to the requirement that the bridge should accommodate potential significant mining induced ground movements without intervention or adjustment. Through consultation with a wide range of parties an efficient and robust design solution was achieved. The existing bridge was demolished and the new bridge constructed with minimum disruption to road and rail users and with no delay to the longwall mining operations. Acknowledgements Kevin Golledge Tahmoor Coal David Talbert Tahmoor Coal Ian Sheppard Tahmoor Coal Daryl Kay MSEC Mark Dolan Robson Civil Virendra Ghodke Mageba

Shifting the Canning Bus Bridge Sideways

Shifting the Canning Bus Bridge Sideways Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus

More information

Conditional assessment of Kiri Bridge in Shkoder, Albania

Conditional assessment of Kiri Bridge in Shkoder, Albania Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,

More information

Semi-Integral Abutment Bridges

Semi-Integral Abutment Bridges Ministry of Transportation Report BO-99-03 Bridge Office Leslie Street Over Hwy 407 Semi-Integral Abutment Bridges Ministry of Transportation Report BO-99-03 Bridge Office Semi-Integral Abutment Bridges

More information

Rahvusvaheline puitarhitektuuri konverents

Rahvusvaheline puitarhitektuuri konverents Experiences from Modern Timber Bridge Building Rahvusvaheline puitarhitektuuri konverents Tallinn 25-26.11.2015 Hauke Burkart NPRA Bridge Section Topics Short history of modern Norwegian timber bridges

More information

APPENDIX A INTEGRAL ABUTMENTS

APPENDIX A INTEGRAL ABUTMENTS APPENDIX A INTEGRAL ABUTMENTS Appendix A Guidelines for Design of Integral Abutments Rev. 1 - September, 2007 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT

More information

Numerical analysis of the embedded abutments of integral bridges

Numerical analysis of the embedded abutments of integral bridges Numerical analysis of the embedded abutments of integral bridges Ming XU Researcher, Dept. of Civil & Env. Engrg., University of Southampton, UK Summary Alan G. BLOODWORTH Lecturer, Dept. of Civil & Env.

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

Ahmed Mongi, M.S., P.E. Engineering Division

Ahmed Mongi, M.S., P.E. Engineering Division 1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span

More information

Comparative Study of Behaviour of Integral and Bearing Type Bridge under Temperature Loading

Comparative Study of Behaviour of Integral and Bearing Type Bridge under Temperature Loading IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 03, 2015 ISSN (online): 2321-0613 Comparative Study of Behaviour of Integral and Bearing Type Bridge under ing B. J. Shah

More information

Appendix C Guidelines for Design of Integral Abutments March 3, 2003

Appendix C Guidelines for Design of Integral Abutments March 3, 2003 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT s and the UK Highways Agency. They provide guidance and outline the issues that need to be considered and should

More information

PENNDOT e-notification

PENNDOT e-notification PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 027 August 30, 2010 Release of Version 3.1.5.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)

More information

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge

More information

CHAPTER 5 MODELING OF THE BRIDGE

CHAPTER 5 MODELING OF THE BRIDGE 62 CHAPTER 5 MODELING OF THE BRIDGE 5.1 MODELING SAP2000, a nonlinear software package was used for modeling and analysing the study bridge. The following list provides details about the element type used

More information

Four simply supported steel plate girders (appear to be an old railcar).

Four simply supported steel plate girders (appear to be an old railcar). BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure

More information

300 GEORGE ST REDEVELOPMENT IMPACT OF PROPOSED BASEMENT EXCAVATION ON THE ANN STREET ONRAMP STRUCTURES

300 GEORGE ST REDEVELOPMENT IMPACT OF PROPOSED BASEMENT EXCAVATION ON THE ANN STREET ONRAMP STRUCTURES 300 GEORGE ST REDEVELOPMENT IMPACT OF PROPOSED BASEMENT EXCAVATION ON THE ANN STREET ONRAMP STRUCTURES BONACCI GROUP DOCUMENT HISTORY ISSUE REVISION DATE AUTHOR REVIEWER Issued for DTMR Review A October

More information

2007 Niigata Chuetsu-oki Earthquake, Field Reconnaissance Report

2007 Niigata Chuetsu-oki Earthquake, Field Reconnaissance Report Tokyo Institute of Technology, Japan Department of Civil Engineering, Kawashima Laboratory Address: -1-1, O-okayama, Meguro-ku, Tokyo, Japan, Zip code: 15-855 Assistant Professor: Gakuho Watanabe Master

More information

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas

More information

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014 Updated: 5/15/14 1 What was driver for deciding to slide vs. roll? Overall weight? 2 1. Why the two different slide methods? 2. How much experience should your contractor have to perform the slide work?

More information

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014 Accent image here Primary Image here Presentation Outline Overview of the Project Scope ABC Project

More information

EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT

EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT Norton et al. Word Count: 8400 Tables: 5 Figures: 13 1 EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT Date submitted: 08/01/02 Date Revised and Resubmitted: 11/15/02

More information

R-Group Finland Oy. RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

R-Group Finland Oy. RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved R-Group Finland Oy RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 9.1.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...

More information

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation

More information

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and Overview Design criteria for I-90 over Kishwaukee Integral Abutment Bridges (IAB) Design Criteria Design analysis, details and construction Lessons Learned during construction Instrumentation by Illinois

More information

STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END

STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END by Zhengyu Liu Research Team: Zhengyu Liu, Graduate Research Student, Bridge Engineering Center, Iowa State University Brent M Phares, Director,

More information

OVER US 6 LATERAL BRIDGE SLIDE: I-75

OVER US 6 LATERAL BRIDGE SLIDE: I-75 LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

Critically damaged bridges & concepts for earthquake recovery

Critically damaged bridges & concepts for earthquake recovery Critically damaged bridges & concepts for earthquake recovery J. Waldin, J. Jennings & P. Routledge Opus International Consultants Ltd, Christchurch, New Zealand 2012 NZSEE Conference ABSTRACT: This paper

More information

DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA

DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA Brian Lord, Arup Pty Ltd, Australia ABSTRACT Arup was lead designer for Lend Lease on the Victoria Park Drive Modifications

More information

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report Final Report VTRC 06-R35 Virginia Transportation Research Council research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report http:/www.virginiadot.org/vtrc/main/online_reports/pdf/06-r35.pdf

More information

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Introduction The purpose of this white paper is to provide information regarding the potential for fractures

More information

Figure 3: Analytic procedure

Figure 3: Analytic procedure International Journal of Scientific and Research ublications, Volume 7, Issue 5, May 2017 567 Investigation of Integral Bridge Effect under Dynamic Loading Haymanmyintmaung *,kyawlinnhtat ** * Department

More information

ACCELERATED BRIDGE REPLACEMENT

ACCELERATED BRIDGE REPLACEMENT Christopher Beck Chief Engineer: Bridge & Structures Northern Indiana Commuter Transportation District 601 North Roeske Avenue Michigan City, IN chris.beck@nictd.com Accelerated Bridge Replacement (ABR)

More information

Integral bridges and environmental conditions

Integral bridges and environmental conditions Integral bridges and environmental conditions COMISU CLAUDIU-CRISTIAN, BOACĂ GHEORGHITĂ Department of Roads and Foundations Faculty of Civil Engineering and Building Services The "Gheorghe Asachi" Technical

More information

Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples

Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples BY MARTIN P. BURKE, JR. Innumerable bridges both in the U.S. and abroad have been, and continue to be, damaged by the restrained growth

More information

IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse)

IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) AGENDA Project Overview and Need Design and Special Provisions Construction Engineering

More information

Measurement of Residual Stress in Rails using Ultrasonics

Measurement of Residual Stress in Rails using Ultrasonics Measurement of Residual Stress in Rails using Ultrasonics ICRI Discussion Dr Henry Brunskill henry@pktopk.co.uk www.pktopk.co.uk Contents Introduction. New ultrasonic applications in wheel/rail. Residual

More information

Low-Volume Road Abutment Design Standards

Low-Volume Road Abutment Design Standards Low-Volume Road Abutment Design Standards V.W. Robbins HNTB Corporation 7450 W. 130th St., Suite 400 Overland Park, KS 66213 vrobbins@hntb.com F. Wayne Klaiber Bridge Engineering Center 418 Town Engineering

More information

SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION

SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION 3.2.5.0 Since the release of BRADD Version 3.2.4.3, several operational issues have been addressed. This release of BRADD Version 3.2.5.0 contains the following

More information

NON DESTRUCTIVE STRUCTURAL ASSESSMENT OF BRIDGES USING IN-SERVICE DYNAMIC RESPONSE

NON DESTRUCTIVE STRUCTURAL ASSESSMENT OF BRIDGES USING IN-SERVICE DYNAMIC RESPONSE NON DESTRUCTIVE STRUCTURAL ASSESSMENT OF BRIDGES USING IN-SERVICE DYNAMIC RESPONSE Introducing Mainmark Mainmark offers unique, innovative services for rectifying problems in residential, industrial, commercial,

More information

Keywords: integral abutment bridge, pile head abutment connection, finite element method.

Keywords: integral abutment bridge, pile head abutment connection, finite element method. Global Journal of Researches in Engineering: e Civil And Structural Engineering Volume 15 Issue 1 Version 1.0 Year 2015 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global

More information

5 DAMAGE TO TRANSPORTATION FACILITIES

5 DAMAGE TO TRANSPORTATION FACILITIES 5 DAMAGE TO TRANSPORTATION FACILITIES In the Kocaeli, Turkey earthquake of August 17, 1999, extensive damage of transportation facilities occurred in the Kocaeli and Sakarya region, Turkey as shown in

More information

Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri

Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Adams et al. (2012), FHWA Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation

More information

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017 Introduction Substructure Inspection and Rating That portion of the bridge located below the bearings Abutments Piers Rated separately Purpose is to: Receive the loads from the superstructure Transfer

More information

Application of Structure Monitoring Systems to the Assessment of the Behaviour of Bridges in Mining Areas

Application of Structure Monitoring Systems to the Assessment of the Behaviour of Bridges in Mining Areas IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Application of Structure Monitoring Systems to the Assessment of the Behaviour of Bridges in Mining Areas To cite this article:

More information

I lllll llllllll Ill lllll lllll lllll lllll lllll

I lllll llllllll Ill lllll lllll lllll lllll lllll (12) United States Patent Masini I lllll llllllll Ill lllll lllll lllll lllll lllll 111111111111111111111111111111111 US006558426Bl (10) Patent No.: US 6,558,426 Bl (45) Date of Patent: May 6, 2003 (54)

More information

Magellan s Transport Route Lead Monitoring Program

Magellan s Transport Route Lead Monitoring Program Magellan s Transport Route Lead Monitoring Program Magellan s lead monitoring requirements Magellan s approval to export sealed shipments of lead carbonate through Fremantle is subject to the Interim Implementation

More information

EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE

EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 64 EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE Jiachen WANG 1, Athol

More information

MARS. Ideally prepared for every task

MARS. Ideally prepared for every task MARS Ideally prepared for every task Ready for every scenario General and specialty in one New OR methods, efficient workflows, digital OR management: Trumpf Medical understands both current and future

More information

Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass

Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass D. Novakov, D. Ashby, T. Chin & A. George Opus International Consultants Ltd, Wellington - Auckland, New Zealand. G. Gregg

More information

Structural Rehabilitation of Buildings

Structural Rehabilitation of Buildings Structural Rehabilitation of Buildings Satish Jain Iowa State University President, Satish Jain Consulting Engineers (INDIA) Iowa Better Concrete Conference-2017 Satish Jain Consulting Engineers Pvt. Ltd.

More information

Experimental and Analytical Investigation of UHPC Pile-to-Abutment Connections

Experimental and Analytical Investigation of UHPC Pile-to-Abutment Connections Experimental and Analytical Investigation of UHPC Pile-to-Abutment Connections Sriram Aaleti 1 and Sri Sritharan 2 1 Assistant Professor, Department of Civil, Construction and Environmental Engineering,

More information

Pillar Abutment Loading New Concepts for Coal Mining Industry

Pillar Abutment Loading New Concepts for Coal Mining Industry University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2 Pillar Abutment Loading New Concepts for Coal Mining Industry David Hill Golder Associates

More information

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala

More information

Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake

Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake G. Watanabe, K. Iiyama, N. Kawano Tokyo Institute of Technology July 20-21, 2007 Route 116 National

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

Ashton Avenue Integral Bridge

Ashton Avenue Integral Bridge Ashton Avenue Integral Bridge Behzad Golfa, Senior Bridge Engineer, GHD Pty Ltd ABSTRACT The Ashton Avenue Bridge is a replacement of the original three-span timber bridge over Perth- Fremantle Rail line

More information

S T R E N G T H. Innovative Commercial Strength Equipment. Comfort, Design and Natural Bio-Mechanics G T F I T N E S S

S T R E N G T H. Innovative Commercial Strength Equipment. Comfort, Design and Natural Bio-Mechanics G T F I T N E S S PACKAGES S T R E N G T H Innovative Commercial Strength Equipment G T F I T N E S S C O M M E R C I A L S T R E N G T H E Q U I P M E N T G T - 7 9 S E L E C T O R I S E D Comfort, Design and Natural Bio-Mechanics

More information

Development of a Transducer for Measuring Tensile Strains in Concrete Bridge Girders

Development of a Transducer for Measuring Tensile Strains in Concrete Bridge Girders Development of a Transducer for Measuring Tensile Strains in Concrete Bridge Girders By Dr. Jim Richardson, Dr. Michael Triche and Mr. Stephan Skelton Department of Civil and Environmental Engineering

More information

SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION

SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION 3.2.0.0 Since the release of BRADD Version 3.1.6.2, several major enhancements have been made to the software and many reported operational issues have been

More information

Novel treatment technique

Novel treatment technique Final conference Zagreb, 27 th April 2018 TREAT How to choose the optimal rehabilitation technique Novel treatment technique Stanislav Lenart Slovenian National Building and Civil Engineering Institute

More information

MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: One of the most common causes of vibration in rotating

More information

Monitoring of a bridge with integral abutments

Monitoring of a bridge with integral abutments Monitoring of a bridge with integral abutments J. Erisen, M. Veljovic, & M. Nilsson Luleå University of Technology, Luleå, Sweden ABSTRACT: Preliminary results obtained from short term test-loading are

More information

Integral Abutment Bridge Design with Soil Structure Interaction

Integral Abutment Bridge Design with Soil Structure Interaction Integral Abutment Bridge Design with Soil Structure Interaction Thursday, May 11, 2017 3:00 PM 4:00 PM EST Speaker Engineer: Suthichai Saelim Project Location WESTBOROUGH Railroad HOPKINTON Project Location

More information

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2012 NZSEE Conference Twelve State Highway (SH) bridges subjected

More information

Instrumentation Options

Instrumentation Options Instrumentation Options With the introduction of Microplasty and Premier Instrumentation platforms and advancements such as our patented Slidex Technology, the Vanguard Complete Knee System is the surgeon

More information

Update on Seismic Behavior and Design of

Update on Seismic Behavior and Design of Update on Seismic Behavior and Design of Steel Plate Girder Bid Bridges Ahmad M. Itani, Ph.D., P.E., S.E. Professor Department of Civil and Environmental Engineering University of Nevada, Reno Background

More information

H E R I T A G E S T R U C T U R E S E R I E S CREMONA BRIDGE

H E R I T A G E S T R U C T U R E S E R I E S CREMONA BRIDGE Cremona Bridge H E R I T A G E S T R U C T U R E S E R I E S CREMONA BRIDGE 1913-1930 CONTRIBUTORS Alexandra & Yea Standard National Library Australia State Library Victoria University of Melbourne Sandra

More information

DUAL MOBILITY CUP, CEMENTED OR CEMENTLESS

DUAL MOBILITY CUP, CEMENTED OR CEMENTLESS HIP Documentation DUAL MOBILITY CUP, CEMENTED OR CEMENTLESS >>DUAL MOBILITY ACETABULAR CUPS Dual mobility acetabular cup P r Gilles Bousquet invented the concept of dual mobility more than thirty years

More information

Structural health monitoring of the reinforced concrete plug joint system for existing concrete bridges

Structural health monitoring of the reinforced concrete plug joint system for existing concrete bridges Proceedings of the 9th International Conference on Structural Dynamics, EURODYN 214 Porto, Portugal, 3 June - 2 July 214 A. Cunha, E. Caetano, P. Ribeiro, G. Müller (eds.) ISSN: 2311-92; ISBN: 978-972-752-165-4

More information

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways ANNUAL REPORT FOR FY 2011 ODOT SPR ITEM NUMBER 2228 Submitted to: John Bowman, P.E. Planning and Research

More information

Modular Hand System. Product Overview

Modular Hand System. Product Overview Modular Hand System Product Overview Modular Hand System Designed to address specific indications throughout the hand, from the carpals to the phalanges, the Acumed Modular Hand System offers a variety

More information

12 series (Pneufit) Push-in fittings Ø 1/8... 1/2, Ø mm tube size, BSP and NPT threads

12 series (Pneufit) Push-in fittings Ø 1/8... 1/2, Ø mm tube size, BSP and NPT threads 2 series (Pneufit) Push-in fittings Ø /8... /2, Ø 4... 2 mm tube size, SP and NPT threads Very compact units asy tube insertion for rapid assembly of pneumatic circuits Positive tube anchorage ll taper

More information

MAURER MSM Sliding Bearings

MAURER MSM Sliding Bearings MAURER MSM Sliding Bearings MAURER MSM the Innovative Sliding Material What is MSM? MSM can display the total band width of its superior material characteristics in the spherical bearing, facilitating

More information

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges *Memduh Karalar 1) and Murat Dicleli 2) 1) Department of Civil Engineering, Bülent Ecevit

More information

Fort Goff Creek Bridge R04 ABC Project. Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015

Fort Goff Creek Bridge R04 ABC Project. Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015 Fort Goff Creek Bridge R04 ABC Project Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015 Fort Goff Creek Bridge Lead Adopter SHRP2 Solutions Innovative

More information

AN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION

AN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 9, September 2018, pp. 1831 1838, Article ID: IJCIET_09_09_177 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=9

More information

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 F. W. Klaiber, D. J. White, T. J. Wipf, B. M. Phares, V. W. Robbins Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 Development of Design Methodology August 2004 Sponsored

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS

More information

Covator The Height-Adjustable Bucky Table with Integrated Mobile Column System

Covator The Height-Adjustable Bucky Table with Integrated Mobile Column System Covator The Height-Adjustable Bucky Table with Integrated Mobile Column System 1 Extremely high flexibility and effortless patient positioning thanks to the floating tabletop with height adjustment. Covator

More information

It consist of two components: the outer, laminar fibrous container (or annulus), and the inner, semifluid mass (the nucleus pulposus).

It consist of two components: the outer, laminar fibrous container (or annulus), and the inner, semifluid mass (the nucleus pulposus). Lumbar Spine The lumbar vertebrae are the last five vertebrae of the vertebral column. They are particularly large and heavy when compared with the vertebrae of the cervical or thoracicc spine. Their bodies

More information

Trinity. Advanced Bearing Acetabular System Surgical technique

Trinity. Advanced Bearing Acetabular System Surgical technique Advanced Bearing Acetabular System Surgical technique Contents Operative summary Introduction Pre-operative planning Acetabular preparation Acetabular reaming Reamer guide Acetabular shell trials Acetabular

More information

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment

More information

Corrigendum. 1. Last date of bid document downloading and submission Date:- 21/2/2017, Upto Hrs.

Corrigendum. 1. Last date of bid document downloading and submission Date:- 21/2/2017, Upto Hrs. Corrigendum Extension of Dates 1. Last date of bid document downloading and submission Date:- 21/2/2017, Upto 16.00 Hrs. 2. Last date &time of Submission of Tender Fees, EMD & Physical Documents. Date

More information

(12) United States Patent

(12) United States Patent US008556757B2 (12) United States Patent Kilshaw (10) Patent No.: (45) Date of Patent: Oct. 15, 2013 (54) BICYCLE GEAR MECHANISM (76) Inventor: Richard J. Kilshaw, Lake Oswego, OR (US) *) Notice: Subject

More information

CYCLIC TESTING OF REINFORCED CONCRETE COLUMNS WITH UNBONDED REINFORCEMENT

CYCLIC TESTING OF REINFORCED CONCRETE COLUMNS WITH UNBONDED REINFORCEMENT CYCLIC TESTING OF REINFORCED CONCRETE COLUMNS WITH UNBONDED REINFORCEMENT Keerthi RANASINGHE* 1, Hiroshi MUTSUYOSHI* 2 and Hiroki UCHIBORI* 3 ABSTRACT: This paper describes the seismic behavior of RC columns

More information

Consistency in U2 Knee System over Time

Consistency in U2 Knee System over Time U2 TM Knee System Consistency in U2 Knee System over Time Share the same femoral profile of all types allow inter-changibility Uniform AP/ML dimensions in all tibial components enhance intraoperative flexibility

More information

EFFECTS OF SKEWED ABUTMENTS ON CURVED BRIDGE CONSTRUCTION RESPONSE. Tyler Goodman. Spring 2013

EFFECTS OF SKEWED ABUTMENTS ON CURVED BRIDGE CONSTRUCTION RESPONSE. Tyler Goodman. Spring 2013 THE PENNSYLVANIA STATE UNIVERSITY SCHREYER HONORS COLLEGE DEPARTMENT OF CIVIL AND ENVIROMENTAL ENGINEERING EFFECTS OF SKEWED ABUTMENTS ON CURVED BRIDGE CONSTRUCTION RESPONSE Tyler Goodman Spring 2013 A

More information

How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions

How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions Webinar In-Place Recycling Workshop Earth Day April 22, 2008 Sohila Bemanian, PE Parsons Transportation Group The Myth! Sustainability

More information

HIV POSITIVE YOUTH: LINKAGE & RETENTION IN CARE

HIV POSITIVE YOUTH: LINKAGE & RETENTION IN CARE HIV POSITIVE YOUTH: LINKAGE & RETENTION IN CARE Site C Youth clinic HIV care pathway DAY 1 Test HIV + PIMA point of care CD4 count in in 3-5 days initiation + in session 3 session 4 1 month Youth Club

More information

The KineSpring Knee Implant System Product Information

The KineSpring Knee Implant System Product Information The KineSpring Knee Implant System Product Information The Treatment Gap Increasing numbers of young, active OA patients with longer life expectancy and higher activity demands. 1 Large increase in arthroplasty

More information

DELUXE HOME GYM HG Model HG Retain This Manual for Reference OWNER'S MANUAL

DELUXE HOME GYM HG Model HG Retain This Manual for Reference OWNER'S MANUAL NOTE: Please read all instructions carefully before using this product Table of Contents Safety Notice Important Assembly Information DELUXE HOME GYM HG 8250 Care and Maintenance Parts List Warranty Ordering

More information

3229 PRO SERIES INCLINE LEVER ROW

3229 PRO SERIES INCLINE LEVER ROW 3229 PRO SERIES INCLINE LEVER ROW 57 x 36 x 50 302 lbs Reduces low-back strain during lat work. Handle offers wide and neutral grips. 3229 has adjustable, wheeled footplates for quick adjustments. Main

More information

NETAFIM FLEXIBLE PIPES FLATNET

NETAFIM FLEXIBLE PIPES FLATNET NETAFIM FLEXIBLE PIPES FLATNET REINFORCED POLYETHYLENE FLEXIBLE PIPE & FITTINGS APPLICATIONS For use in agricultural, horticultural and other portable water application systems. SPECIFICATIONS Available

More information

Integral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction

Integral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction Integral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction Sergei Terzaghi BE(Hons), MIPENZ Gillian Sisk BEng PhD MIEI CEng Synopsis Integral bridges present

More information

Understanding Hip Implant Options

Understanding Hip Implant Options Understanding Hip Implant Options Cup (Socket) Bearing (Liner) Head Stem (Femur) Modern Hip Implants (Ball) Metal Femoral Head on Marathon Cross-linked Polyethylene Liner Proven materials Polyethylene

More information

Rochester Bridge Trust Learning about Bridges

Rochester Bridge Trust Learning about Bridges Rochester Bridge Trust Learning about Bridges Let s learn about bridges! The Rochester Bridge Trust was founded in 1399 to provide a crossing over the River Medway in Kent. The Trust still provides free

More information

SEISMIC PERFORMANCE OF SEAT- TYPE ABUTMENT HIGHWAY BRIDGES IN ILLINOIS

SEISMIC PERFORMANCE OF SEAT- TYPE ABUTMENT HIGHWAY BRIDGES IN ILLINOIS CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 18-015 UILU-ENG-2018-2015 ISSN: 0197-9191 SEISMIC PERFORMANCE OF SEAT- TYPE ABUTMENT HIGHWAY BRIDGES IN ILLINOIS Prepared By James

More information

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 SITE NUMBER AND NAME: NC 52 Pembina River Bridge LEGAL DESCRIPTION: SE 1-50-9-W5M STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 NAD 83 COORDINATES:

More information

Optimum implant geometry

Optimum implant geometry Design Rationale Optimum implant geometry Extending proven Tri-Lock heritage The original Tri-Lock was introduced in 1981. This implant was the first proximally coated tapered-wedge hip stem available

More information