1 STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala Sivakumar, P.E HNTB, Vice President 1
2 Talking Points Quick Facts Lou Ruzzi,PE, District Bridge Engineer, PennDOT District 11-0 (Pittsburgh area) Project Goals Lou Ruzzi,PE Design Highlights Bala Sivikumar, PE (HNTB) Construction Highlights and Lessons Learned John Myler, Assistant Construction Engineer, PennDOT District 11-0 (Pittsburgh area) 2
3 Existing Bridge 3
4 Existing Bridge Location STATE ROUTE 30 over BESSEMER AVE Allegheny County, Pennsylvania 1 4
5 Existing Bridge Aerial 5
6 Project was let on 11/5/2015 with 3 bidders Quick Facts Brayman Construction was the successful low bidder for $2,333,212. Second bidder bid the job for $3,130,000 Third bidder was at $3,209,308 Pre Bid meeting attended by 4 contractors HNTB was the designer Pre-Cast Abutment Caps, steel beam modules with concrete deck/barrier, Ultra High Performance Concrete (UHPC) joints between the modules with a latex placed over the deck, pre- cast approach slabs SR 30 ADT is 21,798 (2015) with 4% trucks 6
7 Detour Route 7
8 Replace the superstructure over a weekend Project Goals Utilize as many precast/pre-fab elements as possible, UHPC and cover the deck with an appropriate overlay(latex) that would last a long time(20 years) Minimize impact to the adjacent property owner Applied many lessons learned from a previous project that was built in 7 days Considered innovative bidding Under-clearance from 13-9 to
9 Design Highlights Use of Pro Team Meeting plus subsequent constructability meetings to limit the number of alternatives Design the bridge as quickly as possible due to the condition of the existing T Beam bridge (falling debris from superstructure and a hole in the deck) 9
10 Existing Bridge Built 1930 Carries State Route 30 over Bessemer Ave. in East Pittsburgh, PA; high traffic volume Concrete T-Beam Superstructure Span = curved alignment Concrete abutments on spread footing. Concrete strengths from 2.5 to 3.6 ksi Under-clearance from Project required a superstructure replacement with substructure rehab in a single weekend 10
11 ABC Design Decisions Accuracy of As-Built Information to confirm fit Choice of ABC method that fits site constraints and 57 hour closure period Urban area; limited ROW; overhead wires Skew, curvature, super-elevation considerations for ABC design Removal and replacement of deteriorated portions of abutment walls Approach slab replacement ABC connections 11
12 LIDAR SURVEY : AS-BUILT BRIDGE MODEL 12
13 As-Built Bridge Model Shows Bridge Elements to be Removed 13
14 ABC Construction Sequence Pre-Weekend Closure Precut and brace abutment walls along frontface Sawcut roadway pavement at ends Repair abutment spalls and cracks 14
15 ABC Construction Sequence Weekend Closure (57 Hours) continued Demolish superstructure, remove approach slabs and excavate backfill Sawcut abutment along backface and remove sections Connect abutments caps with dowels Erect the six superstructure modules with cranes Erect precast sleeper slabs and approach slabs Place accelerated cure UHPC closure pours Reopen to traffic Monday 6 AM 15
16 ABC Construction Sequence Post-Weekend Closure Backfill abutments with flowable fill (approach slabs are designed to support traffic loads) Place and cure rapid set Latex Modified Concrete (LMC) overlay to 1 ¼ depth and sawcut grooves Apply epoxy resin protective coating to abutment surfaces 16
17 Engineer s ABC Schedule Activity Superstructure & approach roadway removals, backfill excavation Duration (hrs) 8 Substructure saw-cutting and removal 6 Install precast abutment caps 8 Install superstructure modules 8 Install approach slabs 4 Place UHPC closure pours 5 Cure time for UHPC 12 Total Duration (ABC) 51 Hrs 17
18 ABC Replacement Using Prefabricated Bridge Elements 54-0 Single Span Composite Steel Modular Superstructure (shop painted) Straight Steel Beams with Variable Overhangs to Accommodate Curvature Accelerated Cure UHPC Closure Pours New Precast Abutment Caps to Address Deterioration and Super-elevation New Precast Approach Slabs 18
19 New Superstructure Cross Section Design Live Load: AASHTO LRFD / PHL-93 OR P-82 (204 Kip PERMIT LOAD) Lightweight Concrete (5 ksi) to minimize lifting weights 19
20 Design Checks for Erection Crane sizes limited by overhead high voltage electrical lines (De-energized during ABC weekend). Lightweight Concrete (117 pcf) to minimize lifting weights Concrete Stresses During Erection: Not to Exceed Modulus of Rupture fr = 7.5*Sqrt(f'ci), Divided by a Safety factor of 1.5. Dead Loads Multiplied by a Factor of Did not control design Lifting locations shown for each element 20
21 3D Model for Design AutoCad Revit Software 3D model of existing bridge using Lidar New elements modeled in 3D and superimposed on existing Virtual assembly of bridge during design Check fitup at each stage of assembly Several dimensional adjustments were made to precast elements to ensure fit 3D renderings shared with Contractor 21
22 New Superstructure Plan Straight beams / modules. Bridge curvature accommodated using overhangs with variable widths 22
23 Removal of Deteriorated Sections 23
24 Precast Abutment Caps Stepped to Match Superelevation 24
25 Precast Cap Elevation Steel shims used to achieve proper seat elevations Gap around shims filled with rapid set grout -- through grout ports in cap 25
26 Replace with Precast Abutment Cap 26
27 27
28 Superstructure Interior Module 28
29 Superstructure Exterior Module Includes Sidewalk and Parapet 29
30 Superstructure Modules Assembly 30
31 Approach Slab Section 31
32 Precast Sleeper Slab 32
33 Abutment Spall and Crack Repairs 33
34 CONSTRUCTION HIGHLIGHTS 34
35 Bridge Demolition Friday 11:15 PM 35
36 Bridge Demolition 36
37 Bridge Demolition Friday 11:45 PM 37
38 Precast Abutment Cap Saturday 1:00 PM 38
39 Precast Abutment Cap 39
40 Precast Abutment Cap Saturday 3:00 PM 40
41 Precast Deck Panel Sunday 12:00 AM M2-79 Ton with Rigging 41
42 Precast Deck Panel Sunday 7:00 AM 42
43 UHPC Placement Sunday 4:00 PM 43
44 UHPC Placement 44
45 New Bridge after 57 Hours 45
46 Approach Slab Flow Fill 46
47 Profile Milling and LMC Prep. Saturday 1:15 AM 47
48 LMC Placement Saturday 6:20 AM 48
49 New Structure and Roadway Sunday 12:00 PM 49
50 New Structure 50
51 Time Lapse Video 51
52 Lessons Learned 1. More time: a. b. Weekend closure duration Additional lead time 2. Improve ability to level precast caps 3. Reduce deck panel weights 4. Discuss straight or hoop reinforcement in the UHPC joint. 5. Water tight seal for UHPC 6. Latex overlay is recommended 7. Is structure dry fit necessary? 8. 3D renderings were very helpful. 52
53 Closing Questions Contact info: Louis J. Ruzzi : lruzzi@pa.gov> John Myler : jmyler@pa.gov Bala Sivakumar : bsivakumar@hntb.com 53
ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue
ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014 Accent image here Primary Image here Presentation Outline Overview of the Project Scope ABC Project
More informationACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK
ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA
More informationAhmed Mongi, M.S., P.E. Engineering Division
1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span
More informationACCELERATED BRIDGE REPLACEMENT
Christopher Beck Chief Engineer: Bridge & Structures Northern Indiana Commuter Transportation District 601 North Roeske Avenue Michigan City, IN chris.beck@nictd.com Accelerated Bridge Replacement (ABR)
More informationThree Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA
Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance
More informationOVER US 6 LATERAL BRIDGE SLIDE: I-75
LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,
More informationIL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse)
IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) AGENDA Project Overview and Need Design and Special Provisions Construction Engineering
More information2011 BRIDGE INSPECTION REPORT
2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030
More informationFort Goff Creek Bridge R04 ABC Project. Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015
Fort Goff Creek Bridge R04 ABC Project Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015 Fort Goff Creek Bridge Lead Adopter SHRP2 Solutions Innovative
More informationWebinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014
Updated: 5/15/14 1 What was driver for deciding to slide vs. roll? Overall weight? 2 1. Why the two different slide methods? 2. How much experience should your contractor have to perform the slide work?
More informationLesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure
Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on
More informationModified Sheet Pile Abutment for Low-Volume Road Bridge
Modified Sheet Pile Abutment for Low-Volume Road Bridge Ryan R. Evans Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 50011 ryevans@iastate.edu
More informationExecutive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report
Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation
More informationConditional assessment of Kiri Bridge in Shkoder, Albania
Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationEmergency Bridge Stabilization at Mile Watrous Subdivision
Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)
More informationIntegral Abutment Bridge Design with Soil Structure Interaction
Integral Abutment Bridge Design with Soil Structure Interaction Thursday, May 11, 2017 3:00 PM 4:00 PM EST Speaker Engineer: Suthichai Saelim Project Location WESTBOROUGH Railroad HOPKINTON Project Location
More informationRebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and
Overview Design criteria for I-90 over Kishwaukee Integral Abutment Bridges (IAB) Design Criteria Design analysis, details and construction Lessons Learned during construction Instrumentation by Illinois
More informationL. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015
Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior
More informationEXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT
Norton et al. Word Count: 8400 Tables: 5 Figures: 13 1 EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT Date submitted: 08/01/02 Date Revised and Resubmitted: 11/15/02
More informationPennDOT s Use of Nondestructive Testing Solutions
PennDOT s Use of Nondestructive Testing Solutions 2016 NASTO Conference Richard N. Roman, P.E. June 6, 2016 PennDOT Overview PennDOT s 11 engineering districts are directly responsible for nearly 40,000
More informationTechnology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.
Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are
More informationReducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples
Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples BY MARTIN P. BURKE, JR. Innumerable bridges both in the U.S. and abroad have been, and continue to be, damaged by the restrained growth
More informationSEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN
SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch
More informationPENNDOT e-notification
PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 027 August 30, 2010 Release of Version 3.1.5.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)
More informationFour simply supported steel plate girders (appear to be an old railcar).
BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationAppendix C Guidelines for Design of Integral Abutments March 3, 2003
These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT s and the UK Highways Agency. They provide guidance and outline the issues that need to be considered and should
More informationShifting the Canning Bus Bridge Sideways
Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus
More informationIntegral bridges and environmental conditions
Integral bridges and environmental conditions COMISU CLAUDIU-CRISTIAN, BOACĂ GHEORGHITĂ Department of Roads and Foundations Faculty of Civil Engineering and Building Services The "Gheorghe Asachi" Technical
More informationB. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price.
Section 02222 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Abandonment in place of existing sewers, junction structures, manholes, and force mains. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment
More informationPennsylvania s Experience with LRFD Implementation. By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation
Pennsylvania s Experience with LRFD Implementation By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation Overview Case History Spread Footing Width and Braking force Approach
More informationModular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge
Modular Steel Bridges Stark County Fischer Bridge Bottineau County Oak Creek Bridge This John Deere grain hauler was too heavy for the bridge. OOPS! An excavator and tow truck are needed to remove the
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationState-Aid Bridge News August 2, 2005
State-Aid Bridge News August 2, 2005 Bridge Hydraulic Information The FHWA has been inquiring about our Scour Program. In particular, there are two areas of concern; 1. Are our Scour Action Plans current
More informationEFFECTS OF SKEWED ABUTMENTS ON CURVED BRIDGE CONSTRUCTION RESPONSE. Tyler Goodman. Spring 2013
THE PENNSYLVANIA STATE UNIVERSITY SCHREYER HONORS COLLEGE DEPARTMENT OF CIVIL AND ENVIROMENTAL ENGINEERING EFFECTS OF SKEWED ABUTMENTS ON CURVED BRIDGE CONSTRUCTION RESPONSE Tyler Goodman Spring 2013 A
More informationAPPENDIX A INTEGRAL ABUTMENTS
APPENDIX A INTEGRAL ABUTMENTS Appendix A Guidelines for Design of Integral Abutments Rev. 1 - September, 2007 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT
More informationSUMMARY OF NOVEMBER 2013 REVISIONS - VERSION
SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION 3.2.0.0 Since the release of BRADD Version 3.1.6.2, several major enhancements have been made to the software and many reported operational issues have been
More informationAshton Avenue Integral Bridge
Ashton Avenue Integral Bridge Behzad Golfa, Senior Bridge Engineer, GHD Pty Ltd ABSTRACT The Ashton Avenue Bridge is a replacement of the original three-span timber bridge over Perth- Fremantle Rail line
More informationFigure 3: Analytic procedure
International Journal of Scientific and Research ublications, Volume 7, Issue 5, May 2017 567 Investigation of Integral Bridge Effect under Dynamic Loading Haymanmyintmaung *,kyawlinnhtat ** * Department
More informationAn Integral Abutment Bridge with Precast Concrete Piles
An Integral Abutment Bridge with Precast Concrete Piles Final Report May 2007 Sponsored by the Iowa Highway Research Board (IHRB Project TR-438) and the Iowa Department of Transportation (CTRE Project
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationThe Pennsylvania State University. The Graduate School. Department of Civil and Environmental Engineering
The Pennsylvania State University The Graduate School Department of Civil and Environmental Engineering LENGTH LIMITATIONS OF PRESTRESSED CONCRETE GIRDER INTEGRAL ABUTMENT BRIDGES A Thesis in Civil Engineering
More informationExperimental and Analytical Investigation of UHPC Pile-to-Abutment Connections
Experimental and Analytical Investigation of UHPC Pile-to-Abutment Connections Sriram Aaleti 1 and Sri Sritharan 2 1 Assistant Professor, Department of Civil, Construction and Environmental Engineering,
More information5 DAMAGE TO TRANSPORTATION FACILITIES
5 DAMAGE TO TRANSPORTATION FACILITIES In the Kocaeli, Turkey earthquake of August 17, 1999, extensive damage of transportation facilities occurred in the Kocaeli and Sakarya region, Turkey as shown in
More informationSemi-Integral Abutment Bridges
Ministry of Transportation Report BO-99-03 Bridge Office Leslie Street Over Hwy 407 Semi-Integral Abutment Bridges Ministry of Transportation Report BO-99-03 Bridge Office Semi-Integral Abutment Bridges
More informationDESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA
DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA Brian Lord, Arup Pty Ltd, Australia ABSTRACT Arup was lead designer for Lend Lease on the Victoria Park Drive Modifications
More informationAppendix B. Shallow Foundations Report
12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization
More informationCold In Place Recycling In Washington State
Cold In Place Recycling In Washington State Jeff Uhlmeyer Pavement Design Engineer State Materials Laboratory Washington State Department of Transportation First Western States Regional In-Place Recycling
More informationSUMMARY OF NOVEMBER 2018 REVISIONS - VERSION
SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION 3.2.5.0 Since the release of BRADD Version 3.2.4.3, several operational issues have been addressed. This release of BRADD Version 3.2.5.0 contains the following
More informationEvaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures
InTrans Project Reports Institute for Transportation 9-2015 Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures Brent Phares Institute for Transportation, bphares@iastate.edu
More informationGeosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri
Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Adams et al. (2012), FHWA Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationDevelopment of Abutment Design Standards for Local Bridge Designs Volume 1 of 3
F. W. Klaiber, D. J. White, T. J. Wipf, B. M. Phares, V. W. Robbins Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 Development of Design Methodology August 2004 Sponsored
More informationMed School Design and Construction Schedule Med School - Classic WBS Layout w/ WBS S 20-Jul-16 09: d 452d 03-Aug-15 A 09-May-18 0d 6.
Med School Design and Construction Schedule 755d 452d 03-Aug-15 A 09-May-18 0d 6.89% s 701d 432d 19-Aug-15 A 21-Mar-18 0d 0% 147 Institution Approvals (Trustees) 0d 0d 19-Aug-15 A 100% EVHR 000-000-1000
More informationLow-Volume Road Abutment Design Standards
Low-Volume Road Abutment Design Standards V.W. Robbins HNTB Corporation 7450 W. 130th St., Suite 400 Overland Park, KS 66213 vrobbins@hntb.com F. Wayne Klaiber Bridge Engineering Center 418 Town Engineering
More informationresearch report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report
Final Report VTRC 06-R35 Virginia Transportation Research Council research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report http:/www.virginiadot.org/vtrc/main/online_reports/pdf/06-r35.pdf
More informationCE 332 Construction Engineering and Management. MS Project - Recitation
CE 332 Construction Engineering and Management MS Project - Recitation MICROSOFT PROJECT Microsoft Project is a project management software, developed and sold by Microsoft, which is designed to assist
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT
VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS
More informationIntegral Abutment Bridges-Development of Soil Model for Soil Structure Interaction in Time History Analysis
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 10, Issue 3 (March 2014), PP.31-40 Integral Abutment Bridges-Development of Soil
More informationQuestions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection
Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment
More informationIntegral Abutment Bridges Australian and US Practice
Integral Abutment Bridges Australian and US Practice John Connal (M.Eng Sci., B.E. (civil) (Hons), Dip. C.E., F.I.E.Aust, M. ASCE, M. IABSE) Maunsell Australia Pty Ltd SYNOPSIS The structural system offered
More informationIntroduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017
Introduction Substructure Inspection and Rating That portion of the bridge located below the bearings Abutments Piers Rated separately Purpose is to: Receive the loads from the superstructure Transfer
More informationCHAPTER 5 MODELING OF THE BRIDGE
62 CHAPTER 5 MODELING OF THE BRIDGE 5.1 MODELING SAP2000, a nonlinear software package was used for modeling and analysing the study bridge. The following list provides details about the element type used
More information2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CR
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 88756 CR 597 over RICE RIVER DISTRICT: District 1 COUNTY: St. Louis CITY/TOWNSHIP: ANGORA STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016
More informationGrade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway
Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers
More informationPrecast Concrete Elements for Accelerated Bridge Construction
Precast Concrete Elements for Accelerated Bridge Construction Volume 3. Laboratory Testing, Field Testing, and Evaluation of a Precast Concrete Bridge: Black Hawk County Final Report January 2009 Sponsored
More informationPrediction of Concrete Integral Abutment Bridge Unrecoverable Displacements
SP-284 11 Prediction of Concrete Integral Abutment Bridge Unrecoverable Displacements WooSeok Kim, Jeffrey A. Laman, and Daniel G. Linzell Synopsis: Integral abutment bridges (IABs) have performed successfully
More informationFiled: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8
Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889
More informationDATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE
DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge
More information2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency
2017 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # L4870 TWP 332 over ROOT RIVER DISTRICT: District 6 COUNTY: Fillmore CITY/TOWNSHIP: JORDAN STATE: Minnesota Date of Inspection: Equipment Used: 10/22/2016
More informationForces in Wingwalls from Thermal Expansion of Skewed Semi-Integral Bridges
Forces in Wingwalls from Thermal Expansion of Skewed Semi-Integral Bridges Eric Steinberg, Ph.D., P.E. Shad Sargand, Ph.D. for the Ohio Department of Transportation Office of Research and Development and
More informationField and Analytical Studies of the First Folded Plate Girder Bridge
University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses Dissertations and Theses 2014 Field and Analytical Studies of the First Folded Plate Girder Bridge Man Hou Sit University of
More informationProject Cost Estimating System
ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%
More informationEffect of Pile Orientation in Skewed Integral Abutment Bridges
Effect of Pile Orientation in Skewed Integral Abutment Bridges RABIH NAJIB, Ph.D., PE, Alpha Corporation, Baltimore, Maryland and AMDE M. AMDE, Ph.D., PE, University of Maryland, College Park, Maryland
More informationCritically damaged bridges & concepts for earthquake recovery
Critically damaged bridges & concepts for earthquake recovery J. Waldin, J. Jennings & P. Routledge Opus International Consultants Ltd, Christchurch, New Zealand 2012 NZSEE Conference ABSTRACT: This paper
More informationAerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements
Aerial of Conceptual Path and Bridge Barnes & Noble at One Place Project Location Corner Center Proposed Bridge Encore Condominiums Regency Club Condominiums Path continues to Dolley Madison Boulevard
More informationBEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE
BEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE Paul J. Barr Marv W. Halling Conner Huffaker Hugh Boyle Utah State University Department of Civil and Environmental Engineering Logan, Utah September
More informationThe Long Term Performance Of Skew Integral Bridges
The Long Term Performance Of Skew Integral Bridges Popoola, Oladele.O. Civil Engineering Department Afe Babalola University Ado-Ekiti, Nigeria oladelepope@yahoo.com Wasiu, John Civil Engineering Department
More information3/18/03 CE Keith P. Brabant, P.E.
1 Keith P. Brabant, P.E. 2 SELECT GRANULAR BACKFILL 3 4 Maximum of 15% fines Maximum size of 4 inches Free-draining, frictional, and durable Graduation limits referenced by AASHTO T-27 5 US Sieve Size
More informationAnalyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes
Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2012 NZSEE Conference Twelve State Highway (SH) bridges subjected
More informationDetailed Seismic Assessment and Seismic Improvements of Market Road Underpass
Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass D. Novakov, D. Ashby, T. Chin & A. George Opus International Consultants Ltd, Wellington - Auckland, New Zealand. G. Gregg
More informationA Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments
A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas
More informationRahvusvaheline puitarhitektuuri konverents
Experiences from Modern Timber Bridge Building Rahvusvaheline puitarhitektuuri konverents Tallinn 25-26.11.2015 Hauke Burkart NPRA Bridge Section Topics Short history of modern Norwegian timber bridges
More informationInspection Report. River Falls Hydroelectric Project FERC Project No. P Junction Falls Dam River Falls, Wisconsin.
Inspection Report River Falls Hydroelectric Project FERC Project No. P-10489 Junction Falls Dam River Falls, Wisconsin Prepared for: River Falls Municipal Utilities River Falls, Wisconsin December 2009
More informationCaleb Mitchell. B.S., Kansas State University, 2016 A THESIS. submitted in partial fulfillment of the requirements for the degree MASTER OF SCIENCE
Finite Element Analyses and Proposed Strengthening of a Reinforced Concrete Box Girder Bridge Subjected to Differential Settlement by Caleb Mitchell B.S., Kansas State University, 2016 A THESIS submitted
More informationFlume Installation Instructions
Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream
More informationCommunity Meetings November 10 and 12, 2015
Metro Purple Line Extension Section 1 Community Meetings November 10 and 12, 2015 La Cienega Station Agenda Introduction Meeting Purpose Project toverview & Shdl Schedule Roadway Decking Installation Detour
More informationTechnical Report Documentation Page
Technical Report Documentation Page 1. Report No. 2. Government Accession No. 4. Title and Subtitle Design and In-situ Load Testing of Bridge No. 2210010 County Road 6210 - Phelps County, MO 7. Author/s
More information2007 Niigata Chuetsu-oki Earthquake, Field Reconnaissance Report
Tokyo Institute of Technology, Japan Department of Civil Engineering, Kawashima Laboratory Address: -1-1, O-okayama, Meguro-ku, Tokyo, Japan, Zip code: 15-855 Assistant Professor: Gakuho Watanabe Master
More informationField Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake
Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake G. Watanabe, K. Iiyama, N. Kawano Tokyo Institute of Technology July 20-21, 2007 Route 116 National
More informationThe UCD community has made this article openly available. Please share how this access benefits you. Your story matters!
Provided by the author(s) and University College Dublin Library in accordance with publisher policies., Please cite the published version when available. Title Reduction of lateral loads in abutments using
More informationDesign Considerations for Integral Abutment/ Jointless Bridges in the USA
University of Wisconsin Milwaukee UWM Digital Commons Civil and Environmental Engineering Faculty Articles Civil and Environmental Engineering 3-2014 Design Considerations for Integral Abutment/ Jointless
More informationEFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 64 EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE Jiachen WANG 1, Athol
More informationElias Rmeili, P.E. Brownwood District Director of TP&D Darlene Goehl, P.E. Bryan District Pavement/Materials Engineer Miguel Arellano, P.E.
Elias Rmeili, P.E. Brownwood District Director of TP&D Darlene Goehl, P.E. Bryan District Pavement/Materials Engineer Miguel Arellano, P.E. Austin District Pavement/Materials Engineer 4 year Plan Background
More informationStantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905)
Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 4, Page 1 of 10 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889
More informationStructural Rehabilitation of Buildings
Structural Rehabilitation of Buildings Satish Jain Iowa State University President, Satish Jain Consulting Engineers (INDIA) Iowa Better Concrete Conference-2017 Satish Jain Consulting Engineers Pvt. Ltd.
More informationUpdate on Seismic Behavior and Design of
Update on Seismic Behavior and Design of Steel Plate Girder Bid Bridges Ahmad M. Itani, Ph.D., P.E., S.E. Professor Department of Civil and Environmental Engineering University of Nevada, Reno Background
More informationAN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION
International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 9, September 2018, pp. 1831 1838, Article ID: IJCIET_09_09_177 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=9
More information