1 Elias Rmeili, P.E. Brownwood District Director of TP&D Darlene Goehl, P.E. Bryan District Pavement/Materials Engineer Miguel Arellano, P.E. Austin District Pavement/Materials Engineer

2 4 year Plan Background Information Project Selection Basic Procedure we all follow Rural District perspective (Brownwood) Urban District perspective (Bryan) Metro District perspective (Austin)

3 TxDOT s Goal: Ensure that 90 percent of Texas roads will be in good or better condition within 10 years. TxDOT set this goal in 2001.

4 Started in FY2010 Construction (P6) PM projects Rehabilitation Projects Maintenance (Pavement Management Program) Contracted In-house Other Projects Bridge Safety Widening, etc.

5 PMIS is an automated system for storing information to help with the pavement-related decision-making processes.

6 Rutting Failure Patching Alligator Cracking Longitudinal Cracking

7 Failure Failed Joint and Cracks Longitudinal Cracking Shattered Slab Patching

8 Spalling Punchout Asphalt Patch Concrete Patch

9

10 Combines Distress and Ride Quality for a Section. Measure 100% of roadbeds annually. (exception under construction) Ride Quality and rutting are measured with an automated system. Visual distress are measured by an independent contractor and audited by TxDOT.

11 A candidate project request is sent to the Area Offices and Maintenance Offices. Pavement Engineer develops PMIS maps and summaries for district staff. District Staff and Pavement Engineer rides the candidate projects and ranks the projects. District Staff and Pavement Engineer evaluates the 4 year plan, adjust project letting dates and adds new projects.

12 Major Corridor Evaluation IH 45 US 290 SH 6 Evaluate projects in other funding categories. Improve pavement condition score.

13 The Development of the Four-Year Maintenance Plan: Brownwood District Perspective

14 Improve our projected decline in Pavement Condition. 100 Good or Better Score (%) Measured Performance Predicted Performance Year

15 Contains: Construction Projects Maintenance Projects (strategy 144) Maintenance work (strategy 105)

16 Good PM Program Good Rehab Program

17 Seal as many roads as possible Category 1 PM Strategy 144 (Functional Class 6 Roads) Seal Shoulders every other cycle Use grade 4 instead of grade 3

18 Select Rehabilitation projects Standard project selection (Category 1) Pavement committee (Strategy 144)

19 Good PM Program Good Rehab Program Right project - right fix Communication TP&D and Operations areas Transparency

20 The Development of the Four-Year Maintenance Plan:

21 Austin District Roadbed Mileage: ADT (< 5000): 1940 miles ADT ( ,000): 642 miles ADT (>10,000): 788 miles IH-35 = ADT > 100,000 A lot of data to get your arms around Developed some easy, automated methods to analyze pavement performance data

22 Three Step Approach IDENTIFY: Network Level Analysis of PMIS data Preliminary Critical Project List SCOPE & RANK: Project Level Pavement Evaluation Develop scope of PM or Rehab treatment Prioritize and rank project based on performance indexing PLAN: Assign prioritized projects to appropriate funding category and year to make the biggest impact

23

24

25 In the past, we manually plotted & identified potential, as seen below

26 Developed an application to identify and rank the most critical pavement sections in the District network Automatically downloads two year of PMIS data Section Information (HWY, TRM) Raw Distress Data Two Years of Condition & Distress Scores & Calculated Deterioration Rates FISCAL_YEA COUNTY SIGNED_HIGHWBEG_REF_MBEG_REFEND_REFEND_REFACP_RUT_A ACP_RUT_A ACP_PATCHACP_FAILURACP_BLOCK ACP_ALLIGAACP_LONGITACP_TRANS RIDE_SCORE PMIS_DS_2011 PMIS_CS_2011 PMIS_DS_2010 PMIS_CS_2010 DS CS FM0812 K FM0812 K FM0812 K FM0812 K FM0812 K

27 Network Level Project Screening Tool: Identifies critical 0.5 mile sections based on Condition Scores and deterioration rate criteria and rule sets Stitches multiple critical 0.5 mile sections in series on a roadway to create potential P&R projects Identifies and classifies single 0.5 mile section as potential routine maintenance projects Network Level Project Screening Tool DATA INPUT CS Category Input 1. District Austin Good > County Bastrop Fair 3. Pavement type All Flexible Bad < Year 2011 CS Drop Category Input Slow > -5 Medium Fast < -15

28 Preliminary Weighted Performance Ranking based on Condition Score & Drop Score Rank by CS Roadway BRM Disp ERM Disp Condition Score (CS) Drop Condition Score ( CS) CS<30 30 CS<50 50 CS<70 70 CS -10 CS -20 CS< CS<-20 CS -30 Total CS Total Drop CS Total Score 1 SL0150 K FM0696 K FM3000 K SH0021 R US0290 K SH0021 L FM0812 K FM0020 K (0 0.4)+(75 0.3)+(25 0.2)+(0 0.1)= FM1100 K SL0109 K (50 0.1)+(50 0.2)+(0 0.3)+(0 0.4)=15 ( )+(15 0.5)=21.25

29 Network Level Project Screening Tool uses PMIS data to: Consolidates a preliminary candidate list of critical projects for further project level evaluation Use Network Level Raw Visual Distress Data for initial guess of whether a project is PM or Rehab Rank by CS Roadway Beginning Reference Marker Disp Ending Reference Marker Disp Condition Score (CS) Drop Condition Score ( CS) CS< CS< CS< CS - 10 CSD - 20 CSD < CSD <-20 CSD - 30 Total CS Total Drop CS Total Score ACP_RUT_ AUTO_SH ALLOW_A VG_PCT ACP_RUT_ AUTO_DE EP_AVG_P CT Visual Distress Summation ACP_PATC ACP_FAIL HING_PCT URE_QTY ACP_BLO CK_CRACK ING_PCT ACP_ALLI GATOR_C RACKING_ PCT ACP_LON GITUDE_C RACKING_ PCT ACP_TRA NSVERSE_ CRACKING _QTY 1 SL0150 K FM0696 K FM0812 K US0290 K FM1100 K

30

31 Project Level Evaluation Process Step1: Meet with Area/Main. Offices to compare notes on project list (observed vs. measured performance) Step 2: Project evaluation of distress (District, Area & Maintenance Office Personnel) Perform Project Level Distress Rating to verify and clarify network level visual distress data Consensus on distress mechanisms Step 3: Non-destructive testing for potential rehabilitation projects Step 4: Collaborate on the required PM or rehab treatment based on all data available & develop estimate Analyze treatment history as a part of the decision matrix

32 Project Level Evaluation Process Step1: Meet with Area/Main. Offices to compare notes on project list (observe vs. measured performance. Step 2: Project evaluation of distress (Dist. & Area/Maint. Personnel) Eyes on the Road Perform Project Level Distress Rating to verify and clarify network level visual distress data Automated Project Level Distress Survey Form Consensus on distress mechanisms Step 3: Non-destructive testing for potential rehabilitation projects Step 4: Collaborate on the required PM or rehab treatment based on all data available & develop estimate Analyze treatment history as a part of the decision matrix

33 Data collection at project level Distress rating from site visit- density Digital photos- severity Comments- severity It can be classified more specifically 1 to 5 level for density 1 to 5 level for severity Helps differentiate similar but different distresses like edge and longitudinal cracks (environmental vs. structural distress). Provide weighting factor to each distress type Helps develop scope PM vs. Rehab. The scores (grades) can be adjusted FUNCTIONAL DISTRESS STRUCTURAL DISTRESS Weighting factor Distress DENSITY SEVERITY type <10% 10-50% >50% LOW 1 pts 3 pts 5 pts BLOCK MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts JNT CRK MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts FLUSH MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts RAVEL MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts EDG. CRK MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts FAT. CRK MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts RUTTING MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts SHEAR MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts LONG. CRK MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts PATCHING MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts LOW 1 pts 3 pts 5 pts FAILURE MEDIUM 3 pts 5 pts 7 pts HIGH 5 pts 7 pts 10 pts Both density and severity can be recorded with just one click

34 Project Level Evaluation Process Step1: Meet with Area/Main. Offices to compare notes on project list (observe vs. measured performance. Step 2: Project evaluation of distress (District, Area & Maintenance Office Personnel) Perform Project Level Distress Rating to verify and clarify network level visual distress data Consensus on distress mechanisms Step 3: Non-destructive testing for potential rehabilitation projects Step 4: Collaborate on the required PM or rehab treatment based on all data available & develop estimate Analyze treatment history as a part of the decision matrix

35 Ground Penetrating Radar (GPR) Determine existing pavement section and underlying anomalies (water, stripping, etc..) Falling Weight Deflectometer (FWD) Structural capacity and stress analysis Coring and Sampling Quality of existing materials and subgrade conditions

36 Determine existing pavement section Subsurface anomalies (water, stripping, voids, etc..)

37 Determine underlying pavement support Determine depth of failure shear plane for edge failures

38 PMIS data is not a direct means to assess the structural adequacy of a pavement Use network and project level FWD testing to calculate the Structural Condition Index (SCI) to determine structural sufficiency and the extent and degree of rehabilitation SCI is the ratio of existing SN and required SN SCI = SN eff / SN req SN eff = f (total thickness, FWD deflections) SN req = f (20-year ESALs, subgrade Mr)

39

40 Project Level Evaluation Process Step1: Meet with Area/Main. Offices to compare notes on project list (observe vs. measured performance. Step 2: Project evaluation of distress (District, Area & Maintenance Office Personnel) Perform Project Level Distress Rating to verify and clarify network level visual distress data Consensus on distress mechanisms Step 3: Non-destructive testing for potential rehabilitation projects Step 4: Collaborate on the required PM or rehab treatment based on all data available & develop estimate Analyze treatment history as a part of the decision matrix

41 Analysis Treatment History to help prescribe the appropriate P&R treatment Collect treatment history from DCIS, Site Manager, and District databases Use 10 yr. PMIS scores to estimate: Last P&R treatment (years) Analysis Distress & Ride scores before and after treatments success or failure of last treatment

42 About 4 yr About 3 yr HWY_ID BRM DISP FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K FM0141 K Expected Treatment year In 2002, 2001&2006, all segments were treated w/ level up and seal coat. Was it the right decision to treat all segments with this treatment? Maybe may be not

43 Final projects transferred and ranked in the Master 4 yr plan application With all data, Pavement Preservation Evaluation Index (PPEI) is calculate for each project. PPEI = f(adt, % truck, L prj, SCI, CS, CS, t last_trt, etc ) Final 4 yr Plan project lists will be ranked based on PPEI.

44

45 Master 4 yr. Plan application: Assign funding category (CAT 1, 144, 105, etc ) Sets funding percentages for different treatment category (PM, LR, MR, HR, Safety, Seal Coats ) Input the anticipated annual funding for each year/ category Automatically backfills the highest ranked projects into earliest funding year and category Estimates the potential impact to network scores Under development

46 Project not selected in one fiscal year will automatically be pushed to the next fiscal year with an apply inflation rate Unfunded projects are placed into a backlog list Safety projects and annual seal coat projects will be removed from the top first Re-analyze each year and modified as necessary List can be modified manually based on engineering judgment

47 Goal of the Austin District Pavement Preservation Program: Identify most critical pavement sections for PM or rehabilitation (both scores & rate of deterioration) Prescribe the appropriate P&R for each critical section Select projects based on performance indexing; not inventory Narrow the degree and scope of P&R to optimize funding Biggest Bang for the Buck!

Automated Distress Surveys: Analysis of Network-Level Data

Automated Distress Surveys: Analysis of Network-Level Data PRODUCT 0-6663-P3 TxDOT PROJECT NUMBER 0-6663 Automated Distress Surveys: Analysis of Network-Level Data Research Supervisor: Michael R. Murphy March 2015; Published April 2017 http://library.ctr.utexas.edu/ctr-publications/0-6663-p3.pdf

More information

Cold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer

Cold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer Cold In-Place Recycling in Tampa Ken Holton, P.E. Street Maintenance Engineer City of Tampa Stats Tampa has 2,600 lane miles of roadways Tampa uses the MicroPAVER system Currently the City of Tampa s average

More information

Advanced Pavement Management:

Advanced Pavement Management: Advanced Pavement Management: Incorporating Nondestructive Testing in Treatment Selection and Timing Lindsi Hammond, P.E. NWPMA Conference October 30, 2014 Seattle, WA Federal Highways Research into Network

More information

Cold In Place Recycling In Washington State

Cold In Place Recycling In Washington State Cold In Place Recycling In Washington State Jeff Uhlmeyer Pavement Design Engineer State Materials Laboratory Washington State Department of Transportation First Western States Regional In-Place Recycling

More information

How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions

How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions How Nevada DOT Uses Sustainability to Achieve Smooth Roads and Save Millions Webinar In-Place Recycling Workshop Earth Day April 22, 2008 Sohila Bemanian, PE Parsons Transportation Group The Myth! Sustainability

More information

Seven Steps of Implementing In- Place Recycling by Public Agencies

Seven Steps of Implementing In- Place Recycling by Public Agencies Seven Steps of Implementing In- Place Recycling by Public Agencies Midwestern States Regional In-Place Recycling Conference Schaumburg, IL Presented by: Tim Aschenbrener, P.E. Pavement & Materials Engineer

More information

An Overview of Pavement Durability Cracking Distress in Pavement Systems by Dr.M.W.Witczak

An Overview of Pavement Durability Cracking Distress in Pavement Systems by Dr.M.W.Witczak An Overview of Pavement Durability Cracking Distress in Pavement Systems by Dr.M.W.Witczak Emeritus Professor University of Maryland Emeritus Professor Arizona State University Partner, ZW Consultants

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa

Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa Cold In-Place Recycling Forensic Study on U.S. Highway 34 Union County, Iowa Michael Heitzman Office of Materials Iowa Department of Transportation 800 Lincoln Way Ames, Iowa 50010 Michael.Heitzman@dot.iowa.gov

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

Performance of Cold In-place Recycling Technologies in Ontario

Performance of Cold In-place Recycling Technologies in Ontario Performance of Cold In-place Recycling Technologies in Ontario Becca Lane, P.Eng. Manager, Materials Engineering and Research Office Ontario Outline Ontario experience with: Cold in-place recycling (CIR)

More information

Cold In-Place Recycling (CIR)

Cold In-Place Recycling (CIR) Cold In-Place Recycling (CIR) North Dakota Asphalt Conference April 4, 2012, Bismarck, ND Mark Watson, MnDOT Outline What is CIR? MN & National CIR Use Project Use Challenges (Lessons Learned) Successes

More information

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment

More information

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala

More information

CC032 Techniques for Pavement Rehabilitation

CC032 Techniques for Pavement Rehabilitation CC032 Techniques for Pavement Rehabilitation H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Pavement rehabilitation is defined as a structural

More information

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways

Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways ANNUAL REPORT FOR FY 2011 ODOT SPR ITEM NUMBER 2228 Submitted to: John Bowman, P.E. Planning and Research

More information

Overview. Disadvantages. Pavement Life. Pavement Preservation Treatments. Asphalt Technology Course SEAUPG ANNUAL MEETING NOVEMBER 15, 2012

Overview. Disadvantages. Pavement Life. Pavement Preservation Treatments. Asphalt Technology Course SEAUPG ANNUAL MEETING NOVEMBER 15, 2012 Overview Determine Benefits Make Project Selection Evaluate Materials and Mix Design (Pooled Fund) Monitor Performance Present Conclusions 2012 SEAUPG Annual Meeting Hilton Head Island, SC November 15,

More information

Determination of Pavement Distress Index for Pavement Management

Determination of Pavement Distress Index for Pavement Management TRANSPORTATION RESEARC RECORD 1344 75 Determination of Pavement Distress Index for Pavement Management D. A. GRIVAS, B. c. SCULTZ, AND c. A. WAITE A methodology is presented for determining a pavement

More information

2 nd International Symposium on Non-Destructive Testing for Design Evaluation and Construction Inspection

2 nd International Symposium on Non-Destructive Testing for Design Evaluation and Construction Inspection 2 nd International Symposium on Non-Destructive Testing for Design Evaluation and Construction Inspection 25 April 2008 Ljubljana, Slovenia Dr. Andrew Wimsatt TTI Dr. Monica Starnes SHRP 2 SHRP 2 Renewal

More information

NDT Technology for QA of Flexible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007

NDT Technology for QA of Flexible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007 NDT Technology for QA of Fleible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007 Harold L. Von Quintus, P.E. Presentation Outline 1. Overview

More information

Potholes: Prevent Before They Present

Potholes: Prevent Before They Present : Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.

More information

A STEP IN THE RIGHT DIRECTION: Presented By. Part I Problems Underfoot EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT. It Didn t Happen Overnight

A STEP IN THE RIGHT DIRECTION: Presented By. Part I Problems Underfoot EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT. It Didn t Happen Overnight 1 A STEP IN THE RIGHT DIRECTION: EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT FINAL,Sept 6, 07 1 Presented By Overland Park, Kansas, Public Works Department Dave Bergner, Superintendent Janet Luessenheide,

More information

Iowa s Best Practices for Full Depth Reclamation and Cold In-Place Recycling

Iowa s Best Practices for Full Depth Reclamation and Cold In-Place Recycling Iowa s Best Practices for Full Depth Reclamation and Cold In-Place Recycling Scott Schram, Ph.D., P.E. State Bituminous Engineer Iowa Department of Transportation Experience with In-Place Recycling! Cold-in-place

More information

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016

WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 FM 457 Public Hearing September 1, 2015 Agenda Introductions Project overview Technical overview Environmental overview Right-of-way overview

More information

2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)

2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP) 2 ND AMENDMENT TO THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP) Occasionally, MPO s identify issues and/or initiatives that impact the MTP after the fact. Such is the case here. On Tuesday, November

More information

QUANTIFICATION OF CHANGES IN SURFACE CONDITIONS OF AIRPORT PAVEMENTS IN JAPAN

QUANTIFICATION OF CHANGES IN SURFACE CONDITIONS OF AIRPORT PAVEMENTS IN JAPAN QUNTIFITION OF HNGES IN SURFE ONDITIONS OF IRPORT PVEMENTS IN JPN Yoshitaka HHIY, Takashi WTNE, Kentaro KITOHI and Takehiko KOD Service enter of Port Engineering (SOPE), JPN STRT: n airport pavement management

More information

Evaluation of Long-Term Field Performance of Cold In-Place Recycled Roads:

Evaluation of Long-Term Field Performance of Cold In-Place Recycled Roads: Evaluation of Long-Term Field Performance of Cold In-Place Recycled Roads: Summary Report Final Report May 2007 Sponsored by the Iowa Highway Research Board (IHRB Project TR-502) and the Iowa Department

More information

Conditional assessment of Kiri Bridge in Shkoder, Albania

Conditional assessment of Kiri Bridge in Shkoder, Albania Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,

More information

OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM. TRB Tunnel Workshop. January 11, 2009 Washington, DC

OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM. TRB Tunnel Workshop. January 11, 2009 Washington, DC OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM TRB Tunnel Workshop January 11, 2009 Washington, DC PRESENTATION TEAM Chester Allen, P.E. Martha Averso, P.E. Rick Patrick, P.E. DISCUSSION TOPICS

More information

Project Cost Estimating System

Project Cost Estimating System ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%

More information

Rubber Modified Seal Coat Pilot Project on SBD-95-PM 57.2/64.5 Location 1 (EA 08-0Q4904) Vol 1: Construction Report, Part 2

Rubber Modified Seal Coat Pilot Project on SBD-95-PM 57.2/64.5 Location 1 (EA 08-0Q4904) Vol 1: Construction Report, Part 2 Rubber Modified Seal Coat Pilot Project on SBD-95-PM 57.2/64.5 Location 1 (EA 08-0Q4904) Vol 1: Construction Report, Part 2 Report Number: CP2C-2015-102 February 6, 2015 California Pavement Preservation

More information

LONGITUDINAL JOINT CONSTRUCTION TECHNIQUES FOR ASPHALT PAVEMENTS

LONGITUDINAL JOINT CONSTRUCTION TECHNIQUES FOR ASPHALT PAVEMENTS NCAT Report No. 97-4 LONGITUDINAL JOINT CONSTRUCTION TECHNIQUES FOR ASPHALT PAVEMENTS by Prithvi S. Kandhal Rajib B. Mallick August 1997 LONGITUDINAL JOINT CONSTRUCTION TECHNIQUES FOR ASPHALT PAVEMENTS

More information

New AASHTO Bridge Inspection Process

New AASHTO Bridge Inspection Process New AASHTO Bridge Inspection Process Gary L. Bowling, Oregon DOT Oregon Department of Transportation How we got to where we are today The current AASHTO CoRe Element CS Descriptions use numerous general

More information

HMA Spec Revisions and Testing John Leckie Matt Beeson

HMA Spec Revisions and Testing John Leckie Matt Beeson HMA Spec Revisions and Testing 2018 John Leckie Matt Beeson and Testing 2018 HMA Specification Revisions History until 2017 2017 to now HMA Testing Changes From area labs to three regional testing centers

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

Methodology Development for performance evaluation of low volume roads in the State of Chhattisgarh

Methodology Development for performance evaluation of low volume roads in the State of Chhattisgarh Methodology Development for performance evaluation of low volume roads in the State of Chhattisgarh By Sunny Deol. G Assistant Professor Dept. of Civil Engineering STA- NIT-Raipur 12 th June 2014 Research

More information

OVER US 6 LATERAL BRIDGE SLIDE: I-75

OVER US 6 LATERAL BRIDGE SLIDE: I-75 LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Public Hearing Summary Report

Public Hearing Summary Report Public Hearing Summary Report SH 288 Direct Connectors To the Texas Medical Center Area City of Houston Harris County, Texas CSJ: 0598-01-095 Prepared for Texas Department of Transportation- Houston District

More information

Semi Circular Bend Test:

Semi Circular Bend Test: Semi Circular Bend Test: And Industry Initiative Towards Performance Based Testing Plant Certification Program Update/Refresher Course Outline A Review of Asphalt Concrete Fatigue Tests Semi Circular Bend

More information

PennDOT Longitudinal Joint Density Efforts

PennDOT Longitudinal Joint Density Efforts PennDOT Longitudinal Joint Density Efforts February 5, 2014 Garth D. Bridenbaugh, P.E. Pennsylvania Department of Transportation PennDOT s History at Joints In 2006, PennDOT specs required joints to be

More information

Public Hearing Summary Report

Public Hearing Summary Report Public Hearing Summary Report FM 457 Swingbridge Replacement At Gulf Intracoastal Waterway (GIWW) near Sargent FM 457 Matagorda Co CSJ: 0605-01-060 Alan Migl, Yoakum District TABLE OF CONTENTS Public Hearing

More information

2011 BRIDGE INSPECTION REPORT

2011 BRIDGE INSPECTION REPORT 2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030

More information

Integral bridges and environmental conditions

Integral bridges and environmental conditions Integral bridges and environmental conditions COMISU CLAUDIU-CRISTIAN, BOACĂ GHEORGHITĂ Department of Roads and Foundations Faculty of Civil Engineering and Building Services The "Gheorghe Asachi" Technical

More information

Development of Mix Design and Structural Design Procedures for Cold In-Place Recycling

Development of Mix Design and Structural Design Procedures for Cold In-Place Recycling NDOT Research Report Report No. 643-15-803 Development of Mix Design and Structural Design Procedures for Cold In-Place Recycling June 2018 Nevada Department of Transportation 1263 South Stewart Street

More information

Lake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015

Lake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015 Lake Zumbro Restoration Project Timeline 2005-2015 (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015 2005 3/31/05 Lake Zumbro Improvement Association appointed a Lake Restoration

More information

Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers

Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers Ontario s Move to Hot Mix Asphalt Pavement Smoothness Acceptance Using High Speed Inertial Profilers Seyed Tabib, Senior Bituminous Engineer Materials Engineering and Research Office, Ministry of Transportation

More information

PENNDOT e-notification

PENNDOT e-notification PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 027 August 30, 2010 Release of Version 3.1.5.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)

More information

PennDOT s Use of Nondestructive Testing Solutions

PennDOT s Use of Nondestructive Testing Solutions PennDOT s Use of Nondestructive Testing Solutions 2016 NASTO Conference Richard N. Roman, P.E. June 6, 2016 PennDOT Overview PennDOT s 11 engineering districts are directly responsible for nearly 40,000

More information

Variability of Pavement Distress Data From Manual Surveys

Variability of Pavement Distress Data From Manual Surveys Variability of Pavement Distress Data From Manual Surveys September 17, 2014 Jerry Daleiden, P.E. Fugro Roadware, Inc. Outline Introduction Factors That Affect Variability Results of LTPP Study Observations

More information

PubMed Tutorial for Veterinarians URL:

PubMed Tutorial for Veterinarians URL: Title: Scripts for the PubMed Tutorial for Veterinarians PubMed Tutorial for Veterinarians URL: http://cases.vetmoodle.org/cet_courseplayer/demo1/public/pubmed.html Digital collection of the documents

More information

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation

More information

Open Range Software, LLC

Open Range Software, LLC Comprehensive Tracking System CTS User Manual CTS IH/Medical Surveillance Interface Open Range Software, LLC Revised: 09/04/2013 CONTENTS Introduction...3 WHAT IS THE CTS IH/MEDICAL SURVEILLANCE INTERFACE?...3

More information

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 F. W. Klaiber, D. J. White, T. J. Wipf, B. M. Phares, V. W. Robbins Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 Development of Design Methodology August 2004 Sponsored

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update CORRIDOR ANALYSIS AND STRATEGY IDENTIFICATION Corridor Analysis Process The CMP recommends an action of conducting an inventory of the corridor system to identify availability of existing options. To achieve

More information

Committed to Environment, Health, & Safety

Committed to Environment, Health, & Safety Committed to Environment, Health, & Safety Environment, Health, and Safety Management System and Policy of W. R. Grace & Co. November 8, 2018 The Grace Environment, Health, and Safety Management System,

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

NOISE WORKSHOPS. Let s Talk About That Noise. Date. Date. Footer Text

NOISE WORKSHOPS. Let s Talk About That Noise. Date. Date. Footer Text NOISE WORKSHOPS Let s Talk About That Noise What is a traffic noise workshop? An informal meeting between TxDOT personnel and owners of property adjacent to a proposed noise barrier(s). 2 Traffic Noise

More information

Nodule Detection process: 1. Click on the patient study to be loaded 2. Click the drop down arrow next to the analysis button and select LNA

Nodule Detection process: 1. Click on the patient study to be loaded 2. Click the drop down arrow next to the analysis button and select LNA Application Guide Lung Nodule Assessment Post Processing Portal version 2.5 This is an application guide for Lung Nodule Post Processing on version 2.5. For more detailed information, please refer to the

More information

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min: Page 1 of 5 516111 BETTIS ASPHALT & SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 020001 MAINTENANCE

More information

DURATINET COURSE - Testing Techniques for Structures Inspection LNEC Lisbon Portugal May 2012

DURATINET COURSE - Testing Techniques for Structures Inspection LNEC Lisbon Portugal May 2012 Tópics Course on testing techniques for structures inspection Introduction Manuela Salta LNEC 1.General considerations 2.Main aplications of NDT 3.Reliability of NDT Non-Destructive Testing (NDT) non invasive

More information

FTB TM & Flowable Fill for Trench Backfill

FTB TM & Flowable Fill for Trench Backfill FTB TM & Flowable Fill for Trench Backfill Vermont Green Line Project National Grid April 5, 2016 interra Innovation, Inc. 2016 FTB is a trademark of Geotherm WHAT IS FLUIDIZED THERMAL BACKFILL? Flowable

More information

Appendix C Guidelines for Design of Integral Abutments March 3, 2003

Appendix C Guidelines for Design of Integral Abutments March 3, 2003 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT s and the UK Highways Agency. They provide guidance and outline the issues that need to be considered and should

More information

Ahmed Mongi, M.S., P.E. Engineering Division

Ahmed Mongi, M.S., P.E. Engineering Division 1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span

More information

Region 3 Materials February 23, Jeremy Lucero, Region 3 Materials Engineer

Region 3 Materials February 23, Jeremy Lucero, Region 3 Materials Engineer Region 3 Materials February 23, 2017 Jeremy Lucero, Region 3 Materials Engineer Deserts & Mountains Interstate and Low Volume Roads Independence Pass at 12,096 I 70 near Mack at 4,447 Colorado River Project

More information

Sign Retroreflectivity A Minnesota Toolkit

Sign Retroreflectivity A Minnesota Toolkit Sign Retroreflectivity A Minnesota Toolkit Mike Marti, Primary Author SRF Consulting Group June 2010 Research Project Final Report #2010RIC02 VISUAL NIGHTTIME INSPECTION Method Description: The retroreflectivity

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

CALYPSO 2017 Software Download Portal. https://sdp.metrology.zeiss.com/#/home

CALYPSO 2017 Software Download Portal. https://sdp.metrology.zeiss.com/#/home CALYPSO 2017 Software Download Portal https://sdp.metrology.zeiss.com/#/home 1 CALYPSO 2017 - Highlights standardized: PiWeb reporting modern: new technologies linked: colin3d & CALYPSO easy: improved

More information

The Impact of Economic, Technological and Environmental Changes on Winter Maintenance Operations Plans and Policies: Adapting to the New Normal

The Impact of Economic, Technological and Environmental Changes on Winter Maintenance Operations Plans and Policies: Adapting to the New Normal : Adapting to the New Normal Dave Bergner, M.A., PWLF TRB International Winter Maintenance Conference April, 2016, Ft. Collins, CO TRB 2016 Winter Maintenance Conf. c. MVA, LLC 1 Learning Objectives: Recognize

More information

MTO s Transition to High Speed Profilers for Measuring Pavement Smoothness

MTO s Transition to High Speed Profilers for Measuring Pavement Smoothness MTO s Transition to High Speed Profilers for Measuring Pavement Smoothness Chris Raymond, P.Eng. Head, Bituminous Section Canadian User Producer Group for Asphalt Workshop November 18, 2012 Why Switch

More information

Problem Statement. Focal Point: Patient Re-Admitted, 2nd Surgery Required, Stay Extended

Problem Statement. Focal Point: Patient Re-Admitted, 2nd Surgery Required, Stay Extended Root Cause Analysis Report Patient Re-admitted, 2nd Surgery Required, Stay Problem Statement Report umber RCA-2016-06-09-2016-044 RCA Owner Report Date 9/29/2016 RCA Facilitator Focal Point: Patient Re-Admitted,

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

AIRWORTHINESS ADVISORY CIRCULAR

AIRWORTHINESS ADVISORY CIRCULAR AAC No. 2 of 2017 Dated 21 st March 2017 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION AIRWORTHINESS ADVISORY CIRCULAR Subject: Standard and Procedure for Issuance/ Extension/

More information

Public Perceptions of the Midwest s Pavements - Minnesota - Phase II

Public Perceptions of the Midwest s Pavements - Minnesota - Phase II Marquette University e-publications@marquette Transportation Research Center: Public Perception of Midwest Pavements Transportation Technical Reports 7-1-2001 Public Perceptions of the Midwest s Pavements

More information

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Introduction The purpose of this white paper is to provide information regarding the potential for fractures

More information

Corte Madera Sales Tax Measure B

Corte Madera Sales Tax Measure B Corte Madera Sales Tax Measure B JANUARY 16, 2018 PRESENTED BY: TODD CUSIMANO, TOWN MANAGER DARIA CARRILLO, FINANCE DIRECTOR PETER BROWN, PUBLIC WORKS DIRECTOR SALES TAX MEASURE BACKGROUND In 2013, the

More information

APPENDIX A INTEGRAL ABUTMENTS

APPENDIX A INTEGRAL ABUTMENTS APPENDIX A INTEGRAL ABUTMENTS Appendix A Guidelines for Design of Integral Abutments Rev. 1 - September, 2007 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT

More information

Policy Research CENTER

Policy Research CENTER TRANSPORTATION Policy Research CENTER Value of Travel Time Knowingly or not, people generally place economic value on their time. Wage workers are paid a rate per hour, and service providers may charge

More information

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2 FOR CROSS STREET DESIGN CRITERI MTRIX NOVEMBER 4, 2016 Segment H NORTHBOUND SOUTHBOUND Road 2G Northbound Mainlanes Southbound N/ TxDOT Rural Freeway 70 Loop 494 C TxDOT Rural Collector 45 WB-50 1 6' 5'

More information

Soft tissue biopsy needles

Soft tissue biopsy needles Soft tissue biopsy needles Automated Achieve programmable biopsy systems 4 Semi-automated CareFusion offers a wide range of soft tissue biopsy needles that you can rely on for precise samples every time.

More information

Chapter 15 Section 1

Chapter 15 Section 1 Chapter 15 Section 1 Issue Date: November 6, 2007 Authority: 32 CFR 199.14(a)(3) and (a)(6)(ii) 1.0 APPLICABILITY This policy is mandatory for the reimbursement of services provided either by network or

More information

Visualizing Health Care for Rural Veterans with GIS

Visualizing Health Care for Rural Veterans with GIS Visualizing Health Care for Rural Veterans with GIS Justin Ahern, GIS Analyst U.S. Department of Veterans Affairs, Office of Rural Health, GeoSpatial Outcomes Division Other authors: Cowper Ripley DC,

More information

Department of Corrections and Rehabilitation

Department of Corrections and Rehabilitation Department of Corrections and Rehabilitation The Benefits of Its Correctional Offender Management Profiling for Alternative Sanctions Program Are Uncertain Report 2010-124 Independent NONPARTISAN TRANSPARENT

More information

Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs.

Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs. INDUSTRIAL SERVICES - NON-destructive testing Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs. www.tuv.com/ndt The reliability

More information

Calcium-Based Stabilizer Induced Heave in Oklahoma Sulfate-Bearing Soils

Calcium-Based Stabilizer Induced Heave in Oklahoma Sulfate-Bearing Soils Calcium-Based Stabilizer Induced Heave in Oklahoma Sulfate-Bearing Soils ANNUAL REPORT FOR FY 2009 ODOT SPR ITEM NUMBER 2210 Submitted to: Ginger McGovern, P.E. Planning and Research Division Engineer

More information

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER

CORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 12, 2016 MEETING DATE: October 18, 2016 TO: FROM: SUBJECT: PURPOSE: TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE

More information

Develop a Highway Inventory Data Quality Control Scheme (PL-26)

Develop a Highway Inventory Data Quality Control Scheme (PL-26) Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2017 Develop a Highway Inventory Data Quality Control Scheme (PL-26) Mei Chen Obaidur Rahman Kazi Tony Fields University

More information

TITLE: Evaluation of HMA Moisture Damage in Wisconsin as it Related to Pavement Performance

TITLE: Evaluation of HMA Moisture Damage in Wisconsin as it Related to Pavement Performance Paper No. 06-1605 TITLE: Evaluation of HMA Moisture Damage in Wisconsin as it Related to Pavement Performance AUTHORS: Kunnawee Kanitpong 1 Hussain Bahia 2 1 School of Civil Engineering The Asian Institute

More information

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and Overview Design criteria for I-90 over Kishwaukee Integral Abutment Bridges (IAB) Design Criteria Design analysis, details and construction Lessons Learned during construction Instrumentation by Illinois

More information

Soft tissue biopsy needles

Soft tissue biopsy needles Soft tissue biopsy needles Automated Achieve programmable biopsy systems 2 Semi-automated CareFusion offers a wide range of soft tissue biopsy needles that you can rely on for precise samples every time.

More information

CMS CLARIFICATION JIMMO VS. SEBELIUS

CMS CLARIFICATION JIMMO VS. SEBELIUS CMS CLARIFICATION JIMMO VS. SEBELIUS Liz Almeida-Sanborn, MS, PT, President Maria Maggi, PT, Vice President of Compliance Jodi Wenzel, MPT, Vice President of Operations OBJECTIVES Participants will: Understand

More information

2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency

2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency 2017 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # L4870 TWP 332 over ROOT RIVER DISTRICT: District 6 COUNTY: Fillmore CITY/TOWNSHIP: JORDAN STATE: Minnesota Date of Inspection: Equipment Used: 10/22/2016

More information

September 2005 NO. 0509

September 2005 NO. 0509 September 2005 NO. 0509 TxAPA ANNUAL MEETING We are excited about this year s annual meeting. The Horseshoe Bay Marriott hotel is completely booked to capacity, the agenda is set and final preparations

More information

MnROADS NGCS LITE Test Strip Evaluation

MnROADS NGCS LITE Test Strip Evaluation 2011 MnROADS NGCS LITE Test Strip Evaluation On July 10, 2010 Husqvarna Construction Products and Interstsate Improvement, Inc. constructed a test strip on Cell 37 of the MnROADs Low Volume Road test facility

More information

Committed to Environment, Health and Safety

Committed to Environment, Health and Safety Committed to Environment, Health and Safety Environment, Health and Safety Management System and Policy of GCP Applied Technologies Inc. SEPTEMBER 1, 2017 The GCP Environment, Health, and Safety Management

More information

American Society of Highway. Beardsley Connector Project. Jacob Dean

American Society of Highway. Beardsley Connector Project. Jacob Dean American Society of Highway Engineers (ASHE) Beardsley Connector Project Gary Fromm, PE Design Manager Jacobs Jacob Dean Project Manager Haydon Building Corp. Thinking Outside the Box: Why Go In Circles?