1 APPENDIX H Limit Equilibrium Analysis of Dike 1 Abutments August 25, 2016
2 Appendix H Limit Equilibrium Analysis of Dike 1 Abutments TABLE OF CONTENTS H1 INTRODUCTION... 1 H2 ENGINEERING PROPERTIES OF THE TAILINGS... 3 H3 METHODOLOGY... 4 H3.1 Effective Stress Analyses (ESA)... 4 H3.2 Undrained Strength Analyses (USA)... 4 H4 RIGHT ABUTMENT... 5 H4.1 Model Setup... 5 H4.1.1 Geometry... 5 H4.1.2 Tailings Stratigraphy... 6 H4.1.3 Pore-Water Pressure Conditions... 6 H4.2 Results... 6 H5 LEFT ABUTMENT... 7 H5.1 Model Setup... 7 H5.1.1 Geometry... 7 H5.1.2 Tailings Stratigraphy... 9 H5.1.3 Pore-Water Pressure Conditions... 9 H5.2 Results... 9 List of Tables Table H2-1 Material parameters adopted in pre-failure stability analyses... 3 Table H2-2 Selected effective stress parameters... 3 Table H2-3 Selected undrained strength parameters... 4 Table H4-1 Right abutment model geometry November, Table H4-2 2D limit equilibrium results (Section AA) November, Table H5-1 Left abutment model geometry November, Table H5-2 Left abutment model geometry August, Table H5-3 Left abutment dike crest elevation February through November, Table H5-4 2D limit equilibrium results (Section 01) November, Table H5-5 2D limit equilibrium results (Section 01) August, August 25, 2016 Page H-i
3 TABLE OF CONTENTS (continued) List of Figures Figure H1-1 Stability sections location plan... 2 Figure H4-1 Right abutment model geometry... 6 Figure H5-1 Left abutment model geometry November, Figure H5-2 Left abutment model geometry August, Figure H5-3 2D limit equilibrium results (Section 01) field data ESA FOS tracking (February, 2015 to November, 2015) Figure H5-4 2D limit equilibrium results (Section 01) data ESA FOS tracking (February, 2015 to November, 2015) List of Attachments Attachment H1 Slope Stability Output August 25, 2016 Page H-ii
4 H1 INTRODUCTION This appendix summarizes static slope stability analysis undertaken on the right and left abutments of Fundão Dam for conditions prior to failure on November 5, Analyses were done to compare the drained and undrained static stability of the right and left abutments as one input to understanding why the failure occurred on the left abutment, not on the steeper right abutment. Section AA, one of the instrumentation sections described in Appendix E, was used for the right abutment, while Section 01, also one of the instrumentation sections, was used for the left abutment. Those sections are shown in plan on Figure H 1-1. The geometry of these sections, both the surface of the tailings and the original ground, are taken from the topographic compilation done by the Panel, as described in Appendix B. Key inputs into the stability analysis included tailings stratigraphy, engineering properties of the tailings and pore pressures. Tailings stratigraphy for both sections was based on the work described in Appendix B. Engineering properties of the tailings are based on the field data described in Appendix C and the laboratory data described in Appendix D. The pore pressures are based on the piezometers at the sections themselves, described in Appendix E, augmented with the 3D seepage analyses described in Appendix G. Section H4 presents the analysis undertaken on the right abutment of the Fundão Dam and Section H5 presents the analysis undertaken on the left abutment. August 25, 2016 Page H-1
5 Figure H 1-1 Stability sections location plan August 25, 2016 Page H-2
6 H2 ENGINEERING PROPERTIES OF THE TAILINGS There were a number of stability analyses conducted for the Fundão Dam during the design life of the structure by various parties. Table H 2-1 summarizes the material parameters that have been used in previous stability evaluations by others. Table H 2-1 Type Tailings Foundation Material parameters adopted in pre-failure stability analyses Material Total Unit Weight (kn/m 3 ) Effective Friction Angle (degrees) Effective Cohesion (kpa) Reference Sand VOGBR [64] Slimes Weathered Phyllite University of Ouro Preto [38] DAM [65] and VOGBR [64] The material parameters assumed in this work are listed in Table H 2-2 and Table H 2-3. The material parameters differ from previous assumptions as follows: A total unit weight of 22 kn/m 3 was adopted for all materials based upon the results of the field and laboratory investigations conducted by the Panel (see Appendix C and D). A friction angle of 33 was adopted for the loose sand tailings in the effective stress analyses based upon the results of the direct shear tests (see Appendix D). Undrained shear strength ratios were varied for the loose sand tailings and slimes, see Table H 2-3 and Section H3.2 below. Table H 2-2 Type Tailings Selected effective stress parameters Material Compacted Sand Tailings Unit Weight (kn/m 3 ) Effective Friction Angle (degrees) Effective Cohesion (kpa) Loose Sand Tailings Slimes Foundation Weathered Phyllite August 25, 2016 Page H-3
7 Table H 2-3 Selected undrained strength parameters Material Loose Sand Tailings/Slimes Unit Weight (kn/m 3 ) s u /σ v 22 Varied (Backscarp) 0.22 (Horizontal) 0.14 (Breakout) Description s u /σ v varied to determine the lower-bound of the available undrained yield strength in Section AA (FOS=1.2) Derived from Cone Penetration Tests on blended Sand and Slimes Tailings (Fugro campaign September, 2014 to March, 2015, CPTu-F01 through CPTu-F05 (Appendix C)) Derived from Cone Penetration Tests (Fugro campaign September, 2014 to March, 2015, CPTu-F01 through CPTu-F05 (Appendix C)) Post-liquefaction strength derived from Cone Penetration Tests (Appendix C) Material Loose Sand Tailings/Slimes 1. FOS = Factor of Safety Unit Weight (kn/m 3 ) φ (degrees) Description Peak total stress friction angle (collapse surface) determined from consolidated-undrained triaxial tests on loose sand samples (Appendix D) H3 METHODOLOGY H3.1 Effective Stress Analyses (ESA) Effective stress parameters from Table H 2-2 were used in the effective stress analyses (ESA) to assess the stability of the dam under static conditions. The analysis scenarios included: right abutment for November, 2015; left abutment for November, 2015; left abutment for August, 2014; and left abutment Factor of Safety (FOS) tracking on a monthly basis prior to the failure from February, 2015 to November, H3.2 Undrained Strength Analyses (USA) Undrained strength analyses (USA) were conducted with the dam geometry and pore-water pressure conditions as they existed in August, 2014 and November, These two times were selected to August 25, 2016 Page H-4
8 help understand the drop in factor of safety from August, 2014 to failure in November, The analyses were done using parameters in Table H 2-3. Loose tailings materials above the piezometric surface were modeled with ESA parameters while loose tailings materials located below the piezometric surface were modeled with USA parameters. The following variants of the USA parameters were analyzed: Right abutment undrained strength ratio was varied to determine the lower-bound of the available undrained yield strength (to obtain a FOS of 1.2). The resultant ratio was applied to analyses on the left abutment. Right abutment from an analysis of CPT data (Appendix C) an undrained strength ratio of 0.25 was adopted. Left abutment anisotropic USA properties based on data from cone penetration testing of the blended loose sand and slimes tailings (Appendix C) were used. Left and right abutments a loose sand collapse surface analysis was undertaken. The analysis utilized a friction angle of 16 o based on data determined from consolidated undrained triaxial tests conducted on loose sand samples (Appendix D). Left and right abutments from analysis of CPT data (Appendix C) a post liquefaction undrained strength ratio of 0.07 was adopted. H4 RIGHT ABUTMENT H4.1 Model Setup H4.1.1 Geometry The stability analyses reported for the right abutment were done along Section AA whose location is shown on Figure H 1-1. The idealized stability model from Section AA is shown on Figure H 4-1 with a geometric summary in Table H 4-1. Table H 4-1 Right abutment model geometry November, 2015 Right Abutment (Section AA) Crest Elevation Height (1) Downstream Slope (overall) 1. Height measured from the dam crest to the dam toe. 900 m 71 m 3.2H:1V August 25, 2016 Page H-5
9 Figure H 4-1 Right abutment model geometry H4.1.2 Tailings Stratigraphy The tailings stratigraphy at the right abutment of the Fundão Dam comprises sand tailings in most of the section with mixed sands and slimes below El. 830 m. There are no slimes between El. 830 m and El. 850 m as described in Appendix B. This is a key difference between the right and left abutments. The bedrock comprises weathered phyllite. The slimes below El. 830 m did not affect FOS because there was bedrock between the slimes and the toe on Section AA as shown on Figure H 4-1. The assumed properties of the sand tailings and the phreatic conditions governed the stability. As shown on Figure H 4-1, there is thin compacted shell of sand tailings on the upstream face. This zone was assumed to be 20 m wide and assigned a higher friction angle, 35 versus 33, than the looser beach tailings. H4.1.3 Pore-Water Pressure Conditions The pore-water pressure conditions within the right abutment of the dam were based on piezometers at Section AA (see Appendix E). Also, piezometric conditions were taken directly from the 3D seepage modeling results described in Appendix G. The 3D seepage model was calibrated against the piezometers. H4.2 Results Slope stability analyses were undertaken using SLOPE/W software. The Morgenstern-Price method was used to calculate the Factor of Safety (FOS) for the critical slip surfaces. The results are summarized in Table H 4-2. The stability analysis outputs by Analysis Number in the first column of Table H 4-2 are given in Attachment H1. August 25, 2016 Page H-6
10 Table H 4-2 2D limit equilibrium results (Section AA) November, 2015 Analysis Number H.H1-1A/ H.H1-1B H.H1-2 H.H1-3 H.H1-4A/ H.H1-4B H.H1-5A/ H.H1-5B H.H1-6A/ H.H1-6B 1. WT = Water Table Description ESA Base Case USA below WT USA below WT USA below WT USA below WT with Low Strength Loose Tailings and Slimes below WT USA below WT PWP Conditions Tailings Strength Factor of Safety Assumptions Above WT Below WT Field Data 3D Field Data 33 s u /σ v = N/A 33 s u /σ v = 0.34 N/A s u /σ v = Φ = 16 o s u /σ v = H5 LEFT ABUTMENT H5.1 Model Setup H5.1.1 Geometry The stability analyses reported for the left abutment are located along Section 01 whose location is shown on Figure H 1-1. Stability analyses were done for the conditions that existed in August, 2014 and just prior to failure in November, The stability model for November, 2015 is shown on Figure H 5-1 with key dimensions listed in Table H 5-1. The stability model for August, 2014 is shown on Figure H 5-2 with key dimensions shown in Table H 5-2. Table H 5-1 Left abutment model geometry November, 2015 Left Abutment (Section 01) Crest Elevation Height (1) Downstream Slope (Overall) Setback (Elevation) Setback (Distance) Berm (Distance) 1. Height was measured from the dam crest to the dam toe. 901 m 56 m 6.2H:1V 862 m 160 m 100 m August 25, 2016 Page H-7
11 Figure H 5-1 Left abutment model geometry November, 2015 Table H 5-2 Left abutment model geometry August, 2014 Left Abutment (Section 01) Crest Elevation Height (1) Downstream Slope (Overall) Setback (Elevation) Setback (Distance) 1. Height was measured from the dam crest to the dam toe. 884 m 39 m 7.7H:1V 862 m 160 m Figure H 5-2 Left abutment model geometry August, 2014 An additional analysis set was undertaken to track the stability of the left abutment as the dike was raised through the months prior to failure in November, The left abutment was modeled from February through to November, The assumed dike crest height is summarized in Table H 5-3 by month. More details on the construction sequence are given in Appendix B. Table H 5-3 Left abutment dike crest elevation February through November, 2015 February 2015 May 2015 June 2015 Left Abutment (Section 01) July 2015 August 2015 September 2015 October 2015 November August 25, 2016 Page H-8
12 H5.1.2 Tailings Stratigraphy The stratigraphic model of the left abutment is described in Appendix B. Key to this stratigraphy is that slimes were deposited between El. 830 m and El. 850 m. The assumed continuity of the slimes layers as the downstream toe is approached is also described in Appendix B. For the purposes of stability analyses, slimes material properties were used where slimes could have been present. The slimes areas are in red in the model sections shown above. The sand tailings were divided into two types: loose sand and compacted sand. An approximately 20 m wide compacted sand layer was modeled parallel to the downstream face of the dam. H5.1.3 Pore-Water Pressure Conditions The pore-water pressure conditions within the left abutment of the dam were based on piezometers at Section 01 (see Appendix E) and augmented with the output data from the 3D seepage modeling described in Appendix G. Data was extracted from the seepage model at the dates defined for each analysis listed in Section H3.1. H5.2 Results Slope stability analysis was undertaken using SLOPE/W software (GEO-SLOPE 2012). The Morgenstern-Price method (Morgenstern and Price 1965) was used to calculate the Factor of Safety (FOS) for the critical slip surfaces. The slope stability analysis results are summarized in Table H 5-4 and Table H 5-5 and Figure H 5-3. The stability analysis outputs by Analysis Number in the first column in Table H 5-4 and Table H 5-5 are given in Attachment H1. Table H 5-4 2D limit equilibrium results (Section 01) November, 2015 Analysis Number Description H.H1-7A/ ESA Base Case H.H1-7B H.H1-8 USA below WT H.H1-9 USA below WT H.H1-10A/ USA Heterogeneous H.H1-10B below WT ESA with Low Strength H.H1-11A/ Variant for Loose H.H1-11B Tailings and Slimes below WT H.H1-12A/ ESA above WT / USA H.H1-12B below WT 1. WT = Water Table PWP Conditions Tailings Strength Assumptions Factor of Safety 3D Above WT Below WT Field Data s u /σ v = 0.34 N/A 1.87 Field Data 33 s u /σ v = N/A 33 Backscarp: s u /σ v = 0.30 Horiz. Zone: s u /σ v = 0.22 Breakout Zone: s u /σ v = Φ = 16 o s u /σ v = August 25, 2016 Page H-9
13 Table H 5-5 2D limit equilibrium results (Section 01) August, 2014 Analysis Number H.H1-13A/ H.H1-13B H.H1-14A/ H.H1-14B 1. WT = Water Table Description ESA Base Case USA Heterogeneous below WT PWP Conditions Tailings Strength Assumptions Factor of Safety Above WT Below WT Field Data 3D Backscarp: s u /σ v = 0.30 Horiz. Zone: s u /σ v = 0.22 Breakout Zone: s u /σ v = Factor of Safety Date Figure H 5-3 2D limit equilibrium results (Section 01) field data ESA FOS tracking (February, 2015 to November, 2015) August 25, 2016 Page H-10
14 Factor of Safety Date Figure H 5-4 2D limit equilibrium results (Section 01) data ESA FOS tracking (February, 2015 to November, 2015) August 25, 2016 Page H-11
ATTACHMENT B8 Incident History
Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...
More informationPRELIMINARY GEOTECHNICAL DESIGN
PNCC Manawatu River Pedestrian/ Cycle Bridge PRELIMINARY GEOTECHNICAL DESIGN 1 Introduction Opus has been commissioned by the Palmerston North City Council (PNCC) to prepare a Detailed Business Case (DBC)
More informationBengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam.
Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot Bengt H. Fellenius Amsterdam May 27, 216 Fellenius, B.H. and Nguyen, M.H., 213. Wick Drains and Piling for
More informationGrade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway
Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers
More informationSeismic Response of Piled Bridge Abutments in Multi-Layered Liquefiable Soils Deposits
6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Seismic Response of Piled Bridge Abutments in Multi-Layered Liquefiable Soils Deposits D.
More informationInsights from Laboratory Experiments on the Failure of Earthen Embankments at Bridge-Waterway Abutments
Protections 2016 2 nd International Seminar on Dam Protection Against Overtopping ISBN: 978-1-1889143-27-9 DOI: Ft. Collins, Colorado, USA, 7-9 September 2016 ABSTRACT Insights from Laboratory Experiments
More informationASD and LRFD of Reinforced SRW with the use of software Program MSEW(3.0)
ASD and LRFD of Reinforced SRW with the use of software Program MSEW(3.0) Dov Leshchinsky [A slightly modified version of this manuscript appeared in Geosynthetics (formerly GFR), August 2006, Vol. 24,
More informationWick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012
Wick Drains and Piling for Cai Mep Container Port, Vietnam Bengt H. Fellenius Sower's Lecture Atlanta May 8, 2012 1 The Mekong Saigon/HoChiMinhCity The General Area 3 Thi Vai Port Cai Mep Port 4 Artist
More informationFailure of Spill-Through Bridge Abutments during Scour: Flume and Field Observations
Technical Note Failure of Spill-Through Bridge Abutments during Scour: Flume and Field Observations Robert Ettema, M.ASCE 1 ; Kam Ng, M.ASCE 2 ; Ram Chakradhar 3 ; Joshua Fuller 4 ; and Edward W. Kempema
More informationDynamic Hollow Cylinder System Proposal
Dynamic Hollow Cylinder System Proposal from Wykeham Farrance Limited Weston Road Slough SL1 4HW England Tel:+44 (0)1753 571241 Fax: +44 (0)1753 811313 E-mail: sales@wfi.co.uk Advanced Soils Testing 2
More informationAssessing potential cracking zones in embankment dams
Southern Cross University epublications@scu 23rd Australasian Conference on the Mechanics of Structures and Materials 2014 Assessing potential cracking zones in embankment dams Ke He University of New
More informationNumerical analysis of the embedded abutments of integral bridges
Numerical analysis of the embedded abutments of integral bridges Ming XU Researcher, Dept. of Civil & Env. Engrg., University of Southampton, UK Summary Alan G. BLOODWORTH Lecturer, Dept. of Civil & Env.
More informationEffect of suction on volume change and shear behaviour of an overconsolidated unsaturated silty soil
Geomechanics and Engineering, Vol. 4, No. 1 (2012) 55-65 55 Technical Note Effect of suction on volume change and shear behaviour of an overconsolidated unsaturated silty soil A.R. Estabragh* 1 and A.A.
More informationPermanent deformation of bridge abutment on liquefiable soils
Permanent deformation of bridge abutment on liquefiable soils Akihiro TAKAHASHI 1, Hideki SUGITA 1 & Shunsuke TANIMOTO 1 ABSTRACT Seismic response of a bridge abutment located near a river dyke is the
More informationEngineering characterization of Vetiver system for shallow slope stabilization
Engineering characterization of Vetiver system for shallow slope stabilization Apiniti Jotisankasa T. Sirirattanachat, C. Rattana-areekul, K. Mahannopkul, J. Sopharat* Kasetsart University, *Prince of
More informationThe short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the
2 The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the picture in the top left hand corner. Water in this pathway
More informationFEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT
FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT SURF CITY AND NORTH TOPSAIL BEACH NORTH CAROLINA Appendix E Sand Compatibility Analysis Appendix E: Sand Compatibility
More informationMonitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures
Abu-Hejleh, N., Zornberg, J.G., and Wang, T. (). Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures. Proceedings of the 8th Annual Meeting,
More informationEarthquake Hazard Assessment Along Designated Emergency Vehicle Priority Access Routes
Final Report RDT REDT01-009 Earthquake Hazard Assessment Along Designated Emergency Vehicle Priority Access Routes Neil Anderson, Geology and Geophysics, UMR Hal Baker, Geology and Land Survey, MoDNR Genda
More informationLANDFILL STABILITY ISSUES
LANDFILL STABILITY ISSUES 1 2006 APWA International Congress & Exposition Kansas City, Missouri Timothy D. Stark, Ph.D., P.E. University of Illinois at Urbana-Champaign OUTLINE 2 Current Situation Liner
More informationa.the Vetiver Network International b.vietnam Vetiver Network
Presented at the Southern African Association of Geomorphology (SAAG) 2017 Conference, 25-28 July 2017, Swaziland APPLICATION OF VETIVER SYSTEM TECHNOLOGY FOR RIVERBANK AND COASTAL DIKE STABILISATION IN
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power
More informationABSCOUR 9 USERS MANUAL
OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as
More informationEVALUATION OF FIELD PERFORMANCE OF PREFABRICATED VERTICAL DRAINS (PVD) FOR SOIL GROUND IMPROVEMENT IN THE SOUTHERN VIETNAM
EVALUATION OF FIELD PERFORMANCE OF PREFABRICATED VERTICAL DRAINS (PVD) FOR SOIL GROUND IMPROVEMENT IN THE SOUTHERN VIETNAM Hoang-Hung Tran-Nguyen 1, Huong L.T. Ho 2, Hy H. Ha 2 1 Assistant Professor, Department
More informationTALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION
TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of
More informationPillar Abutment Loading New Concepts for Coal Mining Industry
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2 Pillar Abutment Loading New Concepts for Coal Mining Industry David Hill Golder Associates
More informationSEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS
ICCI2004, The First International Conference on Construction IT, Beijing, CHINA, August 12 th - 14 th SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS Cai,
More informationUniversity of Southampton Research Repository eprints Soton
University of Southampton Research Repository eprints Soton Copyright and Moral Rights for this thesis are retained by the author and/or other copyright owners. A copy can be downloaded for personal non-commercial
More informationCRITICAL STATE BEHAVIOR OF AN UNSATURATED SILTY SAND
Six th International Conference of Seismology and Earthquake Engineering 16-18 May 2011 Tehran, Iran CRITICAL STATE BEHAVIOR OF AN UNSATURATED SILTY SAND M. Maleki 1, M. Bayat 2 1 Associate Professor,
More informationEarthquake Design of Bridges With Integral Abutments
6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Earthquake Design of Bridges With Integral Abutments J. H. Wood 1 ABSTRACT Because of the
More informationA Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments
A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas
More informationIntegral Abutment Bridges-Development of Soil Model for Soil Structure Interaction in Time History Analysis
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 10, Issue 3 (March 2014), PP.31-40 Integral Abutment Bridges-Development of Soil
More informationIdentifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming
Identifying Number MPC-354 Project Title: Geotechnical Limit to Scour at Spill-through Abutments University: The University of Wyoming Principal Investigators: Robert Ettema PhD, PE College of Engineering
More informationEarthquake Resistance of Bridges With Friction Slab Abutments
Earthquake Resistance of s With Friction Slab Abutments J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2010 NZSEE Conference Findings from experimental and numerical research on the force resistance
More informationBearing capacity of low plastic unsaturated soils using effective and total stress approaches
Bearing capacity of low plastic unsaturated soils using effective and total stress approaches Won Taek Oh & Sai K. Vanapalli Civil Engineering Department University of Ottawa, Ottawa, ON, Canada ABSTRACT
More informationThe Structure upon which the ends of a Bridge rests is referred to as an Abutment
ABUTMENTS The Structure upon which the ends of a Bridge rests is referred to as an Abutment The most common type of Abutment Structure is a Retaining Wall, Although other types of Abutments are also possible
More information\\H\15\ PH9 Inspection Photos
SHOP SLIDE Photo 1. at cracking across the footpath at the end of the Hwy 2 EB to Hwy 684 SB off ramp at the 99 Ave. intersection. Drop in asphalt trail (background) has worsened since 2013 and is now
More information29th International Conference on Ground Control in Mining
A Comparison of the Overburden Loading in ARMPS and LaModel Ihsan Berk Tulu, Graduate Tulu, I. Research Assistant Keith A Heasley, K. Professor West Virginia Mark, University C. Morgantown, WV Chris Mark,
More informationAdam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico
Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to
More informationStress Shadowing and Fracture Interference in GOHFER R. D. Barree
Stress Shadowing and Fracture Interference in GOHFER R. D. Barree Stress Shadow or Interference: When hydraulic fracture treatments are carried out in horizontal wells, the spacing of multiple transverse
More informationDESIGN ASSESSMENT OF THE FOUNDERS/MEADOWS GRS ABUTMENT STRUCTURE
Abu-Hejleh, N., Zornberg, J.G., Elias, V., and Watcharamonthein, J. (23). Design Assessment of the Founders/Meadows GRS Abutment Structure. Proceedings of the 82nd Annual Meeting of the Transportation
More informationGeotechnical Issues Associated With the Design and Construction of the Middle River Bridge
Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (2013) - Seventh International Conference on Case Histories in Geotechnical
More informationAN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION
International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 9, September 2018, pp. 1831 1838, Article ID: IJCIET_09_09_177 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=9
More informationAppendix B. Shallow Foundations Report
12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization
More informationMBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure.
Scour Assessment Report Location Plan: Scale 1:5,000 MBW3-45 Score: 16.86 ELR: Contains Ordnance Survey data Crown copyright and database right 2010 Category: HIGH Assessment Date: 19/11/2010 Contract:
More informationRAKED PILES FOR ABUTMENT AND THE BENEFITS OF DRIVEN PRECAST CONCRETE PILES FOR LOW CARBON INFRASTRUCTURE.
AARSLEFF GROUND ENGINEERING & COWI PRESENT... RAKED PILES FOR ABUTMENT AND THE BENEFITS OF DRIVEN PRECAST CONCRETE PILES FOR LOW CARBON INFRASTRUCTURE. AUTHORS Anders Hust Augustesen & Caspar Thrane Leth
More informationSome Thoughts on Calibrating LaModel
Some Thoughts on Calibrating LaModel Dr. Keith A. Heasley Professor Department of Mining Engineering West Virginia University Introduction Recent mine collapses and pillar failures have highlighted hli
More informationv Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes
v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures
More informationMPC K. Ng, R. Ettema, E. Kempema, R. Chakradhar, and J. Fuller
MPC 15-280 K. Ng, R. Ettema, E. Kempema, R. Chakradhar, and J. Fuller Geotechnical Limit to Scour at Spill-through Bridge Abutments: Laboratory Investigation A University Transportation Center sponsored
More informationEFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 64 EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE Jiachen WANG 1, Athol
More informationPotential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint
Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Introduction The purpose of this white paper is to provide information regarding the potential for fractures
More informationGeosynthetic-reinforced soil bridge abutments
Geosynthetic-reinforced soil bridge abutments Measuring the performance of geosynthetic reinforcement in a Colorado bridge structure. By Jorge G. Zornberg, Naser Abu-Hejleh, and Trever Wang The technology
More informationPreliminary Geotechnical and Environmental Report
` Preliminary Geotechnical and Environmental Report (Volume 3) (1 of 2) December 2011 THIS PAGE INTENTIONALLY LEFT BLANK VOLUME 3 Summary As part of PE phase, the following investigations were performed:
More informationEFFECT OF BACKFILL SOIL TYPE ON STIFFNESS AND CAPACITY OF BRIDGE ABUTMENTS
EFFECT OF BACKFILL SOIL TYPE ON STIFFNESS AND CAPACITY OF BRIDGE ABUTMENTS A. Bozorgzadeh 1, S. A. Ashford 2, and J. I. Restrepo 3 1 PhD, Structural Engineering, Moffatt and Nichol Inc, Walnut creek, CA,
More informationDATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE
DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge
More informationFlume Installation Instructions
Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream
More informationPerformance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge
5 th National Conference on Coastal and Estuarine Habitat Restoration Preparing for Climate Change: Science, Practice, and Policy Performance of Vetiver Grass in Protecting Embankments on the Bangladesh
More informationCHAPTER 5 MODELING OF THE BRIDGE
62 CHAPTER 5 MODELING OF THE BRIDGE 5.1 MODELING SAP2000, a nonlinear software package was used for modeling and analysing the study bridge. The following list provides details about the element type used
More informationAuthor(s) Flynn, Kevin N.; McCabe, Bryan A.; Egan, D.
Provided by the author(s) and NUI Galway in accordance with publisher policies. Please cite the published version when available. Title Driven cast-in-situ piles in granular soil: applicability of CPT
More informationNSW Coastal, Ocean and Port Engineering Panel
NSW Coastal, Ocean and Port Engineering Panel Design of Transition Zone for Cement Deep Mixing for a Port Reclamation Project Patrick Wong (23 April 2012) Presentation Outline Project description Site
More informationQuiz 8 Introduction to Polymers (Chemistry)
051117 Quiz 8 Introduction to Polymers (Chemistry) (Figures from Heimenz Colloid Sci.) 1) Surfactants are amphiphilic molecules (molecules having one end hydrophobic and the other hydrophilic) and are
More informationMemorandum AECOM tel fax ABN
AECOM Australia Pty Ltd Level 10, Tower Two 727 Collins Street Melbourne VIC 3008 Australia www.aecom.com +61 3 9653 1234 tel +61 3 9654 7117 fax ABN 20 093 846 925 Memorandum To David Hitchcock Page 1
More informationThe UCD community has made this article openly available. Please share how this access benefits you. Your story matters!
Provided by the author(s) and University College Dublin Library in accordance with publisher policies., Please cite the published version when available. Title Reduction of lateral loads in abutments using
More informationNUMERICAL ANALYSES OF PVD IMPROVED GROUND AT REFERENCE SECTION OF SECOND BANGKOK INTERNATIONAL AIRPORT
NUMERICAL ANALYSES OF PVD IMPROVED GROUND AT REFERENCE SECTION OF SECOND BANGKOK INTERNATIONAL AIRPORT Der-Guey Lin Department of Soil and Water Conservation, National Chung-Hsing University Wen-Tsung
More informationNCHRP REPORT (2)
National Cooperative Highway Research Program NCHRP REPORT 4-5 () ABUTMENT SCOUR IN COHESIVE MATERIALS J.-L. Briaud, H.-C. Chen, K.-A Chang, S. J. Oh, X. Chen October 009 Transportation Research Board
More informationTwo-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota
Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional
More informationFINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN
DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.
More informationWHITE PAPER. Efficient Measurement of Large Light Source Near-Field Color and Luminance Distributions for Optical Design and Simulation
Efficient Measurement of Large Light Source Near-Field Color and Luminance Distributions for Optical Design and Simulation Efficient Measurement of Large Light Source Near-Field Color and Luminance Distributions
More informationR-Group Finland Oy. RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved
R-Group Finland Oy RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 9.1.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...
More informationEffect of Pile Orientation in Skewed Integral Abutment Bridges
Effect of Pile Orientation in Skewed Integral Abutment Bridges RABIH NAJIB, Ph.D., PE, Alpha Corporation, Baltimore, Maryland and AMDE M. AMDE, Ph.D., PE, University of Maryland, College Park, Maryland
More informationCHAPTER 11 APPENDIX D
OFFICE OF STRUCTURES STRUCTURE HYDROLOGY AND HYDRAULICS DIVISION CHAPTER 11 APPENDIX D SCOUR COUNTERMEASURES FOR PIERS AND ABUTMENTS MAY 2015 Maryland SHA Office of Structures, Chapter 11, Appendix D May2015Page
More informationGeosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri
Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Adams et al. (2012), FHWA Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation
More informationSTONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39
SITE NUMBER AND NAME: NC 52 Pembina River Bridge LEGAL DESCRIPTION: SE 1-50-9-W5M STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 NAD 83 COORDINATES:
More informationScientific Working Group on Digital Evidence
Disclaimer: As a condition to the use of this document and the information contained therein, the SWGDE requests notification by e-mail before or contemporaneous to the introduction of this document, or
More informationLong Term Monitoring of a Geosynthetic Reinforced Soil Integrated Bridge System (GRS IBS)
CAIT-UTC-NC22 Long Term Monitoring of a Geosynthetic Reinforced Soil Integrated Bridge System (GRS IBS) FINAL REPORT November 2017 Submitted by: Christopher L. Meehan Associate Professor Tyler M. Poggiogalle
More informationLECTURE 13. Dr. Teresa D. Golden University of North Texas Department of Chemistry
LECTURE 13 Dr. Teresa D. Golden University of North Texas Department of Chemistry Goniometer circle - centered at the sample, with the x-ray source and detector on the circumference of the circle. Focusing
More informationEvaluation of Eurocode 7 Example 2.3 PILE IN CLAY ETC 10. Adriaan van Seters Fugro Ingenieursbureau BV The Netherlands
Evaluation of Eurocode 7 Example 2.3 PILE IN CLAY ETC 10 Adriaan van Seters Fugro Ingenieursbureau BV The Netherlands Introduction in example SLS-design source of parameters Characteristic values of Cu
More informationLow-Volume Road Abutment Design Standards
Low-Volume Road Abutment Design Standards V.W. Robbins HNTB Corporation 7450 W. 130th St., Suite 400 Overland Park, KS 66213 vrobbins@hntb.com F. Wayne Klaiber Bridge Engineering Center 418 Town Engineering
More informationMining Engineering Department West Virginia University
Mining Engineering Department West Virginia University 1600 Calibrating the LaModel Program for Deep Cover Pillar Retreat Coal Mining Final Report September 28, 2009 2000 A. Pillar Safety Factors Keith
More informationModified Sheet Pile Abutment for Low-Volume Road Bridge
Modified Sheet Pile Abutment for Low-Volume Road Bridge Ryan R. Evans Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 50011 ryevans@iastate.edu
More informationfps) at a right angle to the plane of action.
200 Brit J. Sports Med. - Vol. 17, No. 3, September 1983, pp. 200-204 H. Kunz D. A. Kaufmann CINEMATOGRAPHICAL ANALYSIS OF JAVELIN THROWING TECHNIQUES OF DECATHLETES H. KUNZ, DScand D. A. KAUFMANN, PhD
More informationFeature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image
SURFACE WATER MODELING SYSTEM Feature Stamping 1 Introduction In this lesson you will learn how to use conceptual modeling techniques to create numerical models that incorporate flow control structures
More informationLime Stabilisation of Organic Clay and the Effects of Humic Acid Content
Geotechnical Engineering Journal of the SEAGS & AGSSEA Vol. 44 No.1 March 213 ISSN 46-5828 Lime Stabilisation of Organic Clay and the Effects of Humic Acid Content N.Z. Mohd Yunus 1, D. Wanatowski 2 and
More informationAlberta Alpine Ski Association. Physical Testing Protocol
Alberta Alpine Ski Association Physical Testing Protocol Published 13/09/2016 Updated 10/10/2017 Developed in Conjunction with: Alpine Canada Alpin Alberta Alpine Ski Association BC Alpine Alpine Ontario
More informationALOS-Indonesia POL-InSAR Experiment (AIPEX): Progress Update
ALOS-Indonesia POL-InSAR Experiment (AIPEX): Progress Update Mahmud Raimadoya, Bogor Agricultural University (IPB), Indonesia Ludmila Zakharova, Institute of Radio-engineering and Electronics (IRE), RAS,
More informationPERFORMANCE OF REINFORCED EARTH BRIDGE ABUTMENT WALLS IN THE CANTERBURY EARTHQUAKES
PERFORMANCE OF REINFORCED EARTH BRIDGE ABUTMENT WALLS IN THE 2010-2011 CANTERBURY EARTHQUAKES John H Wood 1 and Donald E Asbey-Palmer 2 SUMMARY Reinforced Earth bridge abutment walls were subjected to
More informationOverview of the FITNESSGRAM Body Composition Standards
body composition Body composition refers to the division of total body weight (mass) into components, most commonly fat mass and fat-free mass. The proportion of total body weight that is fat (referred
More information3D SSPP Version 6. ANALYSIS & USE GUIDE For Reactive & Proactive Use
3D SSPP Version 6 ANALYSIS & USE GUIDE For Reactive & Proactive Use REQUIREMENTS The user must complete the UAW-GM 3D SSPP training course offered through the UAW- GM Center for Human Resources for the
More informationSupplementary Figure S1 Black silicon and dragonfly wing nanotopography.
Supplementary Figure S1 Black silicon and dragonfly wing nanotopography. Representative low-magnification scanning electron micrographs of a) Black silicon (bsi) and b) Diplacodes bipunctata dragonfly
More informationBlock-upscaling of transport in heterogeneous aquifers
158 Calibration and Reliability in Groundwater Modelling: From Uncertainty to Decision Making (Proceedings of ModelCARE 2005, The Hague, The Netherlands, June 2005). IAHS Publ. 304, 2006. Block-upscaling
More informationv Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes
v. 12.0 SMS 12.0 Tutorial Objectives In this lesson will teach how to use conceptual modeling techniques to create numerical models that incorporate flow control structures into existing bathymetry. The
More informationTowards Open Set Deep Networks: Supplemental
Towards Open Set Deep Networks: Supplemental Abhijit Bendale*, Terrance E. Boult University of Colorado at Colorado Springs {abendale,tboult}@vast.uccs.edu In this supplement, we provide we provide additional
More informationEngineering characterization of Vetiver system for shallow slope stabilization
Engineering characterization of Vetiver system for shallow slope stabilization A. Jotisankasa, Department of Civil Engineering, Kasetsart University, Jatujak, Bangkok, Thailand, 10900, fengatj@ku.ac.th
More informationIntegral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction
Integral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction Sergei Terzaghi BE(Hons), MIPENZ Gillian Sisk BEng PhD MIEI CEng Synopsis Integral bridges present
More informationREPORT COMMERCENTRE DRIVE, LAKE FOREST, CA 92630
REPORT 28 COMMERCENTRE DRIVE, LAKE FOREST, CA 926 Project No. G67677 Date: June 9, 2 REPORT NO. 67677LAX-2 TEST OF ONE FULL ON AT BEAM ANGLE MODEL NO. RAZOR Q2 ZOOM RENDERED TO ELATION PROFESSIONAL 622
More informationTHE DEVELOPMENT AND MANUFACTURE OF FIXED- ULTRASONIC INSPECTION REFERENCE REFLECTORS AND TRANSDUCERS FOR COMPRESSOR BLADE DOVETAILS
International Workshop SMART MATERIALS, STRUCTURES & NDT in AEROSPACE Conference NDT in Canada 2011 2-4 November 2011, Montreal, Quebec, Canada THE DEVELOPMENT AND MANUFACTURE OF FIXED- ULTRASONIC INSPECTION
More informationL. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015
Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior
More information