Wick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012

Size: px
Start display at page:

Download "Wick Drains and Piling for Cai Mep Container Port, Vietnam. Bengt H. Fellenius. Sower's Lecture Atlanta May 8, 2012"

Transcription

1 Wick Drains and Piling for Cai Mep Container Port, Vietnam Bengt H. Fellenius Sower's Lecture Atlanta May 8,

2 The Mekong

3 Saigon/HoChiMinhCity The General Area 3

4 Thi Vai Port Cai Mep Port 4

5 Artist View 5

6 The site of the new container facility extends over an 800 m by 600 m area along the Thi Vai River CG CFS 6

7 NORTH-SOUTH Locations of Buildings, Boreholes, and Settlement Points 1,200 1,000 N TCM and CPTU SS BH Piezometers Extensometers M-Shop 400 Substation BH-14 C-Gate 200 CFS ,000 EAST-WEST 7

8 DEPTH (m) DEPTH (m) DEPTH (m) Soil Profile WATER CONTENT (%) m GW & GL 0 w P w n w L 0 GRAIN SIZE DISTRIBUTION CONE CONE STRESS, q t t (MPa) CPTU-26 5 w n BH CLAY SILT SAND 40 w n BH w n BH-14 CLAY 45 SILT GRAVEL

9 DEPTH (m) DEPTH (m) DEPTH (m) DEPTH (m) CPTU Sounding Results 0 Cone Stress, q t (MPa) Sleeve Friction, f s (KPa) Pore Pressure (KPa) ,000 1,500 0 Friction Ratio, f R (%)

10 Void Ratio (- -) DEPTH (m) Results from a large series of consolidation tests show the soil to be very compressible, normally consolidated Typical example of results DEPTH: 9 m e 0 = 1.92 C c = 1.40 m r = 55 m = 5 CR = ,000 Stress (KPa) Modulus Number, m From CPTU Sounding From consolidometer Test 10

11 Risk for flooding in the area is real and the inundation can be severe, as illustrated by the flooding of the Fall of The above shows an areal photo of a Honda factory parking lot in Bangkok (October 2011). The highest water level expected at the site is Elev m, which level is about 0.5 m above the ground surface. Therefore, the ground elevation will be raised by about 2.0 m to Elev m in order to avoid flooding and to create a suitable foundation surface. 11

12 Because of the thick very compressible clay and silt layer, the 2+ m thick fill placed to raise the land will cause significant settlement, which would continue for a very long time. To shorten that time, vertical drains (wick drains) were installed to 37 m depth across the site (in some places into the sand, in other places a bit of the clay was left between the drain tip and the sand). Moreover, a temporary surcharge was added raising the surface to Elev. +8 m through Elev. +10 m, i.e., an additional 2.5 m to 4.5 m of fill height. 12

13 SETTLEMENT FILL HEIGHT Principle of the wick drain and surcharge soil improvement scheme Amount of fill placed Surcharge removed when 80% 90% consolidation is achieved FILL Paving and roadways For case of surcharge not removed For case of surcharge removed ORIGINAL GROUND SURFACE Initial compression and consolidation settlement SETTLEMENT ORIGINAL GROUND SURFACE 80 % to 90 % of total consolidation settlement For case of surcharge removed For case of surcharge not removed TIME 13

14 The wick drain used for the project is a 100 mm wide and 3 mm thick and consists of a corrugated, 0.15 mm thick, plastic core wrapped with a synthetic filter. 14

15 Fill height and ground surface settlement until one month before start of driving piles for the building foundations 15

16 Fill height and pore pressures measured June 24, 2009, through September 17, 2010 (Days -527 and -77) at the CFS building The tip elevations are per original installed depth. The settlement of the piezometer tips is not included. 16

17 DEPTH (m) FILL ELEVATION Distribution with depth of the pore pressures at the CFS building PORE PRESSURES JUNE 24, 2009 THROUGH SEP 17, 2010 (KPa) m U 0 June 24, and Sep 18, '09 just before adding surcharge (Days -504 and -447). Sep 17, '09 last reading (Day -77). Dec 1, '09 maximum reading (Day -365)

18 Settlement (mm) Ground surface settlements DAYS Start of pile driving for the CFS and CG buildings ,000 SS-108 1,500 2,000 SS-38 SS-39 SS-30 Surcharge removal SS-29 2,500 SS-32 SS-104 SS-28 3,000 3,500 4,000 Container Freight Station, CFS and Container Gate, CG 18

19 View on October 4, 2011, taken from the south-east end of CFS building showing some of the about 1,680 piles driven for the CFS. 19

20 The building foundations were placed on precast, ordinary reinforced, concrete piles with a square 400 mm cross section made up by 10-m segments spliced in the field by welding steel end-plates together. For Buildings CFS and CG, the piles were driven to 28 m and 18 m depth, respectively. The intended working loads were 347 KN for the CFS building and 265 KN for the other buildings. One pile at each building was subjected to a static loading test. The test piles were not instrumented, and the test schedule included unloading/reloading cycles and varying load hold durations. Therefore, the test results have very limited use for the design. The static loading tests (CFS and CG) were carried out in September 2010, nine months after pile driving Load-movement curves from static loading tests at CFS and CG buildings 20

21 21

22 22

23 Settlement (mm) The below figure shows the settlements measured by the SS-plates at or near the buildings until November 15, The zero date is December 1, 2010, the day of the start of the pile driving for the CGS building. Driving was completed on January 24 at the CG building. DAYS Surcharge removal Pile driving 1,000 SS-108 SS-30 1,500 2,000 SS-39 2,500 SS-108 3,000 SS-28 SS-29 SS-38 SS-32 3,500 4,000 Container Freight Station, CFS and Container Gate, CG SS

24 Settlement (mm) ELEVATION (mm) 10,000 9,000 AS-PLACED FILL HEIGHT 8,000 7,000 6,000 SS-29 SS-28 ELEV m 5,000 MAXIMUM WATER LEVEL 4,000 3,000 ORIGINAL GROUND SURFACE MEAN WATER LEVEL 2, DAYS PILE DRIVING Start placing fill End placing surcharge Removing surcharge Pile driving DAYS ,000 1,500 2,000 2,500 Red heavy lines are SS-28 and SS-29 All values are normalized to the 2,900 mm average settlement at Day 0 3, mm 3,500 AT CFS and CG 4,000 24

25 NORTH-SOUTH Settlement (mm) Pile head settlements and benchmark settlements at the building locations CONTAINER FREIGHT STATION, CFS AND CONTAINER GATE SS-22 SS-23 SS-24 SS-29 SS-108 SS-30 C-Gate SS-227 SS-37 SS-36 SS-235 SS-236 DAYS Surcharge Pile 500 1,000 removal SS-108 SS-30 driving 1, SS-102 SS-228 SS-28 SS-230 CFS Pz-09 Ext-09 SS-33 SS-34 SS-233 SS-234 2,000 2,500 3,000 SS-39 SS-28 CFS Average of Piles added to SS29 C-Gate Average of Piles added to SS108 SS-29 SS-108 SS-38 SS EAST-WEST 3,500 4,000 Container Freight Station, CFS and Container Gate, CG SS-104 Container Freight Station (CFS) and Container Gate (CG) 25

26 Settlement (mm) Settlements measured for SS-plates and piles at the CFS and CG buildings until November 15, ,500 DAYS ,600 2,700 CG Average values of pile head settlement added to SS-108 2,800 SS-108 2,900 3,000 CFS Average values of pile head settlement added to SS-29 SS-29 26

27 DEPTH (m) Settlement distribution measured in an extensometer station (multi-anchor points) outside the CFS building during 18 months: from July 17, 2009 (one to three months after start of placing fill) through January 14, 2011, one month after piles were driven near the location of the extensometer station m First Fill Surface 5 SETTLEMENT (m) Relative settlement between anchor points during last five months of monitoring June 29, 2010, after the temporary surcharge had been removed R 4 mm/m 20 R 6 mm/m R 12 mm/m 25 R 30 mm/m July 17, 2009 January 14, Zero Reading of was taken on July 17, The settlement plates located within the CFS footprint then showed that 0.6 m settlement had already occurred (since February 20, 2009). Total plate settlement on January 14, 2011, was 3.08 m. The curves show readings spaced about one month apart. 27

28 STRESS (KPa) From measured fill height and settlement to input to analysis Stress from as-placed fill (approximated) Stress from fill adjusted for settlement and buoyancy MONTHS Removal of Surcharge Stress from fill elevation Stress reduction due to settlement and buoyancy 28

29 UniSettle4 input and results 29

30 UniSettle4 input and results Input alternatives 30

31 SETTLEMENT (mm) 0 MONTHS Immediate Compression Secondary Compression 1,000 1,500 2,000 2,500 Full fill height reached Measured settlement Settlement calculated with the drains assumed functioning along the full depth 3,000 3,500 4,000 Surcharge removed Piles driven Settlement calculated with the drains assumed not to function below 20 m depth 31

32 28 m CFS Pile 40 m CFS Pile Settlement of the CFS Building for 28 m Pile SETTLEMENT CLAY Neutral Plane SAND Neutral Plane DEPTH 32

33 View on October 4, 2011, taken from the south end of CFS building showing some of the about 750 piles driven for the CFS building. In the background, lengthened piles are being driven for the CG building. 33

34 Photos from the driving of piles with extension 39

35 40

36 CONCLUSIONS The most probable cause to the continued consolidation below about 20 m depth is that large soil stresses have squashed the wick drains preventing the drains from functioning properly. The consequence is that the overall area and the piles will continue to settle even if no new loads are placed. But there will be new loads, so... The problem with the piled foundations can be (and was hopefully) resolved by lengthening the piles to bring the neutral plane (the depth to the settlement equilibrium) into the non-settling sand below the clay. It is not realistic to install new and better drains or arrange, say, for vacuum treatment to get the consolidation to occur quickly. The site will have to live with continuing to add fill to compensate for excessive settlement, which will in turn add consolidation, and to suffer the maintenance actions that regularly will be required for non-piled foundations. The monitoring scheme was designed to confirm that the wick drain method worked. When the measurements showed that the method did not work, the method became very much inadequate, and it could not be of any assistance for selecting a solution to the problem. Every monitoring programme should have redundancy and be designed to resolve issues should the design show to be unsuccessful. How to resolve the question "what if we're wrong?" should always be kept in mind and in the planning of a monitoring programme. 41

37 The Lotus Vietnam's National Flower Thank you for your attention 42

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam.

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot Bengt H. Fellenius Amsterdam May 27, 216 Fellenius, B.H. and Nguyen, M.H., 213. Wick Drains and Piling for

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

PRELIMINARY GEOTECHNICAL DESIGN

PRELIMINARY GEOTECHNICAL DESIGN PNCC Manawatu River Pedestrian/ Cycle Bridge PRELIMINARY GEOTECHNICAL DESIGN 1 Introduction Opus has been commissioned by the Palmerston North City Council (PNCC) to prepare a Detailed Business Case (DBC)

More information

EVALUATION OF FIELD PERFORMANCE OF PREFABRICATED VERTICAL DRAINS (PVD) FOR SOIL GROUND IMPROVEMENT IN THE SOUTHERN VIETNAM

EVALUATION OF FIELD PERFORMANCE OF PREFABRICATED VERTICAL DRAINS (PVD) FOR SOIL GROUND IMPROVEMENT IN THE SOUTHERN VIETNAM EVALUATION OF FIELD PERFORMANCE OF PREFABRICATED VERTICAL DRAINS (PVD) FOR SOIL GROUND IMPROVEMENT IN THE SOUTHERN VIETNAM Hoang-Hung Tran-Nguyen 1, Huong L.T. Ho 2, Hy H. Ha 2 1 Assistant Professor, Department

More information

Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri

Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Adams et al. (2012), FHWA Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation

More information

NSW Coastal, Ocean and Port Engineering Panel

NSW Coastal, Ocean and Port Engineering Panel NSW Coastal, Ocean and Port Engineering Panel Design of Transition Zone for Cement Deep Mixing for a Port Reclamation Project Patrick Wong (23 April 2012) Presentation Outline Project description Site

More information

Numerical analysis of the embedded abutments of integral bridges

Numerical analysis of the embedded abutments of integral bridges Numerical analysis of the embedded abutments of integral bridges Ming XU Researcher, Dept. of Civil & Env. Engrg., University of Southampton, UK Summary Alan G. BLOODWORTH Lecturer, Dept. of Civil & Env.

More information

Modified Sheet Pile Abutment for Low-Volume Road Bridge

Modified Sheet Pile Abutment for Low-Volume Road Bridge Modified Sheet Pile Abutment for Low-Volume Road Bridge Ryan R. Evans Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 50011 ryevans@iastate.edu

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

Table 3-1 Summary of Storm Drain Outfalls

Table 3-1 Summary of Storm Drain Outfalls Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a

More information

Use of Ductile Iron Pipe Piles for a New Shared Use Path Bridge over Maribyrnong River in West Melbourne

Use of Ductile Iron Pipe Piles for a New Shared Use Path Bridge over Maribyrnong River in West Melbourne Use of Ductile Iron Pipe Piles for a New Shared Use Path Bridge over Maribyrnong River in West Melbourne Dr Michael Wei 1, Jawad Zeerak 2, David Barton 3 1 Principal Geotechnical, EIC Activities Pty Ltd

More information

APPENDIX H. Limit Equilibrium Analysis of Dike 1 Abutments Prior to Failure

APPENDIX H. Limit Equilibrium Analysis of Dike 1 Abutments Prior to Failure APPENDIX H Limit Equilibrium Analysis of Dike 1 Abutments August 25, 2016 Appendix H Limit Equilibrium Analysis of Dike 1 Abutments TABLE OF CONTENTS H1 INTRODUCTION... 1 H2 ENGINEERING PROPERTIES OF THE

More information

RAKED PILES FOR ABUTMENT AND THE BENEFITS OF DRIVEN PRECAST CONCRETE PILES FOR LOW CARBON INFRASTRUCTURE.

RAKED PILES FOR ABUTMENT AND THE BENEFITS OF DRIVEN PRECAST CONCRETE PILES FOR LOW CARBON INFRASTRUCTURE. AARSLEFF GROUND ENGINEERING & COWI PRESENT... RAKED PILES FOR ABUTMENT AND THE BENEFITS OF DRIVEN PRECAST CONCRETE PILES FOR LOW CARBON INFRASTRUCTURE. AUTHORS Anders Hust Augustesen & Caspar Thrane Leth

More information

ATTACHMENT B8 Incident History

ATTACHMENT B8 Incident History Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...

More information

Evaluation of Eurocode 7 Example 2.3 PILE IN CLAY ETC 10. Adriaan van Seters Fugro Ingenieursbureau BV The Netherlands

Evaluation of Eurocode 7 Example 2.3 PILE IN CLAY ETC 10. Adriaan van Seters Fugro Ingenieursbureau BV The Netherlands Evaluation of Eurocode 7 Example 2.3 PILE IN CLAY ETC 10 Adriaan van Seters Fugro Ingenieursbureau BV The Netherlands Introduction in example SLS-design source of parameters Characteristic values of Cu

More information

3/18/03 CE Keith P. Brabant, P.E.

3/18/03 CE Keith P. Brabant, P.E. 1 Keith P. Brabant, P.E. 2 SELECT GRANULAR BACKFILL 3 4 Maximum of 15% fines Maximum size of 4 inches Free-draining, frictional, and durable Graduation limits referenced by AASHTO T-27 5 US Sieve Size

More information

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS ICCI2004, The First International Conference on Construction IT, Beijing, CHINA, August 12 th - 14 th SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS Cai,

More information

First Technology Safety Systems. Design Freeze Status. Flex-PLI-GTR Development

First Technology Safety Systems. Design Freeze Status. Flex-PLI-GTR Development Based on TEG-047 29 Nov. 2007 JAMA-JARI JARI First Technology Safety Systems Design Freeze Status Flex-PLI-GTR Development Full Calibration Test Procedures Bernard Been FTSS Europe Comments addressed from

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge Modular Steel Bridges Stark County Fischer Bridge Bottineau County Oak Creek Bridge This John Deere grain hauler was too heavy for the bridge. OOPS! An excavator and tow truck are needed to remove the

More information

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

Geotechnical Issues Associated With the Design and Construction of the Middle River Bridge

Geotechnical Issues Associated With the Design and Construction of the Middle River Bridge Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (2013) - Seventh International Conference on Case Histories in Geotechnical

More information

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the 2 The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the picture in the top left hand corner. Water in this pathway

More information

Permanent deformation of bridge abutment on liquefiable soils

Permanent deformation of bridge abutment on liquefiable soils Permanent deformation of bridge abutment on liquefiable soils Akihiro TAKAHASHI 1, Hideki SUGITA 1 & Shunsuke TANIMOTO 1 ABSTRACT Seismic response of a bridge abutment located near a river dyke is the

More information

Assessing potential cracking zones in embankment dams

Assessing potential cracking zones in embankment dams Southern Cross University epublications@scu 23rd Australasian Conference on the Mechanics of Structures and Materials 2014 Assessing potential cracking zones in embankment dams Ke He University of New

More information

Figure 3: Analytic procedure

Figure 3: Analytic procedure International Journal of Scientific and Research ublications, Volume 7, Issue 5, May 2017 567 Investigation of Integral Bridge Effect under Dynamic Loading Haymanmyintmaung *,kyawlinnhtat ** * Department

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

Four simply supported steel plate girders (appear to be an old railcar).

Four simply supported steel plate girders (appear to be an old railcar). BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure

More information

The UCD community has made this article openly available. Please share how this access benefits you. Your story matters!

The UCD community has made this article openly available. Please share how this access benefits you. Your story matters! Provided by the author(s) and University College Dublin Library in accordance with publisher policies., Please cite the published version when available. Title Reduction of lateral loads in abutments using

More information

Retrofit to improve earthquake performance of bridge abutment slopes

Retrofit to improve earthquake performance of bridge abutment slopes Proceedings of the Ninth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Society 14-16 April, 2011, Auckland, New Zealand Retrofit to improve earthquake performance of bridge

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

Kentucky Lake Bridge Pipe Pile Load Test Program 45 th Annual STGEC Mobile, AL October 27-30, 2014

Kentucky Lake Bridge Pipe Pile Load Test Program 45 th Annual STGEC Mobile, AL October 27-30, 2014 Kentucky Lake Bridge Pipe Pile Load Test Program 45 th Annual STGEC Mobile, AL October 27-30, 2014 Presented by: Darrin Beckett - KYTC Ron Ebelhar - Terracon Consultants 1 Project Site Kentucky Official

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge

More information

PERFORMANCE OF REINFORCED EARTH BRIDGE ABUTMENT WALLS IN THE CANTERBURY EARTHQUAKES

PERFORMANCE OF REINFORCED EARTH BRIDGE ABUTMENT WALLS IN THE CANTERBURY EARTHQUAKES PERFORMANCE OF REINFORCED EARTH BRIDGE ABUTMENT WALLS IN THE 2010-2011 CANTERBURY EARTHQUAKES John H Wood 1 and Donald E Asbey-Palmer 2 SUMMARY Reinforced Earth bridge abutment walls were subjected to

More information

Swell And Compressibility of Fiber Reinforced Expansive Soils

Swell And Compressibility of Fiber Reinforced Expansive Soils Swell And Compressibility of Fiber Reinforced Expansive Soils Mona Malekzadeh & Huriye Bilsel Department of Civil Engineering, Eastern Mediterranean University, Gazimagusa, Mersin 10, Turkey E-mail: mona.malekzadeh@cc.emu.edu.tr,

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA

DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA Brian Lord, Arup Pty Ltd, Australia ABSTRACT Arup was lead designer for Lend Lease on the Victoria Park Drive Modifications

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

Height Calibration Log Sheet

Height Calibration Log Sheet Pine Test Equipment, LLC AFGB1A Gyratory Compactor Actual Physical of Tube: mm NOTE: The example calculations given in the table assume a physical height block height equal to 109.335 mm. A B C D E F G

More information

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge 5 th National Conference on Coastal and Estuarine Habitat Restoration Preparing for Climate Change: Science, Practice, and Policy Performance of Vetiver Grass in Protecting Embankments on the Bangladesh

More information

Shifting the Canning Bus Bridge Sideways

Shifting the Canning Bus Bridge Sideways Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Appendix C Guidelines for Design of Integral Abutments March 3, 2003

Appendix C Guidelines for Design of Integral Abutments March 3, 2003 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT s and the UK Highways Agency. They provide guidance and outline the issues that need to be considered and should

More information

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on

More information

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 SITE NUMBER AND NAME: NC 52 Pembina River Bridge LEGAL DESCRIPTION: SE 1-50-9-W5M STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 NAD 83 COORDINATES:

More information

Modified Sheet Pile Abutments for Low-Volume Road Bridges

Modified Sheet Pile Abutments for Low-Volume Road Bridges EERC Publication ERXX-XX Modified Sheet Pile Abutments for Low-Volume Road Bridges Final Report JANUARY 2012 Sponsored by Iowa Highway Research Board (IHRB Project TR-568) Iowa Department of Transportation

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Application of pile underpinning technology on shield machine crossing through pile foundations of road bridge

Application of pile underpinning technology on shield machine crossing through pile foundations of road bridge Geotechnical Aspects of Underground Construction in Soft Ground Ng, Huang & Liu (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-48475-6 Application of pile underpinning technology on shield machine

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY

More information

NC DOUBLE OPPOSING HEAD DRILL

NC DOUBLE OPPOSING HEAD DRILL NC DOUBLE OPPOSING HEAD DRILL 720ATD 720ATD 1800 x 1100 mm 2600 x 1600 mm 3000 x 2200 mm 3000 x 2600 mm 1. GENERAL PERFORMANCE 720ATD/20 Maximum glass dimension 3000 x 2600 Total weight Maximum Glass weight

More information

Novel treatment technique

Novel treatment technique Final conference Zagreb, 27 th April 2018 TREAT How to choose the optimal rehabilitation technique Novel treatment technique Stanislav Lenart Slovenian National Building and Civil Engineering Institute

More information

Stantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905)

Stantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905) Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 4, Page 1 of 10 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

St. Croix River Crossing Bridge Foundation Load Test Project. 1/27/2010 St. Croix River Crossing Bridge - Foundation Load Test Project

St. Croix River Crossing Bridge Foundation Load Test Project. 1/27/2010 St. Croix River Crossing Bridge - Foundation Load Test Project St. Croix River Crossing Bridge Foundation Load Test Project Load Test Sites 4 driven piles Drilled Shaft Site A Site B Load Test Purpose To gather design data for foundation design Allows for more refined

More information

Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe

Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe Scott M. Lux Charlie Marsh Tom Carlson U.S. Army Engineer Research and Development Center Report Documentation Page Form Approved

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

Prefabricated Vertical Drain with Fabric

Prefabricated Vertical Drain with Fabric Supplemental Technical Specification for Prefabricated Vertical Drain with Fabric SCDOT Designation: SC-M-801-1 (07/16) 1.0 DESCRIPTION 1.1 Furnish all necessary materials, labor, equipment, all necessary

More information

Geosynthetic-reinforced soil bridge abutments

Geosynthetic-reinforced soil bridge abutments Geosynthetic-reinforced soil bridge abutments Measuring the performance of geosynthetic reinforcement in a Colorado bridge structure. By Jorge G. Zornberg, Naser Abu-Hejleh, and Trever Wang The technology

More information

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas

More information

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges *Memduh Karalar 1) and Murat Dicleli 2) 1) Department of Civil Engineering, Bülent Ecevit

More information

NUMERICAL ANALYSES OF PVD IMPROVED GROUND AT REFERENCE SECTION OF SECOND BANGKOK INTERNATIONAL AIRPORT

NUMERICAL ANALYSES OF PVD IMPROVED GROUND AT REFERENCE SECTION OF SECOND BANGKOK INTERNATIONAL AIRPORT NUMERICAL ANALYSES OF PVD IMPROVED GROUND AT REFERENCE SECTION OF SECOND BANGKOK INTERNATIONAL AIRPORT Der-Guey Lin Department of Soil and Water Conservation, National Chung-Hsing University Wen-Tsung

More information

APPENDIX A INTEGRAL ABUTMENTS

APPENDIX A INTEGRAL ABUTMENTS APPENDIX A INTEGRAL ABUTMENTS Appendix A Guidelines for Design of Integral Abutments Rev. 1 - September, 2007 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT

More information

Architect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on

Architect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on Site visit report Project Title Killamarsh Cycleway (TPBN559 SUSTRANS Connect2 - Halfway to Killamarsh (Phase 1)) Project No. 290390 Site Visited Killamarsh Station Road Date of Visit 25 th November 2011

More information

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2012 NZSEE Conference Twelve State Highway (SH) bridges subjected

More information

Environmental Effects on Mitosis Advanced Inquiry Lab Big Idea 3, Investigation 7 Introduction: Background:

Environmental Effects on Mitosis Advanced Inquiry Lab Big Idea 3, Investigation 7 Introduction: Background: Environmental Effects on Mitosis Advanced Inquiry Lab Big Idea 3, Investigation 7 Introduction: All new cells come from previously existing cells. New cells are formed by the process of cell division,

More information

Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures

Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures Abu-Hejleh, N., Zornberg, J.G., and Wang, T. (). Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures. Proceedings of the 8th Annual Meeting,

More information

Integral Abutment Bridges-Development of Soil Model for Soil Structure Interaction in Time History Analysis

Integral Abutment Bridges-Development of Soil Model for Soil Structure Interaction in Time History Analysis International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 10, Issue 3 (March 2014), PP.31-40 Integral Abutment Bridges-Development of Soil

More information

Emergency Bridge Stabilization at Mile Watrous Subdivision

Emergency Bridge Stabilization at Mile Watrous Subdivision Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)

More information

NCAT Report Comparing Friction Reducers for Use in AMPT Testing. By Adam Taylor, P.E. Nam Tran, Ph.D., P.E., LEED GA

NCAT Report Comparing Friction Reducers for Use in AMPT Testing. By Adam Taylor, P.E. Nam Tran, Ph.D., P.E., LEED GA NCAT Report 15-01 Comparing Friction Reducers for Use in AMPT Testing By Adam Taylor, P.E. Nam Tran, Ph.D., P.E., LEED GA April 2015 1. Report No. NCAT Report No. 15-01 4. Title and Subtitle Comparing

More information

AN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION

AN EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF RC PARAPET WALL OF ABUTMENT UNDER COLLISION International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 9, September 2018, pp. 1831 1838, Article ID: IJCIET_09_09_177 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=9

More information

Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing

Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing 1. ABSTRACT While numbers of small to large older cities are undertaking repairs and maintenance, several other newer cities are planning on installing

More information

5 DAMAGE TO TRANSPORTATION FACILITIES

5 DAMAGE TO TRANSPORTATION FACILITIES 5 DAMAGE TO TRANSPORTATION FACILITIES In the Kocaeli, Turkey earthquake of August 17, 1999, extensive damage of transportation facilities occurred in the Kocaeli and Sakarya region, Turkey as shown in

More information

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price.

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price. Section 02222 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Abandonment in place of existing sewers, junction structures, manholes, and force mains. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment

More information

Engineering characterization of Vetiver system for shallow slope stabilization

Engineering characterization of Vetiver system for shallow slope stabilization Engineering characterization of Vetiver system for shallow slope stabilization Apiniti Jotisankasa T. Sirirattanachat, C. Rattana-areekul, K. Mahannopkul, J. Sopharat* Kasetsart University, *Prince of

More information

THE UNIVERSITY OF KANSAS KU RECREATION SERVICES FACILITIES MASTER PLAN

THE UNIVERSITY OF KANSAS KU RECREATION SERVICES FACILITIES MASTER PLAN THE UNIVERSITY OF KANSAS KU RECREATION SERVICES FACILITIES MASTER PLAN AUGUST 2, 2018 EXECUTIVE SUMMARY THE UNIVERSITY OF KANSAS RECREATION SERVICES FACILITIES MASTER PLAN KU Recreation Services continues

More information

EVALUATION OF INTELLIGENT DUAL-LATERAL WELL IN MULTI-LAYERED RESERVOIRS

EVALUATION OF INTELLIGENT DUAL-LATERAL WELL IN MULTI-LAYERED RESERVOIRS EVALUATION OF INTELLIGENT DUAL-LATERAL WELL IN MULTI-LAYERED RESERVOIRS Student: Rinyapat Charoengosan 5471212121 Advisor: Dr.Falan Srisuriyachai Co- advisor: Dr. Suwat Athichanagorn 1 Outline Introduction

More information

R-Group Finland Oy. RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

R-Group Finland Oy. RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved R-Group Finland Oy RLS Lifting Sockets Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 9.1.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...

More information

EVALUATION ON THE SHEAR STRENGTHENING EFFECT OF RC COLUMNS WITH CARBON FIBER SHEETS

EVALUATION ON THE SHEAR STRENGTHENING EFFECT OF RC COLUMNS WITH CARBON FIBER SHEETS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 16, 24 Paper No. 1369 EVALUATION ON THE SHEAR STRENGTHENING EFFECT OF RC COLUMNS WITH CARBON FIBER SHEETS YongTaeg LEE 1,

More information

Earthquake Resistance of Bridges With Friction Slab Abutments

Earthquake Resistance of Bridges With Friction Slab Abutments Earthquake Resistance of s With Friction Slab Abutments J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2010 NZSEE Conference Findings from experimental and numerical research on the force resistance

More information

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Introduction The purpose of this white paper is to provide information regarding the potential for fractures

More information

Ashton Avenue Integral Bridge

Ashton Avenue Integral Bridge Ashton Avenue Integral Bridge Behzad Golfa, Senior Bridge Engineer, GHD Pty Ltd ABSTRACT The Ashton Avenue Bridge is a replacement of the original three-span timber bridge over Perth- Fremantle Rail line

More information

a.the Vetiver Network International b.vietnam Vetiver Network

a.the Vetiver Network International b.vietnam Vetiver Network Presented at the Southern African Association of Geomorphology (SAAG) 2017 Conference, 25-28 July 2017, Swaziland APPLICATION OF VETIVER SYSTEM TECHNOLOGY FOR RIVERBANK AND COASTAL DIKE STABILISATION IN

More information

Intrinsically Safe Ultrasonic Testers: How important are they?

Intrinsically Safe Ultrasonic Testers: How important are they? Intrinsically Safe Ultrasonic Testers: How important are they? Introduction The use of ultrasonic devices for non-destructive testing (NDT) has become more common in recent years as equipment has increased

More information

OWNER S MANUAL and INSTALLATION INSTRUCTIONS

OWNER S MANUAL and INSTALLATION INSTRUCTIONS NP-L5003 Ab Crunch OWNER S MANUAL and INSTALLATION INSTRUCTIONS Leverage Ab Crunch Owner s Manual Copyright 2017. Core Health and Fitness, LLC. All rights reserved, including those to reproduce this book

More information

Conditional assessment of Kiri Bridge in Shkoder, Albania

Conditional assessment of Kiri Bridge in Shkoder, Albania Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,

More information

Author(s) Flynn, Kevin N.; McCabe, Bryan A.; Egan, D.

Author(s) Flynn, Kevin N.; McCabe, Bryan A.; Egan, D. Provided by the author(s) and NUI Galway in accordance with publisher policies. Please cite the published version when available. Title Driven cast-in-situ piles in granular soil: applicability of CPT

More information

The Epidemic Model 1. Problem 1a: The Basic Model

The Epidemic Model 1. Problem 1a: The Basic Model The Epidemic Model 1 A set of lessons called "Plagues and People," designed by John Heinbokel, scientist, and Jeff Potash, historian, both at The Center for System Dynamics at the Vermont Commons School,

More information

The Structure upon which the ends of a Bridge rests is referred to as an Abutment

The Structure upon which the ends of a Bridge rests is referred to as an Abutment ABUTMENTS The Structure upon which the ends of a Bridge rests is referred to as an Abutment The most common type of Abutment Structure is a Retaining Wall, Although other types of Abutments are also possible

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions How does the SMRT-Y work? The SMRT-Y sensor accurately measures the moisture level in the soil. When the soil is dry, the SMRT-Y allows the irrigation controller to water as

More information

EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE

EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 64 EFFECTS OF SPATIAL VARIATION OF SEISMIC INPUTS ON BRIDGE LONGITUDINAL RESPONSE Jiachen WANG 1, Athol

More information

NDT Technology for QA of Flexible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007

NDT Technology for QA of Flexible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007 NDT Technology for QA of Fleible Pavement Construction Northeast Asphalt User/Producer Group Annual Meeting Mystic, Connecticut October 17, 2007 Harold L. Von Quintus, P.E. Presentation Outline 1. Overview

More information

Monitoring of a bridge with integral abutments

Monitoring of a bridge with integral abutments Monitoring of a bridge with integral abutments J. Erisen, M. Veljovic, & M. Nilsson Luleå University of Technology, Luleå, Sweden ABSTRACT: Preliminary results obtained from short term test-loading are

More information

THERMAL ENERGY STORAGE TANK DOWN UNDER

THERMAL ENERGY STORAGE TANK DOWN UNDER THERMAL ENERGY STORAGE TANK DOWN UNDER OWNER ENGINEER TANK BUILDER Thermal Energy Storage Tank Walnut, CA Los Angeles area Community College serving over 50,000 students Host to the 2020 U.S. Olympic Track

More information

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017 Introduction Substructure Inspection and Rating That portion of the bridge located below the bearings Abutments Piers Rated separately Purpose is to: Receive the loads from the superstructure Transfer

More information

Plyometrics. Plyo Hurdles (Set of 4) Product Stock

Plyometrics. Plyo Hurdles (Set of 4) Product Stock Plyometrics Posts are marked from 12" to 40" in 4" increments. Secure crossbar in or on top of the dual-clip. For additional stability, fill hollow bases with sand (not included). Crossbar measures 40".

More information

Experimental Procedure

Experimental Procedure 1 of 10 9/13/2018, 3:52 PM https://www.sciencebuddies.org/science-fair-projects/project-ideas/foodsci_p074/cooking-food-science/juice-balls-science-of-spherification (http://www.sciencebuddies.org/science-fair-projects/project-ideas/foodsci_p074/cooking-food-science/juice-balls-science-of-spherification)

More information

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:

More information

Effect of Pile Orientation in Skewed Integral Abutment Bridges

Effect of Pile Orientation in Skewed Integral Abutment Bridges Effect of Pile Orientation in Skewed Integral Abutment Bridges RABIH NAJIB, Ph.D., PE, Alpha Corporation, Baltimore, Maryland and AMDE M. AMDE, Ph.D., PE, University of Maryland, College Park, Maryland

More information