1 THERMAL ENERGY STORAGE TANK DOWN UNDER OWNER ENGINEER TANK BUILDER

2 Thermal Energy Storage Tank Walnut, CA Los Angeles area Community College serving over 50,000 students Host to the 2020 U.S. Olympic Track & Field Competition

3 Why Mt. SAC Considered TES Campus expansion plan through 2025 Increased district cooling requirement Limited space for central plant Reliability Redundancy of the chilled water system Reduce daytime noise Economic benefits

4 Economic Benefits of TES Lowest first cost and operation & maintenance costs when compared to adding more central chiller plant equipment Energy cost savings by shifting the electric load to off-peak periods Permanent Load Shift incentives and State energy efficiency funds

5 What led to a Fully Buried TES Tank? Limited space in central plant area Eliminates aesthetic concerns Less maintenance with a concrete tank

6 Engineering Perspective

7 Engineering Perspective Underground TES tanks have challenges that are not faced by above ground applications. A few significant ones are: The water elevation of the tank may be lower than some or all of the buildings and plant. The tank s venting and access location will be at grade. Draining the tank may require pumping.

8 Tank Water Level in Relation to Building Equipment TES tanks operate as open systems the top of the tank is at atmospheric pressure. If the tank water is at a lower elevation than other parts of the system there is a possibility of chilled water lines going in to a vacuum and/or the tank may overflow.

9 Controlling Pressure in Buildings A pump and control valve arrangement works well for maintaining positive system pressure during tank discharge. Pump the water from the bottom of the tank when discharging TES tank. Maintain positive pressure at all air handlers and fan coils. Pump the water from the top of the tank when charging and control the chilled water return line pressure.

10 Controlling Pressure During Regeneration A pump and control valve arrangement works well for maintaining positive system pressure during tank regeneration. Pump the water from the top of the tank when charging and control the chilled water return line pressure. Maintain positive pressure in the central plant.

11 Alternative Pressure Control & Isolation Methods Pressure sustaining valves are often used, but represent a fixed pressure drop in the system and result in higher pumping energy. For very large elevation differences a pressure isolating heat exchanger may be required, but this poses other concerns: o Second pump system will be added. o Thermal losses in the heat exchanger.

12 Tank Venting and Access The tank needs to have a point of entry and be vented to the atmosphere. With a buried tank, this may be at grade. Securing the access from the public is needed.

13 Draining and Overflow The tank requires an overflow pipe: o Route to sanitary drain? Check with local authorities. o May require a long underground pipe route to get to a suitable drain. o May require a separate sump with a pump. Overflowing the tank is abnormal and designer should provide a means to detect and isolate. Tank may need to be pumped out if it is to be emptied if gravity flow is not feasible.

14 TES Tank Level Control The system chilled water make-up must be controlled by the tank water level. o The tank is the expansion control. o Other make-up water sources must be isolated. Example of level sensor types: o Ultrasonic sensors. o Pressure sensor at the bottom of the tank Ultrasonic Level Sensor LD31 Pressure Sensor

15 Engineering Summary Look at the issues associate with hydraulic elevations. Coordinate the location of the access hatch and vent. Coordinate the tank drain and overflow locations. Control tank water level and isolation any other sources of make-up water.

16 Tank Builder Perspective

17 Example TES Tank Applications College Campuses Los Angeles, CA - USC Riverside, CA - UC Orlando, FL - UCF Government and Municipalities Lackland AFB, TX San Antonio, TX - Airport Raleigh, NC Brooks, CA CCC Resort Santa Clara, CA DFP Front Royal, VA Dominion Private Industry, Power Plants, and Data Centers

18 2.0 MG TES Tank - Considerations for Fully Buried Under a Parking Lot Groundwater level Roof loading HS20 (think firetrucks) Internal distribution piping and diffuser piping among columns Access into the excavation during construction Access through the roof after backfill

19 Floor Construction and Seismic Considerations Column locations 8 thick reinforced concrete floor Seismic restraints

20 Temporary Shoring and Wall Form Placement Form for cast-in-place reinforced concrete wall Temporary Shoring

21 Horizontal Prestressing and Cast-In-Place Roof 12.7 miles of steel cable under 140 ksi of tension placing the wall sections into compression 18 thick reinforced concrete roof

22 Upper Diffuser Piping Stainless steel hangers and supports Sch. 40 PVC distribution and diffuser piping Reinforced concrete columns

23 TES Tank Ready to be Backfilled

24 Backfill and Parking Lot Restored

25 Performance of the TES Tank

26 Performance Requirements and Details of Mt. SAC s TES Tank 20,000 ton-hrs useable TES capacity 16 F chilled water ΔT 5,000 gpm maximum chilled water flow rate 2,000,000 gallons total volume inside diameter x 29-9 water depth

27 9/12/ :00:00 AM PDT 9/12/ :27:00 AM PDT 9/12/ :54:00 AM PDT 9/12/ :21:00 AM PDT 9/12/ :48:00 AM PDT 9/12/ :15:00 AM PDT 9/12/ :42:00 AM PDT 9/12/ :09:00 AM PDT 9/12/ :36:00 AM PDT 9/12/ :03:00 AM PDT 9/12/ :30:00 AM PDT 9/12/ :57:00 AM PDT 9/12/ :24:00 AM PDT 9/12/ :51:00 AM PDT 9/12/ :18:00 AM PDT 9/12/ :45:00 AM PDT 9/12/ :12:00 AM PDT 9/12/ :39:00 AM PDT 9/12/ :06:00 AM PDT 9/12/ :33:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :27:00 AM PDT 9/12/ :54:00 AM PDT 9/12/ :21:00 AM PDT 9/12/ :48:00 AM PDT 9/12/ :15:00 AM PDT 9/12/ :42:00 AM PDT 9/12/ :09:00 PM PDT 9/12/ :16:00 PM PDT 9/12/ :43:00 PM PDT 9/12/ :10:00 PM PDT 9/12/ :37:00 PM PDT 9/12/ :04:00 PM PDT 9/12/ :31:00 PM PDT 9/12/ :58:00 PM PDT 9/12/ :25:00 PM PDT 9/12/ :52:00 PM PDT 9/12/ :19:00 PM PDT 9/12/ :46:00 PM PDT 9/12/ :13:00 PM PDT 9/12/ :40:00 PM PDT 9/12/ :07:00 PM PDT 9/12/ :34:00 PM PDT 9/12/ :01:00 PM PDT 9/12/ :28:00 PM PDT 9/12/ :55:00 PM PDT 9/12/ :22:00 PM PDT 9/12/ :49:00 PM PDT 9/12/ :16:00 PM PDT 9/12/ :43:00 PM PDT Performance Test Chilled Water Flow Rate Thru Tank Chilled Water Flow Rate (gpm) - TES Tank - Sept 12, Discharge Period Discharge Period Coincides with On-Peak Electric Demand Charge

28 Instrumentation Inside of a TES Tank Level Sensor Thermocline Temperature Sensors

29 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 AM PDT 9/12/ :20:00 AM PDT 9/12/ :40:00 AM PDT 9/12/ :00:00 PM PDT 9/12/ :20:00 PM PDT 9/12/ :40:00 PM PDT 9/12/ :00:00 PM PDT 9/12/ :20:00 PM PDT 9/12/ :40:00 PM PDT 9/12/ :00:00 PM PDT Performance Test Water Level in the Tank Water Level (feet) TES Tank September 12, 2017 Water Level Varies Very Little Throughout the Day

30 Performance Test Temperature Readings in the Tank

31 Thermocline Performance Test Temperature Readings in the Tank

32 Q&A James Valiensi P2S Engineering Guy Frankenfield DN Tanks

The detection limit for tritium is 300 pci/l

The detection limit for tritium is 300 pci/l New Jersey Department of Environmental Protection - Bureau of Nuclear Engineering (BNE) Investigation of Found in Onsite Vault Background and Installation of Groundwater Monitoring Wells In April of 009,

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price.

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price. Section 02222 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Abandonment in place of existing sewers, junction structures, manholes, and force mains. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS THANK YOU FOR CHOOSING reo sac THE REVOLUTIONARY REINFORCED RAINWATER STORAGE SYSTEM Before you begin, please take time to review the installation instructions and cross check

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

R A DON IS YOUR FAMILY AT RISK?

R A DON IS YOUR FAMILY AT RISK? A Full Service Radon Testing, Mitigation & Remediation Company providing peace of mind from Radon in homes and businesses throughout Southeastern PA and the Tri-State Area. R A DON IS YOUR FAMILY AT RISK?

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

PRELIMINARY GEOTECHNICAL DESIGN

PRELIMINARY GEOTECHNICAL DESIGN PNCC Manawatu River Pedestrian/ Cycle Bridge PRELIMINARY GEOTECHNICAL DESIGN 1 Introduction Opus has been commissioned by the Palmerston North City Council (PNCC) to prepare a Detailed Business Case (DBC)

More information

DEVELOPMENT OF ULTRASONIC TESTING TECHNIQUE TO INSPECT CONTAINMENT LINERS EMBEDDED IN CONCRETE ON NUCLEAR POWER PLANTS

DEVELOPMENT OF ULTRASONIC TESTING TECHNIQUE TO INSPECT CONTAINMENT LINERS EMBEDDED IN CONCRETE ON NUCLEAR POWER PLANTS DEVELOPMENT OF ULTRASONIC TESTING TECHNIQUE TO INSPECT CONTAINMENT LINERS EMBEDDED IN CONCRETE ON NUCLEAR POWER PLANTS H. Ishida 1, Y. Kurozumi 1, and Y. Kaneshima 2 1 Institute of Nuclear Safety System,

More information

CSTR Digestion of Manure and Food Wastes. Co-Digestion of Manure and Food Wastes at Inland Empire California

CSTR Digestion of Manure and Food Wastes. Co-Digestion of Manure and Food Wastes at Inland Empire California CSTR Digestion of Manure and Food Wastes Co-Digestion of Manure and Food Wastes at Inland Empire California Torsten Fischer and Dr. Katharina Backes Krieg & Fischer Ingenieure GmbH Hannah-Vogt-Strasse

More information

Choose smart valves for balancing Flow

Choose smart valves for balancing Flow Choose smart valves for balancing Flow For easy balancing of the flow NC Flow balancing valves NC Flow is designed for balancing heating and cooling systems. Incorrectly balanced flow is a common cause

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

PUMPED STORAGE OPERATIONS CONTROL DBPs AND DISTRIBUTION SYSTEM CHLORINE RESIDUALS. Jamie R. Shambaugh, P.E.

PUMPED STORAGE OPERATIONS CONTROL DBPs AND DISTRIBUTION SYSTEM CHLORINE RESIDUALS. Jamie R. Shambaugh, P.E. PUMPED STORAGE OPERATIONS CONTROL DBPs AND DISTRIBUTION SYSTEM CHLORINE RESIDUALS Jamie R. Shambaugh, P.E. Outline Project Background and Objectives DBP Formation and Control Theory DBP Control Study Summary

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

Environmental Submersible Pumps

Environmental Submersible Pumps Environmental Submersible Pumps Grundfos 85S Enviro Retrofitted Submersible Pumps These Grundfos submersible pumps are made of stainless steel and retrofitted with PTFE to handle the rigors of contaminated

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

STATE-COM-GAS-State Commercial Gas Water Heaters RW List Prices - Page T-59

STATE-COM-GAS-State Commercial Gas Water Heaters RW List Prices - Page T-59 RW List Prices - Page T-59 SANDBLASTER SBS LIGHT DUTY GAS 3 Year Limited Warranty on Tank 1 Year Limited Warranty on Parts Part # Description Price 26310110 SBS65-65NE 3Yr Nat Com Wtr Htr Call 26310210

More information

Performance Testing of a Semi-Hermetic Compressor with HFC-236ea and CFC-114 at Chiller Conditions

Performance Testing of a Semi-Hermetic Compressor with HFC-236ea and CFC-114 at Chiller Conditions Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 1994 Performance Testing of a Semi-Hermetic Compressor ith HFC-236ea and CFC-114

More information

3/18/03 CE Keith P. Brabant, P.E.

3/18/03 CE Keith P. Brabant, P.E. 1 Keith P. Brabant, P.E. 2 SELECT GRANULAR BACKFILL 3 4 Maximum of 15% fines Maximum size of 4 inches Free-draining, frictional, and durable Graduation limits referenced by AASHTO T-27 5 US Sieve Size

More information

AIR COOLED CONDENSERS

AIR COOLED CONDENSERS AIR COOLED CONDENSERS SELECTION GUIDE Data Aire, Inc. 230 W. BlueRidge Ave. Orange, CA 92865 www.dataaire.com TABLE OF CONTENTS DARC - Standard outdoor condenser general description... 3 DARC LD - Low

More information

OVER US 6 LATERAL BRIDGE SLIDE: I-75

OVER US 6 LATERAL BRIDGE SLIDE: I-75 LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,

More information

Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe

Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe Use of Dilute Flowable Backfill for Corrosion Mitigation of Buried Pipe Scott M. Lux Charlie Marsh Tom Carlson U.S. Army Engineer Research and Development Center Report Documentation Page Form Approved

More information

Table 3-1 Summary of Storm Drain Outfalls

Table 3-1 Summary of Storm Drain Outfalls Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a

More information

Liquid ring vacuum pumps single-stage

Liquid ring vacuum pumps single-stage Liquid ring vacuum pumps single-stage LOH 20103, LOH 20107 Pressure range: Suction volume flow: 150 to 1013 mbar 7 to 58 m³/h CONSTRUCTION TYPE Sterling SIHI liquid ring vacuum pumps are displacement pumps

More information

2011 BRIDGE INSPECTION REPORT

2011 BRIDGE INSPECTION REPORT 2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions How does the SMRT-Y work? The SMRT-Y sensor accurately measures the moisture level in the soil. When the soil is dry, the SMRT-Y allows the irrigation controller to water as

More information

Case Study of Pipe Bursting In Shreveport, LA

Case Study of Pipe Bursting In Shreveport, LA Case Study of Pipe Bursting In Shreveport, LA M I K E WOODCOCK P O R T L A N D U T I L I T I ES CONST R UC T I O N COMPA N Y, L LC 615-325-3374 M I C H A E LWOODCOCK@PUCC.ORG P U C C. O RG About PUCC Utility

More information

International Process Plants

International Process Plants International Process Plants Stock #600496 Triacetin Plant 15,000 MTPY Visit us at: www.ippe.com Brief Overview Capacity: 15,000 metric tons/year Technology: Free and Clear to Practice Worldwide Utilities:

More information

Kiwa Inspecta. Kiwa Inspecta. Trust Quality Progress

Kiwa Inspecta. Kiwa Inspecta. Trust Quality Progress Pressure equipment Third party agency In-Service Inspection Condition controls Crane and Lifting Risk assesments Elevator acts independently with integrity and full respect for the customers needs. As

More information

ST SERIES. design, development, production made in Germany

ST SERIES. design, development, production made in Germany ST SERIES design, development, production made in Germany ST 01 - Crunch Bench ST 02 - Push-up Bars ST 03 - Pull-up Bars ST 04 - Back Bench ST 05 - Balance Board ST 06 - Stretching Bars SE ST 01 - Crunch

More information

Environmental Submersible Pumps

Environmental Submersible Pumps Environmental Submersible Pumps Grundfos 300S Enviro Retrofitted Submersible Pumps These Grundfos submersible pumps are made of stainless steel and retrofitted with PTFE to handle the rigors of contaminated

More information

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor

More information

Environmental Submersible Pumps

Environmental Submersible Pumps Environmental Submersible Pumps Grundfos 230S Enviro Retrofitted Submersible Pumps These Grundfos submersible pumps are made of stainless steel and retrofitted with PTFE to handle the rigors of contaminated

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report Final Report VTRC 06-R35 Virginia Transportation Research Council research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report http:/www.virginiadot.org/vtrc/main/online_reports/pdf/06-r35.pdf

More information

ANSI API RP-754 Quarterly Webinar. June 21, Process Safety Performance Indicators for the Refining and Petrochemical Industries

ANSI API RP-754 Quarterly Webinar. June 21, Process Safety Performance Indicators for the Refining and Petrochemical Industries ANSI API RP-754 Quarterly Webinar June 21, 2016 Process Safety Performance Indicators for the Refining and Petrochemical Industries 1 Purpose of RP 754 Quarterly Webinars To support broad adoption of RP-754

More information

Granulation SyStEmS For waxes & oleochemicals

Granulation SyStEmS For waxes & oleochemicals Granulation SyStEmS For waxes & oleochemicals One solution for a wide range of applications and capacities 2 Granulation systems for waxes & oleochemicals Rotoform granulation for high quality, free-flowing

More information

Signature and collaborative architecture the climate engineer as a design partner. Matthias Schuler TRANSSOLAR. Stuttgart, Munich, New York, Paris

Signature and collaborative architecture the climate engineer as a design partner. Matthias Schuler TRANSSOLAR. Stuttgart, Munich, New York, Paris Signature and collaborative architecture the climate engineer as a design partner Swissbau, Basel, 20.1.2018 Matthias Schuler TRANSSOLAR Stuttgart, Munich, New York, Paris Folie 1 Client Architect KlimaEngineer

More information

RUBBER WATERBLAST HOSES

RUBBER WATERBLAST HOSES up to 15, PSI (1 Bar) RUBBER WATERBLAST HOSES These high pressure hose assemblies combine rugged construction, dependability and safe performance. Designed specifically for waterblast applications Lightweight

More information

The design and development of a force comparator standard machine to provide national traceability in force measurement to industry.

The design and development of a force comparator standard machine to provide national traceability in force measurement to industry. The design and development of a force comparator standard machine to provide national traceability in force measurement to industry. Speaker/ Author: S. Dlamini Co-author: C. Gouws National Metrology Institute

More information

Zeta Freeze & ThawSystems. Sophisticated solutions for the biopharmaceutical industry.

Zeta Freeze & ThawSystems. Sophisticated solutions for the biopharmaceutical industry. Zeta Freeze & ThawSystems Sophisticated solutions for the biopharmaceutical industry www.zeta.com Zeta FreezeSystem Low-temperature storage and transport of liquid pharmaceutical products & solutions Zeta

More information

MDH GOLD S TANDARD - B UYERS GUIDE

MDH GOLD S TANDARD - B UYERS GUIDE W HAT IS RADON? Radon is a naturally occurring radioactive gas that enters buildings from the surrounding soil. It is colorless, odorless and tasteless. Radon is also the main source of ionizing radiation

More information

Ross Brown Sales Pty. Ltd. Portable Pressure/Vacuum Comparator

Ross Brown Sales Pty. Ltd. Portable Pressure/Vacuum Comparator Ross Brown Sales Pty. Ltd. Portable Pressure/Vacuum Comparator The data provided above is for information purposes only and no warranty of accuracy or reliability is given. Page 17 of 30 Pressure Generating

More information

New Zealand s Most Advanced Urinal Technologies

New Zealand s Most Advanced Urinal Technologies New Zealand s Most Advanced Urinal Technologies Caroma is offering three new, advanced technology urinal options to meet industry needs where water-saving is a vital project requirement. A major breakthrough

More information

Laws and Incentives for RWH in Texas (and in other states) Dr. Hari J. Krishna Austin, Texas

Laws and Incentives for RWH in Texas (and in other states) Dr. Hari J. Krishna Austin, Texas Laws and Incentives for RWH in Texas (and in other states) Dr. Hari J. Krishna Austin, Texas Laws, regulations and incentives Laws and regulations need not be restrictive or difficult. Appropriate laws

More information

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014 Updated: 5/15/14 1 What was driver for deciding to slide vs. roll? Overall weight? 2 1. Why the two different slide methods? 2. How much experience should your contractor have to perform the slide work?

More information

Introduction to sodium technology Neutronic characteristics of sodium and complexities

Introduction to sodium technology Neutronic characteristics of sodium and complexities Introduction to sodium technology Neutronic characteristics of sodium and complexities K.S. Rajan Professor, School of Chemical & Biotechnology SASTRA University Joint Initiative of IITs and IISc Funded

More information

Shifting the Canning Bus Bridge Sideways

Shifting the Canning Bus Bridge Sideways Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus

More information

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:

More information

Kiwa CMT Testing. CMT (Testing) Ltd. Established in 1976 Located in Derby with 27 employees

Kiwa CMT Testing. CMT (Testing) Ltd. Established in 1976 Located in Derby with 27 employees CMT (Testing) Ltd Established in 1976 Located in Derby with 27 employees *UKAS Accredited *ASLEC Registered *CHAS Accreditation *Constructionline *ILE & BSI Members UKAS United Kingdom Accreditation Service

More information

Initiating and Sustaining Your Energy Efficiency Program. Timothy Dantoin Senior Engineer September 10, 2013

Initiating and Sustaining Your Energy Efficiency Program. Timothy Dantoin Senior Engineer September 10, 2013 Initiating and Sustaining Your Energy Efficiency Program Timothy Dantoin Senior Engineer September 10, 2013 Today s Agenda Energy Efficiency in Perspective Consumption, Capacity & Uncertainty Energy Management

More information

NDT Services Division

NDT Services Division NDT Services Division Teddington Engineered Solutions Ltd. Tel: +44 (0) 870 1166 TES (837) or +44 (0) 1554 744517 Fax: +44 (0) 870 1166 838 or +44 (0) 1554 746435 e-mail: ndt@tes.uk.com Website: www.tes.uk.com/ndt

More information

Introduction to Nondestructive Testing

Introduction to Nondestructive Testing What is nondestructive testing? NonDestructive (NDT) is the process of doing inspections, testing, or evaluating materials, components or assemblies for defects without destroying the material or component.

More information

Compressor Accessories

Compressor Accessories Compressor Accessories Series 11 Superior quality for superior performance COMPRESSOR OIL Description MINERAL 11.1100 1 litre container 11.1400 4 litre container SYNTHETIC 11.1200 1 litre container 11.1500

More information

Evaluation of operating conditions of Isolation Condenser, Unit1, Fukushima Daiichi Nuclear Power Station

Evaluation of operating conditions of Isolation Condenser, Unit1, Fukushima Daiichi Nuclear Power Station Reference November 22, 2011 Tokyo Electric Power Company Evaluation of operating conditions of Isolation Condenser, Unit1, Fukushima Daiichi Nuclear Power Station As for the Isolation Condenser of Unit1,

More information

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam.

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot Bengt H. Fellenius Amsterdam May 27, 216 Fellenius, B.H. and Nguyen, M.H., 213. Wick Drains and Piling for

More information

This program is designed to prevent hearing loss for students, staff and employees while engaged in universitysponsored

This program is designed to prevent hearing loss for students, staff and employees while engaged in universitysponsored Hearing Conservation University of Tennessee Safety Program IH-010 Document Contact: EHS-General Safety Date effective: January 1, 2009 Revision Date: April 2, 2015 Purpose This program is designed to

More information

CORESTA Guide N o 18

CORESTA Guide N o 18 CORESTA Guide N o 18 November 2016 Technical Guide for Sample Handling and Sample Collection of E-Cigarettes and E-Vapour Generating Products E-Vapour Sub-Group 1. REVIEW AND HISTORY Issue Date Reason

More information

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on

More information

Introduction to Nondestructive Testing

Introduction to Nondestructive Testing Introduction to Nondestructive Testing Outline Introduction to NDT Overview of Six Most Common NDT Methods Selected Applications Definition of NDT The use of noninvasive techniques to determine the integrity

More information

Are we ready for the switch over?

Are we ready for the switch over? Are we ready for the switch over? More info about this article: http://www.ndt.net/?id=21194 Sadasivan Narayana Materials Evaluation Services (Mumbai) Pvt. Ltd. sadasivan.n24@gmail.com Abstract: The increasing

More information

Available online at ScienceDirect. Physics Procedia 67 (2015 )

Available online at   ScienceDirect. Physics Procedia 67 (2015 ) Available online at www.sciencedirect.com ScienceDirect Physics Procedia 67 (2015 ) 170 175 25th International Cryogenic Engineering Conference and the International Cryogenic Materials Conference in 2014,

More information

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the 2 The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the picture in the top left hand corner. Water in this pathway

More information

TECHNICAL DATA SHEET GROWCLEAR PLUS

TECHNICAL DATA SHEET GROWCLEAR PLUS TECHNICAL DATA SHEET GROWCLEAR PLUS CATHODIC ELECTROPHORETIC CLEAR / TINTED LACQUERING PROCESS Introduction Growclear Plus is an advanced version of the earlier popular electrophoretic Clearlyte lacquer.

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

PROPERTY HIGHLIGHTS. Approximately 6,754 SF of Office Space. Extensive Inventory of Cranes & Equipment. $1,400,000 Asking Price

PROPERTY HIGHLIGHTS. Approximately 6,754 SF of Office Space. Extensive Inventory of Cranes & Equipment. $1,400,000 Asking Price OFFERING SUMMARY Sale Price: $1,400,000 Price / SF: $13.94 PROPERTY OVERVIEW This offering is an excellent investment for an owner/user looking to expand operations, or for a new entrant into the Shreveport-Bossier

More information

Safety & Risk Management Policies and Procedures

Safety & Risk Management Policies and Procedures Safety & Risk Management Policies and Procedures Title: Emergency Eye Wash & Shower Policy Date: August 2013 Rationale: The Occupational Safety and Health Administration (OSHA 29CFR 1910.151) requires

More information

1. Project Background:

1. Project Background: Improving Livelihoods in Flowers Bank Village through the enhancement of the Cohune Processing Facility Flowers Bank Community Group Flowers Bank Village, Belize District April 2016 0 1. Project Background:

More information

EQUINE UNDERWATER TREADMILL SYSTEM REHABILITATION, CONDITIONING AND WELLNESS

EQUINE UNDERWATER TREADMILL SYSTEM REHABILITATION, CONDITIONING AND WELLNESS EQUINE UNDERWATER TREADMILL SYSTEM REHABILITATION, CONDITIONING AND WELLNESS WHY WATER Hydrotherapy in an underwater treadmill uses the natural properties of water, or the principles of relative density,

More information

Radon Gas & What You Need to Know. Bob Caskanette, B.A.Sc., CEC, CAQS, CRS, CIEC, C.E.T., EP (C-NRPP Certified) Caskanette Udall Consulting Engineers

Radon Gas & What You Need to Know. Bob Caskanette, B.A.Sc., CEC, CAQS, CRS, CIEC, C.E.T., EP (C-NRPP Certified) Caskanette Udall Consulting Engineers Radon Gas & What You Need to Know Bob Caskanette, B.A.Sc., CEC, CAQS, CRS, CIEC, C.E.T., EP (C-NRPP Certified) Caskanette Udall Consulting Engineers What is Radon? Naturally occurring radioactive soil

More information

Get Growing NFT 4K Farmers Market Bundle

Get Growing NFT 4K Farmers Market Bundle 1984 Get Growing NFT 4K Farmers Market Bundle Get Growing! Farmers Market 4K Bundle Get Growing! Farmers Market Bundle - Grand Peak 7/1/18 Hydroponics System: NFT 4K Atlas Grand Peak > Plant Sites: 4,320

More information

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual MONTANA FLUME User s Manual i Montana (Short Parshall) Flume User s Manual TABLE OF CONTENTS Introduction to the Montana Flume... 1 Function... 1 Design... 1 Standards... 2 Accuracy... 3 Dimensions...

More information

Emergency Fixtures Replacement Parts. Classic Model Parts. Eyewash Bowls. Dust Caps. Sprayhead and Spray Ring Assemblies

Emergency Fixtures Replacement Parts. Classic Model Parts. Eyewash Bowls. Dust Caps. Sprayhead and Spray Ring Assemblies Classic Model Parts Eyewash Bowls Dust Caps 154-058 Impact-resistant plastic eyewash bowl, 10" diameter 187-053 Corrosion-resistant stainless steel bowl, 10¾" diameter 107-371 Eyewash dust caps only (sold

More information

Outbreak of Severe Acute Respiratory Syndrome (SARS) at Amoy Gardens, Kowloon Bay, Hong Kong Main Findings of the Investigation

Outbreak of Severe Acute Respiratory Syndrome (SARS) at Amoy Gardens, Kowloon Bay, Hong Kong Main Findings of the Investigation Outbreak of Severe Acute Respiratory Syndrome (SARS) at Amoy Gardens, Kowloon Bay, Hong Kong Main Findings of the Investigation INTRODUCTION An outbreak of Severe Acute Respiratory Syndrome (SARS) occurred

More information

RLS /M MX SERIES

RLS /M MX SERIES The RLS/M MX series of burners are characterised by a modular monoblock structure that means all necessary components can be combined in a single unit thus making installation easier, faster and, above

More information

6 Submersible Turbine Pump

6 Submersible Turbine Pump 6 Submersible Turbine Pump 100 to 375 GPM PAGE: SP-200 Model Number Explanation Example: 175ST10D6B-0464 175 = GPM ST = Sub Turbine 10 = Horsepower D = Ductile Iron 6 = 6 Pump B = Impeller Trim 04 = Number

More information

Geräteblatt Pallazza III PGI

Geräteblatt Pallazza III PGI Technische Dokumentation Geräteblatt Pallazza III 535.08 PGI Geräteblatt Pallazza III 535.08 PGI Geräteblatt Pelletofen Fiche technique Poêle à pellets Scheda tecnica Stufe pellet Equipment sheet Pellet

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Lift Accessories. For Hunter Wheel Alignment Lift Racks. Includes Inflation Stati and Fully Inte Alignment Features

Lift Accessories. For Hunter Wheel Alignment Lift Racks. Includes Inflation Stati and Fully Inte Alignment Features Lift Accessories For Hunter Wheel Alignment Lift Racks Includes Inflation Stati on and Fully Inte grated Alignment Features PowerSlide System RX-Series & L441 / L444 Lifts The PowerSlide locking mechanism

More information

COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES.

COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES. COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES Authors D. Nyborg, Research Physicist, TISEC Inc., Montreal;

More information

Functional Performance Test. Air-Side Economizer

Functional Performance Test. Air-Side Economizer Date: Functional Performance Test Air-Side Economizer Building Name: Address: Phone: Testing Agent: Assisted by: Equipment Name: Manufacturer: ECM No. ECM Name: New/Retrofit: Unit ID AHU ID Size (tons)

More information

SWAT. Environmental. Mitigating radon and reducing cancer risks in commercial and multifamily residential properties

SWAT. Environmental. Mitigating radon and reducing cancer risks in commercial and multifamily residential properties T H E M A G A Z I N E F O R LEADING C O N S T R U C T I O N E X E C U T I V E S Swat Environmental BEST OF THE UNITED STATES 2017 www.usbuildersreview.com BEST OF THE UNITED STATES 2017 SWAT Environmental

More information

NOTICE TO BIDDERS: HONDA PIPELINE PHASE 1, Owner: THE WATER WORKS AND SEWER BOARD OF THE CITY OF ANNISTON, CALHOUN COUNTY, ALABAMA.

NOTICE TO BIDDERS: HONDA PIPELINE PHASE 1, Owner: THE WATER WORKS AND SEWER BOARD OF THE CITY OF ANNISTON, CALHOUN COUNTY, ALABAMA. NOTICE TO BIDDERS: HONDA PIPELINE PHASE 1, Owner: THE WATER WORKS AND SEWER BOARD OF THE CITY OF ANNISTON, CALHOUN COUNTY, ALABAMA. The Water Works and Sewer Board of the City of Anniston, 931 NOBLE STREET,

More information

Emergency Bridge Stabilization at Mile Watrous Subdivision

Emergency Bridge Stabilization at Mile Watrous Subdivision Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)

More information

US Patent No. 6,481,300; No. 6,837,120 others pending Standard Operating Procedure: Sampling Groundwater with a HydraSleeve

US Patent No. 6,481,300; No. 6,837,120 others pending Standard Operating Procedure: Sampling Groundwater with a HydraSleeve US Patent No. 6,481,300; No. 6,837,120 others pending Standard Operating Procedure: Sampling Groundwater with a HydraSleeve Copyright 2016 GeoInsight This guide should be used in addition to field manuals

More information

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior

More information

Variable Frequency Drives Lessons Learned

Variable Frequency Drives Lessons Learned Variable Frequency Drives Lessons Learned Presented by: Trindera Engineering 204 N. Division Street #300 Spokane, WA 99202 (509) 435-0523 www.trindera.com 1 Introductions Grady J. Weisz, P.E. (Gweisz@Trindera.com)

More information

THS74/75 Industrial Temperature & Humidity Transmitter. Operation Manual

THS74/75 Industrial Temperature & Humidity Transmitter. Operation Manual THS74/75 Industrial Temperature & Humidity Transmitter Operation Manual 1. Features 2. Security considerations 3. Installation 4. Connection 5. Display and LED instruction 6. Software setting and calibration

More information

Grundfos letter about Cycle Stop Valves

Grundfos letter about Cycle Stop Valves Grundfos letter about Cycle Stop Valves The attached memo is typical of the tactics used by pump, motor, and VFD manufacturers. They try to persuade others into believing that a VFD saves energy, to promote

More information

RLS/E-EV MX SERIES. Low NOx Modulating Dual Fuel Burners FIRING RATES

RLS/E-EV MX SERIES. Low NOx Modulating Dual Fuel Burners FIRING RATES The RLS/E-EV MX series of burners covers a firing range from 350 to 2400 kw, and they have been designed for use in low or medium temperature hot water boilers, hot air or steam boilers, diathermic oil

More information

RLS /M MX SERIES

RLS /M MX SERIES RLS/M burners are characterised by a modular monoblock structure that means all necessary components can be combined in a single unit thus making installation easier, faster and, above all, more flexible.

More information

Scovell J.M., Barrera E.V., Leihui G., Perito P.E., Wilson S.K., Carrion R.E., Hakky T.S.

Scovell J.M., Barrera E.V., Leihui G., Perito P.E., Wilson S.K., Carrion R.E., Hakky T.S. Scovell J.M., Barrera E.V., Leihui G., Perito P.E., Wilson S.K., Carrion R.E., Hakky T.S. The penile implant is designed to emulate an erection in the form of a hydraulic pump. Penetration (longitudinal

More information

Town of Sherborn - Board of Health Regulations I SEWAGE DISPOSAL

Town of Sherborn - Board of Health Regulations I SEWAGE DISPOSAL I SEWAGE DISPOSAL INTRODUCTION These Regulations are adopted in accordance with Title 1, Regulation 2 of the State Environmental Code and Article 1 of the State Sanitary Code and are intended to supplement

More information

Good Cleanroom Design & Construction Practice. Presented by Gordon Farquharson July 2017

Good Cleanroom Design & Construction Practice. Presented by Gordon Farquharson July 2017 Good Cleanroom Design & Construction Practice Presented by Gordon Farquharson July 2017 Slide 1 PharmOut 2017 Agenda Good Design & Construction Practice Cleanrooms Based on the scope and intents of the

More information

Functional Phosphates & Non Phosphates for Seafood

Functional Phosphates & Non Phosphates for Seafood Functional Phosphates & Non Phosphates for Seafood Insert Diary.indd 1 11/18/11 2:44:11 PM Functional Phosphates & Non Phosphates for Seafood Quality Service Reliability Safety Increases water holding

More information

Quality Service Value Annual Report. Chester Water Authority

Quality Service Value Annual Report. Chester Water Authority Chester Water Authority Quality Service Value 2013 Annual Report Achieving the highest standards of excellence today, preparing for sustainable performance in the future. Our Board of Directors Thomas

More information

Dry Directional Drilling

Dry Directional Drilling INFRA 2000 6th Annual Urban Infrastructures Week November 13-15, 15, 2000 Laval Convention Center Quebec, Canada. Dry Directional Drilling Dr. Ing. Renzo Chirulli SE Industries, Inc. 1/40 presentation

More information

MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E MUE247 Alignment Methods and Application H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: One of the most common causes of vibration in rotating

More information

Ultrasonic Condition Monitoring MORE THAN JUST A LEAK DETECTOR

Ultrasonic Condition Monitoring MORE THAN JUST A LEAK DETECTOR Innovative Sound Solutions TM Ultrasonic Condition Monitoring MORE THAN JUST A LEAK DETECTOR Presented by Benjamin Fried May, 2006 CTRL Systems, Inc. 1004 Littlestown Pike, Suite H Westminster, MD 21157

More information