Culvert Safety Inspection Report (CSIR)
|
|
- Barrie Henderson
- 5 years ago
- Views:
Transcription
1 Conference Workshop Culvert Safety Inspection Report (CSIR) Rich Kathrens MDOT Bridge Safety Inspection Engineer March 22, 2015
2 Culvert Safety Inspection Updates Pre 2015 CSIR CSIR Updates 03/2/2016 2
3 Pre 2015 CSIR, continued???????????? CSIR Updates 03/2/2016 3
4 Pre 2015 CSIR, continued CSIR Updates 03/2/2016 4
5 Pre 2015 CSIR (PDF Report) 2016 Michigan Bridge CSIR Updates 03/2/2016 5
6 Pre 2015 CSIR Element (PDF Report) CSIR Updates 03/2/2016 6
7 Pre 2015 CSIR Work Recommendations (PDF Report) CSIR Updates 03/2/2016 7
8 Previous reports remain on older report format. CSIR Updates 03/2/2016 8
9 Double Barrel CIP Culvert CSIR Form? CIP Slab w/abutments CSIR Form? CSIR Updates 03/2/2016 9
10 Changes to the Culvert Safety Inspection Report (CSIR) Released in MiBRIDGE on 1/29/2015 The Culvert Safety Inspection Report (CSIR) has been updated and combined with the Element Level report to create one report for collecting the condition information. This is the first attempt to create a structure specific all inclusive report for the collection of condition information. Several items were removed from the old CSIR report that did not apply to a culvert type structure (deck, deck soffit, pipe, and abutment). CSIR Updates 03/2/
11 MiBRIDGE uses CSIR when Item 43B = 19 (Culvert) CSIR Updates 03/2/
12 New CSIR Report (NBI Items) 2016 Michigan Bridge CSIR Updates 03/2/
13 CSIR Updates 03/2/
14 New CSIR Report (AASHTO Elements) Inspector is required to add a minimum of (1) culvert type element. This will allow them to gain access to add comments. Unfortunately there was no easy way to map the previous comments to the new CSIR. Therefore the inspector will have to re-enter them for the first time. Previous reports contained relevant culvert information in the Deck, Deck Soffit, Pipe, Abutments, Piers, and Culvert components. CSIR Updates 03/2/
15 Users can view the previous PDF report and copy the appropriate comments into the new CSIR report. CSIR Updates 03/2/
16 New CSIR Report (AASHTO Elements) Element 851 CSIR Updates 03/2/
17 CSIR Updates 03/2/
18 New CSIR Report (AASHTO Elements) CSIR Updates 03/2/
19 New CSIR Report (AASHTO Elements) Element 862, Culvert Footing is an ADE that is a child element to Substructure Element 220 Reinforced Concrete Pile Cap/Footing CSIR Updates 03/2/
20 New CSIR Report (AASHTO Elements) CSIR Updates 03/2/
21 New CSIR Report (AASHTO Elements) 2016 Michigan Bridge CSIR Updates 03/2/
22 New CSIR Report (AASHTO Elements) 2016 Michigan Bridge Scour Protection Elements Other Elements CSIR Updates 03/2/
23 Additional changes to MiB RIDG E to both BSIR and CSIR Added Good, Fair, Poor, Severe to the headings indicating CS1, CS2, CS3, and CS4. Opened up the comment box for each primary element Allow the condition state quantities to be collected by percentages CSIR Updates 03/2/
24 Printing/Viewing PDF CSIR Report now contains all the condition information on one Report, (NBI, Element, and Work Recommendations) CSIR Updates 03/2/
25 Determine feasibility of creating combined BSIR/Element Report CSIR Updates 03/2/
26 CSIR Updates 03/2/
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationQuestions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection
Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment
More information2011 BRIDGE INSPECTION REPORT
2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationConditional assessment of Kiri Bridge in Shkoder, Albania
Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,
More informationFour simply supported steel plate girders (appear to be an old railcar).
BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure
More informationNew AASHTO Bridge Inspection Process
New AASHTO Bridge Inspection Process Gary L. Bowling, Oregon DOT Oregon Department of Transportation How we got to where we are today The current AASHTO CoRe Element CS Descriptions use numerous general
More informationState-Aid Bridge News August 2, 2005
State-Aid Bridge News August 2, 2005 Bridge Hydraulic Information The FHWA has been inquiring about our Scour Program. In particular, there are two areas of concern; 1. Are our Scour Action Plans current
More informationFort Goff Creek Bridge R04 ABC Project. Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015
Fort Goff Creek Bridge R04 ABC Project Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015 Fort Goff Creek Bridge Lead Adopter SHRP2 Solutions Innovative
More informationThree Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA
Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance
More informationABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue
ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014 Accent image here Primary Image here Presentation Outline Overview of the Project Scope ABC Project
More informationExecutive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report
Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation
More informationPennsylvania s Experience with LRFD Implementation. By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation
Pennsylvania s Experience with LRFD Implementation By: Thomas Macioce, P.E. Beverly Miller, P.E. Pennsylvania Department of Transportation Overview Case History Spread Footing Width and Braking force Approach
More informationAhmed Mongi, M.S., P.E. Engineering Division
1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span
More informationOVER US 6 LATERAL BRIDGE SLIDE: I-75
LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,
More informationACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK
ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA
More informationWinona Bridge Visual Quality Review Committee
Winona Bridge Visual Quality Review Committee Summary of Preferred Features October 7, 2014 Creating Bridges As Art 1 Summary of Preferred Features Based on Visual Quality Review Committee Final Design
More informationIntegral Abutment Bridge Design with Soil Structure Interaction
Integral Abutment Bridge Design with Soil Structure Interaction Thursday, May 11, 2017 3:00 PM 4:00 PM EST Speaker Engineer: Suthichai Saelim Project Location WESTBOROUGH Railroad HOPKINTON Project Location
More informationIntegral Bridge Design. Integral Bridge Design. in Midas Civil. Midas UK
Integral Bridge Design in Midas Civil Midas UK Contents Types of Integral Bridges Why Integral Construction? Do we need Construction Stage Analysis for Integral Bridges? Soil-Structure Interaction at abutments
More informationSEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN
SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch
More information2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency
2017 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # L4870 TWP 332 over ROOT RIVER DISTRICT: District 6 COUNTY: Fillmore CITY/TOWNSHIP: JORDAN STATE: Minnesota Date of Inspection: Equipment Used: 10/22/2016
More informationAerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements
Aerial of Conceptual Path and Bridge Barnes & Noble at One Place Project Location Corner Center Proposed Bridge Encore Condominiums Regency Club Condominiums Path continues to Dolley Madison Boulevard
More informationAppendix B. Shallow Foundations Report
12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization
More informationIntegral bridges and environmental conditions
Integral bridges and environmental conditions COMISU CLAUDIU-CRISTIAN, BOACĂ GHEORGHITĂ Department of Roads and Foundations Faculty of Civil Engineering and Building Services The "Gheorghe Asachi" Technical
More informationPENNDOT e-notification
PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 027 August 30, 2010 Release of Version 3.1.5.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)
More informationSTONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39
SITE NUMBER AND NAME: NC 52 Pembina River Bridge LEGAL DESCRIPTION: SE 1-50-9-W5M STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 NAD 83 COORDINATES:
More informationEffect of Pile Orientation in Skewed Integral Abutment Bridges
Effect of Pile Orientation in Skewed Integral Abutment Bridges RABIH NAJIB, Ph.D., PE, Alpha Corporation, Baltimore, Maryland and AMDE M. AMDE, Ph.D., PE, University of Maryland, College Park, Maryland
More informations MASH Mobility (m/s)/n Frequency, Hz 2.5 x x x x x Average mobility
Purpose For a long time, users of NDT systems have wished for a rapid, easy to use method for rapid screening of the integrity of structures. The s MASH impulse-response test system fulfills this wish.
More informationEAH 422 ADVANCED WATER RESOURCES ENGINEERING
EAH 422 ADVANCED WATER RESOURCES ENGINEERING Bridge Hydraulics Prof. Aminuddin Ab. Ghani References The Art And Science Of River Engineering Bridge Failure Pier scour Pier scour Pier scour Bridge Failure
More informationLesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure
Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on
More informationPRELIMINARY GEOTECHNICAL DESIGN
PNCC Manawatu River Pedestrian/ Cycle Bridge PRELIMINARY GEOTECHNICAL DESIGN 1 Introduction Opus has been commissioned by the Palmerston North City Council (PNCC) to prepare a Detailed Business Case (DBC)
More information2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CR
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 88756 CR 597 over RICE RIVER DISTRICT: District 1 COUNTY: St. Louis CITY/TOWNSHIP: ANGORA STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016
More informationCE 332 Construction Engineering and Management. MS Project - Recitation
CE 332 Construction Engineering and Management MS Project - Recitation MICROSOFT PROJECT Microsoft Project is a project management software, developed and sold by Microsoft, which is designed to assist
More informationOverturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways
Overturning Forces at Bridge Abutments and the Interaction of Horizontal Forces from Adjacent Roadways ANNUAL REPORT FOR FY 2011 ODOT SPR ITEM NUMBER 2228 Submitted to: John Bowman, P.E. Planning and Research
More informationMBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure.
Scour Assessment Report Location Plan: Scale 1:5,000 MBW3-45 Score: 16.86 ELR: Contains Ordnance Survey data Crown copyright and database right 2010 Category: HIGH Assessment Date: 19/11/2010 Contract:
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT
VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS
More information5 DAMAGE TO TRANSPORTATION FACILITIES
5 DAMAGE TO TRANSPORTATION FACILITIES In the Kocaeli, Turkey earthquake of August 17, 1999, extensive damage of transportation facilities occurred in the Kocaeli and Sakarya region, Turkey as shown in
More informationReducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples
Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples BY MARTIN P. BURKE, JR. Innumerable bridges both in the U.S. and abroad have been, and continue to be, damaged by the restrained growth
More informationShifting the Canning Bus Bridge Sideways
Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus
More informationModified Sheet Pile Abutment for Low-Volume Road Bridge
Modified Sheet Pile Abutment for Low-Volume Road Bridge Ryan R. Evans Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 50011 ryevans@iastate.edu
More informationCritically damaged bridges & concepts for earthquake recovery
Critically damaged bridges & concepts for earthquake recovery J. Waldin, J. Jennings & P. Routledge Opus International Consultants Ltd, Christchurch, New Zealand 2012 NZSEE Conference ABSTRACT: This paper
More informationA Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments
A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas
More informationDATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE
DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge
More informationComparative Study of Behaviour of Integral and Bearing Type Bridge under Temperature Loading
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 03, 2015 ISSN (online): 2321-0613 Comparative Study of Behaviour of Integral and Bearing Type Bridge under ing B. J. Shah
More informationFigure 3: Analytic procedure
International Journal of Scientific and Research ublications, Volume 7, Issue 5, May 2017 567 Investigation of Integral Bridge Effect under Dynamic Loading Haymanmyintmaung *,kyawlinnhtat ** * Department
More informationAn ANN-Based Backward Prediction Model for Reliable Bridge Management System Implementations Using Limited Inspection Records Case Studies.
An ANN-Based Backward Prediction Model for Reliable Bridge Management System Implementations Using Limited Inspection Records Case Studies. Author Lee, Jaeho, Guan, Hong, Blumenstein, Michael, Loo, Yew-Chaye
More informationIntroduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017
Introduction Substructure Inspection and Rating That portion of the bridge located below the bearings Abutments Piers Rated separately Purpose is to: Receive the loads from the superstructure Transfer
More informationIL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse)
IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) AGENDA Project Overview and Need Design and Special Provisions Construction Engineering
More information3/18/03 CE Keith P. Brabant, P.E.
1 Keith P. Brabant, P.E. 2 SELECT GRANULAR BACKFILL 3 4 Maximum of 15% fines Maximum size of 4 inches Free-draining, frictional, and durable Graduation limits referenced by AASHTO T-27 5 US Sieve Size
More informationSUMMARY OF NOVEMBER 2013 REVISIONS - VERSION
SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION 3.2.0.0 Since the release of BRADD Version 3.1.6.2, several major enhancements have been made to the software and many reported operational issues have been
More informationSemi-Integral Abutment Bridges
Ministry of Transportation Report BO-99-03 Bridge Office Leslie Street Over Hwy 407 Semi-Integral Abutment Bridges Ministry of Transportation Report BO-99-03 Bridge Office Semi-Integral Abutment Bridges
More informationSTATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS
STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala
More informationRebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and
Overview Design criteria for I-90 over Kishwaukee Integral Abutment Bridges (IAB) Design Criteria Design analysis, details and construction Lessons Learned during construction Instrumentation by Illinois
More informationGeosynthetic-reinforced soil bridge abutments
Geosynthetic-reinforced soil bridge abutments Measuring the performance of geosynthetic reinforcement in a Colorado bridge structure. By Jorge G. Zornberg, Naser Abu-Hejleh, and Trever Wang The technology
More informationMonitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures
Abu-Hejleh, N., Zornberg, J.G., and Wang, T. (). Monitored Displacements of a Unique Geosynthetic-Reinforced Walls Supporting Bridge and Approaching Roadway Structures. Proceedings of the 8th Annual Meeting,
More informationTHE EFFECT OF EPS GEOFOAM BACKFILL ON THE SEISMIC PERFORMANCE OF INTEGRAL ABUTMENT BRIDGES MEGAN OOMS. A thesis submitted to the
THE EFFECT OF EPS GEOFOAM BACKFILL ON THE SEISMIC PERFORMANCE OF INTEGRAL ABUTMENT BRIDGES By MEGAN OOMS A thesis submitted to the Graduate School-New Brunswick Rutgers, The State University of New Jersey
More informationPennDOT s Use of Nondestructive Testing Solutions
PennDOT s Use of Nondestructive Testing Solutions 2016 NASTO Conference Richard N. Roman, P.E. June 6, 2016 PennDOT Overview PennDOT s 11 engineering districts are directly responsible for nearly 40,000
More informationDESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA
DESIGN AND CONSTRUCTION OF BR1449 VICTORIA PARK DRIVE MODIFICATIONS, BURSWOOD, WA Brian Lord, Arup Pty Ltd, Australia ABSTRACT Arup was lead designer for Lend Lease on the Victoria Park Drive Modifications
More informationKeywords: integral abutment bridge, pile head abutment connection, finite element method.
Global Journal of Researches in Engineering: e Civil And Structural Engineering Volume 15 Issue 1 Version 1.0 Year 2015 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global
More informationAnalyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes
Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2012 NZSEE Conference Twelve State Highway (SH) bridges subjected
More informationSTUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END
STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END by Zhengyu Liu Research Team: Zhengyu Liu, Graduate Research Student, Bridge Engineering Center, Iowa State University Brent M Phares, Director,
More informationPrecast Concrete Elements for Accelerated Bridge Construction
Precast Concrete Elements for Accelerated Bridge Construction Volume 3. Laboratory Testing, Field Testing, and Evaluation of a Precast Concrete Bridge: Black Hawk County Final Report January 2009 Sponsored
More informationRetrofit to improve earthquake performance of bridge abutment slopes
Proceedings of the Ninth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Society 14-16 April, 2011, Auckland, New Zealand Retrofit to improve earthquake performance of bridge
More informationDesign Considerations for Integral Abutment/ Jointless Bridges in the USA
University of Wisconsin Milwaukee UWM Digital Commons Civil and Environmental Engineering Faculty Articles Civil and Environmental Engineering 3-2014 Design Considerations for Integral Abutment/ Jointless
More informationLow-Volume Road Abutment Design Standards
Low-Volume Road Abutment Design Standards V.W. Robbins HNTB Corporation 7450 W. 130th St., Suite 400 Overland Park, KS 66213 vrobbins@hntb.com F. Wayne Klaiber Bridge Engineering Center 418 Town Engineering
More informationField Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake
Field Reconnaissance on the Damage of Transportation Facilities in the 2007 Niigata Chuetsu-oki Earthquake G. Watanabe, K. Iiyama, N. Kawano Tokyo Institute of Technology July 20-21, 2007 Route 116 National
More informationEmergency Bridge Stabilization at Mile Watrous Subdivision
Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)
More informationModified Sheet Pile Abutments for Low-Volume Road Bridges
EERC Publication ERXX-XX Modified Sheet Pile Abutments for Low-Volume Road Bridges Final Report JANUARY 2012 Sponsored by Iowa Highway Research Board (IHRB Project TR-568) Iowa Department of Transportation
More informationArchitect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on
Site visit report Project Title Killamarsh Cycleway (TPBN559 SUSTRANS Connect2 - Halfway to Killamarsh (Phase 1)) Project No. 290390 Site Visited Killamarsh Station Road Date of Visit 25 th November 2011
More informationProject Cost Estimating System
ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%
More informationEvaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures
InTrans Project Reports Institute for Transportation 9-2015 Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures Brent Phares Institute for Transportation, bphares@iastate.edu
More informationOVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM. TRB Tunnel Workshop. January 11, 2009 Washington, DC
OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM TRB Tunnel Workshop January 11, 2009 Washington, DC PRESENTATION TEAM Chester Allen, P.E. Martha Averso, P.E. Rick Patrick, P.E. DISCUSSION TOPICS
More informationGeosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri
Geosynthetic Reinforced Soil (GRS) Integrated Bridge Systems (IBS) John Bowders University of Missouri Adams et al. (2012), FHWA Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation
More informationDESIGN ASSESSMENT OF THE FOUNDERS/MEADOWS GRS ABUTMENT STRUCTURE
Abu-Hejleh, N., Zornberg, J.G., Elias, V., and Watcharamonthein, J. (23). Design Assessment of the Founders/Meadows GRS Abutment Structure. Proceedings of the 82nd Annual Meeting of the Transportation
More informationIntegral Abutment Bridges-Development of Soil Model for Soil Structure Interaction in Time History Analysis
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 10, Issue 3 (March 2014), PP.31-40 Integral Abutment Bridges-Development of Soil
More informationThe Pennsylvania State University. The Graduate School. Department of Civil and Environmental Engineering
The Pennsylvania State University The Graduate School Department of Civil and Environmental Engineering LENGTH LIMITATIONS OF PRESTRESSED CONCRETE GIRDER INTEGRAL ABUTMENT BRIDGES A Thesis in Civil Engineering
More informationv Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes
v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures
More informationExhibitor Packet. Re-Engineer Your Life Holistic Health Summit. Saturday, January 27, :00AM-4:30PM
Exhibitor Packet Re-Engineer Your Life Holistic Health Summit Saturday, January 27, 2018 9:00AM-4:30PM Pryzbyla Conference Center Catholic University 620 Michigan Ave., NE Washington, DC 20064 Why a Holistic
More informationSUMMARY OF NOVEMBER 2018 REVISIONS - VERSION
SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION 3.2.5.0 Since the release of BRADD Version 3.2.4.3, several operational issues have been addressed. This release of BRADD Version 3.2.5.0 contains the following
More informationBridge Office Trunk Highway Bridge Flood Response Plan
Bridge Office Trunk Highway Bridge Flood Response Plan Updated 7/18/2012 Purpose Bridges are vulnerable to damage and failure during flooding. Scour may undermine the bridge foundations or remove the protection
More informationL. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015
Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior
More informationFeature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image
SURFACE WATER MODELING SYSTEM Feature Stamping 1 Introduction In this lesson you will learn how to use conceptual modeling techniques to create numerical models that incorporate flow control structures
More informationBank Erosion and Bridge Scour
JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP
More informationService Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual
Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Resource # 07-135 (04/16) 2 2016 American Concrete Pipe Association, all rights reserved. The last comprehensive inspection of
More informationNDT METHODS APPLICABLE TO HEALTH MONITORING OF ABC CLOSURE JOINTS
NDT METHODS APPLICABLE TO HEALTH MONITORING OF ABC CLOSURE JOINTS Quarterly Progress Report For the period ending November 30, 2017 Submitted by: PI- Armin Mehrabi Graduate Student- Saman Farhangdoust
More informationv Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes
v. 12.0 SMS 12.0 Tutorial Objectives In this lesson will teach how to use conceptual modeling techniques to create numerical models that incorporate flow control structures into existing bathymetry. The
More informationIntegral Abutment Bridges Australian and US Practice
Integral Abutment Bridges Australian and US Practice John Connal (M.Eng Sci., B.E. (civil) (Hons), Dip. C.E., F.I.E.Aust, M. ASCE, M. IABSE) Maunsell Australia Pty Ltd SYNOPSIS The structural system offered
More informationBahavior and Analysis of an Integral Abutment Bridge
Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 2013 Bahavior and Analysis of an Integral Abutment Bridge Conner D. Huffaker Follow this and additional works
More informationFiled: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8
Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889
More informationK & A Childminding Child Minding
K & A Childminding Child Minding Type of inspection: Announced (short notice) Inspection completed on: 19 April 2017 Service provided by: Neil, Pamela Service provider number: SP2013985585 Care service
More informationSEISMIC PERFORMANCE OF SEAT- TYPE ABUTMENT HIGHWAY BRIDGES IN ILLINOIS
CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 18-015 UILU-ENG-2018-2015 ISSN: 0197-9191 SEISMIC PERFORMANCE OF SEAT- TYPE ABUTMENT HIGHWAY BRIDGES IN ILLINOIS Prepared By James
More informationFun With Foam Deep Injection
Fun With Foam Deep Injection Stephen Cruise Environmental Resource Specialist Where were we? Original Project Culvert to Bridge Fish Passage Improvement Modular Concrete Block bridge design Pacific Bridge
More informationIntegral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction
Integral Bridge Design - Derivation of the Spring Constant for Modelling the Soil-Structure Interaction Sergei Terzaghi BE(Hons), MIPENZ Gillian Sisk BEng PhD MIEI CEng Synopsis Integral bridges present
More informationAshton Avenue Integral Bridge
Ashton Avenue Integral Bridge Behzad Golfa, Senior Bridge Engineer, GHD Pty Ltd ABSTRACT The Ashton Avenue Bridge is a replacement of the original three-span timber bridge over Perth- Fremantle Rail line
More informationresearch report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report
Final Report VTRC 06-R35 Virginia Transportation Research Council research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report http:/www.virginiadot.org/vtrc/main/online_reports/pdf/06-r35.pdf
More informationUpdate on Seismic Behavior and Design of
Update on Seismic Behavior and Design of Steel Plate Girder Bid Bridges Ahmad M. Itani, Ph.D., P.E., S.E. Professor Department of Civil and Environmental Engineering University of Nevada, Reno Background
More information