1 The New S in SSES Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen
2 Outline Introduction to the City s program plan Current program status Data collection Statistical analysis / data trends Data Utilization
3 Motivating Factors Better understand risk/consequence of failure Improve routine asset management practices Inform future renewal project decisions Can be accomplished by piggy-backing on existing MS4 permit mapping activities
4 The 4-Year Plan Map every public stormwater asset in the City Perform top-side condition assessment of all public stormwater structures Delineate the MS4 area that drains to each outfall
5 Lynchburg: At a Glance Statistics: Established in 1786 Size: 50 mi 2 Population: 78,000 1 of 3 Combined Sewer System Localities in VA
6 Lynchburg: Up Close µ Urban Area 25,000 Acres CSS Area B A 1,300 Acres (5% of UA) D MS4 Area C 9,000 Acres Legend MS4 Area (Verified) MS4 Area (Unverified) CSS Area Urbanized Area (35% of UA)
7 GIS Updates Item Inlets Manholes Outlets Ditches Pipes Original GIS 5, ,458 3,429 5,987 Verified GIS 7, ,921 4,746 6,815 Change 1, , Change 26% 16% 19% 38% 14%
8 Condition Assessment Scope
9 Inlet Exterior Damage
10 Inlet Interior Damage
11 Manhole Wall/Chimney Damage
12 Ditch - Erosion Major Moderate Minor
13 Ditches Grading Issues Sediment Deposition Ponding
14 Outlet Surface Damage
15 Outlet - Undermining
16 O&M Vegetation Overgrowth Ditch Outlet
17 Recommendations Major Repair Category Description Proposed Action Moderate Repair Minor Repair Structural Structural defect(s) that have a major impact on asset functionality/safety Still functional; no safety issues; but has potential to fail if conditions worsen Completely functional; no safety issues; preventative measure. Rehabilitate within the next year Inspect, verify and rehabilitate within the next 2 years Inspect, verify and rehabilitate within the next 5 years Minor Observation Observed defect; very minor Reassess within the next 5 years No Action No visible defect None O&M Immediate Cleaning > 50% blockage Clean within the next year; include on routine maintenance schedule Routine Cleaning 25% - 50 % blockage Include on routine maintenance schedule No Action < 25% blockage None
18 Conc. Conc. Conc. Brick Block Block Block Brick Brick Data Trends - Inlet Material 14% 4% 12% 11.6% 21% 10% 9.8% 9.6% Brick 8% 6% 75% Conc. 4% 3.9% 3.9% 2% 2.4% 1.0% 0.8% 0.7% 0% % Major % Moderate % Minor Block Brick Concrete
19 20-30 yr yr < 10 yr yr yr < 10 yr < 10 yr yr yr yr yr yr Data Trends - Inlet Age 10% 9% 8% 8.6% 7.9% 17% < 10 yr 20% 7% 6% 5.2% 24% yr yr 5% yr 24% 4% 15% 3% 3.1% 2% 1% 1.4% 2.0% 2.0% 1.8% 1.5% 0.3% 0.6% 0.9% 0.4% 0.4% 0.8% 0% % MAJOR % MODERATE % MINOR
20 Conc. Conc. Brick Conc. Brick Block Block Data Trends - Manhole Material 16% 14% 14.3% 5% 21% 12% Brick 10% 9.3% 8% 6% Concrete 74% 4% 3.7% 3.2% 2% 1.1% 1.6% 0% % Major % Moderate % Minor Block Brick Concrete
21 10-20 yr yr yr yr yr yr yr < 10 yr yr < 10 yr Data Trends - Manhole Age 7% 12% 18% 6% 5.9% < 10 yr 5% 4% 3.4% 4.5% 29% yr yr 24% 3% 2% 1% 2.3% 2.3% 1.8% 1.8% 1.6% 1.6% 1.5% 0.9% 1.1% yr 17% 0% % Major % Moderate % Minor
22 Concrete Grass Rip Rap Dirt Rip Rap Concrete Rip Rap Dirt Concrete Grass Dirt Asphalt Asphalt Asphalt Grass Data Trends - Ditch Material 6% 9% 5% 5.2% 4.5% 7% 6% Dirt Concrete 18% 4.1% 4% 3.6% 3.3% 3.6% 3% Grass 2.2% 60% 2% 1.6% 1% 0.0% 0.4% 1.0% 0.9% 0.8% 0.8% 0.9% 0% % Major % Moderate % Minor
23 30-50 yr yr < 10 yr yr yr < 10 yr < 10 yr yr yr yr yr Data Trends - Ditch Age 10% 9.4% 8% 2% 9% 8% 7.5% 7.5% 5% yr 30% 7% 6% 5% 5.2% yr 4% 3.4% 55% 3% 2% 1% 1.7% 1.3% 1.1% 0.2% 2.7% 2.7% 2.4% 2.2% 2.8% 0% % MAJOR % MODERATE % MINOR
24 30-50 yr yr yr 10 yr yr yr < 10 yr yr yr yr yr Data Trends - Outlet Age 12% 10% 10.8% 13% yr 9% < 10 yr 24% 8.6% 8% 7.0% 7.2% 13% yr 6% 5.4% 5.3% 6.2% 5.6% 5.3% yr 41% 4% 3.0% 3.7% 3.5% 2% 1.9% 1.9% 0% % Major % Moderate % Minor
25 ft ft < 20 ft < 20 ft < 20 ft > 100 ft ft ft ft ft > 100 ft > 100 ft Data Trends - Outlet Location Distance from Street Centerline 4% 4% 3% 3.0% 3.6% 32% > 100 ft. < 20 ft 20% 3% 2% 2% 1.1% 1.3% 1.6% 1.5% 1.7% 12% ft ft 36% 1% 1% 0.7% 0.7% 0.2% 0.7% 0.5% 0% % MAJOR % MODERATE % MINOR
26 Data Trends Summary Poor Condition Older assets (> 30 years old) Block & brick structures Assets located outside of the right-of-way (out of sight out of mind) Good Condition Newer assets (< 20 years old) Concrete structures Assets located within the right-of-way
27 Data Utilization
28 Final Thoughts Condition assessment is a huge need Piggy-backing on mapping field work provides cost savings Data trends help inform large scale renewal projects Integration with GIS & asset management software help inform routine / annual projects
29 THANK YOU
GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets
GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets Tony Bedogne, GISP GIS Technician Washtenaw County, MI bedognea@ewashtenaw.org
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power
More informationProject Cost Estimating System
ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%
More informationAdam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico
Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to
More informationVisual On-land Trash Assessment Protocol for Stormwater
Visual On-land Trash Assessment Protocol for Stormwater Version 1.3 Prepared by: EOA, Inc. 1410 Jackson St. Oakland, CA 94612 April 15, 2015 Visual On-land Trash Assessment Methodology INTRODUCTION This
More informationDynamic Routing Applied to an Urban Subsurface Drainage System
Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview
More informationGreensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring
Greensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring November 2017 Chris Nesbit, PE, BCEE, Meredith Miller, PE, CDM Smith and Robbie Bald,
More informationHIGHLANDS COMMUNITY DEVELOPMENT DISTRICT
SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark
More informationExecutive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report
Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation
More informationCase To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017
Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:
More informationDeKalb County All Hazards Mitigation Plan Annual Evaluation Report
Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a
More informationINSTRUCTION FLYER FOR INTERIM PRIORITY AREAS PROJECT REPORT. September 12, 2018
INSTRUCTION FLYER FOR INTERIM PRIORITY AREAS PROJECT REPORT September 12, 2018 Web Access A copy of the draft Interim Priority Areas Project Report is available for review on the SARP10 webpage. The Report
More information2011 BRIDGE INSPECTION REPORT
2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030
More informationDrainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016
Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)
More informationDRAINAGE ANALYSIS REPORT
DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite
More informationFEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS
Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR UNITY AVENUE STREET IMPROVEMENTS IMPROVEMENT PROJECT NO. 2011-05 CITY OF BROOKLYN CENTER, MINNESOTA January
More informationTHE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY
THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY NPDES PERMIT NO. AR342 ORIGINAL SUBMISSION DATE: NOVEMBER 16, 215
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT
VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS
More informationSEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN
SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch
More informationClay Sewer Pipe-Joint Infiltration Leak-Rate Testing
Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing 1. ABSTRACT While numbers of small to large older cities are undertaking repairs and maintenance, several other newer cities are planning on installing
More informationStormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018
Stormwater Report For ACORN PLACE ACORN STREET MILLIS, MA Proposed Senior Residential Community July, PREPARED BY: MERRIKIN ENGINEERING, LLP Consulting Engineers Main Street, Suite C Millis, MA PREPARED
More informationVETIVER SYSTEM FOR BEACH EROSION REHABILITATION
VETIVER SYSTEM FOR BEACH EROSION REHABILITATION Paul Truong - TVNI Technical Director All materials in this document remain the property of TVNI. Permission must be obtained for their use. Copyright 2017
More informationStormwater Mitigation Worksheet
Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:
More informationNORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report
INITIAL ANNUAL INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION Initial Annual RCRA CCR Unit Inspection Report PRIMARY BASIN NUMBER 2 SURFACE IMPOUNDMENT Submitted
More informationPerformance Standards Workshop Midwest Case Studies
Performance Standards Workshop Midwest Case Studies Permeable Paving Permeable Paving Bioretention 1 Bioretention Bioretention Bioretention Bioretention 2 Green Roof Portland Stormwater Management Manual
More informationInspection Report. River Falls Hydroelectric Project FERC Project No. P Junction Falls Dam River Falls, Wisconsin.
Inspection Report River Falls Hydroelectric Project FERC Project No. P-10489 Junction Falls Dam River Falls, Wisconsin Prepared for: River Falls Municipal Utilities River Falls, Wisconsin December 2009
More informationMDH GOLD S TANDARD - B UYERS GUIDE
W HAT IS RADON? Radon is a naturally occurring radioactive gas that enters buildings from the surrounding soil. It is colorless, odorless and tasteless. Radon is also the main source of ionizing radiation
More informationAlvarez Engineers, Inc.
FL Certificate of Authorization No. 7538 10305 NW 41 Street Suite 103 Doral, Florida 33178 Tel. (305) 640-1345 Fax (305) 640-1346 E-Mail: Juan.Alvarez@AlvarezEng.com June 30, 2015 Mr. Neil Kalin District
More information2013 Annual Report June 30, 2014
2013 Annual Report June 30, 2014 2013 Annual Report i i 2013 Annual Report III. TABLE OF CONTENTS I. COVER... 1 II. III. IV. CERTIFICATION DECLARATION... i TABLE OF CONTENTS... i ACRONYMS AND ABBREVIATIONS...
More informationUsing the sharp-crested weir formula the outflow was:
Date: 2009 July 16 11:00 AM 14 Island Lake Dam Inspection Report Persons Present: Bryon Keene, P.Eng. Harry Stinson Brett Dark (14 Island Lake Association) Peter Peart (14 Island Lake Association) The
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationSign Retroreflectivity A Minnesota Toolkit
Sign Retroreflectivity A Minnesota Toolkit Mike Marti, Primary Author SRF Consulting Group June 2010 Research Project Final Report #2010RIC02 VISUAL NIGHTTIME INSPECTION Method Description: The retroreflectivity
More informationVETIVER SYSTEM FOR BEACH EROSION REHABILITATION. Paul Truong TVNI Technical Director Brisbane, Australia.
VETIVER SYSTEM FOR BEACH EROSION REHABILITATION Paul Truong TVNI Technical Director Email Brisbane, Australia. All materials in this document remain the property of TVNI. Permission
More informationQuestions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection
Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment
More informationACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK
ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA
More informationCADDO LEVEE DISTRICT
CADDO LEVEE DISTRICT 1320 Grimmett Dr. Shreveport, LA 71107 www.caddolevee.org Phone: (318) 221-2654 2015 ANNUAL REPORT ADMINISTRATOR S LETTER Working for Caddo Levee District and serving the residents
More informationPotholes: Prevent Before They Present
: Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.
More informationAmethyst House Strategic Plan
Amethyst House Strategic Plan Mission Amethyst House provides a foundation for sober living by partnering with individuals, families and communities impacted by addictions and substance-abuse issues, offering
More informationRADON. January 2010 Greenfield Health Department. Mary Kapelis RN RS
RADON January 2010 Greenfield Health Department Mary Kapelis RN RS What is Radon? Radon is a colorless, tasteless and odorless gas. Radon is a cancer-causing, radioactive gas. Where Does Radon Come From?
More informationRevised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts
An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,
More information\\H\15\ PH9 Inspection Photos
SHOP SLIDE Photo 1. at cracking across the footpath at the end of the Hwy 2 EB to Hwy 684 SB off ramp at the 99 Ave. intersection. Drop in asphalt trail (background) has worsened since 2013 and is now
More informationWest Penn Hospital Institutional Master Plan
West Penn Hospital Institutional Master Plan 16 October 2018 AGENDA INSTITUTIONAL MASTER PLAN (IMP) EXISTING CONDITIONS THE VISION 10-YEAR PLAN 25-YEAR PLAN COMMUNITY INVOLVEMENT What is an IMP? Zoning
More informationMONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual
MONTANA FLUME User s Manual i Montana (Short Parshall) Flume User s Manual TABLE OF CONTENTS Introduction to the Montana Flume... 1 Function... 1 Design... 1 Standards... 2 Accuracy... 3 Dimensions...
More informationAPPENDIX F. El Cerrito Parks and Recreation Facilities Master Plan Opinion of Probable Cost
APPENDIX F El Cerrito Parks and Recreation Facilities Master Plan Opinion of Probable Cost This page is intentionally blank OPINION OF PROBABLE COST ADULT/MULTI-GENERATION PROGRAMMING SPACE 1.0 Permanent
More informationEyewash & Emergency Shower Equipment (Plumbed) Academic Affairs Laboratories of Ferris State University
EYEWASH & EMERGENCY SHOWER SECURED DOCUMENT Academic Affairs Laboratory Safety Eyewash & Emergency Shower Equipment (Plumbed) Academic Affairs Laboratories of Ferris State University Number: AALSD-2-50-1001
More informationPermeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies
EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone
More informationLessons learned in multi-objective urban detention basin projects
Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban
More informationNiagara Escarpment Plan Revised Amendment Acton Quarry Extension May 31, 2012
TAB 1 Niagara Escarpment Plan Revised Amendment Acton Quarry Extension May 31, 2012 The following amendment is proposed to update the Niagara Escarpment Plan Amendment application originally dated March
More information2350 Whitesburg Drive Huntsville, AL 35801
, Huntsville HSV - Office / Med Bldg Great Corner Location Beautiful Building with Multi Uses Ample Parking Beautifully Landscaped Near Hospital dmc@chasecommercial.com AL #000033300-0 No warranty, express
More informationStantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905)
Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 4, Page 1 of 10 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889
More informationWhat Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.
What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor
More informationCity of Sioux City Pierce Corridor Façade Improvement Program Guidelines
I. Background City of Sioux City Pierce Corridor Façade Improvement Program Guidelines The Façade Improvement Program is a reimbursement grant program of the City of Sioux City to prevent or eliminate
More informationCold In-Place Recycling in Tampa. Ken Holton, P.E. Street Maintenance Engineer
Cold In-Place Recycling in Tampa Ken Holton, P.E. Street Maintenance Engineer City of Tampa Stats Tampa has 2,600 lane miles of roadways Tampa uses the MicroPAVER system Currently the City of Tampa s average
More informationArchitect/Contractor/QS/Sub-Contractor/C of W/RE/File ref PiMS Documents Site Visit Report. Item Text Action on
Site visit report Project Title Killamarsh Cycleway (TPBN559 SUSTRANS Connect2 - Halfway to Killamarsh (Phase 1)) Project No. 290390 Site Visited Killamarsh Station Road Date of Visit 25 th November 2011
More informationA STEP IN THE RIGHT DIRECTION: Presented By. Part I Problems Underfoot EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT. It Didn t Happen Overnight
1 A STEP IN THE RIGHT DIRECTION: EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT FINAL,Sept 6, 07 1 Presented By Overland Park, Kansas, Public Works Department Dave Bergner, Superintendent Janet Luessenheide,
More informationFlume Installation Instructions
Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream
More informationA.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING
GRAVEL ACCESS ROAD PUBLIC TOILET /1179358 CURRENT DISPOSAL AREA (INDICATIVE) WEATHER STATION (LOCATION INDICATIVE) 3/819237 (LEASE) MAIN PUBLIC CAR PARKING AREA R5 LARGE LOT RESIDENTIAL ZONE WEST COWRA
More informationATTACHMENT B8 Incident History
Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...
More informationSlope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success.
Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success. By Paulo R.Rogerio,PE,Geotechnical Consulting Engineer Pomerode SC Brazil email: prrog@terra.com.br and Joao
More informationThe New Jersey Nonstructural Strategies Point System (NSPS)
2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)
More informationWaterless urinals Choosing the appropriate model for your business
Waterless urinals Choosing the appropriate model for your business There is increasing interest in waterless urinals and ultra-low flush urinal systems as a way to save water in large buildings and public
More informationThe Role of Vetiver Grass in Erosion Control and Slope Stabilization Along the Highways of Thailand
1 The Role of Vetiver Grass in Erosion Control and Slope Stabilization Along the Highways of Thailand Surapol Sanguankaeo, Chawalit Sukhawan and Ekawit Veerapunth Department of Highways Bangkok Thailand
More informationAnomaly Assessment and Repair Panel
Anomaly Assessment and Repair Panel Tool Tolerances October 22 nd, 2008 Stephen Westwood Manager New Product Development BJ Pipeline Inspection Services Axial Magnetic Flux Leakage Leakage Flux Pipe Wall
More informationOVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM. TRB Tunnel Workshop. January 11, 2009 Washington, DC
OVERVIEW AND IMPLEMENTATION of the TUNNEL MANAGEMENT SYSTEM TRB Tunnel Workshop January 11, 2009 Washington, DC PRESENTATION TEAM Chester Allen, P.E. Martha Averso, P.E. Rick Patrick, P.E. DISCUSSION TOPICS
More informationHART ENVIRONMENTAL RESOURCES
HART ENVIRONMENTAL RESOURCES 262 Hedge Dr. Springfield, OH 45504 (937) 325-8777 (937) 324-0288 FAX ASBESTOS INSPECTION REPORT 525 Steele Ave. Dayton, Ohio 45410 PREPARED FOR: Mr. Dennis Zimmer Montgomery
More informationWarren County Housing Authority No Smoking Policy
Warren County Housing Authority No Smoking Policy As required by HUD, the Warren County Housing Authority (WCHA) is hereby adopting a policy to forbid smoking in all of its structures and within 25 feet
More informationCC032 Techniques for Pavement Rehabilitation
CC032 Techniques for Pavement Rehabilitation H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Pavement rehabilitation is defined as a structural
More informationNondestructive Testing Procedure: Liquid Penetrant Testing
MOGAS INDUSTRIES, INC. Nondestructive Testing Procedure: Liquid Penetrant Testing Specification: NDT 0200 Version: 2.0 November 10, 2014 Approved by: Signature Paul T. Marks Consulting Level III ACCP Professional
More informationSterile U Network. Quality Control for Table-top Steam Sterilizers. Introduction: T U T O R I A L S
3M Attest Products TM TM Sterile U Network T U T O R I A L S Quality Control for Table-top Steam Sterilizers Introduction: Many health care professionals in office-based settings are not aware that they
More informationUNITED STATES DISTRICT COURT
0 A Professional Corporation MICHAEL E. VERGARA, ESQ. (SBN ) ROBERTA L. LARSON, ESQ. (SBN 0) NICHOLAS A. JACOBS, ESQ. (SBN 00) Sixth Street, Third Floor Sacramento, California Telephone: () - Facsimile:
More informationSCARP SEWER IMPROVEMENT PLAN Understanding proposed cost sharing and implementation mechanisms
February 13, 2017 USEPA Administrative Order and PADEP Chapter 94 Corrective Action Requirements SCARP SEWER IMPROVEMENT PLAN Understanding proposed cost sharing and implementation mechanisms Klines Island
More informationGround Truthing Satellite Imagery
Ground Truthing Satellite Imagery With the introduction of the International Vetiver Grass Tracking System it is important that the input of vetiver site locations are accurately entered and that where
More informationPEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:
PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE
More informationHMUA MINUTES REGULAR MEETING OF MARCH 16, 2017
HMUA MINUTES REGULAR MEETING OF MARCH 16, 2017 ADMINISTRATION BUILDING 424 Hurley Drive Hackettstown, NJ REGULAR MEETING MARCH 16, 2017 JACOB GARABED ADMINISTRATION BUILDING The meeting was called to order
More informationADMINISTRATIVE DIRECTIVE
ADMINISTRATIVE DIRECTIVE Title: Emergency Eyewash and Shower Stations Issuing Department: Town Manager s Safety Office Effective Date: June 1, 2014 Approved: Gilbert Davidson, Town Manager Type of Action:
More informationService Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual
Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Resource # 07-135 (04/16) 2 2016 American Concrete Pipe Association, all rights reserved. The last comprehensive inspection of
More information!"#$"! NEPHRON SYSTEM. Protect engine. Save money
!"#$"! NEPHRON SYSTEM Protect engine Save resources Protect environment Save money NEPHRON is the very special oil recycling system. It enables it to use LO permanently. This is an important factor in
More informationFALL RIVER HOUSING AUTHORITY SMOKE-FREE HOUSING POLICY
FALL RIVER HOUSING AUTHORITY SMOKE-FREE HOUSING POLICY A. PURPOSE The U.S. Department of Housing and Urban Development (HUD) requires each public housing agency that administers public housing programs
More informationAnnual Report The Raritan River Rail Road Historical Society, Inc.
Annual Report The Raritan River Rail Road Historical Society, Inc. For the Year 2016 Created by: Tom Reynolds President 1 Table of Contents Table of Contents 2 Summary 3 Raritan River Rail Road Historical
More informationEcosystem Services in the City Urban Greening & Public Health
Ecosystem Services in the City Urban Greening & Public Health Kathleen Wolf, Ph.D. College of the Environment University of Washington ACES :: December 2010 Why are city trees & urban greening important?
More informationPROCEDURE. Madison Landmarks Commission. Landmark Plaque Procedure (Legistar #19902) Date: August 26, 2010 Prepared By: Amy Scanlon
Madison Landmarks Commission PROCEDURE Regarding: Landmark Plaque Procedure (Legistar #19902) Date: August 26, 2010 Prepared By: Amy Scanlon Relevant Ordinance Section: 33.19(5)(g) Recognition Of Landmarks
More informationFILTER REGULATORS AND PARTS
COMPRESSED AIR ACCESSORIES PRICING 5-2017 WWW.RAPIDAIRPRODUCTS.COM 800-954-3310 FILTER REGULATORS AND PARTS 175psi MAX INLET, 0-150psi adjustment range PRICE QUANTITY K93210 INLINE REGULATOR W/GAUGE, 1/4"
More informationRahvusvaheline puitarhitektuuri konverents
Experiences from Modern Timber Bridge Building Rahvusvaheline puitarhitektuuri konverents Tallinn 25-26.11.2015 Hauke Burkart NPRA Bridge Section Topics Short history of modern Norwegian timber bridges
More informationPipeline Technology Conference 2007
The Complete Solution: Combined Crack and Metal Loss Detection Tool using Phased Array Technology By A. Hugger, J. Franz, H. Charbon, R. Bauernschmitt, M. Tschuch, K.-H. Käshammer, I. Lachtchouk, J. Ehrhardt.
More information3-cutter, XL size tip Tip shape simplifies orientation Optimum power transfer Rounded cutting edges Three dust flutes for perfect dust removal
Concrete drill bits XT3 3-cutter, XL size tip Tip shape simplifies orientation Optimum power transfer Rounded cutting edges Three dust flutes for perfect dust removal 10 SDS+ 5 Ø 16 18 SDS MAX 12 Ø 16
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationSection , M-1 Industrial District, shall be amended to add a new section D.11, reading as follows:
The Village of Webberville, Michigan Adopted Resolution An Ordinance amending the Zoning Ordinance for the Village of Webberville to permit and regulate Medical Marijuana Grow Operations, Processing Facilities,
More informationChange from 2016 Budget ($) 2016 Approved Budget Approved Budget
Operating including Pooled Reserves 2016 2017 Change from 2016 ($) Change from 2016 (%) PAYROLL EXPENSES Manager $46,800 $46,800 $0 0% ER Payroll Taxes $3,700 $3,678 -$22-1% Manager Benefits $6,000 $7,000
More informationDodge County Drainage Board
Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128
More informationIntroductory Patient Information
Introductory Patient Information Phone: (650) 350-8046 Fax: (650) 618-0401 www.fiveseasonsmedical.com courtney@fiveseasonsmedical.com WELCOME! It is my pleasure to welcome you to our practice. Our team
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationRecalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation
2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William
More informationConditional assessment of Kiri Bridge in Shkoder, Albania
Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,
More informationSeller-financing opportunity in Redondo 2408 Grant Ave Redondo Beach, CA 90278
Seller-financing opportunity in Redondo Large, all electric units in a highly visible location Grant is a main artery that runs the length of North Redondo Well-maintained by original owner! NEVER been
More informationC/CAG. City/County Association of Governments Annual Report
C/CAG City/County Association of Governments of San Mateo County 2006 Annual Report C/CAG CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY Atherton Belmont Brisbane Burlingame Colma Daly City
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town
More information