VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT

Size: px
Start display at page:

Download "VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT"

Transcription

1 VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS ROAD OVER TRIBUTARY OF CROOKED RUN LOOKING DOWNSTREAM, ABUTMENT A ON LEFT ROUTE NO.: INSPECTION INTERVAL: 12 MONTHS

2 The above load rating data was provided by the VDOT District Office.

3

4

5 BRIDGE INSPECTION REPORT SUMMARY REGULAR Inspection Frequency: 12 Months County/City: Loudoun Feature Intersected: Tributary of Crooked Run Main Route: Facility Carried: Forest Mills Road Lead Inspector: David W. Kee Location: 0.05 miles from Route miles to Route 722 PE Stamp of Reviewer Signature of Lead Inspector David W. Kee Signature of Reviewer David L. McDonald, P.E. SPECIAL REQUIREMENTS Underwater Inspection Fatigue Prone Details Segmental Concrete Fracture Critical Scour Critical Pin & Hanger Movable Bridge CONDITION RATINGS FIELD POSTING TRAFFIC SAFETY FEATURES Deck: 5 Sign Legibility: G Bridge Railings: 0 Superstructure: 4 Sign Visibility: G Transitions: 0 Substructure: 4 Capacity Sign R12-1 (Tons): N Approach Guardrail: 0 Channel/Channel Prot.: 5 Capacity Sign R12-5 Approach Guardrail Ends: 0 Culvert: N Single (Tons): 10 Semi (Tons): 14 YEAR PAINTED 1979 ELEMENT CONDITION STATE DATA No. Description Env. Unit State 1 State 2 State 3 State 4 State 5 Total 32 Timber Deck w/ AC Overlay Low SF Open Girder/stringer with Timber Deck Low LF Other Pier Wall Low LF Other Abutment Low LF Reinforced Concrete Pier Cap Low LF Scour (Smart Flag) Low EA Section Loss (Smart Flag) Low EA Debris in Channel (Smart Flag) Low EA 1 1 Attachments Inspection Notes Photographs Channel Profile Clearance Sheet Sketches

6 BRIDGE INSPECTION REPORT COVER PHOTOGRAPHS Abutment B (west) approach. Beam 1 side (north) elevation. Page 1

7 BRIDGE INSPECTION REPORT COMMENTARY County/City: Loudoun Feature Intersected: Tributary of Crooked Run Main Route: Facility Carried: Forest Mills Road Location: 0.05 miles from Route 841 Oakland Green Road 0.75 miles to Route 722 Lincoln Road Lead Inspector: David Kee Additional Inspectors: Gilberto Rosado P.E., James Lytal, Mitchel Ripple DESCRIPTION ORIENTATION Two Simple Multi-Steel Beam Spans with Timber Deck with Asphalt Overlay. Total Structure Length = 67. Looking downstream, Abutment A is on the left (east towards Route Oakland Green Rd. approach) and Abutment B is on the right (west towards Route 772 Lincoln Road). Looking from Abutment A to Abutment B, beams are numbered from right (north) to left (south) Beam 1 to Beam 5. Spans are numbered from Abutment A to Abutment B Span 1 to Span 2. Water flows to south. The above orientation is consistent with the previous report. MISCELLANEOUS (Items which are structure specific and cannot be included in another section.) GPS Coordinates: N 39º ; W 77º Year Built Changes since last inspection are denoted in italicized and underlined font. This structure has previously been screened for Asbestos Containing Material. Inspection of this structure started on 1/16/16 and returned on 1/31/2016 and 2/1/16 to finish inspection. Channel profile was not checked during this inspection because of abnormal water level (1/16/16) and because of the ice/snow in channel during the 1/31/16 and 2/1/16 inspection days. Previous channel profile sheet from 5/9/15 is attached. SPECIAL REQUIREMENTS (Special Equipment needed or Special Inspections required such as: Fracture Critical, Underwater, Fatigue Prone, Scour Critical, Moveable Bridge, Segmental Concrete, Pin and Hanger, etc.) Waders used to access abutments, pier, and superstructure. WORK DONE Beam 5 curb replaced at Abutment A end. Beams have been retrofitted with plates, channels and angles. Approaches have been regraded. Tree in Span 1 side of pier and some vegetation have been cleared. STRUCTURAL ANALYSIS Load Rating Summary Sheet reviewed, new analysis is recommended due superstructure retrofits. Page 2

8 BRIDGE INSPECTION REPORT COMMENTARY OVERALL CONDITION RECOMMENDATIONS Poor, due to: No Traffic Safety Features in place. Severe corrosion with holes in beam ends at abutments and pier. However, retrofits have been installed (welded) to beams. Missing load posting signs at bridge at Abutment B. One Lane Bridge warning sign not present at Abutment B side at bridge. Object marker fallen over at Abutment B, Beam 1 side. Worn timber deck in areas of missing asphalt overlay. Decay, splits, and checks in curbs with loose and damaged connections to deck. Paint system failed on all beams with active corrosion throughout. Vertical cracks on both abutment backwalls. Loss of bearing area under beams at abutments and pier due to spalls. Scour below mid-span of both spans. Debris on abutment seats, upstream and downstream channel, and below bridge. Potholes on approaches. High Priority Repairs 1. Consider installing traffic safety features, LS. 2. Place One Lane Bridge sign near Abutment B, 1 EA. 3. Place load posting signs at bridge, 1 EA. 4. Reinstall fallen object marker at Abutment B, Beam 1, 1 EA. 5. Repair corrosion holes and areas of significant section loss in beams, LS. 6. Recast concrete bearing seats, 3 CF. Intermediate Repairs 1. Clean and paint all steel beams, 330 LF. 2. Patch wide cracks on abutment backwalls, 4 LF. 3. Provide protection on embankments to prevent future erosion, LS. 4. Resurface deck, LS. 5. Replace timber curbs, 134 LF. Long Term Repairs 1. Remove silt deposits and timber debris, LS. 2. Regrade both approaches, LS. 3. Remove debris from top of deck, LS. 4. Consideration should be given to replace this bridge with a 2 lane bridge. Page 3

9 BRIDGE INSPECTION REPORT COMMENTARY DECK Wearing Surface Top of Deck Bottom of Deck Curbs Poor, due to: Asphalt surface, 1/4 1/2 thick are worn out with up to 45% of timber surface exposed, particularly at wheel lines. Accumulation of debris up to 2 D, along both curbs and centerline. Fair, due to: Areas exposed to traffic worn up to 1/2 D, with 3/16 D hammer penetration. (See Photo 1) Three deck clips are bent upward on Abutment B end of bridge. Fair, due to: Penetration with hammer 1/8. White rot and moss growth, particularly towards Abutment B. Span 1 o Splits and checks up to 1/32 W throughout. o Notches for ties in span, C - channel beam. o o 3 rd plank from Abutment A backwall, Bay 3 Shake 1-0 L x 3 W x up to 1 D. Five areas of decay near 1 st diaphragm from pier, each up to 3 L x 1-0 W x 1/2 D. Poor, due to: Longitudinal splits up to 1/8 W, throughout both sides. Beam 1 side o Abutment A corner Decayed and broken mounting block. o Span 1 Split at mid-span, 1-0 L x 1 W x 1 D. o Section 4 Checking on top face up to 1 W, 9 LF x 1/4 D. o Abutment B end Checks 1/8 W and split up to 1-0 L x 1/2 W. Beam 5 side o Section 2 Broken section, 8 LF. (See Photo 2) o Span 2, section 3 Section is damaged on outside face. Page 4

10 BRIDGE INSPECTION REPORT COMMENTARY SUPERSTRUCTURE Bearings Girders, Beams or Slabs N/A, Beams rest directly on substructure. Poor, due to: Beams are 15 D, Span 1 and all beams in Span 2 are steel I-beams. Beam 3 in Span 1 is double steel back to back channels. Except for beams at pier in Span 2, all beams have been strengthened at ends with either channels, plates, or double angles for up to 3 LF. See Component Detail Sheets for information on beam defects and location of retrofits. (See Photos 3 to 12) Major deflection noticeable under some vehicular loads, Spans 1 and 2. Temporary timber blocking in place between beams with significant section loss at abutments. (See Photo 3) All beams at abutment and pier supports exhibit rust scale, with up to 1/16 section loss, evident for end 3 LF, supports on both flanges and webs. All other areas on beams exhibit surface rust and rust scale with pitting on top and bottom flanges and on webs. (See Photos 3 to 12) Beam anchor bolts and nuts missing, Abutment A and pier, Span 1 side, except on exterior side of Beam 1 at pier; remaining bolts and nuts have up to 15% section loss with heavy corrosion and rust scale. Span 1 o Abutment A end, Beams 2 and 3 Bottom flange strengthening plates are becoming detached at ends of beams. o Beam 1 Bowed approximately 1 out of plane toward downstream. o Beams 2 and 5 Bowed out of plane approximately 1/8. Span 2 o Beam 1 Permanent deflection of up to 1 on both sides of bottom flange. (See Photo 13) Beam is swept upwards up to ½ and up to ½ towards the downstream side. o Beam 2 Permanent deflection of up to 1/2. Diaphragms Bracing Paint Good No deficiencies noted. (only in Span 1 at 1/4 point from Abutment A and pier) Good, except for: (iron rods with hooks at each end at mid-span) Span 1 o Beam 1 Bracing connection is bent up to 2. o Beam 3 Heavy corrosion with section loss along ties throughout. Poor, due to: Paint system failed on all beams. Page 5

11 BRIDGE INSPECTION REPORT COMMENTARY SUBSTRUCTURE ABUTMENTS Backwalls Bearing Seats Breastwall Poor, due to: Abutment A, Bay 3 Vertical crack 1/4 W, 1-3 H. Abutment B o Bay 2 Diagonal crack 1 W, 1 LF. o Bay 3 Vertical full-height crack 1/8 W with edge spalling. (See Photo 14) o Bay 4 Vertical crack 1/16 W, 1-0 L. Spall (2 L x 5 H x 1/2 D) Poor, due to: Abutment A Spalls below the following beams, resulting in loss of bearing with beams not fully resting on bearing seats o Beam 1 Up to 3 L x 1-0 W x 4 H. o Beam 2 Up to 1 L x 8 W x 1-1/2 H. o Beam 3 Up to 4 L x 1-4 W x 6 H. o Beam 5 1/2 L x 5 W x 1/2 H. Spalls below the following beams at Abutment B o Beam 1 o 10 L x 2 W x 3 back. o At top Spall (5 L x 8 W x 1 H) resulting in loss of bearing with beam not fully resting on seat. o Beam 5 6 L x up to 11 H x 2 back. Abutment B o Accumulation of flood debris up to 1-0 H. Fair, due to: Typical rubble masonry wall with up to 1/4 W, cracking joints and deterioration of voids, mortar joints. Solid wood block anchored into Abutment A, water level, with decay. Erosion/Scour/Undermining Undermining below Abutment B, upstream end through Bay 3, 6 back under x up to 8 H, filled with mud and silt material. (See Photo 15) PIERS Settlement Bearing Seats None detected. Poor, due to: Spalls below beams, Span 1 face, pier resulting in loss of bearing with beams not fully resting on bearing seats o Beam 1 Up to 5 L x 4 W x 1 H. o Beam 2 Up to 5 L x 1-8 W x 1 H. o Beam L x 1-8 W x 1/2 H. On upstream side of retrofit horizontal leg full-width x 3 wide with loss of bearing area. o Beam 4 Up to 1-6 L x 2-0 W x up to 5 H. (See Photo 16) o Beam 5 Up to 8 L x 1-6 W x up to 2-1/2 H. Spalls below beams, Span 2 face, pier, resulting in loss of bearing, with beams not fully resting on seats o Beam 1 1 L x 7 W x 3 H. o Beam 2 Up to 1-8 L x up to 1-8 W x 3 H. o Beam L x 1-4 W x up to 1-1/2 H. Page 6

12 BRIDGE INSPECTION REPORT COMMENTARY o Beam 4 1/2 L x 1-6 W x 2-1/2 H. o Beam 5 1/2 L x 7 W x 2 H. Beams 2 and 3, Span 2 No longer seated on pier, due to seat spalls, up to 1/8 gap below Beam 2 and up to 1/2 gap below Beam 3. Walls Footings Erosion/Scour/Undermining Settlement Fair, due to: Rubble masonry walls with up to 1/4 W, cracks, light efflorescence, mortar joints and deterioration and voids in joints. Not visible. No deficiencies noted. No deficiencies noted. CHANNEL AND SLOPE PROTECTION Scour Channel scour up to 12-0 L x 12-0 W x 3-0 D, below both spans, near mid-span. Embankment Erosion Upstream o Channel meandering, creating erosion on Abutment A side, with exposed roots, 20-0 L x 2-0 W x up to 6-0 H, partially vegetated over, and up to 3 cut back. o Erosion from Abutment B, 40 LF x 8-0 H, 3 cut back with exposed roots. Downstream Erosion up to 8-0 H, 3 cut back with exposed roots on Abutment A side, approximately 100 D/S. (See Photo 17) Drift Upstream Fallen trees, up to 2-6 Dia. across channel, approximately 100 U/S. Sediment accumulation up to 1-10 D below Span 1. See attached Channel Profile Sheet. Flood debris on Abutment B seat, between beams, Bays 1-3, Span 1, and trapped in curb openings on top of deck. Minor debris at pier. Downstream o Fallen trees across channel approximately 60 D/S from Abutment A. o Rock and silt island, with tree growth and flood debris, in front of Span 1, 30 LF x 15-0 W x up to 2-0 H. o Rock accumulation for up to 1-0 H, front of Span 2. o Logs and drift, pier on Span 2 side. o Silt Island, 8-0 L x 4-0 W x 1-6 D near Abutment B. o Drift on embankment with several trees, up to 3-0 Dia on Abutment B side. (See Photo 18) Vegetation Vegetation growth at U/S end, Abutment B breastwall. Rip Rap/Slope Protection Adequacy of Opening Good No deficiencies noted. (grouted riprap along pier) Insufficient Creek tops bridge during floods with signs of overtopping, Abutment B side and flood debris on deck. Page 7

13 BRIDGE INSPECTION REPORT COMMENTARY FIELD POSTING Actual Posting No postings at bridge. One Lane Bridge posting at Abutment A and B approaches and are located too far from the bridge. R12-5 Posting Single: 10 T and Semi: 14 T at both approaches: o Abutment A approach Near intersection with Rte. 841 (Oakland Green Rd.) and it located too far from the bridge. (See Photo 19) o Abutment B approach No sign posted at bridge, however sign is posted approximately 1000 from Abutment B. Abutment B approach One Lane Bridge posting approximately 1,200 from bridge. Legibility Visibility Advanced Warning Signs (In accordance with latest version of the Virginia Supplement to the Manual of Uniform Traffic Control Devices (MUTCD), Part 2 Signs, Section 2B.59) OTHER APPROACH ITEMS TRAFFIC SAFETY FEATURES Bridge Railing Transitions Approach Guardrail Approach Guardrail Terminal Good No deficiencies noted. Good No deficiencies noted. Advance warning sign postings (Single: 10 T and Semi: 14 T) at both approaches: o Abutment A Advance warning near intersections for Rte. 784 (Ward Hill Rd.) and Rte. 841 (Oakland Green Rd.). o Abutment B Posted at Route 722 (Lincoln Rd.) intersection. Fair, due to: Potholes, up to 8 SF x up to 3 D scattered throughout Abutment A approach. 0 Does not meet current standards. No bridge railing present. (See Photo 20) 0 Does not meet current standards. No approach guardrail transitions present. 0 Does not meet current standards. No approach guardrails present. 0 Does not meet current standards. No approach guardrail end treatments present. OBJECT MARKERS Object markers are loose and coming out of ground with minor force. Abutment B, Beam 1 side Object marker has fallen over (Found during the second day of inspection). (See Photo 21) Page 8

14 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 1 Timber deck is worn up to 1/2 D where exposed by asphalt wear. Photo 2 Broken section of curb, Beam 5 side, Section 2. Page 9

15 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 3 Severe corrosion to bottom flange with retrofits on Beam 1, at Abutment A. Note temporary timber blocking. Photo 4 Multiple retrofits to Beam 1 end at Abutment A. Page 10

16 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 5 Corrosion hole with retrofits on Beam 2, Span 1, at pier. Photo 6 Corrosion hole and retrofit on Beam 4 at Abutment A. Page 11

17 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 7 Severe corrosion to bottom flange with retrofits on Beam 5 at Abutment A. Photo 8 Multiple retrofits to Beam 5 end at Abutment A. Page 12

18 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 9 Corrosion and retrofit on Beam 3, Span 1 at pier. Photo 10 Corrosion and retrofit on Beam 4, Span 1 at pier. Page 13

19 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 11 Corrosion hole with retrofit on Beam 3, Span 2 at pier. Photo 12 Corrosion hole with retrofit on Beam 3 at Abutment B. Page 14

20 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 13 Vertical deflection of Beam 1, Span 2. Photo 14 Vertical crack in Abutment B, Bay 3 backwall. Page 15

21 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 15 Undermining of Abutment B Breastwall at upstream end. Photo 16 Spall in bearing seat on pier, Span 1 side under Beam 4. Page 16

22 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 17 Erosion on downstream bank, Abutment A side. Photo 18 Drift on embankment, Abutment B side. Page 17

23 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 19 Abutment A approach load posting sign. Photo 20 Abutment A approach has no traffic safety features installed. Note also potholes on approach. Page 18

24 BRIDGE INSPECTION REPORT PHOTOGRAPHS Photo 21 Fallen object marker, Abutment B approach, Beam 1 side, found during second day of inspection. Page 19

25 BRIDGE INSPECTION REPORT CHANNEL PROFILE SHEET FOREST MILLS ROAD OVER TRIBUTARY OF CROOKED RUN UPSTREAM CHANNEL PROFILE (LOOKING DOWNSTREAM) W.S. = 7.7 W.S. =7.7 STA: ; Abut A STA: ; CL Curb Support STA: ; CL Curb Support STA: ; CL Curb Support STA: ; CL Curb Support STA: ; Pier Span #1 Face STA: ; Pier Span #2 Face STA: ; CL Curb Support STA: ; CL Curb Support STA: ; Abut B 2015 PROFILE 2013 PROFILE 2012 PROFILE 1987 PROFILE Readings Taken at Face of Abutments and Pier and at Curb Supports; Distance is to Top of Curb Page 20

26 BRIDGE INSPECTION REPORT CHANNEL PROFILE SHEET Upstream Channel Readings Station Location Abutment A CL Curb Support CL Curb Support Mid-span CL Curb Support CL Curb Support Pier Span #1 Face Pier Span #2 Face CL Curb Support Mid-span CL Curb Support Abutment B Page 21

27 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 22

28 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 23

29 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 24

30 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 25

31 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 26

32 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 27

33 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 28

34 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 29

35 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 30

36 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 31

37 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 32

38 BRIDGE INSPECTION REPORT COMPONENT DETAIL SHEETS Page 33

39 VIRGINIA DEPARTMENT OF TRANSPORTATION Intra-Departmental Memorandum Structure Preventative Maintenance Form To: From: Scott Brumfield NOVA Bridge Maintenance Manager Chee How, PE (Acting) District Bridge Safety Engineer Date: Route: Over: Tributary of Crooked Run City/County: 053 Loudoun Structure No: Inspected By: Volkert, Inc. Inspection Date: 01/16/2016 Inspection by the District Bridge Safety Inspection Team has revealed that the reference bridge requires Preventative maintenance. These items, with cost estimates are: Approximate Cost Date Work Performed Performed By Clean Deck X Seal Expansion Joints Clean Abutment Seats Clean Pier Seats X X Clean Bearings Clean Truss Panel Points Clean Debris from Scuppers Clean Other Sand and rock deposits under Span 1. X *Clear Debris Drift against pier and trees fallen across U/S and D/S channel. X Other (Identify) *May include removing silt from boxes/culverts/pipes, removing debris between steel beams or at piers. The above deficiencies were corrected on the dates indicated. Signature: NOVA Bridge Maintenance Manager Once the above deficiencies have been corrected, please forward the original of this form to the District Structure and Bridge Engineer.

2011 BRIDGE INSPECTION REPORT

2011 BRIDGE INSPECTION REPORT 2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030

More information

Four simply supported steel plate girders (appear to be an old railcar).

Four simply supported steel plate girders (appear to be an old railcar). BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report

Executive Summary RPT-GEN November 28. Bridge No Quartz Creek Bridge Inspection Report Executive Summary The No. 01607 carries the Trans-Canada Highway over Quartz Creek, approximately 45 km northwest of Golden, BC. As part of an Enhanced Bridge Inspection Program, the BC Ministry of Transportation

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017

Introduction. Substructure Inspection and Rating. Introduction. Introduction 28/03/2017 Introduction Substructure Inspection and Rating That portion of the bridge located below the bearings Abutments Piers Rated separately Purpose is to: Receive the loads from the superstructure Transfer

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection

Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection Questions and Answers on VDOT's Supplement to the AASHTO Manual for Bridge Element Inspection No. 1 2/26/2016 830 MSE Wall V 26 Is ADE 830 MSE Wall to be used in conjunction with NBE 218 Other Abutment

More information

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK

ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK ACCELERATED BRIDGE CONSTRUCTION PROJECT: THE REPLACEMENT OF MD 362 OVER MONIE CREEK Joseph Navarra, P.E, Maryland State Highway Administration, 410-545-8315, jnavarra@sha.state.md.us ABSTRACT The MDSHA

More information

2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency

2017 UNDERWATER BRIDGE INSPECTION REPORT. TWP 332 over ROOT RIVER. Date of Inspection: Equipment Used: 10/22/2016. Town or Township Highway Agency 2017 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # L4870 TWP 332 over ROOT RIVER DISTRICT: District 6 COUNTY: Fillmore CITY/TOWNSHIP: JORDAN STATE: Minnesota Date of Inspection: Equipment Used: 10/22/2016

More information

Conditional assessment of Kiri Bridge in Shkoder, Albania

Conditional assessment of Kiri Bridge in Shkoder, Albania Conditional assessment of Kiri Bridge in Shkoder, Albania Gentian Rexhaj 1, Enea Mustafaraj 2 1 2 Department of Civil Engineering, Epoka University, Albania 2 Department of Civil Engineering, Epoka University,

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CR

2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CR 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 88756 CR 597 over RICE RIVER DISTRICT: District 1 COUNTY: St. Louis CITY/TOWNSHIP: ANGORA STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016

More information

Using the sharp-crested weir formula the outflow was:

Using the sharp-crested weir formula the outflow was: Date: 2009 July 16 11:00 AM 14 Island Lake Dam Inspection Report Persons Present: Bryon Keene, P.Eng. Harry Stinson Brett Dark (14 Island Lake Association) Peter Peart (14 Island Lake Association) The

More information

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint

Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Potential For Fracture To Occur In Iowa DOT Steel Girder Bridges Due to Triaxial Constraint Introduction The purpose of this white paper is to provide information regarding the potential for fractures

More information

\\H\15\ PH9 Inspection Photos

\\H\15\ PH9 Inspection Photos SHOP SLIDE Photo 1. at cracking across the footpath at the end of the Hwy 2 EB to Hwy 684 SB off ramp at the 99 Ave. intersection. Drop in asphalt trail (background) has worsened since 2013 and is now

More information

Inspection Report. River Falls Hydroelectric Project FERC Project No. P Junction Falls Dam River Falls, Wisconsin.

Inspection Report. River Falls Hydroelectric Project FERC Project No. P Junction Falls Dam River Falls, Wisconsin. Inspection Report River Falls Hydroelectric Project FERC Project No. P-10489 Junction Falls Dam River Falls, Wisconsin Prepared for: River Falls Municipal Utilities River Falls, Wisconsin December 2009

More information

PENNDOT e-notification

PENNDOT e-notification PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 027 August 30, 2010 Release of Version 3.1.5.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)

More information

IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse)

IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT. Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) IL 115 OVER GAR CREEK ACCELERATED BRIDGE REPLACEMENT Chad Hodel, S.E., P.E. (WHKS) Stan Kaderbek, S.E., P.E. (Milhouse) AGENDA Project Overview and Need Design and Special Provisions Construction Engineering

More information

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014

Webinar Q&A Documentation Slide In Bridge Construction (SIBC) Construction/Contractor Perspective March 6, 2014 Updated: 5/15/14 1 What was driver for deciding to slide vs. roll? Overall weight? 2 1. Why the two different slide methods? 2. How much experience should your contractor have to perform the slide work?

More information

Ahmed Mongi, M.S., P.E. Engineering Division

Ahmed Mongi, M.S., P.E. Engineering Division 1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span

More information

1 Study the drawings and the installation. 2 Ensure that you have the correct components. 3 Follow the manufacturer s instructions

1 Study the drawings and the installation. 2 Ensure that you have the correct components. 3 Follow the manufacturer s instructions 1 Study the drawings and the installation plan ahead of time. Consider laying the components out in the approximate order in which they will be installed. This will help workers become familiar with the

More information

Modified Sheet Pile Abutment for Low-Volume Road Bridge

Modified Sheet Pile Abutment for Low-Volume Road Bridge Modified Sheet Pile Abutment for Low-Volume Road Bridge Ryan R. Evans Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 50011 ryevans@iastate.edu

More information

Appendix C Guidelines for Design of Integral Abutments March 3, 2003

Appendix C Guidelines for Design of Integral Abutments March 3, 2003 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT s and the UK Highways Agency. They provide guidance and outline the issues that need to be considered and should

More information

Integral Abutment Bridge Design with Soil Structure Interaction

Integral Abutment Bridge Design with Soil Structure Interaction Integral Abutment Bridge Design with Soil Structure Interaction Thursday, May 11, 2017 3:00 PM 4:00 PM EST Speaker Engineer: Suthichai Saelim Project Location WESTBOROUGH Railroad HOPKINTON Project Location

More information

APPENDIX A INTEGRAL ABUTMENTS

APPENDIX A INTEGRAL ABUTMENTS APPENDIX A INTEGRAL ABUTMENTS Appendix A Guidelines for Design of Integral Abutments Rev. 1 - September, 2007 These guidelines draw on the experiences and practices from Ontario, the FHWA, various DOT

More information

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge

Modular Steel Bridges. Stark County Fischer Bridge Bottineau County Oak Creek Bridge Modular Steel Bridges Stark County Fischer Bridge Bottineau County Oak Creek Bridge This John Deere grain hauler was too heavy for the bridge. OOPS! An excavator and tow truck are needed to remove the

More information

Emergency Bridge Stabilization at Mile Watrous Subdivision

Emergency Bridge Stabilization at Mile Watrous Subdivision Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)

More information

Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples

Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples Reducing Bridge Damage Caused by Pavement Forces Part 1: Some Examples BY MARTIN P. BURKE, JR. Innumerable bridges both in the U.S. and abroad have been, and continue to be, damaged by the restrained growth

More information

Shifting the Canning Bus Bridge Sideways

Shifting the Canning Bus Bridge Sideways Shifting the Canning Bus Bridge Sideways Ros MacKinlay Design Engineer, Wyche Consulting SYNOPSIS The Perth Mandurah railway proposed in 2002 required the replacement of an existing Kwinana Freeway bus

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014 Accent image here Primary Image here Presentation Outline Overview of the Project Scope ABC Project

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill.

Technology. Reinforced Earth Wall Typical Section. Traffic Barrier. Roadway. Select Granular Material. Facing Panel Random Backfill. Bridge Applications Technology The Reinforced Earth Company (RECo) offers a variety of bridge abutment and bridge crossing solutions, each are based on project specific requirements. Bridge abutments are

More information

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS

STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS STATE ROUTE 30 OVER BESSEMER AVE. SUPERSTRUCTURE REPLACEMENT IN 57 HOURS Louis J. Ruzzi P.E., PennDOT District 11-0 Bridge Engineer John Myler, PennDOT Assistant Construction Engineer, District 11-0 Bala

More information

STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END

STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END STUDY OF THE REASONS THAT INDUCE CRACKS AT BRIDGE DECK END by Zhengyu Liu Research Team: Zhengyu Liu, Graduate Research Student, Bridge Engineering Center, Iowa State University Brent M Phares, Director,

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39

STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 SITE NUMBER AND NAME: NC 52 Pembina River Bridge LEGAL DESCRIPTION: SE 1-50-9-W5M STONY PLAIN REGION GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY AND KM: Hwy 621:02, km 16.39 NAD 83 COORDINATES:

More information

5 DAMAGE TO TRANSPORTATION FACILITIES

5 DAMAGE TO TRANSPORTATION FACILITIES 5 DAMAGE TO TRANSPORTATION FACILITIES In the Kocaeli, Turkey earthquake of August 17, 1999, extensive damage of transportation facilities occurred in the Kocaeli and Sakarya region, Turkey as shown in

More information

SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION

SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION SUMMARY OF NOVEMBER 2018 REVISIONS - VERSION 3.2.5.0 Since the release of BRADD Version 3.2.4.3, several operational issues have been addressed. This release of BRADD Version 3.2.5.0 contains the following

More information

ACCELERATED BRIDGE REPLACEMENT

ACCELERATED BRIDGE REPLACEMENT Christopher Beck Chief Engineer: Bridge & Structures Northern Indiana Commuter Transportation District 601 North Roeske Avenue Michigan City, IN chris.beck@nictd.com Accelerated Bridge Replacement (ABR)

More information

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA

Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA Three Bridges at I-64/Mercury Boulevard Interchange in Hampton, VA IRFAN A. ALVI, P.E., Alvi Associates, Inc., Baltimore, MD IBC-02-25 KEYWORDS: box girder, counterweight abutment, curved girder, high-performance

More information

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report

research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report Final Report VTRC 06-R35 Virginia Transportation Research Council research report Field Measurements on Skewed Semi-Integral Bridge With Elastic Inclusion: Instrumentation Report http:/www.virginiadot.org/vtrc/main/online_reports/pdf/06-r35.pdf

More information

SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION

SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION SUMMARY OF NOVEMBER 2013 REVISIONS - VERSION 3.2.0.0 Since the release of BRADD Version 3.1.6.2, several major enhancements have been made to the software and many reported operational issues have been

More information

A STEP IN THE RIGHT DIRECTION: Presented By. Part I Problems Underfoot EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT. It Didn t Happen Overnight

A STEP IN THE RIGHT DIRECTION: Presented By. Part I Problems Underfoot EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT. It Didn t Happen Overnight 1 A STEP IN THE RIGHT DIRECTION: EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT FINAL,Sept 6, 07 1 Presented By Overland Park, Kansas, Public Works Department Dave Bergner, Superintendent Janet Luessenheide,

More information

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and

Rebuilding and widening the 54- year-old Jane Addams Memorial Tollway into a state-of-the-art corridor linking Rockford to Elgin (three lanes) and Overview Design criteria for I-90 over Kishwaukee Integral Abutment Bridges (IAB) Design Criteria Design analysis, details and construction Lessons Learned during construction Instrumentation by Illinois

More information

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes

Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes Analyses of State Highway Bridges Damaged in the Darfield and Christchurch Earthquakes J. H. Wood John Wood Consulting, Lower Hutt. ABSTRACT: 2012 NZSEE Conference Twelve State Highway (SH) bridges subjected

More information

EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT

EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT Norton et al. Word Count: 8400 Tables: 5 Figures: 13 1 EXAMINATION OF THE RESPONSE OF SKEWED STEEL BRIDGE SUPERSTRUCTURE DURING DECK PLACEMENT Date submitted: 08/01/02 Date Revised and Resubmitted: 11/15/02

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

EAH 422 ADVANCED WATER RESOURCES ENGINEERING

EAH 422 ADVANCED WATER RESOURCES ENGINEERING EAH 422 ADVANCED WATER RESOURCES ENGINEERING Bridge Hydraulics Prof. Aminuddin Ab. Ghani References The Art And Science Of River Engineering Bridge Failure Pier scour Pier scour Pier scour Bridge Failure

More information

MBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure.

MBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure. Scour Assessment Report Location Plan: Scale 1:5,000 MBW3-45 Score: 16.86 ELR: Contains Ordnance Survey data Crown copyright and database right 2010 Category: HIGH Assessment Date: 19/11/2010 Contract:

More information

Retrofit to improve earthquake performance of bridge abutment slopes

Retrofit to improve earthquake performance of bridge abutment slopes Proceedings of the Ninth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Society 14-16 April, 2011, Auckland, New Zealand Retrofit to improve earthquake performance of bridge

More information

Integral bridges and environmental conditions

Integral bridges and environmental conditions Integral bridges and environmental conditions COMISU CLAUDIU-CRISTIAN, BOACĂ GHEORGHITĂ Department of Roads and Foundations Faculty of Civil Engineering and Building Services The "Gheorghe Asachi" Technical

More information

Effect of Pile Orientation in Skewed Integral Abutment Bridges

Effect of Pile Orientation in Skewed Integral Abutment Bridges Effect of Pile Orientation in Skewed Integral Abutment Bridges RABIH NAJIB, Ph.D., PE, Alpha Corporation, Baltimore, Maryland and AMDE M. AMDE, Ph.D., PE, University of Maryland, College Park, Maryland

More information

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure

Lesner Bridge Replacement. April 24, 2017 Update. Construction Camera. Rendering of the Completed Lesner Bridge Structure Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A construction camera has been installed to view images of the bridge construction. Images are updated on

More information

Keywords: integral abutment bridge, pile head abutment connection, finite element method.

Keywords: integral abutment bridge, pile head abutment connection, finite element method. Global Journal of Researches in Engineering: e Civil And Structural Engineering Volume 15 Issue 1 Version 1.0 Year 2015 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global

More information

Bank Erosion and Bridge Scour

Bank Erosion and Bridge Scour JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP

More information

OVER US 6 LATERAL BRIDGE SLIDE: I-75

OVER US 6 LATERAL BRIDGE SLIDE: I-75 LATERAL BRIDGE SLIDE: I-75 OVER US 6 Bob Beasley, PE, Ohio Bridge Manager, Arcadis U.S., Inc. Todd Lezon, Regional Manager, Kokosing Construction Company, Inc. November 4, 2016 1 Agenda Design Bob Beasley,

More information

Aerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements

Aerial of Conceptual Path and Bridge Tysons-Old Meadow Road Bike/Ped Improvements Aerial of Conceptual Path and Bridge Barnes & Noble at One Place Project Location Corner Center Proposed Bridge Encore Condominiums Regency Club Condominiums Path continues to Dolley Madison Boulevard

More information

Rahvusvaheline puitarhitektuuri konverents

Rahvusvaheline puitarhitektuuri konverents Experiences from Modern Timber Bridge Building Rahvusvaheline puitarhitektuuri konverents Tallinn 25-26.11.2015 Hauke Burkart NPRA Bridge Section Topics Short history of modern Norwegian timber bridges

More information

COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES.

COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES. COMBINED APPLICATION OF ULTRASONIC INSPECTION AND ACOUSTIC EMISSION MONITORING FOR EVALUATION OF FRACTURE CRITICAL MEMBERS IN RAILWAY BRIDGES Authors D. Nyborg, Research Physicist, TISEC Inc., Montreal;

More information

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures

More information

Low-Volume Road Abutment Design Standards

Low-Volume Road Abutment Design Standards Low-Volume Road Abutment Design Standards V.W. Robbins HNTB Corporation 7450 W. 130th St., Suite 400 Overland Park, KS 66213 vrobbins@hntb.com F. Wayne Klaiber Bridge Engineering Center 418 Town Engineering

More information

Critically damaged bridges & concepts for earthquake recovery

Critically damaged bridges & concepts for earthquake recovery Critically damaged bridges & concepts for earthquake recovery J. Waldin, J. Jennings & P. Routledge Opus International Consultants Ltd, Christchurch, New Zealand 2012 NZSEE Conference ABSTRACT: This paper

More information

Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass

Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass Detailed Seismic Assessment and Seismic Improvements of Market Road Underpass D. Novakov, D. Ashby, T. Chin & A. George Opus International Consultants Ltd, Wellington - Auckland, New Zealand. G. Gregg

More information

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments

A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A Tale of Two Bridges: Comparison between the Seismic Performance of Flexible and Rigid Abutments A.M. Morsy. Department of Civil, Architectural, and Environmental Engineering, The University of Texas

More information

SelectTech 4.1 Bench. Assembly Manual

SelectTech 4.1 Bench. Assembly Manual SelectTech 4.1 Bench Assembly Manual Table of Contents Important Safety Instructions...3 Safety Warning Labels and Serial Number...4 Specifications...5 Before Assembly...5 Parts...6 Hardware...7 Tools...7

More information

SelectTech 4.1 Bench Assembly / Owner s Manual

SelectTech 4.1 Bench Assembly / Owner s Manual SelectTech 4.1 Bench Assembly / Owner s Manual This product is compliant with the applicable CE requirements. Table of Contents Important Safety Instructions...3 Safety Warning Labels and Serial Number...4

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

New AASHTO Bridge Inspection Process

New AASHTO Bridge Inspection Process New AASHTO Bridge Inspection Process Gary L. Bowling, Oregon DOT Oregon Department of Transportation How we got to where we are today The current AASHTO CoRe Element CS Descriptions use numerous general

More information

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes v. 12.0 SMS 12.0 Tutorial Objectives In this lesson will teach how to use conceptual modeling techniques to create numerical models that incorporate flow control structures into existing bathymetry. The

More information

Winona Bridge Visual Quality Review Committee

Winona Bridge Visual Quality Review Committee Winona Bridge Visual Quality Review Committee Summary of Preferred Features October 7, 2014 Creating Bridges As Art 1 Summary of Preferred Features Based on Visual Quality Review Committee Final Design

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image SURFACE WATER MODELING SYSTEM Feature Stamping 1 Introduction In this lesson you will learn how to use conceptual modeling techniques to create numerical models that incorporate flow control structures

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Update on Seismic Behavior and Design of

Update on Seismic Behavior and Design of Update on Seismic Behavior and Design of Steel Plate Girder Bid Bridges Ahmad M. Itani, Ph.D., P.E., S.E. Professor Department of Civil and Environmental Engineering University of Nevada, Reno Background

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

BEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE

BEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE BEHAVIOR AND ANALYSIS OF AN INTEGRAL ABUTMENT BRIDGE Paul J. Barr Marv W. Halling Conner Huffaker Hugh Boyle Utah State University Department of Civil and Environmental Engineering Logan, Utah September

More information

Bridge Office Trunk Highway Bridge Flood Response Plan

Bridge Office Trunk Highway Bridge Flood Response Plan Bridge Office Trunk Highway Bridge Flood Response Plan Updated 7/18/2012 Purpose Bridges are vulnerable to damage and failure during flooding. Scour may undermine the bridge foundations or remove the protection

More information

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015

L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Canterbury Bridge Group Ferrymead Bridge L. Greenfield Christchurch City Council M. Cowan Opus International Consultants W. du Plessis HEB Construction 26 March 2015 Presenter: Lloyd Greenfield Senior

More information

State-Aid Bridge News August 2, 2005

State-Aid Bridge News August 2, 2005 State-Aid Bridge News August 2, 2005 Bridge Hydraulic Information The FHWA has been inquiring about our Scour Program. In particular, there are two areas of concern; 1. Are our Scour Action Plans current

More information

Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction Precast Concrete Elements for Accelerated Bridge Construction Volume 3. Laboratory Testing, Field Testing, and Evaluation of a Precast Concrete Bridge: Black Hawk County Final Report January 2009 Sponsored

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY

More information

Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures

Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures InTrans Project Reports Institute for Transportation 9-2015 Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures Brent Phares Institute for Transportation, bphares@iastate.edu

More information

CHAPTER 5 MODELING OF THE BRIDGE

CHAPTER 5 MODELING OF THE BRIDGE 62 CHAPTER 5 MODELING OF THE BRIDGE 5.1 MODELING SAP2000, a nonlinear software package was used for modeling and analysing the study bridge. The following list provides details about the element type used

More information

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3

Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 F. W. Klaiber, D. J. White, T. J. Wipf, B. M. Phares, V. W. Robbins Development of Abutment Design Standards for Local Bridge Designs Volume 1 of 3 Development of Design Methodology August 2004 Sponsored

More information

Potholes: Prevent Before They Present

Potholes: Prevent Before They Present : Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.

More information

Fun With Foam Deep Injection

Fun With Foam Deep Injection Fun With Foam Deep Injection Stephen Cruise Environmental Resource Specialist Where were we? Original Project Culvert to Bridge Fish Passage Improvement Modular Concrete Block bridge design Pacific Bridge

More information

STANDARD 45G GUYED TOWER. includes REV. F & REV. G GENERAL USE FEATURES. Phone (309) Fax (309) The Industry Standard

STANDARD 45G GUYED TOWER. includes REV. F & REV. G GENERAL USE FEATURES. Phone (309) Fax (309) The Industry Standard G GUYED TOWERS 45G STANDARD 45G GUYED TOWER ROHN 45G The first. The original. includes REV. F & REV. G 45G GENERAL USE The 45G is a true multiuse structure that provides excellent strength for applications

More information

Figure 3: Analytic procedure

Figure 3: Analytic procedure International Journal of Scientific and Research ublications, Volume 7, Issue 5, May 2017 567 Investigation of Integral Bridge Effect under Dynamic Loading Haymanmyintmaung *,kyawlinnhtat ** * Department

More information

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam.

Bengt H. Fellenius. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot. Amsterdam. Wick Drains and Piling for Cai Mep Container Port, Vietnam, and the true cost of 5 cent per foot Bengt H. Fellenius Amsterdam May 27, 216 Fellenius, B.H. and Nguyen, M.H., 213. Wick Drains and Piling for

More information

SelectTech 3.1 Bench Assembly / Owner s Manual

SelectTech 3.1 Bench Assembly / Owner s Manual SelectTech 3.1 Bench Assembly / Owner s Manual This product is compliant with the applicable CE requirements. Congratulations on your commitment to fitness and your purchase of the Bowflex SelectTech 3.1

More information

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges

Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges Experimental investigation of axial load on low cycle fatigue performance of steel H piles in integral bridges *Memduh Karalar 1) and Murat Dicleli 2) 1) Department of Civil Engineering, Bülent Ecevit

More information

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE

DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE DATA GATHERING AND DESIGN DETAILS OF AN INTEGRAL ABUTMENT BRIDGE Abstract S. Hassiotis M. ASCE Stevens Institute of Technology, Hoboken, N.J. 07030 sophia.hassiotis@stevens.edu An integral-abutment bridge

More information

Earthquake Design of Bridges With Integral Abutments

Earthquake Design of Bridges With Integral Abutments 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Earthquake Design of Bridges With Integral Abutments J. H. Wood 1 ABSTRACT Because of the

More information

Stantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905)

Stantec Consulting Ltd Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) Fax: (905) Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 4, Page 1 of 10 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information