Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Size: px
Start display at page:

Download "Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey"

Transcription

1 Urban Drainage and Flood Control District Goldsmith Iliff Pond E-19 Survey GOLDSMITH ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver CO, 80203

2 Table of Contents TABLE OF CONTENTS... 2 INTRODUCTION... 3 SITE... 3 SURVEYED LOCATIONS... 4 RATING CURVE DEVELOPMENT... 7 SITE PHOTOGRAPHS...12 STUDY DATA...15 HISTORIC RECORDS...16 APPENDIX...18 Table 1 Rating Curve... 8 Table 2 HEC-RAS Profile Output Table...10 Table 3 Frequency/Discharge Table...15 Table 4 Survey Data...16 Figure 1 Location Map... 3 Figure 2 Vicinity Map... 4 Figure 3 Surveyed Points (Aerial - DRCOG 2004)... 5 Figure 3 Detailed Surveyed Points (Aerial - DRCOG 2004)... 6 Figure 4 HEC-RAS Cross Section with all Profiles... 9 Figure 5 HEC-RAS Log-Log Plot of Rating Table...11 Figure 6 Looking Downstream...12 Figure 7 Looking Upstream with Side Lateral Detention Culverts...12 Figure 8 Transmitter and Iliff Pond...13 Figure 9 Downstream Iliff...13 Figure 10 Side Lateral Culvert Outlets into Detention Pond...14 Figure 11 Scour Hole Downstream of Side Lateral Culvert Outlets...14 Figure Year Floodplain...15 Figure 13 June 3, 2005 Iliff Road Overtopped...16 Figure 14 June 3, 2005 Iliff Road Overtopped...16 Figure 15 June 3, 2005 Bike path overtopped into Iliff Pond...17 Goldsmith Iliff Pond E-19 Survey 2

3 Introduction HDR Engineering Inc. was contracted by the Urban Drainage and Flood Control District to survey and provide information about flood warning stream gage sites in a manner consistent with National Weather Service E-19 procedures. On October 13, 2006, HDR personnel surveyed the Goldsmith Gulch gages located at Iliff Pond. This report is a summary of the work done and information gathered for the dual gage configuration on Goldsmith Gulch at Iliff Pond. Included in this report are elevations of critical points in the vicinity of the site, estimates of stages causing flood damage in vicinity of the gage, and a rating curve. Site The stream gage is located on the south side, upstream, of Iliff Avenue on Goldsmith Gulch. The ALERT ID numbers for these gages are 653 (Goldsmith Gulch channel) and 654 (side channel detention pond). The National Weather Service LID is ILFC2 and is referred to as Goldsmith Gulch at Iliff Pond. There is an off channel detention pond to reduce the peak flood flows at this gage site. The Goldsmith Gulch floodplain at Iliff is fully developed at this location. Potential flooding at the gage itself would consist of flooding of homes, overtopping a recreation trail and Iliff Avenue. Figure 1 shows the location of the site on the Southeast District ALERT map. Figure 1 Location Map Goldsmith Iliff Pond E-19 Survey 3

4 Figure 2 Vicinity Map Surveyed locations Ground elevations were surveyed along a cross section for a rating curve for the site. In addition, the elevations and locations of hazard locations, along with low flow channel water surface elevations up and downstream from the gage. Figures 3-4 show the locations of the surveyed points in the vicinity of the gage. The base of the ALERT transmitter was surveyed at an elevation of for a temporary benchmark. The flow line elevation is 95.2 feet. The low flow channels banks will be overtopped at 2.5 feet above the invert elevation. Water will begin to overtop side weir to the detention pond at 4.6 feet above the invert elevation. Iliff Avenue will begin overtopping shortly after 653 reaches a stage of 7.5 feet. Based on the water surface elevations in the low flow channel, the estimated channel energy slope is 0.6 percent. Goldsmith Iliff Pond E-19 Survey 4

5 Flow Base of Transmitter Iliff Pond Figure 3 Surveyed Points (Aerial - DRCOG 2004) Goldsmith Iliff Pond E-19 Survey 5

6 Base of Transmitter Inlet Lateral Culverts Outlet Lateral Culverts Flow Figure 4 Detailed Surveyed Points (Aerial - DRCOG 2004) Goldsmith Iliff Pond E-19 Survey 6

7 Rating Curve Development Hydraulics for the weir and lateral culverts were evaluated using the HEC River Analysis System (HEC-RAS) program developed by the U.S. Army Corps of Engineers, Hydrologic Engineering Center 1. HEC-RAS uses the standard step method to calculate water surface profiles. The following assumptions are used by HEC-RAS in computing water surface profiles: Steady flow; Gradually varied flow; One-dimensional flow; Channel slopes are small, less than 1:10 A rating curve was established for the gage using the surveyed cross-sections and the Army Corps of Engineers computer program HEC-RAS. The resulting rating curve from the analysis is in Table 1. 1 U.S. Army Corps of Engineers, Hydrologic Engineering Center, HEC-RAS Water Surface Profiles, Computer Program, Davis, California, March Goldsmith Iliff Pond E-19 Survey 7

8 Q (U/S of Lateral Culverts) Q (D/S of Lateral Culverts - Gage Flow) Gage Stage Comments (cfs) (cfs) (ft) Out of Low Flow Channel Flow into Iliff Pond from Lateral Culverts Iliff Road and Side Weir Overtop Table 1 Rating Curve Goldsmith Iliff Pond E-19 Survey 8

9 Iliff Plan: Iliff with downstream culvert 4/25/2007 River =. Reach =. RS = Legend WS 1000 cfs WS 900 cfs WS 870 cfs WS 850 cfs WS 800 cfs WS 700 cfs Elevation (ft) Station (ft) WS 600 cfs WS 500 cfs WS 300 cfs WS 250 cfs WS 200 cfs WS 50 cfs WS 100 cfs WS 25 cfs Lat Struct Ground Bank Sta Figure 5 HEC-RAS Cross Section with all Profiles Denver County E-19 Surveys Goldsmith Iliff Pond 9

10 River Profile Q Total D/S of Side Culverts Min Ch El W.S. Elev E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Goldsmith Gulch Table 2 HEC-RAS Profile Output Table Denver County E-19 Surveys Goldsmith Iliff Pond 10

11 Iliff 10 Depth (ft) Flow (cfs) Figure 6 HEC-RAS Log-Log Plot of Rating Table Denver County E-19 Surveys Goldsmith Iliff Pond 11

12 Site photographs Figure 7 Looking Downstream Figure 8 Looking Upstream with Side Lateral Detention Culverts Denver E-19 Surveys Goldsmith Iliff Pond 12

13 Figure 9 Transmitter and Iliff Pond Figure 10 Downstream Iliff Denver E-19 Surveys Goldsmith Iliff Pond 13

14 Figure 11 Side Lateral Culvert Outlets into Detention Pond Figure 12 Scour Hole Downstream of Side Lateral Culvert Outlets Denver E-19 Surveys Goldsmith Iliff Pond 14

15 Study Data According to the November 17, 2005 City and County of Denver Colorado the Flood Insurance Study (FIS) for Goldsmith Gulch has a drainage area of approximately 8.0 square miles at the Mouth. The following table includes estimates of the frequencydischarge data from a December 2004 study entitled Evaluation of Debris and Flood Control on Goldsmith Gulch I-225 to Iliff Avenue : Frequency Peak Discharge (cfs) 10-year 1, year 1, year 2,200 Table 3 Frequency/Discharge Table Figure Year Floodplain Denver E-19 Surveys Goldsmith Iliff Pond 15

16 Historic records Since the installation date, a peak stage of 9.5 feet above the invert was recorded on June 3, Split flow occurs when the flow gets above the road and therefore an exact flow rate cannot be established with HEC-RAS. The following pictures are from this event. Figure 14 June 3, 2005 Iliff Road Overtopped Figure 15 June 3, 2005 Iliff Road Overtopped Denver E-19 Surveys Goldsmith Iliff Pond 16

17 Figure 16 June 3, 2005 Bike path overtopped into Iliff Pond Denver E-19 Surveys Goldsmith Iliff Pond 17

18 Appendix Goldsmith Gulch at Iliff Pond Point ID Northing (ft) Easting (ft) Elevation (ft) Description OP BS XSGR XSSIDEWALK XSSIDEWALK XSGR XSGR XSGR XSGR XSGR XSFL XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSSIDEWALK XSSIDEWALK LOWDAMAGE XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR TOPPEDBRDG FL FL XSSIDEWALK XSSIDEWALK XSGR XSGR XSGR Denver E-19 Surveys Goldsmith Iliff Pond 18

19 XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR FL FL FL XSSIDEWALK XSSIDEWALK XSGR XSGR WEIR WEIR XS XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSGR XSSIDEWALK XSCULDESAC WEIR WEIR LC TOPPTTUBE FL WATERSURFACE XSSIDEWALK XSSIDEWALK XS XSGR XSGR XSGR XSGR XSGR XSGR XSGR Denver E-19 Surveys Goldsmith Iliff Pond 19

20 XSGR XSGR XSGR XSGR WATERSURFACE CVLVERT LCTRASHRACK LCCULVERTT TOPTRASHRACK ROADCURB ROADCROWN TOPPOND BOTTOMPOND BOTTOMPOND BOTTOMPOND TOPOND INTERSECTION BOTTOMPOND TOPPOND BOTTOMPOND BOTTOMPOND BOTTOMPOND TOPPOND CENTERPOND TOPPTTUBE CNTROUTWEIR EDGECONCRETE BOTMSCURHOLE BOTTOMPTTUBE BASETRANSMITTER Table 4 Survey Data Denver E-19 Surveys Goldsmith Iliff Pond 20

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of

More information

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016 Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Mike Harvey Mussetter Engineering, Inc. WORK CONDUCTED FOR: New Mexico

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 3, 200 by Nadeem Majaj Approximately 575,000 bridges are built over waterways in the US. The most common

More information

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

EAH 422 ADVANCED WATER RESOURCES ENGINEERING

EAH 422 ADVANCED WATER RESOURCES ENGINEERING EAH 422 ADVANCED WATER RESOURCES ENGINEERING Bridge Hydraulics Prof. Aminuddin Ab. Ghani References The Art And Science Of River Engineering Bridge Failure Pier scour Pier scour Pier scour Bridge Failure

More information

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

Dynamic Routing Applied to an Urban Subsurface Drainage System

Dynamic Routing Applied to an Urban Subsurface Drainage System Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview

More information

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: 415-473-7226 lizlewis@marincounty.org SAN ANSELMO TOWN COUNCIL MEETING 9/26/17 SAN ANSELMO FLOOD RISK REDUCTION PROJECT

More information

CHAPTER 11 APPENDIX D

CHAPTER 11 APPENDIX D OFFICE OF STRUCTURES STRUCTURE HYDROLOGY AND HYDRAULICS DIVISION CHAPTER 11 APPENDIX D SCOUR COUNTERMEASURES FOR PIERS AND ABUTMENTS MAY 2015 Maryland SHA Office of Structures, Chapter 11, Appendix D May2015Page

More information

ABSCOUR 9 USERS MANUAL

ABSCOUR 9 USERS MANUAL OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as

More information

Flood Hydrology. for. Michigan Watercourses

Flood Hydrology. for. Michigan Watercourses Flood Hydrology for Michigan Watercourses Michigan Hydrologic Methodologies FEMA Flood Insurance Study (FIS) Statistical Analysis of USGS Gage Data (Gage) Statistical Models for Estimating Flow Characteristics

More information

Hydrau-Tech, Inc. Engineering & Software

Hydrau-Tech, Inc. Engineering & Software Hydrau-Tech, Inc. Engineering & Software HYDRAU-TECH, INC. H ydrau-tech, Inc. is an engineering consulting firm specializing since 1986 in openchannel hydraulics, watershed, river, and reservoir sedimentation,

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020 December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,

More information

F-VC Stream Reach Summary

F-VC Stream Reach Summary F-VC Stream Reach Summary Study Reach: F-VC, Vasquez Creek - Denver Water Diversion downstream to confluence of Fraser River. Reach Description: Approximate channel length: 5 ½ miles with an average channel

More information

Two Dimensional Computer Modeling of

Two Dimensional Computer Modeling of \N P? v&cu&ae yoomk Two Dimensional Computer Modeling of Green River at Dinosaur National Monument and Canyonlands National Park For: Water Rights Branch Water Resources Division National Park Service

More information

Draft. Not yet Approved. Natural Waterways 2012

Draft. Not yet Approved. Natural Waterways 2012 Natural Waterways 2012 3.1 General 1 3 5 3.1.1 Scope (2012) 1 3 5 3.1.2 Importance (1992) R(2012) 1 3 5 3.2 Hydrologic Capacity of Waterway Openings1 1 3 5 3.2.1 General (2012) 1 3 5 3.2.2 Drainage Basin

More information

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency Middle Fork American River Project (FERC Project No. 2079) 2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency 144 Ferguson Road Auburn,

More information

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.

More information

Bridge Office Trunk Highway Bridge Flood Response Plan

Bridge Office Trunk Highway Bridge Flood Response Plan Bridge Office Trunk Highway Bridge Flood Response Plan Updated 7/18/2012 Purpose Bridges are vulnerable to damage and failure during flooding. Scour may undermine the bridge foundations or remove the protection

More information

MBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure.

MBW3-45 ELR: No coring surveys have been found for this structure. There are no records of any previous inspections of the structure. Scour Assessment Report Location Plan: Scale 1:5,000 MBW3-45 Score: 16.86 ELR: Contains Ordnance Survey data Crown copyright and database right 2010 Category: HIGH Assessment Date: 19/11/2010 Contract:

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

CR5 Stream Reach Summary

CR5 Stream Reach Summary CR5 Stream Reach Summary Study Reach: CR5, Colorado River - Williams Fork confluence downstream to the KB Ditch. Reach Description: Approximate channel length: 6.75 miles, approximate channel slope 0.3%.

More information

Missouri River Stage Trends Technical Report

Missouri River Stage Trends Technical Report Missouri River Stage Trends Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska September 2017 Paragraph MISSOURI

More information

CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS

CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS CORPS OF ENGINEERS, U. S. ARMY CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS HYDRAULIC MODEL INVESTIGATION TECHNICAL MEMORANDUM NO. 2-355 CONDUCTED FOR CHICAGO DISTRICT, CORPS OF ENGINEERS BY WATERWAYS EXPERIMENT

More information

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics

More information

Bank Erosion and Bridge Scour

Bank Erosion and Bridge Scour JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP

More information

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,

More information

MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY

MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 STUDY OBJECTIVES... 1 3.0 STUDY AREA... 2 3.1 Upper Adjustable Study Reach (RM 3.5-3.7)...

More information

Backwater rise due to driftwood accumulation

Backwater rise due to driftwood accumulation HAZARD AND RISK ASSESSMENT (ANALYSIS, EVALUATION) Backwater rise due to driftwood accumulation Isabella Schalko 1 ; Dieter Brändli 2 ; Lukas Schmocker, Dr. 1 ; Volker Weitbrecht, Dr. 1 ; Robert Michael

More information

An Overview of Scour Types and Scour-Estimation Difficulties Faced at Bridge Abutments

An Overview of Scour Types and Scour-Estimation Difficulties Faced at Bridge Abutments An Overview of Scour Types and Scour-Estimation Difficulties Faced at Bridge Abutments Robert Ettema, Tatsuaki Nakato, and Marian Muste IIHR ~ Hydroscience and Engineering Department of Civil and Environmental

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Cooperating Agencies US Army Corps of Engineers Philadelphia District Delaware River Basin Commission Pennsylvania

More information

NORTH DAKOTA 2011 FLOOD EVENT

NORTH DAKOTA 2011 FLOOD EVENT NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River

More information

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data)

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed

More information

ATTACHMENT B8 Incident History

ATTACHMENT B8 Incident History Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...

More information

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006 Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and

More information

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a

More information

Memorandum AECOM tel fax ABN

Memorandum AECOM tel fax ABN AECOM Australia Pty Ltd Level 10, Tower Two 727 Collins Street Melbourne VIC 3008 Australia www.aecom.com +61 3 9653 1234 tel +61 3 9654 7117 fax ABN 20 093 846 925 Memorandum To David Hitchcock Page 1

More information

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual MONTANA FLUME User s Manual i Montana (Short Parshall) Flume User s Manual TABLE OF CONTENTS Introduction to the Montana Flume... 1 Function... 1 Design... 1 Standards... 2 Accuracy... 3 Dimensions...

More information

ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA

ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS RIVER FLOW MANAGEMENT BY TULSA DISTRICT HYDROLOGY AND HYDRAULICS BRANCH AND LITTLE ROCK DISTRICT HYDROLOGY

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Wallowa Falls Habitat Modeling Results

Wallowa Falls Habitat Modeling Results Wallowa Falls Habitat Modeling Results Preliminary Results for IFIM Stakeholder Meeting La Grande, OR April 25, 2013 1.0 INTRODUCTION This document provides the results of the instream flow incremental

More information

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and

More information

APPENDIX K Hydrology and Hydraulics Figures

APPENDIX K Hydrology and Hydraulics Figures APPENDIX K Hydrology and Hydraulics Figures This Page Intentionally Left Blank. Dallas Floodway EIS Alt. 1 vs Existing 368 366 364 362 A.T. & S.F. RR Corinth Street I.H. 35E N.B. I.H. 35E S.B. Jefferson

More information

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the

The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the 2 The short path seepage area is between the dam embankment and the bend in the existing drainage tunnel. This area is highlighted in red on the picture in the top left hand corner. Water in this pathway

More information

Red River Valley Association 91st Annual Convention

Red River Valley Association 91st Annual Convention Red River Valley Association 91st Annual Convention Michael Biggs, P.E., CFM Chief, Hydraulics & Technical Services Branch Little Rock District 18 February 2016 US Army Corps of Engineers Little Rock District

More information

Salinas Valley Water Project Annual Flow Monitoring Report

Salinas Valley Water Project Annual Flow Monitoring Report Salinas Valley Water Project Annual Flow Monitoring Report Operational Season 2013 Monterey County Water Resources Agency 893 Blanco Circle Salinas, CA 93901 April 2014 Revised July 2014 TABLE OF CONTENTS

More information

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

Technical Memorandum. Andrew Kopania, EMKO Environmental Karen Spinardi, Spinardi Associates. Prepared by: Nathan Foged, Supervising Engineer

Technical Memorandum. Andrew Kopania, EMKO Environmental Karen Spinardi, Spinardi Associates. Prepared by: Nathan Foged, Supervising Engineer 701 Pike Street, Suite 1200 Seattle, WA 98101 Technical Memorandum Phone: 206-624-0100 Fax: 206-749-2200 Prepared for: CEMEX Construction Materials, Inc. Project Title: Eliot Facility Reclamation Plan

More information

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly

More information

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark

More information

February 6, 2018 Boulder, CO James Creek & Left Hand Creek

February 6, 2018 Boulder, CO James Creek & Left Hand Creek Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda

More information

Fun With Foam Deep Injection

Fun With Foam Deep Injection Fun With Foam Deep Injection Stephen Cruise Environmental Resource Specialist Where were we? Original Project Culvert to Bridge Fish Passage Improvement Modular Concrete Block bridge design Pacific Bridge

More information

Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No: County of Butte Contract Number: 18050

Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No: County of Butte Contract Number: 18050 10540 White Rock Road, Suite 180 Rancho Cordova, California, 95670 Tel: 916-444-0123 phone Fax: 916-635-8805 fax Prepared for: Butte County Department of Water Resource Conservation (BCDWRC) Project No:

More information

Dade County, Missouri

Dade County, Missouri Dade County, Missouri Natural Hazard Mitigation Plan FEMA APPROVED FINAL DRAFT June 2014 Dade County, Missouri Natural Hazard Mitigation Plan For Dade County, its Incorporated Communities, School Districts

More information

APPENDIX B: REFERENCE LIST

APPENDIX B: REFERENCE LIST APPENDIX B: REFERENCE LIST 1 Arroyo Corte Madera del Presidio Corte Madera Creek Miller Creek Novato Creek Storm Water Pollution Prevention Program (MCSTOPPP) 1999 Ambient Monitoring Program 2 Corte Madera

More information

Parcel Data for Primary Planning Areas Included in Draft IGA Feb. 12, Page 1 of 8

Parcel Data for Primary Planning Areas Included in Draft IGA Feb. 12, Page 1 of 8 Area 1: Caribou Ranch-Sherwood Gulch 158311000036 158311000035 158311000034 158311000033 Area Floodplain? 879 COUNTY RD 128W (LOT 5) 4.2 F 0 No Yes 873 COUNTY RD 128W (LOT 4) 4.65 F 0 No Yes 865 COUNTY

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation 2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual

Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Resource # 07-135 (04/16) 2 2016 American Concrete Pipe Association, all rights reserved. The last comprehensive inspection of

More information

Four simply supported steel plate girders (appear to be an old railcar).

Four simply supported steel plate girders (appear to be an old railcar). BRIDGE INSPECTION BRIDGE NO./NAME N4-005: Akolkolex Crawford FSR (19.0 km) Inspection Date: September 22 nd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure

More information

NCHRP REPORT (2)

NCHRP REPORT (2) National Cooperative Highway Research Program NCHRP REPORT 4-5 () ABUTMENT SCOUR IN COHESIVE MATERIALS J.-L. Briaud, H.-C. Chen, K.-A Chang, S. J. Oh, X. Chen October 009 Transportation Research Board

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT

VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT VIRGINIA DEPARTMENT OF TRANSPORTATION NORTHERN VIRGINIA DISTRICT STATE BRIDGE NO. 6081 CITY OR COUNTY 053 LOUDOUN TYPE OF BRIDGE REPORT: REGULAR INSPECTION JANUARY 2016 BRIDGE NAME: DIRECTION: FOREST MILLS

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012 Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Cooperating Agencies Delaware River Basin Commission Pennsylvania Fish & Boat Commission Pennsylvania

More information

PRELIMINARY GEOTECHNICAL DESIGN

PRELIMINARY GEOTECHNICAL DESIGN PNCC Manawatu River Pedestrian/ Cycle Bridge PRELIMINARY GEOTECHNICAL DESIGN 1 Introduction Opus has been commissioned by the Palmerston North City Council (PNCC) to prepare a Detailed Business Case (DBC)

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft

Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft The following is a summary Rationale for Five Agency Alternative BDCP Initial Project

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

on the Lehigh River Public Information Workshop

on the Lehigh River Public Information Workshop Recreational Enhancements on the Lehigh River Public Information Workshop 16 February 2011 Cooperating Agencies US Army Corps of Engineers Philadelphia l District i Delaware River Basin Commission Pennsylvania

More information

Identifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming

Identifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming Identifying Number MPC-354 Project Title: Geotechnical Limit to Scour at Spill-through Abutments University: The University of Wyoming Principal Investigators: Robert Ettema PhD, PE College of Engineering

More information

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map RTKC- East Abutment Extension November 15, 2016 2.1. Figure 1. East Abutment Extension General Vicinity Map WP NATURAL RESOURCE CONSULTING, INC. 4 RTKC- East Abutment Extension November 15, 2016 2.2. Figure

More information

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image SURFACE WATER MODELING SYSTEM Feature Stamping 1 Introduction In this lesson you will learn how to use conceptual modeling techniques to create numerical models that incorporate flow control structures

More information

Table of Contents. Introductory Command Message & Foreword Table of Contents

Table of Contents. Introductory Command Message & Foreword Table of Contents EP 310-1-6a Introduction Section 1 Introduction Section 2 Principles and Guidelines Section 3 Program Plan and Documentation Section 4 Design Standards Section 5 Identification Signs Introductory Command

More information

Hanson Dam s mysteries solved

Hanson Dam s mysteries solved Hanson Dam s mysteries solved Hanson: Earth dams are expected to leak MIKE ARCHBOLD; STAFF WRITER STAFF WRITER LAST UPDATED: APRIL 27TH, 2011 06:34 AM (PDT) It had the makings of a doomsday scenario. Two

More information

Scour at Contracted Bridges

Scour at Contracted Bridges NCHRP Web-Only Document 83 (Project 24-14): Contractor s Final Report and Appendix A Scour at Contracted Bridges Prepared for: National Cooperative Highway Research Program Submitted by: C.R. Wagner, D.S.

More information

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes v. 12.0 SMS 12.0 Tutorial Objectives In this lesson will teach how to use conceptual modeling techniques to create numerical models that incorporate flow control structures into existing bathymetry. The

More information

Dissolved Oxygen Study Report

Dissolved Oxygen Study Report Dissolved Oxygen Study Report Richland Creek McCabe Park Nashville, Tennessee WATER QUALITY MONITORING PROGRAM 2011 Prepared August 2012 by Monette Rebecca, Executive Director World Wildlife Fund and Tennessee

More information

National Levee Database

National Levee Database National Levee Database NLD/MLI Integration June 2013 US Army Corps of Engineers USACE Levee Safety Program Mission Work with stakeholders to assess, communicate, reduce and then manage the residual risks

More information

\\H\15\ PH9 Inspection Photos

\\H\15\ PH9 Inspection Photos SHOP SLIDE Photo 1. at cracking across the footpath at the end of the Hwy 2 EB to Hwy 684 SB off ramp at the 99 Ave. intersection. Drop in asphalt trail (background) has worsened since 2013 and is now

More information

Russian River Estuary Management Project

Russian River Estuary Management Project Russian River Estuary Management Project Marine Mammal Protection Act Incidental Harassment Authorization Report of Activities and Monitoring Results January 1 to December 31, 2013 Prepared for Office

More information

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report INITIAL ANNUAL INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION Initial Annual RCRA CCR Unit Inspection Report PRIMARY BASIN NUMBER 2 SURFACE IMPOUNDMENT Submitted

More information

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross Fully Air Conditioned 44,000 SF Retail/Flex Center ± 2,543 Sq. Ft. Showroom/Warehouse Full Glass Window

More information

Summary of Technical Analysis

Summary of Technical Analysis Introduction The following presentation was provided during a public meeting listening session on June 8, 2017 regarding the establishment of a protective elevation for White Bear Lake. This information

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID

More information