1 SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: SAN ANSELMO TOWN COUNCIL MEETING 9/26/17
2 SAN ANSELMO FLOOD RISK REDUCTION PROJECT Agenda 1. San Anselmo Project Nursery 3000 SFD Blvd + Removal of Building at San Anselmo Avenue 2. Hydraulic Modeling Results 3. Project Update including Environmental Review San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 2
3 San Anselmo Flood Risk Reduction Project Flood Diversion 3000 SFD Blvd- Fairfax Removal of Building at 634 San Anselmo Avenue Flood flow barriers Creek enhancement
4 Ross Valley Flood and Watershed Project Timeline Today Corte Madera Creek Flood Risk Management Project (US Army Corps) Corte Madera Creek Flood Risk Management Project Phase 1 San Anselmo Flood Risk Reduction Project Lower Corte Madera Creek Improvements (Phoenix Lake Grant Migration) Azalea Ave. Bridge Madrone Ave. Bridge Nokomis Ave. Bridge Winship Ave. Bridge Projects with Multiple Flood Reduction Elements Bridge Replacements and/or Modifications Environmental Review Complete Bridge Ave & Sycamore Ave./Center Blvd. Bridges
5 Peak Discharges at Ross Creek Gage San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 5
6 Review of Hydraulic Modeling Maps 2 - DIMENSIONAL MODEL SHOWING FLOW IN CREEKS AND FLOODPLAINS
7 10 year flood event video EXISTING CONDITIONS VS WITH PROPOSED PROJECT
8 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 10-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Any Flooding Increase downstream? Area in blue no longer floods during 10-year event Proposed project reduces depth of flooding by up to 2.1 ft. None shown in San Anselmo 8
9 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 25- YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Reduces inundation depth by up to 0.6 ft or 7.2 Any Flooding Increase Downstream? Limited near the Winship Bridge
10 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT+ BRIDGES AND EXISTING CONDITIONS FOR 25-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (UPPER) Summary of Results Any Flooding Increase downstream? Reduces inundation extent by 26% Reduces inundation depth by up to 1.0 ft None
11 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 10-YEAR FLOOD-Lower SAN ANSELMO AREA Summary of Results Nearly eliminates 10-year flooding in downtown San Anselmo None Any Flooding Increase?
12 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT AND EXISTING CONDITIONS FOR 25-YEAR FLOOD-Lower SAN ANSELMO AREA Summary of Results Reduces inundation depth by up to 0.5 ft Any Flooding Increase? Slightly increases flood water elevations in the area between Winship and Barber Bridges
13 CHANGE IN HEC-RAS-SIMULATED INUNDATION EXTENT AND DEPTH BETWEEN SAN ANSELMO PROJECT+ BRIDGES AND EXISTING CONDITIONS FOR 25-YEAR FLOOD DOWNTOWN SAN ANSELMO AREA (Lower) Summary of Results Any Flooding Increase? Reduces inundation depth by up to 0.7 ft Limited just downstream of Winship Bridge
14
15
16 634 San Anselmo Avenue-Open for Business UPDATE The Marin County Board of Supervisors approved an option to purchase the building at 634 San Anselmo Avenue for $1.75 million. Option to purchase contingent upon EIR being approved in Spring 2018 Businesses in downtown San Anselmo are operating as normal and will continue to do so for the foreseeable future. If businesses are required to move for the project, the District will provide ongoing financial and advisory assistance to the businesses to help with the move and set up in a new location. Every effort will be made to help those businesses who wish to remain in San Anselmo to find available commercial spaces in the Town - wherever possible. District staff will keep the public and business owners fully informed about the project on a regular basis. San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 16
17
18 San Anselmo Flood Risk Reduction Project Proposed view from corner of Tamalpais and San Anselmo Avenue Blasen Landscape Architecture
19 Oct 2016 San Anselmo Project Timeline Phase 1 Memorandum of Agreement between San Anselmo and District approved to perform CEQA and Feasibility Engineering Apr 20, 2017 Dec 17/Jan 2018 Project EIR Public Scoping Meeting Public Draft EIR Release-45 day review/comment period Apr 2018 Apr 2018 Apr 2018 Jan 2019 Dec 2020 Final Project EIR Public Hearing Final EIR certification at Board of Supervisors meeting (merits project approval meeting) Finalize design work for San Anselmo Project, secure permits, possible property acquisition and business relocation activities. Community outreach continues. Construction begins (planning for construction in either 2019 or 2020). Outreach continues during construction. Construction completed. Community outreach continues
20 Stakeholder and Community Input MEETINGS TO LEARN ABOUT PRELIMINARY DESIGN AND GATHER FEEDBACK Fairfax Town Council September 6 San Anselmo Town Council-Sept. 26 Ross Town Council-Oct 10 Flood Zone 9 Advisory board meeting-dec. 19 Draft EIR Public Hearing Jan San Anselmo Flood Risk Reduction Project September 26, 2017 Slide 20
21 Thank You! Rossvalleywatershed.org
MERA NEXT GEN SYSTEM
1 MERA NEXT GEN SYSTEM SUBSEQUENT ENVIRONMENTAL IMPACT REPORT SCOPING MEETING May 31, 2018 2 MERA Member Agencies City of Belvedere Town of Corte Madera Town of Fairfax City of Larkspur City of Mill Valley
More informationPrepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates
CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared
More informationLessons learned in multi-objective urban detention basin projects
Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban
More informationAdam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico
Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to
More informationUrban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey
Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver
More informationLake Zumbro Restoration Project Timeline (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015
Lake Zumbro Restoration Project Timeline 2005-2015 (Draft) Prepared by Terry Lee, Olmsted Water Resources Manager June 25, 2015 2005 3/31/05 Lake Zumbro Improvement Association appointed a Lake Restoration
More informationFebruary 6, 2018 Boulder, CO James Creek & Left Hand Creek
Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda
More informationJim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006
Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and
More informationDon Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description
Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID
More informationDeKalb County All Hazards Mitigation Plan Annual Evaluation Report
Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT June 13, 2018 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2018-050 LOCATION: PROJECT NAME: 2200 Waukegan
More informationALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT
ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT STAFF REPORT TO: Members of the Castro Valley Municipal Advisory Council MEETING DATE: September 12, 2016 RE: Draft Medical Cannabis Dispensary
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: Meeting Date: February 18, 2014 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: City Manager s Office Prepared by: Cory Bytof Volunteer & Sustainability Program Coordinator City Manager
More informationAlluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow
Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Mike Harvey Mussetter Engineering, Inc. WORK CONDUCTED FOR: New Mexico
More informationDynamic Routing Applied to an Urban Subsurface Drainage System
Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview
More informationPEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:
PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE
More informationConsideration of an Ordinance Establishing Regulation of Single Use Carryout Bags
STAFF REPORT City Council of the City of Sausalito AGENDA TITLE: Consideration of an Ordinance Establishing Regulation of Single Use Carryout Bags RECOMMENDATION: 1. Staff presentation and Council questions
More informationUpdates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer
Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Presented by Jim Winterle November 14, 2017 EAA Modeling Team: Angang Al Liu Ned Troshanov Andi Zhang Jim Winterle
More informationCORTE MADERA TOWN COUNCIL STAFF REPORT TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE CIVIL ENGINEER
CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 12, 2016 MEETING DATE: October 18, 2016 TO: FROM: SUBJECT: PURPOSE: TOWN MANAGER, MAYOR AND MEMBERS OF THE TOWN COUNCIL KELLY CROWE, ASSOCIATE
More informationWhat Costs How Much Where in Marin County
What Costs How Much Where in Marin County Paragon Real Estate Mid-Year 207 Review of 2 Months Sales Sales Prices by City & Bedroom Count The Median Sales Price is that price at which half the properties
More informationCommercial Cannabis in Los Angeles County
Commercial Cannabis in Los Angeles County PRESENTATION TO THE EMPOWERMENT CONGRESS HEALTH SUBCOMMITTEE Joseph M. Nicchitta, Cannabis Management Officer Transitioning Out of an Unregulated Cannabis Industry
More informationCity of Santa Rosa Comprehensive Cannabis Ordinance & Program Implementation
City of Santa Rosa Comprehensive Cannabis Ordinance & Program Implementation City Council December 12, 2017 Clare Hartman, Deputy Director - Planning Planning and Economic Development 1 Santa Rosa Cannabis
More informationNORTH DAKOTA 2011 FLOOD EVENT
NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River
More informationAPPENDIX B: REFERENCE LIST
APPENDIX B: REFERENCE LIST 1 Arroyo Corte Madera del Presidio Corte Madera Creek Miller Creek Novato Creek Storm Water Pollution Prevention Program (MCSTOPPP) 1999 Ambient Monitoring Program 2 Corte Madera
More informationLions Gate Secondary Wastewater Treatment Plant
Lions Gate Secondary Wastewater Treatment Plant Lions Gate Public Advisory Committee June 26, 2012 Orbit 6241100 Lions Gate Secondary Wastewater Treatment Plant Building a working relationship with the
More informationCycle Elements Amended Goals, Objectives, and Policies ESR (Effective August 13, 2018) County Ordinance No City Ordinance No.
Tallahassee-Leon County Comprehensive Plan: Table of Amended Policies, 1991-2018 (in reverse order) Cycle Elements Amended Goals, Objectives, and Policies 2018-2 ESR (Effective August 13, 2018) County
More informationCotton Belt Regional Rail Corridor Project
Cotton Belt Regional Rail Corridor Project Public Meeting November 2017 0 Meeting Focus Today s discussion focuses on Impacts & Proposed Mitigation Large volume of material to cover Request that questions
More informationPort of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter
Port of Portland Hillsboro Airport Master Plan Update Planning Advisory Committee Charter Charter Purpose The purpose of this charter is to define the role of the Planning Advisory Committee () within
More informationMARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT
MARIN CLEAN ENERGY ADDENDUM NO. 5 TO THE REVISED COMMUNITY CHOICE AGGREGATION IMPLEMENTATION PLAN AND STATEMENT OF INTENT TO ADDRESS MCE EXPANSION TO CONTRA COSTA COUNTY; THE CITIES OF CONCORD, MARTINEZ,
More informationWelcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008
Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Cooperating Agencies US Army Corps of Engineers Philadelphia District Delaware River Basin Commission Pennsylvania
More informationCorte Madera Sales Tax Measure B
Corte Madera Sales Tax Measure B JANUARY 16, 2018 PRESENTED BY: TODD CUSIMANO, TOWN MANAGER DARIA CARRILLO, FINANCE DIRECTOR PETER BROWN, PUBLIC WORKS DIRECTOR SALES TAX MEASURE BACKGROUND In 2013, the
More informationOne Community At A Time
One Community At A Time Who We Are Kids Central: Building Better Lives Kids Central, Inc. is the nonprofit human service agency selected to be the Community- Based Care Child Welfare Lead Agency for Florida
More informationTOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 6/05/15
TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 6/05/15 6th Annual ENTER RAFFLE TO WIN PRIZES! Presents FREE Community-wide Hands-Only CPR and AED Training (Training is NON-certified) Saturday, June
More informationCity of Santa Rosa Comprehensive Cannabis Policy
City of Santa Rosa Comprehensive Cannabis Policy Council Policy Subcommittee September 12, 2017 David Guhin, Director Clare Hartman, Deputy Director - Planning Planning and Economic Development 1 Santa
More informationPEACHLAND CREEK WATERSHED (Second Year of Snowline Data)
Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed
More informationApril 17, 2018 City Council Workshop
April 17, 2018 City Council Workshop Community Engagement Plan 5TH AVENUE DEVELOPMENT COMMUNITY ENGAGEMENT OUTREACH & INPUT OPPORTUNITIES AS OF 12/19 OUTREACH & INPUT OPPORTUNITIES AS OF 4/17 254 ENEWSLETTERS
More informationTECHNICAL APPENDIX. E. PMT Meeting #5
TECHNICAL APPENDIX E. PMT Meeting #5 PMT Meeting #5 Agenda INT GLENWOOD ST & STATE ST STUDY, BOISE ITD PN A020(049), Key No. 20049 / ACHD PN 317045 October 26, 2017-10:00 AM to 12:00 PM ITD District 3
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL PROJECT APPROVAL, PRELIMINARY ENGINEERING, AND DESIGN SERVICES FOR CENTRAL MARIN REGIONAL PATHWAYS GAP CLOSURE PROJECT SEPTEMBER 2018 Submit proposal to: R.J. Suokko, Senior Civil
More informationSalinas Valley Water Project Annual Flow Monitoring Report
Salinas Valley Water Project Annual Flow Monitoring Report Operational Season 2013 Monterey County Water Resources Agency 893 Blanco Circle Salinas, CA 93901 April 2014 Revised July 2014 TABLE OF CONTENTS
More informationRA INTERIM FLOW PROGRAM RECOMMENDATIONS: Updated April 12, 2013
RA INTERIM FLOW PROGRAM RECOMMENDATIONS: Updated April 12, 2013 Background On April 10 I received a new Allocation and Default Flow Schedule (Allocation) from Reclamation that was based on the April 1
More informationRationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft
Rationale for Five Agency Proposed Alternative BDCP Initial Project Operations Criteria May 18, 2011 Working Draft The following is a summary Rationale for Five Agency Alternative BDCP Initial Project
More informationNatural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review
Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and
More informationHydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District
Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff
More informationRestoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012
Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals
More informationCommunity Meeting: Local Cannabis Policy in Oroville
Community Meeting: Local Cannabis Policy in Oroville May 24, 2018 Presented by: Neil Hall, Cannabis Lead Kyle Tankard, Consultant Agenda Welcome/Introduction Cannabis 101 Presentation Public Comment Period
More informationMerced, California Next Steps and Strategies for Successful Implementation of Cannabis-Related Health and Safety Regulations
Merced, California Next Steps and Strategies for Successful Implementation of Cannabis-Related Health and Safety Regulations Presented by: Neil Hall Arcelia Herrera May 9, 2017 4745 Mangels Blvd, Fairfield,
More informationThe Center for Outreach and Community Care
The Center for Outreach and Community Care Annual Report 2013-2014 P r e p a r e d b y : C h i l d a n d Y o u t h C a r e A p r i l 2 0 1 4 TABLE OF CONTENTS EXECUTIVE SUMMARY 2 i History of the Outreach
More informationCotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017
Cotton Belt Regional Rail Corridor Project DART Board Committee of the Whole Briefing November 1, 2017 0 Agenda Schedule Project Overview Noise Methodology and Impact Analysis Mitigation and Discussion
More informationCARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager
CARSON CITY FREEWAY April 9, 2014 Nevada Transportation Conference Jeff Lerud, PE, CPM Senior Project Manager Presentation Overview Carson Freeway Overview Construction Phases Schedule Budget Questions
More informationPublic Hearing Summary Report
Public Hearing Summary Report FM 457 Swingbridge Replacement At Gulf Intracoastal Waterway (GIWW) near Sargent FM 457 Matagorda Co CSJ: 0605-01-060 Alan Migl, Yoakum District TABLE OF CONTENTS Public Hearing
More informationPROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES. United States National Advisory Committee on Oceans And Atmosphere
Accession No.: 93-12 PROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES United States National Advisory Committee on Oceans And Atmosphere U.S. National Advisory Committee on Oceans And Atmosphere
More informationMaywood Chemical Company Superfund Site ADMINISTRATIVE RECORD. Document Number MISS- 127.
Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Chemical Company Superfund Site ADMINISTRATIVE RECORD Document Number MISS- 127. Cooperative Guidance Group P.O. Box 811 l Maywood. NJ 07607-0811
More informationSausalito City Council October 30, 2018
Sausalito City Council October 30, 2018 Interim Urgency Marijuana Ordinance JANUARY 9, 2018 Ordinance Amendment and Extension (10 months and 15 days) Original Urgency Ordinance: Ordinance No. 1248 Ordinance
More informationBLUE UMBRELLA PROJECT: Building a Dementia Friendly Community in Blind River
Slide 1 BLUE UMBRELLA PROJECT: Building a Dementia Friendly Community in Blind River Lisa Meschino Dementia Friendly Communities Coordinator Blind River The Alzheimer Society of Sault Ste. Marie launched
More informationMoved by S. Kuperis, seconded by R. Santiago, that the minutes of the Homelessness Action Advisory Committee, held July 16,2015, be adopted.
September 10, 2015, at 3:02 p.m., in Room 530, located at 32315 South Fraser Way, Abbotsford BC Committee Members Present: Chair - N. McCready; and R. Santiago Councillor D. Loewen ; G. Glaim; S. Kuperis;
More informationVintage and Nonconforming Amendments to Salt Lake City s Sign Ordinance
BRIEFING MEMO PLANNING DIVISION DEPARTMENT of COMMUNITY and NEIGHBORHOODS ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
More informationProgress from the Patient-Centered Outcomes Research Institute (PCORI)
Progress from the Patient-Centered Outcomes Research Institute (PCORI) Anne Beal, Chief Operating Officer of the Patient-Centered Outcomes Research Institute Sharon-Lise Normand, Vice Chair, Methodology
More informationMARIN COUNTY HAZARDOUS & SOLID WASTE MANAGEMENT JOINT POWERS AUTHORITY
MARIN COUNTY HAZARDOUS & SOLID WASTE MANAGEMENT JOINT POWERS AUTHORITY Board of Directors Meeting & Public Hearing February 23, 2017 Central Marin Police Authority 250 Doherty Drive, Larkspur, CA 9:00
More informationTOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 4/07/17
TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 4/07/17 awaycomedanceth e n ight 2017 8PM-10PM FREADMISION&REFRESHMENTS FORMOREINFORMATION www.cmparksandrec.org 415-927-5072 cortemaderaparks& recreation
More informationWelcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010
Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Cooperating Agencies Delaware River Basin Commission Pennsylvania Fish & Boat Commission Pennsylvania
More informationRecreational Marijuana Town of Mammoth Lakes Proposed implementation of Prop 64 April 26, 2017
Recreational Marijuana Town of Mammoth Lakes Proposed implementation of Prop 64 April 26, 2017 Workshop summary Personal Use Taxation State licensing requirements for marijuana sales Current Town regulations
More informationA mandatory pre-proposal meeting will be held on Tuesday, July 9, 2013 at 1:00 p.m. at the City Hall Multi Purpose Room.
INVITATION FOR REQUEST FOR PROPOSAL CLOCK TOWER RENOVATIONS GREEN RIVER, WYOMING Notice is hereby given that the City of Green River through the coordination of Green River URA/Main Street Agency (hereafter
More informationTOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 11/06/15
TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 11/06/15 TOWN OF CORTE MADERA PLANNING COMMISSION AGENDA Tuesday, November 10, 2015 Council Chambers, 300 Tamalpais Drive, Corte Madera, California
More informationSustainable Detrick. Outreach, Partnerships, Transformation and Continuous Improvement. Neighborhood Advisory Council Update
Sustainable Detrick Outreach, Partnerships, Transformation and Continuous Improvement Neighborhood Advisory Council Update COL Judith D. Robinson Commanding 20 September 2010 Fort Detrick, Maryland Fort
More informationon the Lehigh River Public Information Workshop
Recreational Enhancements on the Lehigh River Public Information Workshop 16 February 2011 Cooperating Agencies US Army Corps of Engineers Philadelphia l District i Delaware River Basin Commission Pennsylvania
More informationHYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE
HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0
More informationTOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 9/11/15
TOWN OF CORTE MADERA FRIDAY MAILING FOR WEEK ENDING: 9/11/15 AGENDA CORTE MADERA TOWN COUNCIL AND SANITARY DISTRICT NO. 2 BOARD TOWN HALL COUNCIL CHAMBERS 300 TAMALPAIS DRIVE TUESDAY, SEPTEMBER 15, 2015
More informationGuam Early Hearing Detection and Intervention
Guam Early Hearing Detection and Intervention Project Riko hi: Reducing Loss to Follow-Up after Failure to Pass Newborn Hearing Screening and at All Levels of the Hearing Continuum Quarterly Meeting, March
More informationMedical Cannabis Uses
Medical Cannabis Uses Comprehensive Ordinance Cannabis Policy Subcommittee February 16, 2017 David Guhin, Director Clare Hartman, Deputy Director-Planning Planning and Economic Development 1 City Response
More informationMatrix of Strong Local Smokefree Multi-Unit Housing Ordinances
Matrix of Strong Local Smokefree Multi-Unit Housing Ordinances February 2019 Cities and counties in California have led the way on many secondhand smoke issues throughout the years by passing groundbreaking
More informationPublic Workshop Industry Professional Outreach June 5, 2017 Robert J. Cabral Agricultural Center
Public Workshop Industry Professional Outreach June 5, 2017 Robert J. Cabral Agricultural Center 1 Workshop Agenda u INTRODUCTION u The Cannabis Policy Project u What Can the County Regulate? u Workshop
More information601 TAMALPAIS DRIVE CORTE MADERA, CA
6,477 SF Retail Available for Lease Conceptual Elevation Existing Stand-Alone Retail Opportunity John Cumbelich & Associates is pleased to present this rare, stand-alone retail opportunity in the heart
More informationTALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION
TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of
More informationCorte Madera Chronicles
Corte Madera Chronicles November 17, 2017 IN THIS ISSUE Announcements from CMPA....Pg. 3 PG&E: Know Your Overhead Lines.....Pg. 4 What s Happening in Town this week.......pg. 5 What s Happening in Marin....Pg.
More informationDodge County Drainage Board
Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128
More informationNEVADA DISASTER RESPONSE FLOOD JANUARY 2017 NORTHERN NEVADA
NEVADA 2-1-1 DISASTER RESPONSE FLOOD JANUARY 2017 NORTHERN NEVADA ACTIVITIES OUTCOMES / RESOLUTION Purpose Objectives January 6, 2017 Nevada 2-1-1 was contacted by Washoe County Emergency Operations Center
More informationCORTE MADERA TOWN COUNCIL STAFF REPORT. Tracy Hegarty, Administrative Analyst, Planning & Building Reviewed by Phil Boyle, Senior Planner
CORTE MADERA TOWN COUNCIL STAFF REPORT REPORT DATE: October 31, 2018 MEETING DATE: November 5, 2018 TO: FROM: Honorable Mayor and Members of the Town Council Tracy Hegarty, Administrative Analyst, Planning
More informationWASHOE COUNTY EMERGENCY MEDICAL SERVICES : Five-Year Strategic Plan
WASHOE COUNTY EMERGENCY MEDICAL SERVICES 2017-2021: Five-Year Strategic Plan 2017 W a s h o e C o u n t y E M S O v e r s i g h t P r o g r a m 1 The Washoe County Emergency Medical Services (EMS) Five-
More informationEconomic Development. Periodic Report January August Committee Periodic Report
Economic Development Periodic Report January August 2015 Presented by Staff and Committee September 15, 2015 1 The Committee Executive Committee Jenelle Osborne, Chair Jeremy Ball Tom Davidson Maria Hall,
More informationCommunity Health Equity Needs Assessment and Implementation Plan Process
Community Health Equity Needs Assessment and Implementation Plan Process Stephen Wade Health Equity Policy Analyst Washtenaw County Public Health January 2017 History Coalition of HIP Partnership Existed
More informationMRERP EIS Individual Scoping Meeting Summary Bismarck, North Dakota August 18, 2009 October 28, 2009
MRERP EIS Individual Scoping Meeting Summary Bismarck, North Dakota August 18, 2009 October 28, 2009 MEETING OVERVIEW The United States Army Corps of Engineers (USACE) and United States Fish and Wildlife
More informationIf you have questions or need additional information, please contact us. Attachment: Prior Lake Outlet Annual Operations Report, Year 2008
January 16, 2009 Ms. Janell Miersch, Area Hydrologist Metro Region of Waters Department of Natural Resources 1200 Warner Road St. Paul, Minnesota 55106 Prior Lake Outlet Annual Operations Report, Year
More informationLakewood Ranch CDD Supervisor Orientation. January 10, :00 p.m.
Lakewood Ranch CDD Supervisor Orientation January 10, 2017 2:00 p.m. CDD s in the State of Florida Counties 67 General Purpose Government; Constitutional or Charter Mandated Responsibilities Tax Collection,
More informationCounty of Santa Clara Department of Agriculture and Environmental Management Integrated Waste Management Division MEMORANDUM
County of Santa Clara Department of Agriculture and Environmental Management Integrated Waste Management Division 1553 Berger Drive, Bldg. #1 San Jose, CA 95112 (408) 282-3180 Fax (408) 282-3188 www.reducewaste.org
More informationTwo-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota
Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional
More informationWELCOME! Public Hearing: FM 969 Improvements December 13, 2016
WELCOME! Public Hearing: FM 969 Improvements December 13, 2016 FM 457 Public Hearing September 1, 2015 Agenda Introductions Project overview Technical overview Environmental overview Right-of-way overview
More information2 Lanes vs. 4 Lanes. A Community Information Session About the South Phoenix Light Rail Expansion. Saturday, September 15, 2018
2 Lanes vs. 4 Lanes A Community Information Session About the South Phoenix Light Rail Expansion Saturday, September 15, 2018 2017 Bailey Strategic Innovation Group Over 300 Questions Answered Principles
More informationWHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA. In Aurora
WHAT NEIGHBORS WANT TO KNOW ABOUT RETAIL MARIJUANA In Aurora WWW.AURORAGOV.ORG/AMED LEGALIZING RETAIL MARIJUANA IN COLORADO In 2010, Aurora voters opposed a ballot question that would have allowed medical
More informationCHARLES B. FOSTER, JR COLLECTION
152 CHARLES B. FOSTER, JR COLLECTION FOLDER DESCRIPTION DATE Letters 1 1 Letter. Geo. R. Wickham, Acting Commissioner, General Land Office, Dept. of Interior to Secretary of the Interior. Re: application
More informationWindsor Solar Project Water Assessment Report APPENDIX A
Windsor Solar Project Water Assessment Report APPENDIX A Supplementary Information APPENDIX A1 Official Plan Mapping DOUGALL AVE HURON CHURCH RD DOMINION BLVD WALKER RD GEORGE AVE OUELLETTE AVE HOWARD
More informationCalaveras County TRL Evaluation Reporting Plan
Calaveras County 07-10 TRL Evaluation Reporting Plan Evaluation Activity Plan (3.2.1) Objective: By June 30, 2010, the City Council of Angels Camp will adopt a tobacco retail licensing policy as a result
More information1. Reconfirm and approve the goals and objectives for the La Honda Parking and Trailhead Access Feasibility Study project.
R-19-39 Meeting 19-09 April 9, 2019 AGENDA ITEM AGENDA ITEM 1 Formation of the La Honda Public Access Working Group GENERAL MANAGER S RECOMMENDATIONS 1. Reconfirm and approve the goals and objectives for
More informationHydraulic Fracturing Test Site (HFTS)
Hydraulic Fracturing Test Site (HFTS) > July 10, 2013 > Trevor Smith > Gas Technology Institute Hydraulic Fracturing Test Site (HFTS) A field-based hydraulic fracturing research program. 1. Improve cost
More informationHow to Integrate Peer Support & Navigation into Care Delivery
How to Integrate Peer Support & Navigation into Care Delivery Andrew Bertagnolli, PhD Care Management Institute Why Integrate Peer Support into the Care Delivery Pathway? Improved health Increased feelings
More informationReferences: 1/18/05 References R-1
References: AGRA Infrastructure, 2000, Strategies to Reduce the Cost of Converting Septic Tanks to Community Sewers in Washoe County (Septic to Sewer Conversion Study) final Report, prepared for Washoe
More informationNational Levee Database
National Levee Database NLD/MLI Integration June 2013 US Army Corps of Engineers USACE Levee Safety Program Mission Work with stakeholders to assess, communicate, reduce and then manage the residual risks
More informationCITY OF JANESVILLE. City Council Meeting August 10, 2015
CITY OF JANESVILLE City Council Meeting August 10, 2015 JANESVILLE NOON LIONS CLUB www.janesvillenoonlions.org/ Janesville Noon Lions Lions Club International founded in Chicago in 1917 46,000 local clubs
More informationNevada County Mental Health Board Minutes
Nevada County Mental Health Board Minutes Date: November 02, 2018 Time: 9:30 a.m. 12:00 p.m. Place Behavioral Health Department 500 Crown Point Circle, Grass Valley STANDING ORDERS 1. Call to Order Self-introductions
More informationCommercial Vacant Land
PROPERTY HIGHLIGHTS 2911 Piedmont Rd. Atlanta, GA 30305 $378,000, 2.61 acres Located in Pinnacle Business Center, Norcross, GA Intersection of Beaver Ruin Rd & Pinnacle Way Nearby the newest green space
More information