1 Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008

2 Project Overview Routing Methodologies Comparison of Results System outfall Downstream of outfall Practical modeling considerations

3 Project Location Floyd Branch Beltline Large diameter Box Culvert system Watershed is highly urbanized I-75 Kaufman Outfall Existing site includes retail, 10-story bank building, industrial facilities, and Spring Creek BBQ Open channel crosses several major roads and DART downstream

4 Project Overview Study Phase Hydrologic model in HEC-HMS 8 total basins contribute 500 ac to Kaufman LAG ROUTINGS for large pipes Hydraulic model in HEC-RAS Upstream study limit = Kaufman outfall (3-9 x7 ) Kaufman Outfall

5 Existing Infrastructure JB in NB 75 Frontage Road

6 Existing Infrastructure JB in NB 75 Frontage Road Standing in 9 x6 ; looking at 2-7 x4 outfall to the south and 5 x4 inlet from the west

7 Project Overview Concept Phase Preliminary improvements to upstream pipe system Hydraulic analysis in StormCAD User input peak flows from HMS Manual flow splitting for existing and proposed conditions Proposed alternatives for 25- and 100-year protection Ignored inlet capacity

8 Project Overview Design Phase Design of upstream pipe system improvements Hydraulic analysis and routing in EPA SWMM 5.0 Dynamic model solves full St. Venant equations, which account for momentum and acceleration terms ignored in steady state analysis User input hydrographs from HMS Modeled both conduits, streets, and flow splitting simultaneously Ignored inlet capacity

9 Kaufman Outfall

10 Flow Comparison at Kaufman Outfall Peak Discharge at Kaufman (Q p ) Return Period (yr) HMS SWMM % Decrease

11 Kaufman Outfall (100-year) HMS SWMM Q p = 3520 cfs Q p = 3183 cfs (10% reduction) Q (cfs) Time (min)

12 Kaufman Outfall (25-year) HMS SWMM 3000 Q p = 2604 cfs 2500 Q p = 2391 cfs (8% reduction) 2000 Q (cfs) Time (min)

13 Kaufman Outfall (5-year) HMS SWMM Q p = 1680 cfs Q p = 1346 cfs (20% reduction) 1200 Q (cfs) Time (min)

14 Kaufman Outfall (2-year) HMS SWMM 1500 Q p = 1213 cfs 1200 Q p = 1063 cfs (12% reduction) 900 Q (cfs) Time (min)

15 Practical Results Cost savings! Structure/Link Study Design Cost Savings (%) Hydraulic Highway (900 lf) 2-9 x6 2-8 x5 26 Realign existing 2-8 x42 x4 (500 lf) 2-8 x4 1-8 x4 50 Junction Boxes

16 Phillips Street Bridge Improvements Phillips Street (670-ft downstream of Kaufman Outfall) Reduced peak 7% DART (1200-ft downstream of Kaufman Outfall) Reduced peak 10%

17 HEC-HMS Model Update Step 1: From existing conditions SWMM model, obtain hydrograph at pipe system outfall (Kaufman) Step 2: In HMS, replace basins C1-C8 with hydrograph from SWMM Step 3: Compare flows downstream Location (Distance 100-yr Peak Discharge (Q p ) from Kaufman, ft) HMS SWMM % Decrease Kaufman Phillips (670) DART (1200) Spring Valley (2790)

18 Phillips - 670' Downstream (100-year) HMS SWMM 4000 Q p = 3625 cfs 3000 Q p = 3362 cfs (7% reduction) Q (cfs) Time (min)

19 DART ' Downstream (100-year) HMS SWMM Q p = 4825 cfs Q p = 4332 cfs (10% reduction) 3000 Q (cfs) Time (min)

20 Spring Valley ' Downstream (100-year) HMS SWMM 6000 Q p = 5071 cfs Q p = 4512 cfs (11% reduction) Q (cfs) Time (min)

21 Other modeling considerations Design Time & Cost (StormCAD vs. SWMM) Existing condition modeling more intense in SWMM due to an increased level of input Proposed condition modeling effort drastically reduced due to elimination of manual iteration in flow splitting Increased accuracy level of routing in large pipes with SWMM as opposed to HMS (none in StormCAD!) Inlet analysis weirs in EPA SWMM are sometimes unstable leading to model reliability concerns. Client/Audience consideration

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016 Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of

More information

THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY

THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY THE CITY OF BRYANT, ARKANSAS SAMPLING AND TESTING PLAN FOR SITE SPECIFIC TESTING FOR COPPER AND ZINC BRYANT WASTEWATER TREATMENT FACILITY NPDES PERMIT NO. AR342 ORIGINAL SUBMISSION DATE: NOVEMBER 16, 215

More information

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual

MONTANA FLUME. User s Manual. Montana (Short Parshall) Flume User s Manual MONTANA FLUME User s Manual i Montana (Short Parshall) Flume User s Manual TABLE OF CONTENTS Introduction to the Montana Flume... 1 Function... 1 Design... 1 Standards... 2 Accuracy... 3 Dimensions...

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

Flood Hydrology. for. Michigan Watercourses

Flood Hydrology. for. Michigan Watercourses Flood Hydrology for Michigan Watercourses Michigan Hydrologic Methodologies FEMA Flood Insurance Study (FIS) Statistical Analysis of USGS Gage Data (Gage) Statistical Models for Estimating Flow Characteristics

More information

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: 415-473-7226 lizlewis@marincounty.org SAN ANSELMO TOWN COUNCIL MEETING 9/26/17 SAN ANSELMO FLOOD RISK REDUCTION PROJECT

More information

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics

More information

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.

More information

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020 December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,

More information

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 3, 200 by Nadeem Majaj Approximately 575,000 bridges are built over waterways in the US. The most common

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Presented by Jim Winterle November 14, 2017 EAA Modeling Team: Angang Al Liu Ned Troshanov Andi Zhang Jim Winterle

More information

Stormwater Mitigation Worksheet

Stormwater Mitigation Worksheet Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:

More information

ABSCOUR 9 USERS MANUAL

ABSCOUR 9 USERS MANUAL OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as

More information

Hydrau-Tech, Inc. Engineering & Software

Hydrau-Tech, Inc. Engineering & Software Hydrau-Tech, Inc. Engineering & Software HYDRAU-TECH, INC. H ydrau-tech, Inc. is an engineering consulting firm specializing since 1986 in openchannel hydraulics, watershed, river, and reservoir sedimentation,

More information

The New S in SSES. Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen

The New S in SSES. Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen The New S in SSES Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen Outline Introduction to the City s program plan Current program status Data collection Statistical analysis /

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data)

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed

More information

Bank Erosion and Bridge Scour

Bank Erosion and Bridge Scour JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Cavitation. Cameron Fritz, John Glover, Maia Griswold

Cavitation. Cameron Fritz, John Glover, Maia Griswold Cavitation Cameron Fritz, John Glover, Maia Griswold CIVE 401, Hydraulic Engineering Dr. P.Y. Julien November 19, 2014 Table of Contents Introduction Page 1 Theory Page 2 Failures Page 5 Prevention Page

More information

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation 2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William

More information

APPENDIX K Hydrology and Hydraulics Figures

APPENDIX K Hydrology and Hydraulics Figures APPENDIX K Hydrology and Hydraulics Figures This Page Intentionally Left Blank. Dallas Floodway EIS Alt. 1 vs Existing 368 366 364 362 A.T. & S.F. RR Corinth Street I.H. 35E N.B. I.H. 35E S.B. Jefferson

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town

More information

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow

Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Alluvial Bar Morphology and Dynamics in the Middle Rio Grande: Application to Habitat Restoration for the Rio Grande Silvery Minnow Mike Harvey Mussetter Engineering, Inc. WORK CONDUCTED FOR: New Mexico

More information

Greensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring

Greensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring Greensboro s Confirmation: Documenting I/I Reduction in North Buffalo Basin with Post Rehabilitation Flow Monitoring November 2017 Chris Nesbit, PE, BCEE, Meredith Miller, PE, CDM Smith and Robbie Bald,

More information

CHAPTER 11 APPENDIX D

CHAPTER 11 APPENDIX D OFFICE OF STRUCTURES STRUCTURE HYDROLOGY AND HYDRAULICS DIVISION CHAPTER 11 APPENDIX D SCOUR COUNTERMEASURES FOR PIERS AND ABUTMENTS MAY 2015 Maryland SHA Office of Structures, Chapter 11, Appendix D May2015Page

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0

More information

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,

More information

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

Identifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming

Identifying Number MPC-354. Project Title: Geotechnical Limit to Scour at Spill-through Abutments. University: The University of Wyoming Identifying Number MPC-354 Project Title: Geotechnical Limit to Scour at Spill-through Abutments University: The University of Wyoming Principal Investigators: Robert Ettema PhD, PE College of Engineering

More information

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017

Cotton Belt Regional Rail Corridor Project. DART Board Committee of the Whole Briefing November 1, 2017 Cotton Belt Regional Rail Corridor Project DART Board Committee of the Whole Briefing November 1, 2017 0 Agenda Schedule Project Overview Noise Methodology and Impact Analysis Mitigation and Discussion

More information

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager

CARSON CITY FREEWAY. April 9, Nevada Transportation Conference. Jeff Lerud, PE, CPM Senior Project Manager CARSON CITY FREEWAY April 9, 2014 Nevada Transportation Conference Jeff Lerud, PE, CPM Senior Project Manager Presentation Overview Carson Freeway Overview Construction Phases Schedule Budget Questions

More information

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures

More information

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff

More information

American Society of Highway. Beardsley Connector Project. Jacob Dean

American Society of Highway. Beardsley Connector Project. Jacob Dean American Society of Highway Engineers (ASHE) Beardsley Connector Project Gary Fromm, PE Design Manager Jacobs Jacob Dean Project Manager Haydon Building Corp. Thinking Outside the Box: Why Go In Circles?

More information

Project Background and Need

Project Background and Need Date: May 31, 2018 To: Robert McHaney, AICP; Susan Maclay, MBA From: Roma Stevens, P.E., PTOE Subject: Operational Analysis for Extending Palomino Lane to Grissom Road Project Background and Need The proposed

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor

More information

Ahmed Mongi, M.S., P.E. Engineering Division

Ahmed Mongi, M.S., P.E. Engineering Division 1 Ahmed Mongi, M.S., P.E. Engineering Division 2 Honey Creek Bridge Completed in 2006 at a cost of $2.6 Million Precast pier caps and abutments. 3 Honey Creek Bridge Bridge closed for 60 days Simple span

More information

F-VC Stream Reach Summary

F-VC Stream Reach Summary F-VC Stream Reach Summary Study Reach: F-VC, Vasquez Creek - Denver Water Diversion downstream to confluence of Fraser River. Reach Description: Approximate channel length: 5 ½ miles with an average channel

More information

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

Cotton Belt Regional Rail Corridor Project

Cotton Belt Regional Rail Corridor Project Cotton Belt Regional Rail Corridor Project Public Meeting November 2017 0 Meeting Focus Today s discussion focuses on Impacts & Proposed Mitigation Large volume of material to cover Request that questions

More information

2011 BRIDGE INSPECTION REPORT

2011 BRIDGE INSPECTION REPORT 2011 BRIDGE INSPECTION REPORT BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL April 2011 FINAL December 2011 Looking - from Abutment B to Abutment A Prepared by: WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS

CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS CORPS OF ENGINEERS, U. S. ARMY CHANNEL IMPROVEMENTS, FARM CREEK, ILLINOIS HYDRAULIC MODEL INVESTIGATION TECHNICAL MEMORANDUM NO. 2-355 CONDUCTED FOR CHICAGO DISTRICT, CORPS OF ENGINEERS BY WATERWAYS EXPERIMENT

More information

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012 Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 36508 CSAH NO. 6 OVER A BRANCH OF THE CALDWELL CREEK DISTRICT 1 - KOOCHICHING COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark

More information

Cycle Elements Amended Goals, Objectives, and Policies ESR (Effective August 13, 2018) County Ordinance No City Ordinance No.

Cycle Elements Amended Goals, Objectives, and Policies ESR (Effective August 13, 2018) County Ordinance No City Ordinance No. Tallahassee-Leon County Comprehensive Plan: Table of Amended Policies, 1991-2018 (in reverse order) Cycle Elements Amended Goals, Objectives, and Policies 2018-2 ESR (Effective August 13, 2018) County

More information

Draft. Not yet Approved. Natural Waterways 2012

Draft. Not yet Approved. Natural Waterways 2012 Natural Waterways 2012 3.1 General 1 3 5 3.1.1 Scope (2012) 1 3 5 3.1.2 Importance (1992) R(2012) 1 3 5 3.2 Hydrologic Capacity of Waterway Openings1 1 3 5 3.2.1 General (2012) 1 3 5 3.2.2 Drainage Basin

More information

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID

More information

EAH 422 ADVANCED WATER RESOURCES ENGINEERING

EAH 422 ADVANCED WATER RESOURCES ENGINEERING EAH 422 ADVANCED WATER RESOURCES ENGINEERING Bridge Hydraulics Prof. Aminuddin Ab. Ghani References The Art And Science Of River Engineering Bridge Failure Pier scour Pier scour Pier scour Bridge Failure

More information

MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY

MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY MONO CREEK SEDIMENT TRANSPORT AND FLOODPLAIN CONNECTIVITY STUDY TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 STUDY OBJECTIVES... 1 3.0 STUDY AREA... 2 3.1 Upper Adjustable Study Reach (RM 3.5-3.7)...

More information

February 6, 2018 Boulder, CO James Creek & Left Hand Creek

February 6, 2018 Boulder, CO James Creek & Left Hand Creek Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda

More information

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a

More information

DRAFT. Figure 5.15: San Rafael Basin Workers, 2008

DRAFT. Figure 5.15: San Rafael Basin Workers, 2008 Figure 5.15: San Rafael Basin Workers, 2008 Central and Southern Marin Transit Study Page 67 of 87 Task 2: Existing Conditions Analysis Report v.7 12/23/08 Figure 5.16: San Rafael Basin Workers, 2018 Central

More information

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross Fully Air Conditioned 44,000 SF Retail/Flex Center ± 2,543 Sq. Ft. Showroom/Warehouse Full Glass Window

More information

COUNCIL AGENDA REPORT

COUNCIL AGENDA REPORT COUNCIL AGENDA REPORT Meeting Date: 8 September 2015 Subject: Boards Routed Through: South Point Commercial and Residential NSPs Municipal Planning Commission Date: 20 August 2015 Issue: Council is being

More information

Project Cost Estimating System

Project Cost Estimating System ect Cost Estimating System SUMMARY PAGE UPC: **** DISTRICT PROJECT NUMBER CULPEPER Alternative A-1 CONSTRUCTION END YEAR FY2018 UPC **** AD YEAR ESTIMATE YEAR FY2015 FY2014 RATE OF INFLATION TO AD 1.80%

More information

DULLES CONNCECTOR ROAD SOUND WALL PROJECT FUNDAMENTALS OF TRAFFIC NOISE AND RESULTS. Paul M. Kohler Noise Abatement Program Manager

DULLES CONNCECTOR ROAD SOUND WALL PROJECT FUNDAMENTALS OF TRAFFIC NOISE AND RESULTS. Paul M. Kohler Noise Abatement Program Manager DULLES CONNCECTOR ROAD SOUND WALL PROJECT FUNDAMENTALS OF TRAFFIC NOISE AND RESULTS Paul M. Kohler Noise Abatement Program Manager WHAT IS NOISE? Noise is unwanted sound. It is perceived differently by

More information

Tools for Accurate Sewer Metering and Billing

Tools for Accurate Sewer Metering and Billing Tools for Accurate Sewer Metering and Billing May 20, 2008 Tim Prince Chief Engineer Oakland County Drain Commissioner O&M Division Robert Czachorski Orchard, Hiltz & McCliment Livonia, Michigan The Clinton-Oakland

More information

Obtaining Water Data for Oil Shale Research Using HydroSeek

Obtaining Water Data for Oil Shale Research Using HydroSeek Obtaining Water Data for Oil Shale Research Using HydroSeek Brian Gallagher Ecotonics Environmental Scientists 27 th Oil Shale Symposium October 15-19, 19, 2007 Colorado School of Mines Major Topics 1.

More information

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 12.0 Tutorial Prerequisites Requirements TABS model Map Module Mesh Module Scatter Module Time minutes v. 12.0 SMS 12.0 Tutorial Objectives In this lesson will teach how to use conceptual modeling techniques to create numerical models that incorporate flow control structures into existing bathymetry. The

More information

NORTH DAKOTA 2011 FLOOD EVENT

NORTH DAKOTA 2011 FLOOD EVENT NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River

More information

Overview of State and Federal Water Law. Jennifer Gimbel Colorado Water Institute

Overview of State and Federal Water Law. Jennifer Gimbel Colorado Water Institute Overview of State and Federal Water Law Jennifer Gimbel Colorado Water Institute Mormons establish large irrigated network. By 1865, Mormons had dug 1,000 miles of canals in Utah. 1859 Gold Rush in the

More information

CITY OF AUBURN, NEW YORK

CITY OF AUBURN, NEW YORK CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24

More information

CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS

CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS CROSS VALLEY CONNECTOR GAP CLOSURE: I-5 to COPPER HILL DR. - FULL IMPROVEMENTS Project Number: S11 Newhall Ranch Road from I-5 to Copper Hill Drive. This project will design and construct an extension

More information

Appendix L. Vermont Stream Geomorphic Assessment. Flood History of Vermont Rivers. Vermont Agency of Natural Resources April, 2004

Appendix L. Vermont Stream Geomorphic Assessment. Flood History of Vermont Rivers. Vermont Agency of Natural Resources April, 2004 Vermont Stream Geomorphic Assessment Appendix L Flood History of Vermont Rivers Vermont Agency of Natural Resources April, 24 April, 24 -L- Vermont Agency of Natural Resources Flood History of Vermont

More information

Backwater rise due to driftwood accumulation

Backwater rise due to driftwood accumulation HAZARD AND RISK ASSESSMENT (ANALYSIS, EVALUATION) Backwater rise due to driftwood accumulation Isabella Schalko 1 ; Dieter Brändli 2 ; Lukas Schmocker, Dr. 1 ; Volker Weitbrecht, Dr. 1 ; Robert Michael

More information

Potholes: Prevent Before They Present

Potholes: Prevent Before They Present : Prevent Before They Present Dave Bergner, M.A., PWLF Mike Hale, P.E., P.L.S, M.S.C.E. TRB/ AASHTO Transportation Infrastructure Maintenance and Operations Conference, July 21, 2015 Des Moines, IA c.

More information

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b Plano esquemático 1 Estudio de flora y fauna 2 Estudio geotécnico 3 Determinación jurisdiccional de humedales 4 Prospección arqueológica fase 1a-1b 5 Cartas de las agencias 6 Estudio hidrológico e hidráulico

More information

Policy Research CENTER

Policy Research CENTER TRANSPORTATION Policy Research CENTER Value of Travel Time Knowingly or not, people generally place economic value on their time. Wage workers are paid a rate per hour, and service providers may charge

More information

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan

More information

Performance Evaluation of 200 and 400 mm PARTI MAG II, Bailey Fischer & Porter Electromagnetic Flowmeters, Installed in Partially Filled Pipes

Performance Evaluation of 200 and 400 mm PARTI MAG II, Bailey Fischer & Porter Electromagnetic Flowmeters, Installed in Partially Filled Pipes Performance Evaluation of 200 and 400 mm PARTI MAG II, Bailey Fischer & Porter Electromagnetic Flowmeters, Installed in Partially Filled Pipes A Report for NMSPU Department of Trade and Industry 151 Buckingham

More information

HIGH SCHOOL BOUNDARY ADJUSTMENT. April 19, 2018 Board Workshop

HIGH SCHOOL BOUNDARY ADJUSTMENT. April 19, 2018 Board Workshop HIGH SCHOOL BOUNDARY ADJUSTMENT April 19, 218 Board Workshop INFO REQUESTS CITY of CS ROAD CONSTRUCTION Signal at Greens Prairie Rd and Arrington which should be complete in the summer Project to widen

More information

Pipeline Technology Conference 2007

Pipeline Technology Conference 2007 The Complete Solution: Combined Crack and Metal Loss Detection Tool using Phased Array Technology By A. Hugger, J. Franz, H. Charbon, R. Bauernschmitt, M. Tschuch, K.-H. Käshammer, I. Lachtchouk, J. Ehrhardt.

More information

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis

More information

Sharing the Results from Asia. World Bank, June 2008

Sharing the Results from Asia. World Bank, June 2008 Sharing the Results from Asia World Bank, June 2008 Objectives 24 case studies in Latin America (7), Asia (7) and Africa (10) all with the aim: To increase the understanding of the impacts of rural mobility

More information

The Parkinson s Disease Questionnaires. User Manual. Crispin Jenkinson Ray Fitzpatrick Viv Peto Sarah Dummett David Morley Phil Saunders

The Parkinson s Disease Questionnaires. User Manual. Crispin Jenkinson Ray Fitzpatrick Viv Peto Sarah Dummett David Morley Phil Saunders The Parkinson s Disease Questionnaires User Manual (PDQ-39, PDQ-8, PDQ Summary Index & PDQ-Carer) Third Edition Crispin Jenkinson Ray Fitzpatrick Viv Peto Sarah Dummett David Morley Phil Saunders Health

More information

PA Water Quality Nontidal Network April 2016 Audit

PA Water Quality Nontidal Network April 2016 Audit PA Water Quality Nontidal Network April 2016 Audit findings and study plan design Feb 05, 2018 Overview: Nontidal Water Quality Monitoring For isokinetic sampling average stream velocity must be greater

More information

Commercial Foodservice R&D&D&E. Dr. Frank Johnson Gas Technology Institute

Commercial Foodservice R&D&D&E. Dr. Frank Johnson Gas Technology Institute Commercial Foodservice R&D&D&E Dr. Frank Johnson Gas Technology Institute Research in Foodservice >Foodservice is Unique People understand it > Everyone eats out > 44% at least once/week People worked

More information

Technical Memorandum. Andrew Kopania, EMKO Environmental Karen Spinardi, Spinardi Associates. Prepared by: Nathan Foged, Supervising Engineer

Technical Memorandum. Andrew Kopania, EMKO Environmental Karen Spinardi, Spinardi Associates. Prepared by: Nathan Foged, Supervising Engineer 701 Pike Street, Suite 1200 Seattle, WA 98101 Technical Memorandum Phone: 206-624-0100 Fax: 206-749-2200 Prepared for: CEMEX Construction Materials, Inc. Project Title: Eliot Facility Reclamation Plan

More information

Site Overview ROSEWICK RD, MD -

Site Overview ROSEWICK RD, MD - Site Overview ROSEWICK RD, MD - Location Site Address : ROSEWICK RD, MD Owner Owner Name : AMK LLC Parcel No. (APN) : 06-043046 Owner Address : PO BOX 2680 STAFFORD, VA 22555 Legal Information : 1 AC ON

More information

Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual

Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Service Life of Aluminized Type 2 Coated Steel Pipe: Predictions vs. Actual Resource # 07-135 (04/16) 2 2016 American Concrete Pipe Association, all rights reserved. The last comprehensive inspection of

More information

Basins Subject to Semi-Annual Monitoring and Reporting Requirements: Too few bacteria for BST source determination

Basins Subject to Semi-Annual Monitoring and Reporting Requirements: Too few bacteria for BST source determination 4. Article Two, B.5- Water Quality Monitoring ( WQM ) Plan Report on whether any of the semi-annual (or annual) WQM required under Article Two, B.5, was conducted during the quarter, and if so, in which

More information

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image

Feature Stamping SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening a Background Image SURFACE WATER MODELING SYSTEM Feature Stamping 1 Introduction In this lesson you will learn how to use conceptual modeling techniques to create numerical models that incorporate flow control structures

More information

The key points of the NPA s submission on the draft management plan are:

The key points of the NPA s submission on the draft management plan are: The Senior Planning Officer Environment and Recreation Parks, Conservation and Lands PO Box 352 CIVIC SQUARE ACT 2608 JERRABOMBERRA WETLANDS NATURE RESERVE The National Parks Association of the ACT (NPA)