1 An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington, MA October 23, 201 Revised: January 19, 201 February 1, 201 Prepared for: Jumbo Self Storage, LLC 1900 Crown Colony Drive, 4 th Floor Quincy, MA 0219 Prepared by: BL Companies 3 Research Parkway Meriden, Connecticut 040 Phone: (203) Fax: (203) BL Project Number: 1D323

2 An Employee-Owned Company Stormwater Management Report Contents Executive Summary... 1 Existing Site Conditions and Hydrologic Conditions... 2 Developed Site Conditions and Hydrologic Conditions... 4 Stormwater Management... Summary... Appendix A: Aerial Map NRCS Soil Report FEMA Flood Insurance Rate Map NOAA Atlas 14 Storm Data Appendix B: Pre-development Hydrology (2-, 10-, 2-, and 100-year storms) Appendix C: Post-development Hydrology (2-, 10-, 2-, and 100-year storms) Appendix D: Water Quality Calculations (Massachusetts Stormwater Handbook Calculations) Appendix E: Drainage Maps Appendix F: Stormwater System Operations and Maintenance Plan Appendix G: Geotechnical Report Note: Only revised appendices have been included in this revised report. Refer to 10/23/1 and 1/19/1 reports for appendix A, B, F and G.

3 An Employee-Owned Company Stormwater Management Report Executive Summary This report has been prepared in support of an application by Jumbo Self Storage LLC for a detailed site development plan application to the Town of Burlington for the proposed development at the corner of Wheeler Road and Blanchard Road. The property is approximately 11 acres in size and is currently undeveloped in the existing condition. The parcel is bounded by Wheeler Road to the south, Blanchard Road to the to the east, Rounder Way (A.K.A Commonwealth Executive Drive) to the north, a commercial hotel development to the west. The proposed development will provide one new -story, 119,033 s.f. self-storage building on the eastern portion of the site. The proposed structure will have a finished first floor above the 100-year FEMA floodplain and will not have a basement. The proposed development is subject to the Massachusetts Wetlands Protection Act (M.G.L. Chapter 131, Section 40), and the implementing regulations (310 CMR 10.00) because the new development is located on a site within the 200-foot Riverfront Area and on bordering land subject to flooding. The project is subject to the DEP Stormwater Policy for new development. Although the existing site is undeveloped, it has historically been disturbed, is lacking topsoil in many areas, and has become an abandoned dumping ground for construction equipment and debris. The site is not located within or adjacent to an Area of Critical Environmental Concern and according to the 200 NHESP rare species database and the 2003 certified vernal pool database on MASGIS, no known state-listed species of special concern, core habitat for rare species or vernal pools occur on or in the immediate vicinity of the Site. Existing topography across the eastern portion of the site generally slopes from the east to west portion toward the existing creek. Elevations vary from 14 feet to 134 feet across the site. The eastern portion of the property discharges directly to a small unnamed tributary to Vine Brook that runs through the center of the site. The unnamed tributary converges with Vine Brook west of the site. Vine Brook runs north under Rte. 9 and past the Burlington Mall and ultimately discharges into the Shawsheen River in Bedford which then in turn, empties into the Merrimack River in Lawrence. The Merrimack river then empties into the Atlantic Ocean in Newburyport. The proposed stormwater management system is designed to follow the Massachusetts Stormwater Handbook, the Massachusetts Wetlands Protection Act regulations (310 CMR 10.00), and the 2003 Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas to the maximum extent practical. The State of Massachusetts requires that the peak flows of stormwater runoff from the proposed development for all intensities and durations of rainfall up to the 100-year storm event shall not 3 Research Parkway Meriden, CT 040 T (203) F (203)

4 An Employee-Owned Company Stormwater Management Report exceed the existing condition peak flows of stormwater runoff. A HydroCad model, using TR- methodology (HydroCAD Release 10.0), was developed to evaluate the existing and proposed drainage conditions of the property. The results of the analysis demonstrate that there will be a decrease in peak stormwater runoff rates for the 2-, 10-, 2-, and 100-year storm events under the developed site conditions. The reduction in runoff rates is attributed to the storage volume generated by the proposed underground detention/recharge system. The proposed drainage design will also provide water quality improvements where currently none exist. Numerous water quality best management practices (BMPs) have been incorporated into the project design and include a rain garden, catch basins, a hydrodynamic separator and an underground detention system with infiltration. The proposed treatment train as designed is expected to remove and exceed the required 44% of TSS removal prior to discharge into the infiltration system and then to the discharge point. Calculations can be found in Appendix D. Existing Site Conditions and Hydrologic Conditions General Site Information The subject property is an undeveloped wooded lot. However, historically it has been disturbed with filling activities and by storage of construction material in various areas on site and based on the geotechnical report, much of the site is lacking a layer of topsoil. A creek, an unnamed tributary of Vine Brook, traverses through the center of the site. The banks of the creek are vegetated with trees and undergrowth. The topography of the eastern portion of the site generally slopes from the corner of Wheeler Road and Blanchard Road toward the creek. There are currently no existing drainage facilities onsite and all stormwater sheet flows untreated from the site into the creek. Likewise, there are no stormwater management systems or water quality measures present onsite to treat the existing runoff. Surrounding properties also contribute stormwater overland to this creek. The site is located in the 100-year floodplain. Per the FEMA Flood Insurance Rate Map Number 201C0402E for Middlesex County, Massachusetts, map effective date: June 4, 2010, the site resides inside FEMA designated flood areas Zone AE (special flood hazard areas subject to inundation by the 100-year annual chance flood with base flood elevation determined). The base flood elevation is Elev. 140 feet (NGVD) across the length of the site. Based on this elevation of the floodplain, floodwaters extend across most of the site during large storm events. According to FEMA floodplain mapping, the site also has areas classified as Zone X (areas determined to be outside the 0.2% annual chance floodplain), Zone XEA (shaded) and a Floodway associated with this creek. Copies of the FEMA Flood Insurance Rate Maps are included in Appendix A for reference. 3 Research Parkway Meriden, CT 040 T (203) F (203)

5 An Employee-Owned Company Stormwater Management Report There are isolated wetlands on site. There are no vernal pools, or endangered species on the property. The site soil in the proposed development area is identified by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) as Udorthents-Urban Land. The hydrologic soil group is identified as D. A copy of the USDA NRCS Hydrologic Soil Group Map is included in Appendix A for reference. Existing Hydrologic Conditions Only the site area to the east of the existing creek has been analyzed as the area to the west of the creek is unaffected by the project. The existing site drainage area that was analyzed totals 3.- acres and is approximately.4% impervious with 13,939 s.f. of impervious surface. Stormwater runoff from the property flows to one distinct point onsite. Below is a description of this individual point. The following is a brief analysis of the existing design point as shown on the enclosed Existing Drainage Area Map (ED-1), in Appendix E; Existing Drainage Area 1 (ED-1): The existing drainage area 1 collects stormwater from a 3.- acre portion of the site with a time of concentration of 43.2 minutes. The ED-1 is approximately.4% impervious with 0.32 ac of impervious surface. This drainage area consists of the eastern portion of the site along Wheeler and Blanchard Roads. This portion of the site consists of existing wooded areas and a small portion of existing parking lot area associated with the abutting property to the north. The existing survey indicates that this portion of this site currently drains to the onsite creek. The creek then flows under Rounder Way via two 30 RCP culverts. Table 1 Pre-Development (Existing Conditions) Drainage Characteristics. Area Composite Impervious (acres) Curve Number Cover (%) Drainage Area / Design Point Time of Concentration (minutes) ED-1: Direct Offsite Table 2 Pre-Development Conditions Peak Flows Peak Flow (cfs) Analysis Point 2-yr 10-yr 2-yr 100-yr Discharge Point Research Parkway Meriden, CT 040 T (203) F (203)

6 An Employee-Owned Company Stormwater Management Report Developed Site Conditions and Hydrologic Conditions General Site Information The proposed development will provide one new -story, 119,033 s.f. self-storage building. The first floor is approximately 9,33 s.f. with a second through fifth floor is approximately 2,30 s.f. each. The second floor cantilevers over the loading and 3 car parking area. An office space will be provided at the front of the building facing Wheeler Road and loading area along the western building façade. A full access driveway is proposed onto Wheeler Road. There are 12 proposed parking spaces, which will provide adequate parking for the use. Only 9 of the 12 spaces will be placed out side and exposed to the elements. The remaining three are located under the portion of the building that is cantilevered with columns. The proposed slab-on-grade structure will have a finished first floor above the 100-year FEMA floodplain elevation. The loading area and main portion of the building will have the finished floors set at elevation and FEMA mapping has determined an elevation of for the 100-year floodplain at the proposed building. The office portion of the building will be set higher, at elevation 14.1, in order to meet grades along Wheeler Road. Internal ramps will accommodate this change in elevation. Compensatory storage will be provided on the site in order to mitigate the impacts of the proposed development. The proposed site grading plan is providing for and overall 1:1 compensatory storage to help mitigate the flooding impacts of existing creek. This calculation excludes any stormwater storage area provided by the underground detention. Proposed Hydrologic Conditions The eastern portion of the proposed site drainage area totals 3.-acres and is approximately 30.3% impervious with 1.11 acres of impervious surface. This is an increase in impervious surface of 0.9 acres from the existing to proposed conditions. The intent of the proposed site drainage system is to mimic existing drainage patterns and rates as much as possible. The site stormwater system will provide rate control with detention/infiltration system as well as water quality improvements through the installation of a rain garden and hydrodynamic separator. The post development site stormwater modeling retained the same Design Point as the existing conditions model. The following drainage areas were developed to model the proposed site 3 Research Parkway Meriden, CT 040 T (203) F (203)

7 An Employee-Owned Company Stormwater Management Report improvements. The proposed design point is shown on the enclosed Post-development Drainage Area Map (PD-1), in Appendix E. Proposed Drainage Area 1 (PD-1): The proposed drainage area 1 collects water from a 2.1-acre portion of the site with a time of concentration of 41. minutes. PD-1 is approximately 11.% impervious with 0.32 of impervious surface. This drainage area consists of the western portion of the developed site east of the creek. As in the existing condition, this portion of this site will drain overland to the existing creek that bisects the site. A portion of this area is being regraded to allow for compensatory flood water storage. Proposed Drainage Area 2A (PDA-2A): The proposed drainage area PD-2A collects water from a 0.4-acre portion of the site with a time of concentration of.0 minutes. PD-2A is 100% impervious. This drainage area consists of the proposed building roof. The outlet control structure for the system will be a manhole structure with various orifices and a weir to control the outflow. Proposed Drainage Area 2B (PDA-2B): The proposed drainage area PD-2B collects water from a 0.31-acre portion of the site with a time of concentration of. minutes. PD-2B is approximately 4.3% impervious with 0.1 acres of impervious surface. This drainage area consists of the parking area to the southeast of the building. The stormwater runoff from the uncovered parking area will first sheet flow into a rain garden which will discharge through a hydrodynamic separator prior to being conveyed to the underground detention/infiltration system. The outlet control structure for the system will be a manhole structure with various orifices and a weir to control the outflow. Table 3 Post Development Drainage Characteristics. Drainage Area / Design Point Area (acres) Composite Curve Number Impervious Cover (%) Time of Concentration (minutes) PD PD-2A PD-2B Table 4 Post-Development Conditions Peak Flows Peak Flow (cfs) Analysis Point 2-yr 10-yr 2-yr 100-yr Discharge Point Research Parkway Meriden, CT 040 T (203) F (203)

8 An Employee-Owned Company Stormwater Management Report Table Existing vs Proposed Peak Rates of Runoff Peak Flow Rate in Cubic Feet per Second (cfs) Drainage Area 2-yr 10-yr 2-yr 100-yr Discharge Pt. 1 Existing Proposed Percent Change -12.4% -11.4% -9.% -.% Stormwater Management Hydrologic Modeling of the Entire Site The hydrologic analysis to determine peak stormwater discharge rates was performed using the HydroCAD stormwater modeling system computer program, version developed by HydroCAD Software Solutions, LLC. Hydrographs for each watershed were developed using the SCS Synthetic Unit Hydrograph Method with a Type III rainfall distribution with Antecedent Moisture Condition II. Rainfall depths per the NOAA Atlas 14 for Burlington, Mass were used for the calculation of peak flow rates and are listed in Table. The drainage areas, or subcatchments as labeled by the program, are depicted by hexagons on the attached drainage diagrams. Pre-development HydroCAD output can be found in Appendix B and Post-development HydroCAD output can be found in Appendix C. Proposed Storm Water Quality Table Rainfall Depths per NOAA Atlas 14 Appendix B - 24-hour Rainfall Data Return Period 24-hour Rainfall Depth 2-year year.1 2-year year.1 Along with the reduction of peak storm water discharge rates, an important element of the proposed drainage system is to improve the quality of stormwater runoff leaving the property. To do this, Best Management Practices (BMP s) have been implemented in this design. 3 Research Parkway Meriden, CT 040 T (203) F (203)

9 An Employee-Owned Company Stormwater Management Report A Rain Garden, Hydrodynamic Separator and a Detention/infiltration system will be installed to provide the water quality storage volume, as well as recharge and infiltrate runoff to the maximum extent practical. Summary The stormwater management system has been designed to safely collect, treat, convey, and improve the quality of the runoff being discharged from the site. Computer modeling of the proposed systems have demonstrated a reduction in post-development peak rates of runoff to below pre-development levels. With proper annual maintenance the stormwater conveyance system, catch basins, manholes, rain garden and water quality structure should operate as anticipated for years to come. The proposed development will decrease the proposed 2-year, 10-year, 2-year, and 100-year storm event peak flows generated by the site and will reduce total runoff volume due to the infiltration system. The proposed drainage network will safely convey the runoff from the site during the storm events as required per Commonwealth of Massachusetts regulations. The drainage system will infiltrate the runoff to the maximum extent practical while adhering to site constraints. This report has been prepared to compliment the submitted project plans as well as to represent the technical basis for the designs presented herein. In consideration of the overall project, we conclude that all technical concerns and design parameters set forth by the Town of Burlington and Commonwealth of Massachusetts have been met to the maximum extent practical. 3 Research Parkway Meriden, CT 040 T (203) F (203)

10 An Employee-Owned Company Stormwater Management Report APPENDIX C POST-DEVELOPMENT HYDROLOGY 3 Research Parkway Meriden, CT 040 T (203) F (203)

11 PD1 Drainage Area #1 PD2A Roof Area 2P Design Point 1 1P Detention System 4P Rain Garden PD2B Developed Area Subcat Reach Pond Link Routing Diagram for 1D323-ProposedHydrology ,

12 Page 2 Area (acres) CN Description (subcatchment-numbers) Area Listing (all nodes) >% Grass cover, Good, HSG D (PD1, PD2B) Paved parking, HSG D EXIST (PD1) Paved parking, HSG D NEW (PD2B) Roofs, HSG D NEW ROOF (PD2A) Woods, Fair, HSG D (PD1, PD2B) 3.0 TOTAL AREA

13 Page 3 Area (acres) Soil Group Subcatchment Numbers HSG A HSG B HSG C 3.0 HSG D PD1, PD2A, PD2B Other 3.0 TOTAL AREA Soil Listing (all nodes)

14 Page 4 HSG-A (acres) HSG-B (acres) HSG-C (acres) Ground Covers (all nodes) HSG-D (acres) Other (acres) Total (acres) Ground Cover >% Grass cover, Good PD1, PD2B Paved parking PD1, PD2B Roofs PD2A Woods, Fair PD1, PD2B TOTAL AREA Subcatchment Numbers

15 Page Line# Node Number In-Invert (feet) Out-Invert (feet) Pipe Listing (all nodes) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 1P

16 Type II 24-hr 2-year Rainfall=3.2" Page Time span= hrs, dt=0.0 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PD1: Drainage Area #1 Subcatchment PD2A: Roof Area Subcatchment PD2B: Developed Area Runoff Area=2.10 ac 11.1% Impervious Runoff Depth>1.3" Flow Length=10' Tc=41. min CN=1 Runoff=2.2 cfs af Runoff Area=0.40 ac % Impervious Runoff Depth>2.0" Tc=.0 min CN=9 Runoff=2.9 cfs af Runoff Area=0.310 ac 4.39% Impervious Runoff Depth>1.91" Flow Length=14' Tc=. min CN= Runoff=1.00 cfs af Pond 1P: Detention System Peak Elev=13.31' Storage=2,3 cf Inflow=2.9 cfs af Discarded=0.14 cfs af Primary=0.4 cfs af Outflow=0.1 cfs af Pond 2P: Design Point 1 Inflow=3.22 cfs af Primary=3.22 cfs af Pond 4P: Rain Garden Peak Elev=143.22' Storage=1,11 cf Inflow=1.00 cfs af Discarded=0.0 cfs 0.03 af Primary=0.00 cfs af Outflow=0.0 cfs 0.03 af Total Runoff Area = 3.0 ac Runoff Volume = 0.0 af Average Runoff Depth = 1." 9.% Pervious = 2.0 ac 30.33% Impervious = ac

17 Type II 24-hr 2-year Rainfall=3.2" Page Summary for Subcatchment PD1: Drainage Area #1 Runoff = hrs, Volume= af, Depth> 1.3" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=3.2" Area (ac) CN Description * Paved parking, HSG D EXIST Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall con2 Woodland Kv=.0 fps Shallow Concentrated Flow, shall to DP1 Woodland Kv=.0 fps Total Subcatchment PD1: Drainage Area #1 Hydrograph Flow (cfs) cfs Type II 24-hr 2-year Rainfall=3.2" Runoff Area=2.10 ac Runoff Volume=0.310 af Runoff Depth>1.3" Flow Length=10' Tc=41. min CN=1 Runoff Time (hours)

18 Type II 24-hr 2-year Rainfall=3.2" Page Summary for Subcatchment PD2A: Roof Area Runoff = hrs, Volume= af, Depth> 2.0" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=3.2" Area (ac) CN Description * Roofs, HSG D NEW ROOF % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).0 Direct Entry, Subcatchment PD2A: Roof Area Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-year Rainfall=3.2" Runoff Area=0.40 ac Runoff Volume=0.149 af Runoff Depth>2.0" Tc=.0 min CN= Time (hours)

19 Type II 24-hr 2-year Rainfall=3.2" Page 9 Summary for Subcatchment PD2B: Developed Area Runoff = hrs, Volume= af, Depth> 1.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=3.2" Area (ac) CN Description * Paved parking, HSG D NEW Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall conc Paved Kv= 20.3 fps Shallow Concentrated Flow, Short Grass Pasture Kv=.0 fps. 14 Total Subcatchment PD2B: Developed Area Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-year Rainfall=3.2" Runoff Area=0.310 ac Runoff Volume=0.049 af Runoff Depth>1.91" Flow Length=14' Tc=. min CN= Time (hours)

20 Type II 24-hr 2-year Rainfall=3.2" Page 10 Summary for Pond 1P: Detention System Inflow Area = 0.90 ac, 3.1% Impervious, Inflow Depth > 1.9" for 2-year event Inflow = hrs, Volume= af Outflow = hrs, Volume= af, Atten= 0%, Lag= 10.0 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= hrs Surf.Area= 2,99 sf Storage= 2,3 cf Plug-Flow detention time= 4.0 min calculated for 0.14 af (99% of inflow) Center-of-Mass det. time= 2.2 min ( ) Volume Invert Avail.Storage Storage Description # ' 3,0 cf 3.0" Round CMP_Round 3" x Inside #2 L=.0' #2 13.0' 2,13 cf Custom Stage Data (Prismatic)Listed below (Recalc) 10,0 cf Overall - 3,0 cf Embedded =,2 cf x 30.0% Voids # ' 393 cf.00'd x.00'h Vertical Cone/Cylinder x 4,10 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,20 10,0 10,0 Device Routing Invert Outlet Devices #1 Primary 13.0' 1.0" Round Culvert L= 0.0' RCP, sq.cut end projecting, Ke= 0.00 Inlet / Outlet Invert= 13.0' / 13.02' S= '/' Cc= n= Corrugated PE, smooth interior, Flow Area= 1. sf #2 Device '.0" Vert. Orifice/Grate C= 0.00 #3 Device 1 13.'.0" Vert. Orifice/Grate C= 0.00 #4 Device '.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) # Discarded 13.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 131.0' Discarded OutFlow Max= hrs HW=13.30' (Free Discharge) =Exfiltration ( Controls 0.14 cfs) Primary OutFlow Max= hrs HW=13.30' (Free Discharge) 1=Culvert (Passes 0.4 cfs of 2.0 cfs potential flow) 2=Orifice/Grate (Orifice Controls fps) 3=Orifice/Grate ( Controls 0.00 cfs) 4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)

21 Type II 24-hr 2-year Rainfall=3.2" Page 11 Pond 1P: Detention System Hydrograph cfs Inflow Area=0.90 ac Peak Elev=13.31' Storage=2,3 cf Inflow Outflow Discarded Primary Flow (cfs) cfs 0.4 cfs 0.14 cfs Time (hours)

22 Type II 24-hr 2-year Rainfall=3.2" Page 12 Summary for Pond 2P: Design Point 1 Inflow Area = 3.0 ac, 30.33% Impervious, Inflow Depth > 1.14" for 2-year event Inflow = hrs, Volume= af Primary = hrs, Volume= af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Pond 2P: Design Point 1 Hydrograph 3.22 cfs 3.22 cfs Inflow Area=3.0 ac Inflow Primary 3 Flow (cfs) Time (hours)

23 Type II 24-hr 2-year Rainfall=3.2" Page 13 Summary for Pond 4P: Rain Garden Inflow Area = ac, 4.39% Impervious, Inflow Depth > 1.91" for 2-year event Inflow = hrs, Volume= af Outflow = hrs, Volume= 0.03 af, Atten= 9%, Lag=.1 min Discarded = hrs, Volume= 0.03 af Primary = 0.00 hrs, Volume= af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= hrs Surf.Area= 99 sf Storage= 1,11 cf Plug-Flow detention time= min calculated for 0.03 af (% of inflow) Center-of-Mass det. time= min ( ) Volume Invert Avail.Storage Storage Description # ' 1, cf Custom Stage Data (Prismatic)Listed below (Recalc) Inside #2 # ' 4 cf Custom Stage Data (Prismatic)Listed below (Recalc) 4,0 cf Overall - 1, cf Embedded = 3,119 cf x 1.0% Voids 2,0 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,00 2 1, Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,41 4, ,00 2 4,0 Device Routing Invert Outlet Devices #1 Primary ' 24.0" x 3.0" Horiz. Orifice/Grate C= 0.00 Limited to weir flow at low heads #2 Discarded 139.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = ' Discarded OutFlow Max= hrs HW=143.22' (Free Discharge) 2=Exfiltration ( Controls 0.0 cfs) Primary OutFlow Max=0.00 hrs HW=139.0' (Free Discharge) 1=Orifice/Grate ( Controls 0.00 cfs)

24 Type II 24-hr 2-year Rainfall=3.2" Page 14 Pond 4P: Rain Garden Hydrograph cfs Inflow Area=0.310 ac Peak Elev=143.22' Storage=1,11 cf Inflow Outflow Discarded Primary Flow (cfs) 0.0 cfs 0.0 cfs 0.00 cfs Time (hours)

25 Type II 24-hr 10-year Rainfall=.1" Page 1 Time span= hrs, dt=0.0 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PD1: Drainage Area #1 Subcatchment PD2A: Roof Area Subcatchment PD2B: Developed Area Runoff Area=2.10 ac 11.1% Impervious Runoff Depth>2." Flow Length=10' Tc=41. min CN=1 Runoff=.9 cfs 0.4 af Runoff Area=0.40 ac % Impervious Runoff Depth>4.0" Tc=.0 min CN=9 Runoff=4.4 cfs af Runoff Area=0.310 ac 4.39% Impervious Runoff Depth>3." Flow Length=14' Tc=. min CN= Runoff=1.1 cfs af Pond 1P: Detention System Peak Elev=13.09' Storage=4,19 cf Inflow=4.4 cfs 0.24 af Discarded=0.1 cfs af Primary=1.39 cfs af Outflow=1. cfs af Pond 2P: Design Point 1 Inflow=.4 cfs 0.0 af Primary=.4 cfs 0.0 af Pond 4P: Rain Garden Peak Elev=144.0' Storage=1, cf Inflow=1.1 cfs af Discarded=0.0 cfs 0.04 af Primary=0.2 cfs af Outflow=0. cfs 0.00 af Total Runoff Area = 3.0 ac Runoff Volume = 0.9 af Average Runoff Depth = 3.21" 9.% Pervious = 2.0 ac 30.33% Impervious = ac

26 Type II 24-hr 10-year Rainfall=.1" Page 1 Summary for Subcatchment PD1: Drainage Area #1 Runoff = hrs, Volume= 0.4 af, Depth> 2." Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 10-year Rainfall=.1" Area (ac) CN Description * Paved parking, HSG D EXIST Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall con2 Woodland Kv=.0 fps Shallow Concentrated Flow, shall to DP1 Woodland Kv=.0 fps Total Subcatchment PD1: Drainage Area #1 Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 10-year Rainfall=.1" Runoff Area=2.10 ac Runoff Volume=0.4 af Runoff Depth>2." Flow Length=10' Tc=41. min CN= Time (hours)

27 Type II 24-hr 10-year Rainfall=.1" Page 1 Summary for Subcatchment PD2A: Roof Area Runoff = hrs, Volume= af, Depth> 4.0" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 10-year Rainfall=.1" Area (ac) CN Description * Roofs, HSG D NEW ROOF % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).0 Direct Entry, Subcatchment PD2A: Roof Area Hydrograph Flow (cfs) cfs Type II 24-hr 10-year Rainfall=.1" Runoff Area=0.40 ac Runoff Volume=0.240 af Runoff Depth>4.0" Tc=.0 min CN=9 Runoff Time (hours)

28 Type II 24-hr 10-year Rainfall=.1" Page 1 Summary for Subcatchment PD2B: Developed Area Runoff = hrs, Volume= af, Depth> 3." Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 10-year Rainfall=.1" Area (ac) CN Description * Paved parking, HSG D NEW Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall conc Paved Kv= 20.3 fps Shallow Concentrated Flow, Short Grass Pasture Kv=.0 fps. 14 Total Subcatchment PD2B: Developed Area Hydrograph 2 Runoff Flow (cfs) cfs Type II 24-hr 10-year Rainfall=.1" Runoff Area=0.310 ac Runoff Volume=0.092 af Runoff Depth>3." Flow Length=14' Tc=. min CN= Time (hours)

29 Type II 24-hr 10-year Rainfall=.1" Page 19 Summary for Pond 1P: Detention System Inflow Area = 0.90 ac, 3.1% Impervious, Inflow Depth > 3.21" for 10-year event Inflow = hrs, Volume= 0.24 af Outflow = hrs, Volume= af, Atten= %, Lag=. min Discarded = hrs, Volume= af Primary = hrs, Volume= af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= 12.0 hrs Surf.Area= 2,99 sf Storage= 4,19 cf Plug-Flow detention time=.0 min calculated for af (9% of inflow) Center-of-Mass det. time=.1 min ( ) Volume Invert Avail.Storage Storage Description # ' 3,0 cf 3.0" Round CMP_Round 3" x Inside #2 L=.0' #2 13.0' 2,13 cf Custom Stage Data (Prismatic)Listed below (Recalc) 10,0 cf Overall - 3,0 cf Embedded =,2 cf x 30.0% Voids # ' 393 cf.00'd x.00'h Vertical Cone/Cylinder x 4,10 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,20 10,0 10,0 Device Routing Invert Outlet Devices #1 Primary 13.0' 1.0" Round Culvert L= 0.0' RCP, sq.cut end projecting, Ke= 0.00 Inlet / Outlet Invert= 13.0' / 13.02' S= '/' Cc= n= Corrugated PE, smooth interior, Flow Area= 1. sf #2 Device '.0" Vert. Orifice/Grate C= 0.00 #3 Device 1 13.'.0" Vert. Orifice/Grate C= 0.00 #4 Device '.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) # Discarded 13.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 131.0' Discarded OutFlow Max= hrs HW=13.09' (Free Discharge) =Exfiltration ( Controls 0.1 cfs) Primary OutFlow Max= hrs HW=13.09' (Free Discharge) 1=Culvert (Passes 1.3 cfs of.9 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.4 fps) 3=Orifice/Grate (Orifice Controls fps) 4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)

30 Type II 24-hr 10-year Rainfall=.1" Page 20 Pond 1P: Detention System Hydrograph cfs Inflow Area=0.90 ac Peak Elev=13.09' Storage=4,19 cf Inflow Outflow Discarded Primary Flow (cfs) cfs 1.39 cfs cfs Time (hours)

31 Type II 24-hr 10-year Rainfall=.1" Page 21 Summary for Pond 2P: Design Point 1 Inflow Area = 3.0 ac, 30.33% Impervious, Inflow Depth > 2.49" for 10-year event Inflow = hrs, Volume= 0.0 af Primary = hrs, Volume= 0.0 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Pond 2P: Design Point 1 Hydrograph.4 cfs.4 cfs Inflow Area=3.0 ac Inflow Primary Flow (cfs) Time (hours)

32 Type II 24-hr 10-year Rainfall=.1" Page 22 Summary for Pond 4P: Rain Garden Inflow Area = ac, 4.39% Impervious, Inflow Depth > 3." for 10-year event Inflow = hrs, Volume= af Outflow = hrs, Volume= 0.00 af, Atten= %, Lag= 10. min Discarded = hrs, Volume= 0.04 af Primary = hrs, Volume= af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= 12.1 hrs Surf.Area= 1,00 sf Storage= 1, cf Plug-Flow detention time= 10.3 min calculated for 0.00 af (% of inflow) Center-of-Mass det. time= 1.9 min ( ) Volume Invert Avail.Storage Storage Description # ' 1, cf Custom Stage Data (Prismatic)Listed below (Recalc) Inside #2 # ' 4 cf Custom Stage Data (Prismatic)Listed below (Recalc) 4,0 cf Overall - 1, cf Embedded = 3,119 cf x 1.0% Voids 2,0 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,00 2 1, Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,41 4, ,00 2 4,0 Device Routing Invert Outlet Devices #1 Primary ' 24.0" x 3.0" Horiz. Orifice/Grate C= 0.00 Limited to weir flow at low heads #2 Discarded 139.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = ' Discarded OutFlow Max= hrs HW=144.0' (Free Discharge) 2=Exfiltration ( Controls 0.0 cfs) Primary OutFlow Max= hrs HW=144.0' (Free Discharge) 1=Orifice/Grate (Weir Controls fps)

33 Type II 24-hr 10-year Rainfall=.1" Page 23 Pond 4P: Rain Garden Hydrograph cfs Inflow Area=0.310 ac Peak Elev=144.0' Storage=1, cf Inflow Outflow Discarded Primary Flow (cfs) 1 0. cfs 0.2 cfs 0.0 cfs Time (hours)

34 Type II 24-hr 2-year Rainfall=.33" Page 24 Time span= hrs, dt=0.0 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PD1: Drainage Area #1 Subcatchment PD2A: Roof Area Subcatchment PD2B: Developed Area Runoff Area=2.10 ac 11.1% Impervious Runoff Depth>3." Flow Length=10' Tc=41. min CN=1 Runoff=.9 cfs 0.1 af Runoff Area=0.40 ac % Impervious Runoff Depth>." Tc=.0 min CN=9 Runoff=.4 cfs 0.29 af Runoff Area=0.310 ac 4.39% Impervious Runoff Depth>4.3" Flow Length=14' Tc=. min CN= Runoff=2.31 cfs af Pond 1P: Detention System Peak Elev=13.3' Storage=,09 cf Inflow=.4 cfs af Discarded=0.1 cfs 0.13 af Primary=3. cfs 0.1 af Outflow=3. cfs 0.31 af Pond 2P: Design Point 1 Inflow=9.3 cfs 1.00 af Primary=9.3 cfs 1.00 af Pond 4P: Rain Garden Peak Elev=144.1' Storage=1,9 cf Inflow=2.31 cfs af Discarded=0.0 cfs af Primary=2.00 cfs 0.03 af Outflow=2.0 cfs 0.04 af Total Runoff Area = 3.0 ac Runoff Volume = 1.2 af Average Runoff Depth = 4.22" 9.% Pervious = 2.0 ac 30.33% Impervious = ac

35 Type II 24-hr 2-year Rainfall=.33" Page 2 Summary for Subcatchment PD1: Drainage Area #1 Runoff = hrs, Volume= 0.1 af, Depth> 3." Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=.33" Area (ac) CN Description * Paved parking, HSG D EXIST Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall con2 Woodland Kv=.0 fps Shallow Concentrated Flow, shall to DP1 Woodland Kv=.0 fps Total Subcatchment PD1: Drainage Area #1 Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-year Rainfall=.33" Runoff Area=2.10 ac Runoff Volume=0.1 af Runoff Depth>3." Flow Length=10' Tc=41. min CN= Time (hours)

36 Type II 24-hr 2-year Rainfall=.33" Page 2 Summary for Subcatchment PD2A: Roof Area Runoff = hrs, Volume= 0.29 af, Depth>." Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=.33" Area (ac) CN Description * Roofs, HSG D NEW ROOF % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).0 Direct Entry, Subcatchment PD2A: Roof Area Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-year Rainfall=.33" Runoff Area=0.40 ac Runoff Volume=0.29 af Runoff Depth>." Tc=.0 min CN= Time (hours)

37 Type II 24-hr 2-year Rainfall=.33" Page 2 Summary for Subcatchment PD2B: Developed Area Runoff = hrs, Volume= af, Depth> 4.3" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 2-year Rainfall=.33" Area (ac) CN Description * Paved parking, HSG D NEW Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall conc Paved Kv= 20.3 fps Shallow Concentrated Flow, Short Grass Pasture Kv=.0 fps. 14 Total Subcatchment PD2B: Developed Area Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-year Rainfall=.33" Runoff Area=0.310 ac Runoff Volume=0.120 af Runoff Depth>4.3" Flow Length=14' Tc=. min CN= Time (hours)

38 Type II 24-hr 2-year Rainfall=.33" Page 2 Summary for Pond 1P: Detention System Inflow Area = 0.90 ac, 3.1% Impervious, Inflow Depth > 4.20" for 2-year event Inflow = hrs, Volume= af Outflow = hrs, Volume= 0.31 af, Atten= 34%, Lag=.4 min Discarded = hrs, Volume= 0.13 af Primary = hrs, Volume= 0.1 af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= 12.0 hrs Surf.Area= 2,99 sf Storage=,09 cf Plug-Flow detention time=.1 min calculated for 0.31 af (9% of inflow) Center-of-Mass det. time= 4.9 min ( ) Volume Invert Avail.Storage Storage Description # ' 3,0 cf 3.0" Round CMP_Round 3" x Inside #2 L=.0' #2 13.0' 2,13 cf Custom Stage Data (Prismatic)Listed below (Recalc) 10,0 cf Overall - 3,0 cf Embedded =,2 cf x 30.0% Voids # ' 393 cf.00'd x.00'h Vertical Cone/Cylinder x 4,10 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,20 10,0 10,0 Device Routing Invert Outlet Devices #1 Primary 13.0' 1.0" Round Culvert L= 0.0' RCP, sq.cut end projecting, Ke= 0.00 Inlet / Outlet Invert= 13.0' / 13.02' S= '/' Cc= n= Corrugated PE, smooth interior, Flow Area= 1. sf #2 Device '.0" Vert. Orifice/Grate C= 0.00 #3 Device 1 13.'.0" Vert. Orifice/Grate C= 0.00 #4 Device '.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) # Discarded 13.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 131.0' Discarded OutFlow Max= hrs HW=13.0' (Free Discharge) =Exfiltration ( Controls 0.1 cfs) Primary OutFlow Max= hrs HW=13.0' (Free Discharge) 1=Culvert (Passes 3.4 cfs of. cfs potential flow) 2=Orifice/Grate (Orifice Controls 0. fps) 3=Orifice/Grate (Orifice Controls fps) 4=Sharp-Crested Rectangular Weir (Weir Controls fps)

39 Type II 24-hr 2-year Rainfall=.33" Page 29 Pond 1P: Detention System Hydrograph.4 cfs 3. cfs Inflow Area=0.90 ac Peak Elev=13.3' Storage=,09 cf Inflow Outflow Discarded Primary Flow (cfs) cfs cfs Time (hours)

40 Type II 24-hr 2-year Rainfall=.33" Page 30 Summary for Pond 2P: Design Point 1 Inflow Area = 3.0 ac, 30.33% Impervious, Inflow Depth > 3.44" for 2-year event Inflow = hrs, Volume= 1.00 af Primary = hrs, Volume= 1.00 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Pond 2P: Design Point 1 Hydrograph cfs 9.3 cfs Inflow Area=3.0 ac Inflow Primary Flow (cfs) Time (hours)

41 Type II 24-hr 2-year Rainfall=.33" Page 31 Summary for Pond 4P: Rain Garden Inflow Area = ac, 4.39% Impervious, Inflow Depth > 4.3" for 2-year event Inflow = hrs, Volume= af Outflow = hrs, Volume= 0.04 af, Atten= 11%, Lag= 4.2 min Discarded = hrs, Volume= af Primary = hrs, Volume= 0.03 af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= 12.0 hrs Surf.Area= 1,03 sf Storage= 1,9 cf Plug-Flow detention time= 11. min calculated for 0.04 af (0% of inflow) Center-of-Mass det. time= 0. min ( ) Volume Invert Avail.Storage Storage Description # ' 1, cf Custom Stage Data (Prismatic)Listed below (Recalc) Inside #2 # ' 4 cf Custom Stage Data (Prismatic)Listed below (Recalc) 4,0 cf Overall - 1, cf Embedded = 3,119 cf x 1.0% Voids 2,0 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,00 2 1, Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,41 4, ,00 2 4,0 Device Routing Invert Outlet Devices #1 Primary ' 24.0" x 3.0" Horiz. Orifice/Grate C= 0.00 Limited to weir flow at low heads #2 Discarded 139.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = ' Discarded OutFlow Max= hrs HW=144.14' (Free Discharge) 2=Exfiltration ( Controls 0.0 cfs) Primary OutFlow Max= hrs HW=144.14' (Free Discharge) 1=Orifice/Grate (Weir Controls fps)

42 Type II 24-hr 2-year Rainfall=.33" Page 32 Pond 4P: Rain Garden Hydrograph cfs 2.31 cfs 2.0 cfs Inflow Area=0.310 ac Peak Elev=144.1' Storage=1,9 cf Inflow Outflow Discarded Primary Flow (cfs) cfs Time (hours)

43 Type II 24-hr 100-year Rainfall=.1" Page 33 Time span= hrs, dt=0.0 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PD1: Drainage Area #1 Subcatchment PD2A: Roof Area Subcatchment PD2B: Developed Area Runoff Area=2.10 ac 11.1% Impervious Runoff Depth>.4" Flow Length=10' Tc=41. min CN=1 Runoff=11.02 cfs af Runoff Area=0.40 ac % Impervious Runoff Depth>.20" Tc=.0 min CN=9 Runoff=.3 cfs 0.34 af Runoff Area=0.310 ac 4.39% Impervious Runoff Depth>.29" Flow Length=14' Tc=. min CN= Runoff=3.0 cfs 0.13 af Pond 1P: Detention System Peak Elev=13.9' Storage=,92 cf Inflow=9. cfs 0.4 af Discarded=0.1 cfs 0.14 af Primary=9.29 cfs 0.2 af Outflow=9.4 cfs af Pond 2P: Design Point 1 Inflow=13.3 cfs 1.1 af Primary=13.3 cfs 1.1 af Pond 4P: Rain Garden Peak Elev=144.22' Storage=2,023 cf Inflow=3.0 cfs 0.13 af Discarded=0.0 cfs 0.03 af Primary=3.34 cfs 0.01 af Outflow=3.39 cfs af Total Runoff Area = 3.0 ac Runoff Volume = 1. af Average Runoff Depth =.3" 9.% Pervious = 2.0 ac 30.33% Impervious = ac

44 Type II 24-hr 100-year Rainfall=.1" Page 34 Summary for Subcatchment PD1: Drainage Area #1 Runoff = hrs, Volume= af, Depth>.4" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 100-year Rainfall=.1" Area (ac) CN Description * Paved parking, HSG D EXIST Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall con2 Woodland Kv=.0 fps Shallow Concentrated Flow, shall to DP1 Woodland Kv=.0 fps Total Subcatchment PD1: Drainage Area #1 Hydrograph 12 Runoff Flow (cfs) cfs Type II 24-hr 100-year Rainfall=.1" Runoff Area=2.10 ac Runoff Volume=1.231 af Runoff Depth>.4" Flow Length=10' Tc=41. min CN= Time (hours)

45 Type II 24-hr 100-year Rainfall=.1" Page 3 Summary for Subcatchment PD2A: Roof Area Runoff = hrs, Volume= 0.34 af, Depth>.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 100-year Rainfall=.1" Area (ac) CN Description * Roofs, HSG D NEW ROOF % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).0 Direct Entry, Subcatchment PD2A: Roof Area Hydrograph Flow (cfs) cfs Type II 24-hr 100-year Rainfall=.1" Runoff Area=0.40 ac Runoff Volume=0.34 af Runoff Depth>.20" Tc=.0 min CN=9 Runoff Time (hours)

46 Type II 24-hr 100-year Rainfall=.1" Page 3 Summary for Subcatchment PD2B: Developed Area Runoff = hrs, Volume= 0.13 af, Depth>.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= hrs, dt= 0.0 hrs Type II 24-hr 100-year Rainfall=.1" Area (ac) CN Description * Paved parking, HSG D NEW Woods, Fair, HSG D >% Grass cover, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Sheet Flow, Sheet Flow Woods: Light underbrush n= P2= 3.2" Shallow Concentrated Flow, shall conc Paved Kv= 20.3 fps Shallow Concentrated Flow, Short Grass Pasture Kv=.0 fps. 14 Total Subcatchment PD2B: Developed Area Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 100-year Rainfall=.1" Runoff Area=0.310 ac Runoff Volume=0.13 af Runoff Depth>.29" Flow Length=14' Tc=. min CN= Time (hours)

47 Type II 24-hr 100-year Rainfall=.1" Page 3 Summary for Pond 1P: Detention System Inflow Area = 0.90 ac, 3.1% Impervious, Inflow Depth >.4" for 100-year event Inflow = hrs, Volume= 0.4 af Outflow = hrs, Volume= af, Atten= 3%, Lag= 1. min Discarded = hrs, Volume= 0.14 af Primary = hrs, Volume= 0.2 af Routing by Stor-Ind method, Time Span= hrs, dt= 0.0 hrs Peak Elev= hrs Surf.Area= 2,99 sf Storage=,92 cf Plug-Flow detention time=.3 min calculated for af (94% of inflow) Center-of-Mass det. time= 3.3 min ( ) Volume Invert Avail.Storage Storage Description # ' 3,0 cf 3.0" Round CMP_Round 3" x Inside #2 L=.0' #2 13.0' 2,13 cf Custom Stage Data (Prismatic)Listed below (Recalc) 10,0 cf Overall - 3,0 cf Embedded =,2 cf x 30.0% Voids # ' 393 cf.00'd x.00'h Vertical Cone/Cylinder x 4,10 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,20 10,0 10,0 Device Routing Invert Outlet Devices #1 Primary 13.0' 1.0" Round Culvert L= 0.0' RCP, sq.cut end projecting, Ke= 0.00 Inlet / Outlet Invert= 13.0' / 13.02' S= '/' Cc= n= Corrugated PE, smooth interior, Flow Area= 1. sf #2 Device '.0" Vert. Orifice/Grate C= 0.00 #3 Device 1 13.'.0" Vert. Orifice/Grate C= 0.00 #4 Device '.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) # Discarded 13.0' 1.00 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 131.0' Discarded OutFlow Max= hrs HW=13.94' (Free Discharge) =Exfiltration ( Controls 0.1 cfs) Primary OutFlow Max= hrs HW=13.94' (Free Discharge) 1=Culvert (Passes. cfs of 9.2 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.9 fps) 3=Orifice/Grate (Orifice Controls 1.3 fps) 4=Sharp-Crested Rectangular Weir (Weir Controls fps)

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016

Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016 Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98)

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020 December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town

More information

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.

More information

CITY OF AUBURN, NEW YORK

CITY OF AUBURN, NEW YORK CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24

More information

APPENDIX A Existing Conditions Map

APPENDIX A Existing Conditions Map APPENDIX A Existing Conditions Map APPENDIX B Conceptual Improvements Plans Sheets B-B- APPENDIX C Soil Mapping Hydrologic Soil Group Albany County, New York (McKownville Stormwater Project Soils)

More information

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b Plano esquemático 1 Estudio de flora y fauna 2 Estudio geotécnico 3 Determinación jurisdiccional de humedales 4 Prospección arqueológica fase 1a-1b 5 Cartas de las agencias 6 Estudio hidrológico e hidráulico

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

The New Jersey Nonstructural Strategies Point System (NSPS)

The New Jersey Nonstructural Strategies Point System (NSPS) 2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)

More information

Westcott site services

Westcott site services Westcott site services 6 prospect street Waltham ma 2453 781-647-62 westcottsite.com Hillside Center for Sustainable Living Newburyport, Massachusetts STORMWATER REPORT December 28, 215 WESTCOTT SITE SERVICES

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

Table 3-1 Summary of Storm Drain Outfalls

Table 3-1 Summary of Storm Drain Outfalls Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District February 4, 2003 MEMORANDUM TO: File FROM: Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District SUBJECT: Proposed minimum

More information

Stormwater Mitigation Worksheet

Stormwater Mitigation Worksheet Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:

More information

Flood Hydrology. for. Michigan Watercourses

Flood Hydrology. for. Michigan Watercourses Flood Hydrology for Michigan Watercourses Michigan Hydrologic Methodologies FEMA Flood Insurance Study (FIS) Statistical Analysis of USGS Gage Data (Gage) Statistical Models for Estimating Flow Characteristics

More information

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map RTKC- East Abutment Extension November 15, 2016 2.1. Figure 1. East Abutment Extension General Vicinity Map WP NATURAL RESOURCE CONSULTING, INC. 4 RTKC- East Abutment Extension November 15, 2016 2.2. Figure

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation 2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William

More information

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone

More information

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan

More information

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018 Stormwater Report For ACORN PLACE ACORN STREET MILLIS, MA Proposed Senior Residential Community July, PREPARED BY: MERRIKIN ENGINEERING, LLP Consulting Engineers Main Street, Suite C Millis, MA PREPARED

More information

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:

More information

Performance Standards Workshop Midwest Case Studies

Performance Standards Workshop Midwest Case Studies Performance Standards Workshop Midwest Case Studies Permeable Paving Permeable Paving Bioretention 1 Bioretention Bioretention Bioretention Bioretention 2 Green Roof Portland Stormwater Management Manual

More information

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark

More information

Visual On-land Trash Assessment Protocol for Stormwater

Visual On-land Trash Assessment Protocol for Stormwater Visual On-land Trash Assessment Protocol for Stormwater Version 1.3 Prepared by: EOA, Inc. 1410 Jackson St. Oakland, CA 94612 April 15, 2015 Visual On-land Trash Assessment Methodology INTRODUCTION This

More information

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006 Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and

More information

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Menkes Milton Industrial

Menkes Milton Industrial Menkes Milton Industrial Functional Servicing and Stormwater Management Report Prepared for: Menkes Milton Industrial Ltd. Prepared by: Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham,

More information

Dynamic Routing Applied to an Urban Subsurface Drainage System

Dynamic Routing Applied to an Urban Subsurface Drainage System Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY

More information

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR UNITY AVENUE STREET IMPROVEMENTS IMPROVEMENT PROJECT NO. 2011-05 CITY OF BROOKLYN CENTER, MINNESOTA January

More information

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN

SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN SEPTEMBER, 2006 ROAD DESIGN MANUAL 7-0(1) CHAPTER 7 PAVEMENT DESIGN 7-1.0 INTRODUCTION 7-2.0 RIGID PAVEMENT DESIGN 7-2.01 Cross Sections 7-2.02 Ramps and Loops with Storage Area 7-2.03 Major Forks, Branch

More information

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly

More information

Appendix B. Shallow Foundations Report

Appendix B. Shallow Foundations Report 12/10/2013 GEOTECHNICAL MANUAL Appendix B. Shallow Foundations Report PLEASE NOTE A sample foundations report is included here for reference. It is provided as an example of content, format, and organization

More information

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor

More information

NORTH DAKOTA 2011 FLOOD EVENT

NORTH DAKOTA 2011 FLOOD EVENT NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River

More information

ATTACHMENT B8 Incident History

ATTACHMENT B8 Incident History Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...

More information

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency Middle Fork American River Project (FERC Project No. 2079) 2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency 144 Ferguson Road Auburn,

More information

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012 Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals

More information

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID

More information

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff

More information

FINAL AND TEMPORARY REHABILITATION PRINCIPLES. BLOOMFIELD GROUP REPORT 2014 Rix s Creek

FINAL AND TEMPORARY REHABILITATION PRINCIPLES. BLOOMFIELD GROUP REPORT 2014 Rix s Creek Rix s Creek Lane Singleton NSW 2330 AUSTRALIA PO Box 4 East Maitland NSW 2323 T: 61 2 6578 8888 F: 61 2 6571 1066 ABN 25 003 824 244 FINAL AND TEMPORARY REHABILITATION PRINCIPLES BLOOMFIELD GROUP REPORT

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0

More information

APPENDIX D LAND INVENTORY DETAIL

APPENDIX D LAND INVENTORY DETAIL APPENDIX D LAND INVENTORY DETAIL 329 2009-204 Introduction The County s inventory of suitable land available for residential development includes vacant sites and sites with high potential for redevelopment

More information

The New S in SSES. Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen

The New S in SSES. Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen The New S in SSES Erin Hawkins, CFM, City of Lynchburg Ben Custalow, PE, Greeley and Hansen Outline Introduction to the City s program plan Current program status Data collection Statistical analysis /

More information

NORTH FORK FEATHER RIVER, CA

NORTH FORK FEATHER RIVER, CA Hydropower Project License Summary NORTH FORK FEATHER RIVER, CA ROCK CREEK CRESTA HYDROELECTRIC PROJECT (P-1962) Kayakers below the Cresta Dam Photo: Hydropower Reform Coalition This summary was produced

More information

ABSCOUR 9 USERS MANUAL

ABSCOUR 9 USERS MANUAL OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as

More information

Providence St. Peter Hospital s Annex to the Natural Hazards Mitigation Plan for the Thurston Region

Providence St. Peter Hospital s Annex to the Natural Hazards Mitigation Plan for the Thurston Region Providence St. Peter Hospital s Annex to the Natural Hazards Mitigation Plan for the Thurston Region Table of Contents Title Page and Table of Contents...1 Adopting Resolution...3...5 Providence St. Peter

More information

Bank Erosion and Bridge Scour

Bank Erosion and Bridge Scour JULY 2017 NCHRP PRACTICE-READY SOLUTIONS FOR Bank Erosion and Bridge Scour NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Bank Erosion and Bridge Scour: NCHRP

More information

Summary of Technical Analysis

Summary of Technical Analysis Introduction The following presentation was provided during a public meeting listening session on June 8, 2017 regarding the establishment of a protective elevation for White Bear Lake. This information

More information

The detection limit for tritium is 300 pci/l

The detection limit for tritium is 300 pci/l New Jersey Department of Environmental Protection - Bureau of Nuclear Engineering (BNE) Investigation of Found in Onsite Vault Background and Installation of Groundwater Monitoring Wells In April of 009,

More information

Two and One Half Year groundwater monitoring report at D.H. Griffin s Tower Ridge Landfill, GMS I.D. Number: NWD/17/

Two and One Half Year groundwater monitoring report at D.H. Griffin s Tower Ridge Landfill, GMS I.D. Number: NWD/17/ GLM & Associates Geoffrey L. Maddux Environmental Consultant 7497 Harvest Village Court Mailing Address P.O. Box 5339 Navarre, Florida 32566 (850) 939-8037 Fax (850) 936-5261 August 10, 2015 Ms. Dawn Templin,

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

Emergency Bridge Stabilization at Mile Watrous Subdivision

Emergency Bridge Stabilization at Mile Watrous Subdivision Emergency Bridge Stabilization at Mile 189.70 Watrous Subdivision Christophe Deniaud, Ph.D., P.Eng. Bridge Engineer, CN 10004-104 Avenue Edmonton, Alberta, Canada T5J 0K2 Tel: (780) 421-6021 Fax: (780)

More information

PARSONS PHARMACY REDEVELOPMENT

PARSONS PHARMACY REDEVELOPMENT FOR SALE PARSONS PHARMACY REDEVELOPMENT 294 NW 2nd Avenue, Canby, OR 97013 RYAN IMBRIE MANAGING DIRECTOR ryan.imbrie@svn.com O: 503.28.9403 M: 503.705.7352 The information listed above has been obtained

More information

By James Owino, Universität für Bodenkultur, Wien Ralph Gretzmacher, Universität für Bodenkultur, Wien

By James Owino, Universität für Bodenkultur, Wien Ralph Gretzmacher, Universität für Bodenkultur, Wien PERFORMANCE OF NARROW STRIPS OF VETIVER GRASS (Vetiveria zizanioides) AND NAPIER GRASS (Pennisetum purpureum) AS BARRIERS AGAINST RUNOFF AND SOIL LOSS ON A CLAY LOAM SOIL IN KENYA. By James Owino, Universität

More information

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge 5 th National Conference on Coastal and Estuarine Habitat Restoration Preparing for Climate Change: Science, Practice, and Policy Performance of Vetiver Grass in Protecting Embankments on the Bangladesh

More information

COUNCIL AGENDA REPORT

COUNCIL AGENDA REPORT COUNCIL AGENDA REPORT Meeting Date: 8 September 2015 Subject: Boards Routed Through: South Point Commercial and Residential NSPs Municipal Planning Commission Date: 20 August 2015 Issue: Council is being

More information

February 6, 2018 Boulder, CO James Creek & Left Hand Creek

February 6, 2018 Boulder, CO James Creek & Left Hand Creek Public Review of Draft Boulder County Floodplain Maps February 6, 2018 Boulder, CO James Creek & Left Hand Creek HOUSEKEEPING Sign-in sheet Newsletters & Flyers Snacks, restrooms, etc. Tonight s Agenda

More information

ORDINANCE NUMBER 2381

ORDINANCE NUMBER 2381 Ordinance Number 2381 Page 1 ORDINANCE NUMBER 2381 AN ORDINANCE TO FURTHER AMEND THE ZONING ORDINANCE AND THE ZONING MAP OF THE CITY OF VESTAVIA HILLS, ALABAMA, ADOPTED SEPTEMBER 16, 1985, AND AS LAST

More information

LAKE NAIVASHA. A Lake in Trouble. A Possible Solution?

LAKE NAIVASHA. A Lake in Trouble. A Possible Solution? LAKE NAIVASHA A Lake in Trouble A Possible Solution? THE PROBLEM Significant and dangerous reduction in the size of the Lake Naivasha water body and serious degradation of water quality caused by: 1. Large

More information

GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets

GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets GIS-centric Workflows: Cityworks Getting Detail on Stormwater Assets Tony Bedogne, GISP GIS Technician Washtenaw County, MI bedognea@ewashtenaw.org

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

EAH 422 ADVANCED WATER RESOURCES ENGINEERING

EAH 422 ADVANCED WATER RESOURCES ENGINEERING EAH 422 ADVANCED WATER RESOURCES ENGINEERING Bridge Hydraulics Prof. Aminuddin Ab. Ghani References The Art And Science Of River Engineering Bridge Failure Pier scour Pier scour Pier scour Bridge Failure

More information

Overview of State and Federal Water Law. Jennifer Gimbel Colorado Water Institute

Overview of State and Federal Water Law. Jennifer Gimbel Colorado Water Institute Overview of State and Federal Water Law Jennifer Gimbel Colorado Water Institute Mormons establish large irrigated network. By 1865, Mormons had dug 1,000 miles of canals in Utah. 1859 Gold Rush in the

More information

Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success.

Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success. Slope Stabilization in Itaipava Petropolis, RJ, Brazil Using Vetiver Solution A Total Success. By Paulo R.Rogerio,PE,Geotechnical Consulting Engineer Pomerode SC Brazil email: prrog@terra.com.br and Joao

More information

Guide to Public Participation. Addressing: Hearing Examiner Process

Guide to Public Participation. Addressing: Hearing Examiner Process Guide to Public Participation Addressing: Hearing Examiner Process COVER LAST REVISED 7/25/2014 GUIDE TO PUBLIC PARTICIPATION BEFORE THE HEARING EXAMINER FOR SPECIAL EXCEPTIONS, VARIANCES, AND REZONINGS

More information

Sharon Call, Chairperson Mike Marchbanks, Commissioner Rob Kallas, Commissioner Kathy Moosman, Recorder

Sharon Call, Chairperson Mike Marchbanks, Commissioner Rob Kallas, Commissioner Kathy Moosman, Recorder The Lindon City held a regularly scheduled meeting on Tuesday, February 13, beginning at 7:00 p.m. at the Lindon City Center, City Council Chambers, 0 North State Street, Lindon, Utah. REGULAR SESSION

More information

Sampling road runoff to estimate loads of copper and zinc

Sampling road runoff to estimate loads of copper and zinc Sampling road runoff to estimate loads of copper and zinc Jonathan Moores NZWWA 6th South Pacific Stormwater Conference Auckland, April 29-11 May 2009. Background Key questions Previous studies Vehicle

More information

Getting Results: Measuring Postwildfire. Treatment Effectiveness

Getting Results: Measuring Postwildfire. Treatment Effectiveness Getting Results: Measuring Postwildfire Erosion Control Treatment Effectiveness BAER Burned Area Emergency Response Pete Robichaud, R. Brown, P. Wohlgemuth, J. Wagenbrenner Rocky Mountain and Pacific Southwest

More information

Common Guidance for the Interpretation & Identification of High Conservation Values. 1 July, 2013 Santiago

Common Guidance for the Interpretation & Identification of High Conservation Values. 1 July, 2013 Santiago Common Guidance for the Interpretation & Identification of High Conservation Values 1 July, 2013 Santiago HCV Common Guidance Update on P9 and Common Guidance Key considerations for interpretation The

More information

Flume Installation Instructions

Flume Installation Instructions Flume Installation Instructions To ensure a successful installation, it is important to keep the following points in mind: 1) There should be no bend, dips, elbows, or flow junction immediately upstream

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

ADD THE FOLLOWING TO THE END OF SECTION 8 SPECIAL PROVISIONS - AS A NEW SECTION 8.11

ADD THE FOLLOWING TO THE END OF SECTION 8 SPECIAL PROVISIONS - AS A NEW SECTION 8.11 ADD THE FOLLOWING TO THE END OF SECTION 8 SPECIAL PROVISIONS - AS A NEW SECTION 8.11 8.11. Licensed Marijuana Establishments. A. Purpose. The purpose of this section is to provide for the placement of

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 4992 CSAH NO. 4 OVER THE CLEARWATER RIVER (DAM) DISTRICT 2 - CLEARWATER COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing

Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing Clay Sewer Pipe-Joint Infiltration Leak-Rate Testing 1. ABSTRACT While numbers of small to large older cities are undertaking repairs and maintenance, several other newer cities are planning on installing

More information

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY Supporting the Marcellus Shale Boom Marc Reeves, P.G. May 6, 2011 Outline Intro to SAIC Basics on the Marcellus Shale Natural gas demand Nationwide

More information

APPENDIX B: REFERENCE LIST

APPENDIX B: REFERENCE LIST APPENDIX B: REFERENCE LIST 1 Arroyo Corte Madera del Presidio Corte Madera Creek Miller Creek Novato Creek Storm Water Pollution Prevention Program (MCSTOPPP) 1999 Ambient Monitoring Program 2 Corte Madera

More information

Site Overview ROSEWICK RD, MD -

Site Overview ROSEWICK RD, MD - Site Overview ROSEWICK RD, MD - Location Site Address : ROSEWICK RD, MD Owner Owner Name : AMK LLC Parcel No. (APN) : 06-043046 Owner Address : PO BOX 2680 STAFFORD, VA 22555 Legal Information : 1 AC ON

More information

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report INITIAL ANNUAL INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION Initial Annual RCRA CCR Unit Inspection Report PRIMARY BASIN NUMBER 2 SURFACE IMPOUNDMENT Submitted

More information

Nall Corporate Centre I and II SWC of College Boulevard and Nall Avenue

Nall Corporate Centre I and II SWC of College Boulevard and Nall Avenue Nall Corporate Centre I and II SWC of College Boulevard and Nall Avenue Presented by: Kenneth G. Block, SIOR, CCIM 816.932.5551 kblock@blockllc.com Hunter Johnson 816.412.5878 hjohnson@blockllc.com Block

More information

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures

More information

Public Hearing Handout November 2012

Public Hearing Handout November 2012 West Waukesha Bypass Draft Environmental Impact Statement Waukesha County Department of Public Works I.D. 2788-01-00 Public Hearing Handout November 2012 TBG051110133551MKE Handout Packet Contents Page

More information

Two Dimensional Computer Modeling of

Two Dimensional Computer Modeling of \N P? v&cu&ae yoomk Two Dimensional Computer Modeling of Green River at Dinosaur National Monument and Canyonlands National Park For: Water Rights Branch Water Resources Division National Park Service

More information

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis

More information

MDH GOLD S TANDARD - B UYERS GUIDE

MDH GOLD S TANDARD - B UYERS GUIDE W HAT IS RADON? Radon is a naturally occurring radioactive gas that enters buildings from the surrounding soil. It is colorless, odorless and tasteless. Radon is also the main source of ionizing radiation

More information

ADDENDUM. Submitted to: CPV Valley, LLC 35 Braintree Hill Office Park Braintree, MA Submitted by: