Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016

Size: px
Start display at page:

Download "Drainage and Detention Report. for. Charity Auto Sales. located at: East 116 th Street North Collinsville, OK Revised August 22, 2016"

Transcription

1 Drainage and Detention Report for Charity Auto Sales located at: 9 East 6 th Street North Collinsville, OK 742 Revised August 22, 26 Olsson Associates, Inc. 9 N. Birch Street, Suite 2 Owasso, OK 74 (98) Fax (98) Oklahoma Certificate of Authorization No. 2483

2 LETTER AGREEMENT FOR PROFESSIONAL SERVICES City of Owasso, Public Works Department 3 W. 2 nd Avenue Owasso, OK 74 8/2/26 Re: Submittal of Revised Drainage and Detention Report Charity Auto Sales 9 E. 6 th Street N. On behalf of Charity Auto Sales, Impact Engineering and Planning, PLC hereby submits this revised drainage report for permitting of the proposed facility located at 9 E. 6 th Street N. in Owasso, OK. It is the intent of Charity Auto Sales to construct a new facility on the property for use as a used car dealership. It is our goal to show that the proposed improvements will not adversely affect the stormwater flows in the Blackjack Creek basin and the Brookfield Crossing subdivision. We have evaluated the existing and proposed system for the -, 2-, -, -, 2-, -, - and -year storm events. It was our intent to model the existing system using methodologies acceptable to the City of Owasso. The stormwater flows are at or below the existing conditions for the -, -, 2-, -, - and -year events. The proposed flows do exceed the existing flows for the - and 2-year events. We would like to request a variance from the City of Owasso Stormwater Drainage Criteria to allow for the increases in the low instance events since no downstream impacts would be evident. Please feel free to call with any questions or comments. Sincerely, Kevin Vanover, P.E., LEED AP I hereby certify that this drainage and detention report was prepared by me in accordance with local drainage design criteria. Kevin Vanover, P.E. Registered Professional Engineer State of Oklahoma No Page of

3 Index Cover Letter... General Location and Description... 3 Drainage Design Criteria... Detention Summary... 8 Project Hydraulic Summary... 9 References... Appendices Proposed Grading Plans... 3 Existing Drainage Area Map (Fold-out)... 4 Existing Hydrology/Hydraulic Data... Area Map (Fold-out) Proposed Hydrology/Hydraulic Data Tables Table Detention Summary... 8 Table 2 Runoff Summary (Combined Flows at Existing 36 Pipe)... Table 3 Runoff Summary (Flows on to Lots 36 and 37, Block 2)... 2

4 General Location and Description Location The legal description of the project site is: A Parcel of land commencing at a point in the southwest corner of Section, Township 2 North, Range 4 East, Tulsa County, State of Oklahoma; thence N E a distance of 88. feet to the Point of Beginning; thence N E a distance of 37. feet; thence N 8 4 W a distance of 22. feet; thence S W a distance of 37. feet; thence S 8 4 E a distance of 22. feet to the point of beginning. Less the south 6. feet. Said Parcel containing.9 Acres (22,6. S.F.) more or less. Description of Property The proposed Charity Auto Sales sits on approximately.2 acres of land 82 feet east of N. Garnett Road on E. 6 th Street N. on the north side of 6th in the City of Owasso, OK. The site is bordered on the north and east by a residential subdivision (Brookfield Crossing) on the west by Agriculturally zoned undeveloped land (Owasso Land Use Masterplan identifies as Commercial) and on the south by an arterial road (E. 6 th Street N). The site drains to the north and west into an open cut ditch that runs to the west then to the north into a 36 pipe that directs the stormwater flow to the stormwater detention facility for Brookfield Crossing. The current topography of the site slopes from the southeast to the northwest. The grades are gradual (% to 3% maximum). Stormwater Detention Objects Watershed: Detention: The Charity Auto Sales project lies within the Blackjack Creek watershed and will require facilities to regulate the stormwater runoff from the site to mitigate the downstream impacts to the Blackjack Creek basin. The overall drainage patterns will remain unchanged. It is the intent of the design to mitigate the impacts of the increased stormwater flows using a parking lot detention facility. The design of the detention facility is detailed in the construction plans included in the appendix of this report. The pond is controlled using a series of 3

5 curb openings along with an extended curb measuring -7 /4 at its tallest. The top of the curb is set as a broad-crested weir with an elevation of 698.8, containing the stormwater storage volume within the proposed parking lot. The detention basin provides storage and a control structure slowing the rate of flow through the facility off-setting the increased flows created by the site development for the all storm events. 4

6 Drainage Design Criteria Regulations: Owasso Stormwater Drainage Criteria methods approved and recommended by local design criteria were applied in the hydrologic and hydraulic design of the Charity Auto Sales project drainage facilities. Hydrologic Methodology: The SCS hydrologic method requires basic data similar to the Rational Method: drainage area, a runoff factor, time of concentration, and rainfall. However, the SCS approach is more sophisticated in that it also considers the time distribution of the rainfall, the initial rainfall losses due to interception and depression storage, and an infiltration rate that decreases during the course of a storm. A typical application of the SCS method includes the following basic steps:. Determination of curve numbers that represent different land uses within the drainage area; 2. Calculation of time of concentration to the study point; 3. Use of the SCS Type II rainfall distribution in this area (per Owasso Drainage Design Criteria Section.2.F); and 4. Use of the unit hydrograph approach to develop the hydrograph of direct runoff from the drainage basin. The SCS method can be used for both the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. The SCS method can be used for most design applications, including storage facilities and outlet structures, storm drain systems, culverts, small drainage ditches and open channels, and energy dissipaters. The principal physical watershed characteristics affecting the relationship between rainfall and runoff are land use, land treatment, soil types, and land slope. The SCS method uses a combination of soil conditions and land uses (ground cover) to assign a runoff factor to an area. These runoff factors, called runoff curve numbers (CN), indicate the runoff potential of an area. The higher the CN, the higher the runoff potential. Soil properties influence the relationship between runoff and rainfall since soils have differing rates of infiltration. Based on infiltration rates, the SCS has divided soils into four hydrologic soil groups (HSG). Group A Soils having a low runoff potential due to high infiltration rates. These soils consist primarily of deep, well-drained sands and gravels.

7 Group B Soils having a moderately low runoff potential due to moderate infiltration rates. These soils consist primarily of moderately deep to deep, moderately well to well drained soils with moderately fine to moderately coarse textures. Group C Soils having a moderately high runoff potential due to slow infiltration rates. These soils consist primarily of soils in which a layer exists near the surface that impedes the downward movement of water or soils with moderately fine to fine texture. Group D Soils having a high runoff potential due to very slow infiltration rates. These soils consist primarily of clays with high swelling potential, soils with permanently high water tables, soils with a claypan or clay layer at or near the surface, and shallow soils over nearly impervious parent material. Data obtained from the soil borings performed on the site and from the U.S. Department of Agriculture, Natural Resources Conservation Service, Web Soil Survey site, indicated that the soil group to be used for this project is Group C. The corresponding Curve Numbers are shown in tabular form for each drainage area on the Existing and Area Maps. The Rainfall used for the SCS method was derived directly from the City of Owasso Engineering Design Criteria (Section 4.2) is based on a storm event that has a Type II time distribution. This distribution is used to distribute the 24-hour volume of rainfall for the different storm frequencies. Detention Discharge and Storage Calculation Method (when required): The Dynamic-Storage-Indication method was the technique used for sequential pond routing due to the presence of a dynamic tailwater at the pond s discharge. The Dynamic-Storage-Indications methods uses the same calculations as the static Storage-Indication method, except that the stagedischarge and storage-indication curves are re-evaluated at each time step, based on the current elevation of any downstream nodes. This allows the routing to respond to ongoing tailwater changes, rather than assuming static tailwater conditions. A simplified description of this procedure follows. ) The pond's stage-discharge relationship is calculated based on the specified outlet devices. This curve typically covers the entire elevation range over which storage and/or outlet devices have been specified. 2) Using the specified storage information, a stage-storage relationship is determined over the same elevation range. 6

8 3) The stage-discharge and stage-storage curves are used to create a storage-indication curve, defined by the equation: where SI = S dt O 2 SI=Storage Indication value S=Pond Storage O=Pond Outflow dt=time increment 4) Routing is performed using the specified time span and time increment. At each point in time, a storage-indication value is calculated based on the equation: O I+I2 SI = S - -- dt dt 2 2 where S=Storage at start of time step O=Outflow at start of time step I/I2=Inflow at start/end of time step ) The original storage-indication curve is consulted to determine the elevation that corresponds to the new storage-indication value. 6) Using the new elevation, the stage-storage and stage-discharge curves are consulted to determine the new storage and discharge values. 7) This process is repeated for all points in the inflow hydrograph. If the pond has multiple outlets, the routing is performed based on the total discharge, and is then split according to the characteristics of the individual outlets. Design Storm Recurrence Intervals 24-hour design storms were developed for the -, 2-, -, -, 2-, -, - and -year storms. The -year flood is the standard for design of most drainage structures. 7

9 Detention Summary The proposed development will have a detention facility working to maintain the pre-developed flows. The pond detailed is located in the parking lot on the west side of the project. Table, shown below, summarizes the developed flow rates from the proposed detention facility. As shown, the proposed detention facility controls flow from the site for the -, 2-, -, -, 2-, -, - and -year events. The hydrographs for each sub basin (-year event only) are included in the appendix of this report for both the existing and the proposed conditions. Table. Detention Summary (Parking Lot Detention Facility) Storm Event Inflow (Q) Outflow (Q) Max. Depth* W.S. Elev. -year.63 cfs.84 cfs.93 ft year 2.3 cfs.3 cfs.6 ft year 3.6 cfs.39 cfs.26 ft year 3.4 cfs.63 cfs.3 ft year 4.28 cfs 2. cfs.46 ft year 4.79 cfs 2.2 cfs.3 ft year.42 cfs 2.6 cfs.6 ft year 6.67 cfs.42 cfs.68 ft * Maximum Depth of detained flow occurs at curb opening. Bottom elevation of curb opening is

10 Project Hydraulic Summary The pre-developed site consists of a two (2) basins. Existing Drainage Areas E and Area E2 (as shown on the Existing Drainage Map included in the appendix) are the existing conditions of the development site. Area E drains the western portion of the existing site to the north and west and into a system that directs the flow into the Brookfield Crossing detention facility. Area E2 consists of the eastern portion of the site that flows overland to lots 36 and 37, Block 2 of Brookfield Crossing. The existing flow hydrographs are included with the Existing Drainage Data in Appendix A. The SCS model indicates that the peak flow for a -year storm in Area E of.66 cfs occurring at 2. hours (723. minutes) during the modeled Type II 24-hour storm. This flow will establish the baseline to be used in comparing the effects of the pre- and post-development impacts. The proposed system consists of three basins as shown on the Map included in the appendix. Basin P drains to the proposed detention facility located on the west side of the proposed development. The discharge from the detention facility combines with the discharge from area P2 in a ditch to the south of the southern boundary of Block 2 of the Brookfield Crossing subdivision. The existing 36 stormwater pipe is located in the southwest corner of Lot 34, Block 2. Once it enters the Brookfield Crossing system it is carried directly into a detention facility. The detention facility discharges into an unnamed tributary of Blackjack Creek. Blackjack Creek carries the flow north to Horsepen Creek and eventually into the Caney River near 6 st Street N. and U.S. 69. Drainage Basin P2 consists of the street yard along 6 th Street along with the undeveloped land to the west of the project site. The area analyzed drains from a high point in the right-of-way to the west and then north where it joins the discharge from area P at the Brookfield Crossing inlet pipe. Drainage Basin P3 consists of the slim section of the site that consists of back yards to the east and the northern yard of the site along with the northern half of the proposed building. This area is mostly maintained grasses, as well as the northern portion of the proposed building, and it directed to the northwest and into the yards to the north of the project site. This drainage basin is a remnant of the existing area E2. The majority of area E2 was diverted to the detention basin. Drainage Basins P and P2 were combined at the northwest corner of the site for the purpose of this analysis. The Data is included in Appendix A. The SCS model indicates that the peak flow for a -year storm of 6.27 cfs occurs at.9 hours (77. minutes) during the modeled Type II 24-hour storm. When the reduction of stormwater flows that were directed to the lots north of the proposed facility during the existing conditions are taken into account, since they combine in the street directly north of the project location, a net reduction of all storm events with the exception of the - and 2- year events occurs. 9

11 The hydrographs for each sub basin are included in the appendix of this report for both the existing and the proposed conditions and the drainage data is shown on the following tables. Table 2. Runoff Summary (Combined Flows at Existing 36 Pipe) Storm Existing Site Proposed Site Existing Proposed Event Outflow Outflow Velocity* Velocity* -year.97 cfs.4 cfs 2. fps 2.6 fps 2-year. cfs.97 cfs 2.3 fps 2.4 fps -year 2.62 cfs 3. cfs 2.73 fps 2.7 fps -year 3.22 cfs 3.72 cfs 2.9 fps 2.89 fps 2-year 4.7 cfs 4.69 cfs 3. fps 3.8 fps -year 4.83 cfs.39 cfs 3.3 fps 3.9 fps -year.66 cfs 6.27 cfs 3.46 fps 3.33 fps -year 7.32 cfs 8.7 cfs 3.7 fps 3.6 fps * The existing and proposed velocities are determined in the ditch along the northwest corner of the proposed site after the point of the combined flows. Table 3. Runoff Summary (Flows on to Lots 36 and 37, Block 2) Storm Existing Site Proposed Site Existing Proposed Event Outflow Outflow Velocity Velocity -year.49 cfs.26 cfs 2.6 fps.88 fps 2-year.78 cfs.38 cfs 2.6 fps.88 fps -year.39 cfs.64 cfs 2.6 fps.88 fps -year.72 cfs.77 cfs 2.6 fps.88 fps 2-year 2.2 cfs.98 cfs 2.6 fps.88 fps -year 2.62 cfs.3 cfs 2.6 fps.88 fps -year 3.9 cfs.32 cfs 2.6 fps.88 fps -year 4.2 cfs.68 cfs 2.6 fps.88 fps

12 References. HydroCAD Software Solutions, LLC. Internet web site ( / Program About information. Version 9., Copyright U.S. Department of Agriculture, Natural Resources Conservation Service, Web Soil Survey internet web site ( 3. City of Owasso Engineering Design Criteria, May 8, 2

13 Appendices 2

14 R N LEGEND Know what's 8/2/26 % CONSTRUCTION DOCUMENTS drawn by: KGV checked by: KGV approved by: QA/QC by: project no.: drawing no.: date: //26 SHEET C-2 GRADING PLAN CHARITY AUTO SALES NEW FACILITY REV. NO. DATE REVISIONS DESCRIPTION 8/2/26 R 9 EAST 6TH STREET NORTH OWASSO, OK REVISIONS 9 N. Birch St., Suite 2 Owasso, OK 74 TEL FAX

15 Know what's R E HOGWIRE FENCE 6' WOOD FENCE E HOME WOOD -STORY E2 E2 6' WOOD FENCE N LEGEND E 8/2/26 % CONSTRUCTION DOCUMENTS drawn by: KGV checked by: KGV approved by: QA/QC by: project no.: drawing no.: date: //26 SHEET C-3 EXISTING DRAINAGE PLAN CHARITY AUTO SALES NEW FACILITY REV. NO. DATE REVISIONS DESCRIPTION 8/2/26 R 9 EAST 6TH STREET NORTH OWASSO, OK REVISIONS 9 N. Birch St., Suite 2 Owasso, OK 74 TEL FAX

16 7S 8S Area E Area E2 9R (new Reach) Subcat Reach Pond Link Drainage Diagram for Existing Drainage, Printed 8/24/26

17 Existing Drainage Existing Data - August 26 Printed 8/24/26 Page 2 Area (acres) CN.2 74 (7S, 8S) (7S, 8S) Description (subcatchment-numbers) Area Listing (all nodes)

18 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 3 Time span=.-2. hrs, dt=. hrs, 3 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: Area E Subcatchment 8S: Area E2 Reach 9R: (new Reach) Runoff Area=3,33 sf 7.79% Impervious Runoff Depth>.9" Flow Length=42' Tc=3. min CN=76 Runoff=.97 cfs. af Runoff Area=6,8 sf.9% Impervious Runoff Depth>.82" Flow Length=272' Tc=. min CN=74 Runoff=.49 cfs.2 af Avg. Flow Depth=.7' Max Vel=2. fps Inflow=.97 cfs. af n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Outflow=.94 cfs. af

19 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 4 Summary for Subcatchment 7S: Area E Runoff = hrs, Volume=. af, Depth>.9" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=3." Area (sf) CN Description * 2, * 28, ,33 76 Weighted Average 28, % Pervious Area 2, % Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps Total Subcatchment 7S: Area E Hydrograph Runoff Flow (cfs).97 cfs Type II 24-hr -Year Rainfall=3." Runoff Area=3,33 sf Runoff Volume=. af Runoff Depth>.9" Flow Length=42' Tc=3. min CN= Time (hours)

20 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page Summary for Subcatchment 8S: Area E2 Runoff = hrs, Volume=.2 af, Depth>.82" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=3." Area (sf) CN Description * *, ,8 74 Weighted Average, % Pervious Area 37.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps. 272 Total Subcatchment 8S: Area E2 Hydrograph Runoff Flow (cfs) cfs Type II 24-hr -Year Rainfall=3." Runoff Area=6,8 sf Runoff Volume=.2 af Runoff Depth>.82" Flow Length=272' Tc=. min CN= Time (hours)

21 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 6 Summary for Reach 9R: (new Reach) Inflow Area =.79 ac, 7.79% Impervious, Inflow Depth >.9" for -Year event Inflow = hrs, Volume=. af Outflow = hrs, Volume=. af, Atten= 4%, Lag= 2.4 min Routing by Stor-Ind+Trans method, Time Span=.-2. hrs, dt=. hrs Max. Velocity= 2. fps, Min. Travel Time=.3 min Avg. Velocity =.79 fps, Avg. Travel Time= 3.3 min Peak Storage= hrs Average Depth at Peak Storage=.7' Bank-Full Depth=.', Capacity at Bank-Full= 42.8 cfs.' x.' deep Parabolic Channel, n=.24 Length= 7.' Slope=.9 '/' Inlet Invert= 696.', Outlet Invert= 693.' Reach 9R: (new Reach) Hydrograph Flow (cfs).97 cfs.94 cfs Inflow Area=.79 ac Avg. Flow Depth=.7' Max Vel=2. fps n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Inflow Outflow Time (hours)

22 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 7 Reach 9R: (new Reach) Stage-Discharge Primary Depth 2 2 Discharge (cfs) Reach 9R: (new Reach) Stage-Storage Storage Depth Storage (cubic-feet) 7 8 9,

23 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 8 Stage-Discharge for Reach 9R: (new Reach) Velocity (ft/sec) Discharge (cfs) Velocity (ft/sec) Discharge (cfs)

24 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=3." Printed 8/24/26 Page 9 Stage-Area-Storage for Reach 9R: (new Reach) End-Area (sq-ft) Storage (cubic-feet) End-Area (sq-ft) Storage (cubic-feet) , , , ,47

25 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page Time span=.-2. hrs, dt=. hrs, 3 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: Area E Subcatchment 8S: Area E2 Reach 9R: (new Reach) Runoff Area=3,33 sf 7.79% Impervious Runoff Depth>.4" Flow Length=42' Tc=3. min CN=76 Runoff=.2 cfs.84 af Runoff Area=6,8 sf.9% Impervious Runoff Depth>.28" Flow Length=272' Tc=. min CN=74 Runoff=.78 cfs.39 af Avg. Flow Depth=.2' Max Vel=2.3 fps Inflow=.2 cfs.84 af n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Outflow=.47 cfs.84 af

26 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page Summary for Subcatchment 7S: Area E Runoff =.2 2. hrs, Volume=.84 af, Depth>.4" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr 2-Year Rainfall=3.7" Area (sf) CN Description * 2, * 28, ,33 76 Weighted Average 28, % Pervious Area 2, % Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps Total Subcatchment 7S: Area E Hydrograph Runoff Flow (cfs).2 cfs Type II 24-hr 2-Year Rainfall=3.7" Runoff Area=3,33 sf Runoff Volume=.84 af Runoff Depth>.4" Flow Length=42' Tc=3. min CN= Time (hours)

27 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page 2 Summary for Subcatchment 8S: Area E2 Runoff = hrs, Volume=.39 af, Depth>.28" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr 2-Year Rainfall=3.7" Area (sf) CN Description * *, ,8 74 Weighted Average, % Pervious Area 37.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps. 272 Total Subcatchment 8S: Area E2 Hydrograph Flow (cfs) cfs Type II 24-hr 2-Year Rainfall=3.7" Runoff Area=6,8 sf Runoff Volume=.39 af Runoff Depth>.28" Flow Length=272' Tc=. min CN=74 Runoff Time (hours)

28 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page 3 Summary for Reach 9R: (new Reach) Inflow Area =.79 ac, 7.79% Impervious, Inflow Depth >.4" for 2-Year event Inflow =.2 2. hrs, Volume=.84 af Outflow = hrs, Volume=.84 af, Atten= 4%, Lag= 2. min Routing by Stor-Ind+Trans method, Time Span=.-2. hrs, dt=. hrs Max. Velocity= 2.3 fps, Min. Travel Time=. min Avg. Velocity =.8 fps, Avg. Travel Time= 3. min Peak Storage= hrs Average Depth at Peak Storage=.2' Bank-Full Depth=.', Capacity at Bank-Full= 42.8 cfs.' x.' deep Parabolic Channel, n=.24 Length= 7.' Slope=.9 '/' Inlet Invert= 696.', Outlet Invert= 693.' Reach 9R: (new Reach) Hydrograph Flow (cfs).2 cfs.47 cfs Inflow Area=.79 ac Avg. Flow Depth=.2' Max Vel=2.3 fps n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Inflow Outflow Time (hours)

29 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page 4 Reach 9R: (new Reach) Stage-Discharge Primary Depth 2 2 Discharge (cfs) Reach 9R: (new Reach) Stage-Storage Storage Depth Storage (cubic-feet) 7 8 9,

30 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page Stage-Discharge for Reach 9R: (new Reach) Velocity (ft/sec) Discharge (cfs) Velocity (ft/sec) Discharge (cfs)

31 Existing Drainage Existing Data - August 26 Type II 24-hr 2-Year Rainfall=3.7" Printed 8/24/26 Page 6 Stage-Area-Storage for Reach 9R: (new Reach) End-Area (sq-ft) Storage (cubic-feet) End-Area (sq-ft) Storage (cubic-feet) , , , ,47

32 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 7 Time span=.-2. hrs, dt=. hrs, 3 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: Area E Subcatchment 8S: Area E2 Reach 9R: (new Reach) Runoff Area=3,33 sf 7.79% Impervious Runoff Depth>2.4" Flow Length=42' Tc=3. min CN=76 Runoff=2.63 cfs.46 af Runoff Area=6,8 sf.9% Impervious Runoff Depth>2.28" Flow Length=272' Tc=. min CN=74 Runoff=.39 cfs.7 af Avg. Flow Depth=.27' Max Vel=2.73 fps Inflow=2.63 cfs.46 af n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Outflow=2.4 cfs.46 af

33 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 8 Summary for Subcatchment 7S: Area E Runoff = hrs, Volume=.46 af, Depth> 2.4" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=." Area (sf) CN Description * 2, * 28, ,33 76 Weighted Average 28, % Pervious Area 2, % Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps Total Subcatchment 7S: Area E Hydrograph Runoff Flow (cfs) cfs Type II 24-hr -Year Rainfall=." Runoff Area=3,33 sf Runoff Volume=.46 af Runoff Depth>2.4" Flow Length=42' Tc=3. min CN= Time (hours)

34 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 9 Summary for Subcatchment 8S: Area E2 Runoff = hrs, Volume=.7 af, Depth> 2.28" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=." Area (sf) CN Description * *, ,8 74 Weighted Average, % Pervious Area 37.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps. 272 Total Subcatchment 8S: Area E2 Hydrograph Runoff Flow (cfs).39 cfs Type II 24-hr -Year Rainfall=." Runoff Area=6,8 sf Runoff Volume=.7 af Runoff Depth>2.28" Flow Length=272' Tc=. min CN= Time (hours)

35 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 2 Summary for Reach 9R: (new Reach) Inflow Area =.79 ac, 7.79% Impervious, Inflow Depth > 2.4" for -Year event Inflow = hrs, Volume=.46 af Outflow = hrs, Volume=.46 af, Atten= 3%, Lag=.7 min Routing by Stor-Ind+Trans method, Time Span=.-2. hrs, dt=. hrs Max. Velocity= 2.73 fps, Min. Travel Time=. min Avg. Velocity =.94 fps, Avg. Travel Time= 2.8 min Peak Storage= 2.6 hrs Average Depth at Peak Storage=.27' Bank-Full Depth=.', Capacity at Bank-Full= 42.8 cfs.' x.' deep Parabolic Channel, n=.24 Length= 7.' Slope=.9 '/' Inlet Invert= 696.', Outlet Invert= 693.' Reach 9R: (new Reach) Hydrograph Flow (cfs) cfs 2.4 cfs Inflow Area=.79 ac Avg. Flow Depth=.27' Max Vel=2.73 fps n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Inflow Outflow Time (hours)

36 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 2 Reach 9R: (new Reach) Stage-Discharge Primary Depth 2 2 Discharge (cfs) Reach 9R: (new Reach) Stage-Storage Storage Depth Storage (cubic-feet) 7 8 9,

37 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 22 Stage-Discharge for Reach 9R: (new Reach) Velocity (ft/sec) Discharge (cfs) Velocity (ft/sec) Discharge (cfs)

38 Existing Drainage Existing Data - August 26 Type II 24-hr -Year Rainfall=." Printed 8/24/26 Page 23 Stage-Area-Storage for Reach 9R: (new Reach) End-Area (sq-ft) Storage (cubic-feet) End-Area (sq-ft) Storage (cubic-feet) , , , ,47

39 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 24 Time span=.-2. hrs, dt=. hrs, 3 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: Area E Subcatchment 8S: Area E2 Reach 9R: (new Reach) Runoff Area=3,33 sf 7.79% Impervious Runoff Depth>3.2" Flow Length=42' Tc=3. min CN=76 Runoff=3.23 cfs.8 af Runoff Area=6,8 sf.9% Impervious Runoff Depth>2.84" Flow Length=272' Tc=. min CN=74 Runoff=.72 cfs.87 af Avg. Flow Depth=.3' Max Vel=2.9 fps Inflow=3.23 cfs.8 af n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Outflow=3.3 cfs.8 af

40 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 2 Summary for Subcatchment 7S: Area E Runoff = hrs, Volume=.8 af, Depth> 3.2" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=.88" Area (sf) CN Description * 2, * 28, ,33 76 Weighted Average 28, % Pervious Area 2, % Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps Total Subcatchment 7S: Area E Hydrograph Runoff Flow (cfs) cfs Type II 24-hr -Year Rainfall=.88" Runoff Area=3,33 sf Runoff Volume=.8 af Runoff Depth>3.2" Flow Length=42' Tc=3. min CN= Time (hours)

41 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 26 Summary for Subcatchment 8S: Area E2 Runoff = hrs, Volume=.87 af, Depth> 2.84" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr -Year Rainfall=.88" Area (sf) CN Description * *, ,8 74 Weighted Average, % Pervious Area 37.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps. 272 Total Subcatchment 8S: Area E2 Hydrograph Runoff Flow (cfs).72 cfs Type II 24-hr -Year Rainfall=.88" Runoff Area=6,8 sf Runoff Volume=.87 af Runoff Depth>2.84" Flow Length=272' Tc=. min CN= Time (hours)

42 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 27 Summary for Reach 9R: (new Reach) Inflow Area =.79 ac, 7.79% Impervious, Inflow Depth > 3.2" for -Year event Inflow = hrs, Volume=.8 af Outflow = hrs, Volume=.8 af, Atten= 3%, Lag=. min Routing by Stor-Ind+Trans method, Time Span=.-2. hrs, dt=. hrs Max. Velocity= 2.9 fps, Min. Travel Time=.9 min Avg. Velocity =.98 fps, Avg. Travel Time= 2.7 min Peak Storage= hrs Average Depth at Peak Storage=.3' Bank-Full Depth=.', Capacity at Bank-Full= 42.8 cfs.' x.' deep Parabolic Channel, n=.24 Length= 7.' Slope=.9 '/' Inlet Invert= 696.', Outlet Invert= 693.' Reach 9R: (new Reach) Hydrograph Flow (cfs) cfs 3.3 cfs Inflow Area=.79 ac Avg. Flow Depth=.3' Max Vel=2.9 fps n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Inflow Outflow Time (hours)

43 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 28 Reach 9R: (new Reach) Stage-Discharge Primary Depth 2 2 Discharge (cfs) Reach 9R: (new Reach) Stage-Storage Storage Depth Storage (cubic-feet) 7 8 9,

44 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 29 Stage-Discharge for Reach 9R: (new Reach) Velocity (ft/sec) Discharge (cfs) Velocity (ft/sec) Discharge (cfs)

45 Existing Data - August 26 Existing Drainage Type II 24-hr -Year Rainfall=.88" Printed 8/24/26 Page 3 Stage-Area-Storage for Reach 9R: (new Reach) End-Area (sq-ft) Storage (cubic-feet) End-Area (sq-ft) Storage (cubic-feet) , , , ,47

46 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 3 Time span=.-2. hrs, dt=. hrs, 3 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: Area E Subcatchment 8S: Area E2 Reach 9R: (new Reach) Runoff Area=3,33 sf 7.79% Impervious Runoff Depth>3.9" Flow Length=42' Tc=3. min CN=76 Runoff=4.8 cfs.236 af Runoff Area=6,8 sf.9% Impervious Runoff Depth>3.74" Flow Length=272' Tc=. min CN=74 Runoff=2.2 cfs. af Avg. Flow Depth=.34' Max Vel=3.6 fps Inflow=4.8 cfs.236 af n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Outflow=4.6 cfs.236 af

47 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 32 Summary for Subcatchment 7S: Area E Runoff = hrs, Volume=.236 af, Depth> 3.9" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr 2-Year Rainfall=7." Area (sf) CN Description * 2, * 28, ,33 76 Weighted Average 28, % Pervious Area 2, % Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps Total Subcatchment 7S: Area E Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-Year Rainfall=7." Runoff Area=3,33 sf Runoff Volume=.236 af Runoff Depth>3.9" Flow Length=42' Tc=3. min CN= Time (hours)

48 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 33 Summary for Subcatchment 8S: Area E2 Runoff = hrs, Volume=. af, Depth> 3.74" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-2. hrs, dt=. hrs Type II 24-hr 2-Year Rainfall=7." Area (sf) CN Description * *, ,8 74 Weighted Average, % Pervious Area 37.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (ft/ft) (ft/sec) (cfs) Sheet Flow, Grass: Short n=. P2= 3.7" Shallow Concentrated Flow, Grassed Waterway Kv=. fps. 272 Total Subcatchment 8S: Area E2 Hydrograph Runoff Flow (cfs) cfs Type II 24-hr 2-Year Rainfall=7." Runoff Area=6,8 sf Runoff Volume=. af Runoff Depth>3.74" Flow Length=272' Tc=. min CN= Time (hours)

49 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 34 Summary for Reach 9R: (new Reach) Inflow Area =.79 ac, 7.79% Impervious, Inflow Depth > 3.9" for 2-Year event Inflow = hrs, Volume=.236 af Outflow = hrs, Volume=.236 af, Atten= 3%, Lag=.4 min Routing by Stor-Ind+Trans method, Time Span=.-2. hrs, dt=. hrs Max. Velocity= 3.6 fps, Min. Travel Time=.8 min Avg. Velocity =.3 fps, Avg. Travel Time= 2. min Peak Storage= hrs Average Depth at Peak Storage=.34' Bank-Full Depth=.', Capacity at Bank-Full= 42.8 cfs.' x.' deep Parabolic Channel, n=.24 Length= 7.' Slope=.9 '/' Inlet Invert= 696.', Outlet Invert= 693.' Reach 9R: (new Reach) Hydrograph Flow (cfs) cfs 4.6 cfs Inflow Area=.79 ac Avg. Flow Depth=.34' Max Vel=3.6 fps n=.24 L=7.' S=.9 '/' Capacity=42.8 cfs Inflow Outflow Time (hours)

50 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 3 Reach 9R: (new Reach) Stage-Discharge Primary Depth 2 2 Discharge (cfs) Reach 9R: (new Reach) Stage-Storage Storage Depth Storage (cubic-feet) 7 8 9,

51 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 36 Stage-Discharge for Reach 9R: (new Reach) Velocity (ft/sec) Discharge (cfs) Velocity (ft/sec) Discharge (cfs)

52 Existing Data - August 26 Existing Drainage Type II 24-hr 2-Year Rainfall=7." Printed 8/24/26 Page 37 Stage-Area-Storage for Reach 9R: (new Reach) End-Area (sq-ft) Storage (cubic-feet) End-Area (sq-ft) Storage (cubic-feet) , , , ,47

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN

FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN DRAFT ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN BBAPPENDIX K. FINAL COVER SYSTEM SURFACE WATER MANAGEMENT SYSTEM DESIGN p:\honeywell -syr\ - lake detail design\ reports\.

More information

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts

Revised Stormwater Management Report. Self-Storage Development. Wheeler Road Burlington, Massachusetts An Employee-Owned Company Revised Stormwater Management Report For the Proposed: Self-Storage Development Located at: Wheeler Road Burlington, Massachusetts Prepared for Submission to: Town of Burlington,

More information

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020

December 12, Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 1930 Second Avenue North Suite 150 Bessemer, AL 35020 December 12, 2014 Mr. Ronald Gilbert, P.E. City Engineer City of Bessemer 130 Second Avenue North Suite Bessemer, AL 3020 Re: The proposed new development of Pediatrics West McAdory Bell Hill Road Bessemer,

More information

DRAINAGE ANALYSIS REPORT

DRAINAGE ANALYSIS REPORT DRAINAGE ANALYSIS REPORT FOR The Village at Barnstable (Phase ) Active Adult Apartments Located at: Communication Way Hyannis, Massachusetts Prepared for: Greystar Group II, LLC, LLC Greensboro Drive Suite

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT HOG HILL BROOK Island Pond Road and West Side Drive Atkinson, New Hampshire December 21, 2009 KNA Project No. 09-0722-1 Prepared For: Prepared By: Ted Stewart, Road Agent Town

More information

CITY OF AUBURN, NEW YORK

CITY OF AUBURN, NEW YORK CITY OF AUBURN, NEW YORK History s Hometown Auburn Planning Board The Regular Monthly Meeting of the Planning Board will be held at 6:30 PM on January 2, 2018 at Council Chambers, Memorial City Hall, 24

More information

APPENDIX A Existing Conditions Map

APPENDIX A Existing Conditions Map APPENDIX A Existing Conditions Map APPENDIX B Conceptual Improvements Plans Sheets B-B- APPENDIX C Soil Mapping Hydrologic Soil Group Albany County, New York (McKownville Stormwater Project Soils)

More information

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico

Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM. NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Adam D. James, P.E., CFM Eric Y. Chow, P.E., CFM NRCS DAM RISK ASSESSMENTS Sites 6 and 8 Eddy and Chaves Counties, New Mexico Cottonwood Walnut Creek watershed, drains east to the Pecos River Purpose to

More information

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey

Urban Drainage and Flood Control District. Goldsmith Iliff Pond E-19 Survey Urban Drainage and Flood Control District Goldsmith Gulch @ Iliff Pond E-19 Survey GOLDSMITH GULCH @ ILIFF ALERT ID: 653/654 LID: ILFC2 Prepared by: HDR Engineering, Inc. 303 E 17 th Ave. Suite 700 Denver

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Burlington Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.001 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Dodge County Drainage Board

Dodge County Drainage Board Dodge County Drainage Board Drainage District 1 ATCP 48.20 Specifications November 24, 2016 Prepared By: DesignTech Engineering, LLC P.O. Box 293 Beaver Dam, Wisconsin 53916-0293 Phone: (920) 887-3128

More information

Stormwater Mitigation Worksheet

Stormwater Mitigation Worksheet Planning & Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731 1706 Phone: 803 329 5515 FAX: 803 329 7228 www.cityofrockhill.com Date Received:

More information

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT SIXTH SUPPLEMENTAL ENGINEER S REPORT (Phase 3C Assessment Area) HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Prepared For: Board of Supervisors Highlands Community Development District Prepared By: Landmark

More information

Dynamic Routing Applied to an Urban Subsurface Drainage System

Dynamic Routing Applied to an Urban Subsurface Drainage System Dynamic Routing Applied to an Urban Subsurface Drainage System Michelle Iblings, PE, CFM (Freese and Nichols, Inc.) Jim Dulac,, PE (City of Richardson) TFMA Spring Conference May 1, 2008 Project Overview

More information

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number:

PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES. Final Report. Olmsted County, MN November 2008 Project Number: PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE CREEK TRIBUTARIES Final Report Olmsted County, MN November 28 Project Number: 362-614 COUNTY OF OLMSTED PEAK FLOW REDUCTION OPPORTUNITIES IN THE CASCADE

More information

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b

Plano esquemático. Estudio de flora y fauna. Estudio geotécnico. Determinación jurisdiccional de humedales. Prospección arqueológica fase 1a-1b Plano esquemático 1 Estudio de flora y fauna 2 Estudio geotécnico 3 Determinación jurisdiccional de humedales 4 Prospección arqueológica fase 1a-1b 5 Cartas de las agencias 6 Estudio hidrológico e hidráulico

More information

Table 3-1 Summary of Storm Drain Outfalls

Table 3-1 Summary of Storm Drain Outfalls Table 3-1 Summary of Storm Drain Outfalls Outfall Number Description 005 The drainage area associated with Outfall 005 is to the west of the plant adjacent to and north of Warehouse 2/3, and includes a

More information

ORDINANCE NUMBER 2381

ORDINANCE NUMBER 2381 Ordinance Number 2381 Page 1 ORDINANCE NUMBER 2381 AN ORDINANCE TO FURTHER AMEND THE ZONING ORDINANCE AND THE ZONING MAP OF THE CITY OF VESTAVIA HILLS, ALABAMA, ADOPTED SEPTEMBER 16, 1985, AND AS LAST

More information

The New Jersey Nonstructural Strategies Point System (NSPS)

The New Jersey Nonstructural Strategies Point System (NSPS) 2011 Low Impact Development Symposium The New Jersey Nonstructural Strategies Point System (NSPS) NJDEP SWM Rules (NJAC 7:8) Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14)

More information

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office

Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office Scott Miller, PE Engineering Supervisor Washtenaw County Water Resources Commissioner s Office BS Civil and Env. Engineering University of Toledo MS Env. And Water Resources Engineering University of Michigan

More information

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation

Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation 2011 Low Impact Development Symposium 9/28/2011 Recalibration of New York City s Drainage System Models to Support Green Infrastructure Planning and Implementation Sri Rangarajan, Chenchen Li, William

More information

Lessons learned in multi-objective urban detention basin projects

Lessons learned in multi-objective urban detention basin projects Lessons learned in multi-objective urban detention basin projects Raymond Wong, PhD, PE, LEED AP Patrick Sullivan, PE Bill Silva, PE Floodplain Management Association Conference September 6, 2017 Urban

More information

Westcott site services

Westcott site services Westcott site services 6 prospect street Waltham ma 2453 781-647-62 westcottsite.com Hillside Center for Sustainable Living Newburyport, Massachusetts STORMWATER REPORT December 28, 215 WESTCOTT SITE SERVICES

More information

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report

DeKalb County All Hazards Mitigation Plan Annual Evaluation Report Overview DeKalb County All Hazards Mitigation Plan 2014 Annual Evaluation Report The DeKalb County All Hazards Mitigation Plan (Plan) was developed by the DeKalb County Hazard Mitigation Committee as a

More information

Flood Hydrology. for. Michigan Watercourses

Flood Hydrology. for. Michigan Watercourses Flood Hydrology for Michigan Watercourses Michigan Hydrologic Methodologies FEMA Flood Insurance Study (FIS) Statistical Analysis of USGS Gage Data (Gage) Statistical Models for Estimating Flow Characteristics

More information

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017

Case To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Case 2143 To: Oxford Board of Adjustment From: Benjamin Requet, Senior Planner Date: January 09, 2017 Applicant: Sydicated Investment Owner: Same Request: Site Plan Approval O Bryan Property Location:

More information

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds

A Sensitivity Analysis of the Influence of Watershed and Development Characteristics on the Cumulative Impacts of Stormwater Detention Ponds University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2003 A Sensitivity Analysis of the Influence of Watershed and Development Characteristics

More information

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies

Permeable Pavement Systems. BMP Impacts on Cost. Green vs Gray Economic Factors. Permeable Pavement Economic Considerations & Case Studies EGRA Stone Permeable Pavement Systems Permeable Pavement Economic Considerations & Case Studies Economic Considerations Public Facility Parking Lots Main Street Streetscape Residential Streets ECO Stone

More information

A.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING

A.01 LEGEND SCALE A2 EXISTING SITE PLAN EXISTING PUBLIC TOILET BUILDING EXISTING AIRPORT TERMINAL CURRENT DISPOSAL AREA (INDICATIVE) BUILDING GRAVEL ACCESS ROAD PUBLIC TOILET /1179358 CURRENT DISPOSAL AREA (INDICATIVE) WEATHER STATION (LOCATION INDICATIVE) 3/819237 (LEASE) MAIN PUBLIC CAR PARKING AREA R5 LARGE LOT RESIDENTIAL ZONE WEST COWRA

More information

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates

Prepared for Friends of the Corte Madera Creek Watershed. By Ross Taylor and Associates CATALOG OF STREAM CROSSINGS WITH CULVERTS AND OTHER MANMADE IMPEDIMENTS TO FISH PASSAGE LOCATED ON ANADROMOUS STREAM REACHES WITHIN FAIRFAX CREEK, CORTE MADERA CREEK WATERSHED, MARIN COUNTY, CA. Prepared

More information

Visual On-land Trash Assessment Protocol for Stormwater

Visual On-land Trash Assessment Protocol for Stormwater Visual On-land Trash Assessment Protocol for Stormwater Version 1.3 Prepared by: EOA, Inc. 1410 Jackson St. Oakland, CA 94612 April 15, 2015 Visual On-land Trash Assessment Methodology INTRODUCTION This

More information

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS

FEASIBILITY REPORT UNITY AVENUE STREET IMPROVEMENTS Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR UNITY AVENUE STREET IMPROVEMENTS IMPROVEMENT PROJECT NO. 2011-05 CITY OF BROOKLYN CENTER, MINNESOTA January

More information

ATTACHMENT B8 Incident History

ATTACHMENT B8 Incident History Appendix B GIS/Imagery Outputs ATTACHMENT B8 Incident History Appendix B - GIS/Imagery Outputs Appendix B: Attachment B8 Incident History TABLE OF CONTENTS B.B8-1 INTRODUCTION... 1 B.B8-2 FACT SHEETS...

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7883 CRANE LAKE ROAD OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District February 4, 2003 MEMORANDUM TO: File FROM: Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District SUBJECT: Proposed minimum

More information

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map

RTKC- East Abutment Extension Individual Permit Application November 15, Figure 1. East Abutment Extension General Vicinity Map RTKC- East Abutment Extension November 15, 2016 2.1. Figure 1. East Abutment Extension General Vicinity Map WP NATURAL RESOURCE CONSULTING, INC. 4 RTKC- East Abutment Extension November 15, 2016 2.2. Figure

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: FEBRUARY 12 THROUGH FEBRUARY

More information

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj

County of Orange. Presented to the Flood Division August 13, 2001 by Nadeem Majaj Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 3, 200 by Nadeem Majaj Approximately 575,000 bridges are built over waterways in the US. The most common

More information

DeKalb County Government Public Meetings & Agendas. January 23 26, 2017 Monday 1/23 Tuesday 1/24 Wednesday 1/25 Thursday 1/26

DeKalb County Government Public Meetings & Agendas. January 23 26, 2017 Monday 1/23 Tuesday 1/24 Wednesday 1/25 Thursday 1/26 DeKalb County Government Public Meetings & Agendas Page 1 of 8 January 23 26, 2017 Monday 1/23 Tuesday 1/24 Wednesday 1/25 Thursday 1/26 Law & Justice Committee 6:30 pm Forest Preserve Committee 6 pm Planning

More information

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report

NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION. Initial Annual RCRA CCR Unit Inspection Report INITIAL ANNUAL INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY MICHIGAN CITY GENERATING STATION Initial Annual RCRA CCR Unit Inspection Report PRIMARY BASIN NUMBER 2 SURFACE IMPOUNDMENT Submitted

More information

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012

Restoring a More Natural Flow Regime to the Clinton River Watershed. MWEA 87 th Annual Conference June 26, 2012 Restoring a More Natural Flow Regime to the Clinton River Watershed MWEA 87 th Annual Conference June 26, 2012 Donald D. Carpenter, Ph.D., PE, LEED AP Lawrence Technological University Agenda Study Goals

More information

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review

Natural Background Levels of Boron in the Clear Lake - Cache Creek Watershed: A Data Analysis and Literature Review Natural Background Levels of in the Clear Lake - Watershed: A Data Analysis and Literature Review June 2007 Table of Contents Introduction 1 in Lake and Yolo Counties.1 History of Borax Mining 2 data and

More information

2911 w. 70th street. Powered by CLIFT MARKETING INC.

2911 w. 70th street. Powered by CLIFT MARKETING INC. 2911 w. 70th street Broker Contact Information *Please contact local Broker Paul Draper 315 Fannin Street, Suite 200 Shreveport, LA 71101 Cell: paul@walkeralley.com Managed by: 155 West New York Avenue

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for: Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power

More information

Menkes Milton Industrial

Menkes Milton Industrial Menkes Milton Industrial Functional Servicing and Stormwater Management Report Prepared for: Menkes Milton Industrial Ltd. Prepared by: Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham,

More information

FEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT

FEASIBILITY REPORT ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT COASTAL STORM DAMAGE REDUCTION PROJECT SURF CITY AND NORTH TOPSAIL BEACH NORTH CAROLINA Appendix E Sand Compatibility Analysis Appendix E: Sand Compatibility

More information

NORTH FORK FEATHER RIVER, CA

NORTH FORK FEATHER RIVER, CA Hydropower Project License Summary NORTH FORK FEATHER RIVER, CA ROCK CREEK CRESTA HYDROELECTRIC PROJECT (P-1962) Kayakers below the Cresta Dam Photo: Hydropower Reform Coalition This summary was produced

More information

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer

Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Updates to the MODFLOW Groundwater Model of the San Antonio Segment of the Edwards Aquifer Presented by Jim Winterle November 14, 2017 EAA Modeling Team: Angang Al Liu Ned Troshanov Andi Zhang Jim Winterle

More information

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District

Hydrologic Modeling Workshop. HEC-5 Modeling of ACF Interim Operation by Mobile District Hydrologic Modeling Workshop HEC-5 Modeling of ACF Interim Operation by Mobile District May 24, 2006 Model Settings Demands Hydropower Water Supply 2001 actual Required Flow Atlanta Columbus Jim Woodruff

More information

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES

MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES MAY 17, 2016 CITY COUNCIL STUDY SESSION POLICY DISCUSSION ON MEDICAL CANNABIS CULTIVATION FACILITIES Staff Presentation 1. Overview of Ordinance 1083 and 1084 and discussion on allowing medical cannabis

More information

DeKalb County Government Public Meetings & Agendas. March 6 9, 2017 Monday 3/6 Tuesday 3/7 Wednesday 3/8 Thursday 3/9

DeKalb County Government Public Meetings & Agendas. March 6 9, 2017 Monday 3/6 Tuesday 3/7 Wednesday 3/8 Thursday 3/9 DeKalb County Government Public Meetings & Agendas Page 1 of 6 March 6 9, 2017 Monday 3/6 Tuesday 3/7 Wednesday 3/8 Thursday 3/9 Agenda -Page 2 Business Incubator Advisory Board 6 pm Location: Community

More information

THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO. BY Eng.

THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO. BY Eng. THE VETIVER SYSTEM FOR SLOPE AND ROAD STABILIZATION AND EROSION CONTROL IN THE DEMOCRATIC REPBULIC OF THE CONGO BY Eng. Alain NDONA NZEY DR Congo country-wide data * Land area is equal to 2.345.410 square

More information

Sharon Call, Chairperson Mike Marchbanks, Commissioner Rob Kallas, Commissioner Kathy Moosman, Recorder

Sharon Call, Chairperson Mike Marchbanks, Commissioner Rob Kallas, Commissioner Kathy Moosman, Recorder The Lindon City held a regularly scheduled meeting on Tuesday, February 13, beginning at 7:00 p.m. at the Lindon City Center, City Council Chambers, 0 North State Street, Lindon, Utah. REGULAR SESSION

More information

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT

2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency Middle Fork American River Project (FERC Project No. 2079) 2006 RALSTON AFTERBAY WATER TEMPERATURE INVESTIGATION STUDY REPORT Placer County Water Agency 144 Ferguson Road Auburn,

More information

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts

Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Colorado Front Range Flood of 2013: Peak Flows, Flood Frequencies, and Impacts Steven Yochum, PhD, PE Hydrologist U.S. Forest Service National Stream and Aquatic Ecology Center Fort Collins, Colorado (formerly

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7685 CSAH 24 OVER HAWKINSON CREEK ST. LOUIS COUNTY JUNE 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data)

PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the PEACHLAND CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed

More information

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc.

What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. What Site Characteristics Explain Variability Of Peak Footing Drain Flows? Oskar Nordstrom, P.E. Mark TenBroek, P.E. CDM Michigan Inc. Ann Arbor, MI MWEA Annual Conference June 22, 2009 City of Ann Arbor

More information

ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA

ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA ARKANSAS RIVER NAVIGATION STUDY ARKANSAS AND OKLAHOMA APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS RIVER FLOW MANAGEMENT BY TULSA DISTRICT HYDROLOGY AND HYDRAULICS BRANCH AND LITTLE ROCK DISTRICT HYDROLOGY

More information

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota

Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Two-Dimensional Computer Modeling of Pomme de Terre River at Highways 12 and 22 in Minnesota Kamal Saffarinia 1, G. Kenneth Young 2, J. Sterling Jones 3, and Stuart Stein 4 This paper investigates two-dimensional

More information

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018

Stormwater Report. For ACORN STREET MILLIS, MA Proposed Senior Residential Community. July 12, 2018 Stormwater Report For ACORN PLACE ACORN STREET MILLIS, MA Proposed Senior Residential Community July, PREPARED BY: MERRIKIN ENGINEERING, LLP Consulting Engineers Main Street, Suite C Millis, MA PREPARED

More information

If you have questions or need additional information, please contact us. Attachment: Prior Lake Outlet Annual Operations Report, Year 2008

If you have questions or need additional information, please contact us. Attachment: Prior Lake Outlet Annual Operations Report, Year 2008 January 16, 2009 Ms. Janell Miersch, Area Hydrologist Metro Region of Waters Department of Natural Resources 1200 Warner Road St. Paul, Minnesota 55106 Prior Lake Outlet Annual Operations Report, Year

More information

ORDINANCE AN ORDINANCE GRANTING A CABLE FRANCHISE FOR COMCAST

ORDINANCE AN ORDINANCE GRANTING A CABLE FRANCHISE FOR COMCAST 1 STATE OF ILLINOIS ) COUNTY OF DEKALB ) )SS ORDINANCE 2006-01 AN ORDINANCE GRANTING A CABLE FRANCHISE FOR COMCAST WHEREAS, DeKalb County Ordinance 90-16 granted a cable television franchise to Warner

More information

ABSCOUR 9 USERS MANUAL

ABSCOUR 9 USERS MANUAL OFFICE OF STRUCTURES BRIDGE SCOUR PROGRAM CHAPTER 11 APPENDIX A ABSCOUR 9 USERS MANUAL PART 1: DERIVATION OF METHODOLOGY APRIL 2011 Preface ABSCOUR 9, Build 2.3 is the current version of this program as

More information

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge

Performance of Vetiver Grass in Protecting Embankments on the Bangladesh Coast against Cyclonic Tidal Surge 5 th National Conference on Coastal and Estuarine Habitat Restoration Preparing for Climate Change: Science, Practice, and Policy Performance of Vetiver Grass in Protecting Embankments on the Bangladesh

More information

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS

SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS ICCI2004, The First International Conference on Construction IT, Beijing, CHINA, August 12 th - 14 th SEEPAGE ANALYSIS OF TWO CASE HISTORIES OF PIPING INDUCED BY EXCAVATIONS IN COHESIONLESS SOILS Cai,

More information

Performance Standards Workshop Midwest Case Studies

Performance Standards Workshop Midwest Case Studies Performance Standards Workshop Midwest Case Studies Permeable Paving Permeable Paving Bioretention 1 Bioretention Bioretention Bioretention Bioretention 2 Green Roof Portland Stormwater Management Manual

More information

ADDENDUM. Submitted to: CPV Valley, LLC 35 Braintree Hill Office Park Braintree, MA Submitted by:

ADDENDUM. Submitted to: CPV Valley, LLC 35 Braintree Hill Office Park Braintree, MA Submitted by: ADDENDUM ADDITIONAL PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED CPV VALLEY ENERGY CENTER AND TRANSMISSION CORRIDORS TOWN OF WAWAYANDA ORANGE COUNTY, NEW YORK Submitted to: CPV Valley, LLC 35 Braintree

More information

COUNCIL AGENDA REPORT

COUNCIL AGENDA REPORT COUNCIL AGENDA REPORT Meeting Date: 8 September 2015 Subject: Boards Routed Through: South Point Commercial and Residential NSPs Municipal Planning Commission Date: 20 August 2015 Issue: Council is being

More information

NORTH DAKOTA 2011 FLOOD EVENT

NORTH DAKOTA 2011 FLOOD EVENT NORTH DAKOTA 2011 FLOOD EVENT OUTLINE Missouri River Basin Geography Generic Reservoir Operations Weather and Climate 2011 Basin-wide Hydrology Missouri River Timeline Missouri River Damages Mouse River

More information

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION

TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION TALLAPOOSA RIVER FLOW ANALYSIS R L HARRIS DAM Downstream to WADLEY GAUGE GEO-TUBES EVALUATION November 3, 003 Page of INTRODUCTION This report addresses hydraulic analysis of a fourteen mile section of

More information

Alcoa Power Generating Inc. Yadkin Division PO Box 576 Badin, North Carolina Tel: Fax:

Alcoa Power Generating Inc. Yadkin Division PO Box 576 Badin, North Carolina Tel: Fax: Alcoa Power Generating Inc. Yadkin Division PO Box 576 Badin, North Carolina 28009-0576 Tel: 1-888-886-1063 Fax: 1-704-422-5776 www.alcoa.com/yadkin July 8, 2008 Secretary Kimberly D. Bose Federal Energy

More information

Walgreens Pharmacy 2551 W. Main Street Alhambra, CA $10,300,000

Walgreens Pharmacy 2551 W. Main Street Alhambra, CA $10,300,000 Walgreens Pharmacy 2551 W. Main Street Alhambra, CA 91801 $10,300,000 INVESTMENT HIGHLIGHTS Rare LA County, Walgreens Net Leased Offering Population in Excess of 265,328 Within 3 Miles Located Blocks Away

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE

SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE SAN ANSELMO FLOOD RISK REDUCTION PROJECT UPDATE RossValleyWatershed.org Contact us: 415-473-7226 lizlewis@marincounty.org SAN ANSELMO TOWN COUNCIL MEETING 9/26/17 SAN ANSELMO FLOOD RISK REDUCTION PROJECT

More information

F-VC Stream Reach Summary

F-VC Stream Reach Summary F-VC Stream Reach Summary Study Reach: F-VC, Vasquez Creek - Denver Water Diversion downstream to confluence of Fraser River. Reach Description: Approximate channel length: 5 ½ miles with an average channel

More information

PART USES ALLOWED WITHIN ZONING DISTRICTS. Sec Allowable Uses In Zoning Districts Table of Allowable Uses in Zoning Districts RD C

PART USES ALLOWED WITHIN ZONING DISTRICTS. Sec Allowable Uses In Zoning Districts Table of Allowable Uses in Zoning Districts RD C Intent Statement The proposed amendment to the Land Development ode regarding medical marijuana dispensing facilities amends the ode to establish zoning and land development regulations related to the

More information

SUMMARY OF PROCEEDINGS DIRECTOR'S HEARINGS. Conference Room. Date: January 7, 2010

SUMMARY OF PROCEEDINGS DIRECTOR'S HEARINGS. Conference Room. Date: January 7, 2010 SUMMARY OF PROCEEDINGS DIRECTOR'S HEARINGS Conference Room Date: ATTENDANCE: Hearing Officer: James E. Ellis Staff: Kathe Malouf, Holly Nelson Kern County Roads Department: Brian Blacklock and Steve Young

More information

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE

HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE HYDRAULIC MODELING ASSESSMENT OF THE TURNER FALLS IMPOUNDMENT TURNERS FALLS HYDROELECTRIC PROJECT (NO. 1889) AND NORTHFIELD MOUNTAIN PUMPED STORAGE PROJECT (NO. 2485) FEBRUARY 2013 TABLE OF CONTENTS 1.0

More information

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description

Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description Don Pedro Project Project Operations/Water Balance Model Attachment B Model Description and User s Guide, Addendum 1 Base Case Description 5-2-213 1. INTRODUCTION The Turlock Irrigation District ( TID

More information

TABLE OF CONTENTS MARIJUANA PRODUCTION, PROCESSING, WHOLESALING, AND RETAILING. (Adopted 01/11/2016) SECTION TITLE PAGE 11.

TABLE OF CONTENTS MARIJUANA PRODUCTION, PROCESSING, WHOLESALING, AND RETAILING. (Adopted 01/11/2016) SECTION TITLE PAGE 11. TABLE OF CONTENTS CHAPTER 11 MARIJUANA PRODUCTION, PROCESSING, WHOLESALING, AND RETAILING (Adopted 01/11/2016) SECTION TITLE PAGE 11.010 PURPOSES 11-2 11.020 APPLICABILITY 11-2 11.030 PROCEDURE 11-2 11.040

More information

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom

HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY. Supporting the Marcellus Shale Boom HARRISBURG UNIVERSITY PROJECT LEADERSHIP FORUM- CASE STUDY Supporting the Marcellus Shale Boom Marc Reeves, P.G. May 6, 2011 Outline Intro to SAIC Basics on the Marcellus Shale Natural gas demand Nationwide

More information

CR5 Stream Reach Summary

CR5 Stream Reach Summary CR5 Stream Reach Summary Study Reach: CR5, Colorado River - Williams Fork confluence downstream to the KB Ditch. Reach Description: Approximate channel length: 6.75 miles, approximate channel slope 0.3%.

More information

CITY OF VALLEJO HIDDENBROOKE IMPROVEMENT DISTRICT NO IMPROVEMENT LEVY ADMINISTRATION REPORT FISCAL YEAR

CITY OF VALLEJO HIDDENBROOKE IMPROVEMENT DISTRICT NO IMPROVEMENT LEVY ADMINISTRATION REPORT FISCAL YEAR CITY OF VALLEJO HIDDENBROOKE IMPROVEMENT DISTRICT NO. 1998-1 IMPROVEMENT LEVY ADMINISTRATION REPORT FISCAL YEAR 2010-11 December 17, 2010 Hiddenbrooke Improvement District No. 1998-1 Improvement Levy Administration

More information

Alvarez Engineers, Inc.

Alvarez Engineers, Inc. FL Certificate of Authorization No. 7538 10305 NW 41 Street Suite 103 Doral, Florida 33178 Tel. (305) 640-1345 Fax (305) 640-1346 E-Mail: Juan.Alvarez@AlvarezEng.com June 30, 2015 Mr. Neil Kalin District

More information

PFAS at Parafield Airport. November 2018

PFAS at Parafield Airport. November 2018 PFAS at Parafield Airport November 2018 2 Summary PFAS has been detected at low levels in groundwater in isolated monitoring wells set up on the southern and western boundary of Parafield Airport. As a

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 18 February 2010 Cooperating Agencies Delaware River Basin Commission Pennsylvania Fish & Boat Commission Pennsylvania

More information

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008

Welcome. Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Welcome Recreational Enhancements on the Lehigh River Public Information Workshop 31 January 2008 Cooperating Agencies US Army Corps of Engineers Philadelphia District Delaware River Basin Commission Pennsylvania

More information

Public Hearing Handout November 2012

Public Hearing Handout November 2012 West Waukesha Bypass Draft Environmental Impact Statement Waukesha County Department of Public Works I.D. 2788-01-00 Public Hearing Handout November 2012 TBG051110133551MKE Handout Packet Contents Page

More information

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross Fully Air Conditioned 44,000 SF Retail/Flex Center ± 2,543 Sq. Ft. Showroom/Warehouse Full Glass Window

More information

City of Sanibel. Planning Department STAFF REPORT

City of Sanibel. Planning Department STAFF REPORT City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting: July 10, 2012 Planning Commission Agenda Item: No. 6 Application Number: Evaluation & Appraisal of the Sanibel Plan Applicant

More information

Two Dimensional Computer Modeling of

Two Dimensional Computer Modeling of \N P? v&cu&ae yoomk Two Dimensional Computer Modeling of Green River at Dinosaur National Monument and Canyonlands National Park For: Water Rights Branch Water Resources Division National Park Service

More information

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8

Filed: , EB , Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Filed: 2018-07-04, EB-2018-0108, Exhibit B, Tab 1, Schedule 1, Attachment 3, Page 1 of 8 Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 89188 7 th STREET OVER THE ZUMBRO RIVER CITY OF ROCHESTER OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006

Jim Woodruff Dam Section 7 Consultation. Hydrological Modeling Technical Workshop II 12 July 2006 Jim Woodruff Dam Section 7 Consultation Hydrological Modeling Technical Workshop II 12 July 2006 Endangered Species Act of 1973 Section 7 Consultation All Federal agencies shall, in consultation with and

More information

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes

v Feature Stamping SMS 13.0 Tutorial Prerequisites Requirements Map Module Mesh Module Scatter Module Time minutes v. 13.0 SMS 13.0 Tutorial Objectives Learn how to use conceptual modeling techniques to create numerical models which incorporate flow control structures into existing bathymetry. The flow control structures

More information