Future Programmatics Beyond 01/07/2019 Sorted By District (Subject to Departmental Changes)

Size: px
Start display at page:

Download "Future Programmatics Beyond 01/07/2019 Sorted By District (Subject to Departmental Changes)"

Transcription

1 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 1 05/06/ D01 GPR FY20 Hir a firm by way of Task Orr Agrmnt to prform Groun Pntrating Raar insption on various struturs an pavmnts. 24 month agrmnt. Groun pntrating raar (GPR) srvis on various struturs an possibly pavmnts. Th ompltion tim will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $200, /09/ D01 Const Insp FY20 / FY D01/D02 ENV FY20 Task Orr 09/08/ D01/D02 ENV FY21 Task Orr Constrution insption ontrat in rit 1 for FY20 & FY21 Environmntal task orr agrmnt for rit 1 an rit 2. Environmntal task orr agrmnt for rit 1 an rit month Constrution Insption Agrmnt to provi onstrution insption an aministration as n throughout th istrit. Contrat valu will b $1,000,000. Environmntal Srvis on a task orr basis (IDIQ) fous mainly on projts in rits 1 an 2. Th uration of th ontrat will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $750,000. Environmntal Srvis on a task orr basis (IDIQ) fous mainly on projts in rits 1 an 2. Th uration of th ontrat will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $750, /03/ D01 UBI FY21 Us a onsultant to prform unrwatr brig insptions D01 GPR FY22 Hir a firm by way of Task Orr Agrmnt to prform Groun Pntrating Raar insption on various struturs an pavmnts. 24 month agrmnt. Consultant to prform unrwatr brig insptions for approximatly twnty struturs in rit 1. Groun pntrating raar (GPR) srvis on various struturs an pavmnts. Th ompltion tim will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $200, /07/ D01 Const Insp FY22 / FY23 Constrution insption ontrat in rit 1 for FY22 & FY23 24 month Constrution Insption Agrmnt to provi onstrution insption an aministration as n throughout th istrit. Contrat valu will b $1,000,000.

2 D01/D02 ENV FY22 Task Orr Environmntal task orr agrmnt for rit 1 an rit 2. Pag 1 of 8 Environmntal Srvis on a task orr basis (IDIQ) fous mainly on projts in rits 1 an 2. Th uration of th ontrat will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $750,000.

3 Constrution 1 09/06/ D01/D02 ENV FY23 Task Orr Projt Nam (i CRS) Projt Dsription Consultant Work Dsription Environmntal task orr agrmnt for rit 1 an rit 2. Environmntal Srvis on a task orr basis (IDIQ) fous mainly on projts in rits 1 an 2. Th uration of th ontrat will b 24 months from th at of authorization to pro. Th maximum prim ompnsation shall not x $750,000. r it Subtot al: /06/ $2,350,000 MED IR Brig RhabilitationMED MED TR 152 Cmtry Roa $2,000,000 WAY SR Brig RplamntWAY ovr W&LE R/R $650,000 HUR SR Brig RplamntHUR (ovr East Branh of Huron Rivr) $2,750,000 LOR SR Brig Dk RplamntLOR (ovr SR 10) $5,000,000 LOR IR Brig Dk RplamntsLOR L&R (ovr Murray Rig R) 09/09/ $850,000 WAY US Brig RplamntWAY (ovr Branh of Appl Crk) $5,000,000 CRA US Brig-Rhab k, approah slabs, Brgs. CRA-US L& R 01/06/ D03 Brig Insption FY2021 Unrwatr Brig Insption Brig Rplamnt Brig Rplamnt..rit will prform nvironmntal 01/01/21 01/01/22 Brig Rplamnt 10/01/21 10/01/21 Brig Dk Rplamnt 10/01/21 10/01/21 Brig Dk Rplamnt Brig Rplamnt 10/01/21 10/01/21 Brig Dsign..ODOT to omplt nvironmntal..odot to omplt survy ontrol an ROW Unrwatr Brig Insption 05/04/ $650,000 WAY SR Brig RplamntWAY Dith Brig Rplamnt..rit will omplt nvironmntal $650,000 HUR SR Brig RplamntHUR (ovr tributary of Wst Branh of Huron Rivr) 05/03/ $8,000,000 RIC US Brig Rplamnt - Twin struturs ovr Koogl Roa $1,200,000 LOR US Brig Dk Rplamnt - LOR (LOR-611D ovr LOR-6)Brig Rplamnt - LOR (Martins Run) 05/08/ $9,000,000 RIC US Brig Rplamnts RIC L&R (US 30 ovr US 42) r it Subtot al: 13 Brig Rplamnt Brig Rplamnt 10/01/24 10/01/24 Brig Rplamnt 10/01/23 10/01/23 Brig Rplamnt 10/01/26 10/01/26 Pag 2 of 8

4 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 6 05/04/ $44,480,000 FRA IR Major rhabilitation of IR-71 an wining to 3 lans in both irtions ntir lngth of projt.rpla an win 2 pairs of mainlin struturs.dsign inlu with Provi onstrution insption srvis for uration of projt 07/01/20 07/01/20 r it Subtot al: /06/ $4,219,000 MOT SR /18.03 MOT Rpla triorat brig ks, invstigat rtrofit vs suprstrutur rplamnt, invstigat smi-intgral abutmnt onvrsion an othr misllanous pathing of substrutur units.mot Rpla xpansion joint sals, rpla fail flxibl suppr onntors, path substrutur $20,110,251 MOT IR Major rhabilitation of th Intrstat 75 pavmnt by rbuiling th asphalt pavmnts. 05/04/ $16,889,749 MOT IR Major rhabilitation of th Intrstat 75 pavmnt by rbuiling th asphalt pavmnts. Consultant will b rquir to omplt th following: AER, Stag 1, 2, & 3 plans, Final Traings, an assist in PrBi Ativitis, as wll as provi On Going Srvis uring Constrution Consultant to livr th following itms assoiat with th sign of this projt: AER, Stag 1, Stag 2, Stag 3, Final Traings. Consultant shall also b availabl or Pr-Bi Ativitis an On Going Srvis uring onstrution. Consultant to livr th following itms assoiat with th sign of this projt: AER, Stag 1, Stag 2, Stag 3, Final Traings. Consultant shall also b availabl or Pr-Bi Ativitis an On Going Srvis uring onstrution. r it Subtot al: /06/ $1,836,000 WAR IR Rpla th Dk, Paint an rais th WAR brig that arris Waynsvill R ovr I $3,865,600 HAM IR Rpla pstrian brig HAM ovr I-71 an I-471 that spans from Mt Aams to US22. Rhabilitat th pstrian brig HAM that spans ovr US22. Construt nw ADA ompliant ramp from Egglston to juntion of I-71/US22 pstrian brigs. Consultant will omplt tail onstrution an right of way plans as n. Consultant to provi omplt onstrution an right of way plans as wll as som nvironmntal work. 01/01/24 01/01/24 10/01/23 10/01/23 Pag 3 of 8

5 Constrution 8 09/09/ D07/D08 GES Task Orr FY 20/21 Projt Nam (i CRS) Projt Dsription Consultant Work Dsription D08/D07 ES Task Orr FY 20/21 rit 7 & 8 Dsign Task Orr for FY2020 an FY2021 rit 7 & 8 Environmtal Srvis Task Orr for FY2020 & FY2021 This task orr will provi gnral nginring srvis on a varity of projts in rits 7 & 8. Th ontrat limit will b $1.5 million with a 24 month uration. Environmntal srvis on a task orr basis in rits 7 an 8. Th ompltion tim with b 24 months from authorization. Th ontrat limit will b $500, $1,500,000 CLE SIGNS FY2021 Systmati sign upgra of all signs on all routs in Clrmont County. Loations to b trmin. Inlus I-275, 2 intrhangs. 01/06/ $462,000 BUT US Rhabilitat Brig BUT ovr th Grat Miami Rivr by pathing an strngthning pirs with (Fibr Rinfor Polymr) FRP 05/04/ $300,000 WAR SR Rhabiltat Brig No. WAR , SFN: ovr a tributary of Halls Crk by rplaing th inlt wingwalls, pathing an prforming othr minor rhabilitation itms. Systmati sign upgra of all signs an ata olltion on all routs in Clrmont County. Loations to b trmin. Inlus I-275, 2 intrhangs. Consultant to prpar omplt onstrution plans as wll as nvironmntal as n. Prparation of tail onstrution plans an nvironmntal oumnt. 04/01/21 04/01/21 01/01/26 01/01/ HAM Mt. Aams Insption FY21-23 Insption, monitoring, an maintnan of th Mt. Aams Slop Stability Systm. Thr yar ontrat bginning July 1, Insption an maintnan of th Mt. Aams slop stability systm for a prio of 3 yars. Consultant may b rquir to omplt maintnan onstrution ontrat plans to rpair itms intifi D08 CEINSP FY2021/2022 (A) D08 CEINSP FY2021/2022 (B) D08 CEINSP FY2021/2022 (C) D08 TSINSP FY2021/FY2022 rit wi gnral projt an brig painting insption for FY2021/2022 (A) rit wi gnral projt an brig painting insption for FY2021/2022 (B) rit wi gnral projt an brig painting insption for FY2021/2022 (C). FY2021/FY2022 Constrution traffi signal insption ontrat $1,411,111 PRE IR Rhabilitat Brig PRE whih arris Monro Cntral Roa ovr I-70 by rplaing th onrt k. 09/08/ D08 BI 2021/2022 (A) D8 Consultant Brig Insption Contrat for various truss brigs in th rit for alnar yar 2021 an rit wi gnral projt an brig painting insption for FY2021/2022 (A) rit wi gnral projt an brig painting insption for FY2021/2022 (B) rit wi gnral projt an brig painting insption for FY2021/2022 (A) FY2021/2022 onstrution traffi signal insption ontrat Consultant to prpar omplt onstrution plans. Annual Brig insption for various fratur ritial stl pir aps for alnar yars 2021 an 2022 Pag 4 of 8

6 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 8 09/08/ D08 BI 2021/2022 (B) D8 Consultant Brig Insption Contrat for alnar yar 2021 an Inlus various fratur ritial stl pir aps an th Brnt Spn Brig Approah Brigs. Annual brig insption for various truss brigs in rit 8 for alnar yars 2021 an $500,000 HAM SIGNS FY 2022 Systmati Sign Rplamnt-gnral routs. Systmati sign upgra an ata olltion of all signs on all routs in Hamilton County $553,000 GRE US 35/ /2.47 Rhabilitat brigs GRE that arris North Fairfil R ovr US 35 an an GRE that arris 235 ovr US 35 by strngthning th pirs with Fibr Rinfor Polymr (FRP) an installing Vanal Prottion Fns. Consultant to prpar omplt onstrution plans. 04/01/22 04/01/ $2,769,000 HAM IR /18.58 Rhabilitat brig HAM (Coopr R ovr I-71) by rplaing th onrt parapts. Rhabilitat brig HAM (Snir R ovr I-71) by rplaing k an raising th strutur D08/D07 GES Task Orr FY 22/ D07/D08 ES Task Orr FY 22/23 rit 7 an 8 Dsign Task Orr for FY2022/FY2023 rit 7 & 8 Environmtal Srvis Task Orr for FY2022 & FY $1,008,000 HAM IR Rpla th ovrlay an rpair th siwalk of th HAM Brig that arris Wooburn Av ovr I HAM Tunnl Insp/Tunnl FY20/21 Projt to Inspt an maintain th Lytl Tunnl (Strutur HAM ) that passs I-71 unr Lytl Park in owntown Cininnati. Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms $650,000 BUT SR R Rpla th boxbam suprstrutur of brig BUT R 09/07/ D08 CEINSP FY2023/FY2024 (A) D08 CEINSP FY2023/FY2024 (B) D08 CEINSP FY2023/FY2024 (C) D08 TSINSP FY2023/FY2024 rit wi gnral projt an brig painting insption for FY2023/2024 (A) rit wi gnral projt an brig painting insption for FY2023/2024 (B) rit wi gnral projt an brig painting insption for FY2023/2024 (C) FY2023/FY2024 Constrution traffi signal insption ontrat. Pag 5 of 8 Consultant to prpar omplt onstrution plans. GES Environmntal srvis Task Orr Prparation of tail onstrution plans through Final Enginring. Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms. Complt sign srvis - Rsrvoir targt sal at 10/01/23 rit Wi gnral projt an brig painting insption for FY2023/2024 rit Wi gnral projt an brig painting insption for FY2023/2024 rit Wi gnral projt an brig painting insption for FY2023/2024 FY2023/FY2024 Constrution traffi signal insption 10/01/23 10/01/24 10/01/24 10/01/24

7 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 8 05/09/ D08 BI FY2023/2024 (A) D8 Consultant Brig Insption Contrat for truss an omplx brigs in rit 8 for alnar yar 2023 an D08 BI FY2023/2024 (B) rit 8 onsultant insption ontrat of various fratur ritial stl pir aps in th rit for alnr yar 2023 an /06/ HAM Tunnl Insp/Tunnl FY22/23 Projt to Inspt an maintain th Lytl Tunnl (Strutur HAM ) that passs I-71 unr Lytl Park in owntown Cininnati. Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms. Consultant brig insption for truss an omplx brigs in rit 8 for alnar yar 2023 an 2024 Consultant insption of various fratur ritial stl pir aps for alnar yar 2023 an 2024 Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms. 01/08/ HAM Tunnl Insp/Tunnl FY24/25 Projt to Inspt an maintain th Lytl Tunnl (Strutur HAM ) that passs I-71 unr Lytl Park in owntown Cininnati. Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms. Inlus NTIS insption, routin xrising of vntilation, stanpip, air quality snsors, fir ttion systms, rainag systms an grss systms. r it Subtot al: /06/ $3,572, ,712 TUS IR Rpla xisting slab suprstruturs on two brigs (TUS L & R). Rpla stl bam suprstruturs on two brigs (TUS L & R) with nw stl bam suprstruturs. Rpla approah slabs on all four struturs an rpair abutmnts. To prpar tail plans for rplamnt of suprstruturs on two brigs. 10/01/23 10/01/23 05/04/ $3,253,164 TUS US Rhabilitation of twin stl bam brigs by rplaing th brig ks an onvrting th abutmnts to smi-intgral. Consultant rqust for Consultant to vlop tail plans for Rhabilitation of two struturs on US 250 in Tusarawas County $3,292,189 TUS US Rpla brig k an paint strutural stl. To vlop onstrution plans to rpla k an paint strutural stl 09/08/ $6,800,658 BEL IR Rpla k an paint strutural stl on two brigs 01/04/ $2,883,934 BEL IR Rpla xisting k with nw rinfor onrt k. Convrt abutmnts to smi-intgral. Prpar tail onstrution plans for th rplamnt of a k an th painting of th strutural stl on two brigs To vlop onstrution plans for k rplamnt of BEL (SFN ) brig. 10/01/24 10/01/24 01/01/27 01/01/27 10/01/25 10/01/25 10/01/26 10/01/26 Pag 6 of 8

8 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 11 09/07/ $950,134 BEL SR Rpla suprstrutur on box bam brig. Tmp onstrution fill in Captina Crk. Prpar omplt onstrution plans for th rplamnt of th xisitng boxbam suprstrutur with a nw suprstrutur typ. 01/01/26 01/01/26 r it Subtot al: /06/ $13,000,000 LAK SR Dk Rpla th k of th Cntr Strt (SR-615) brig ovr NS railroa in Mntor. Inlus painting strutural stl D12/D3 GES FY rit 12 & 3 gnral nginring srvis task orrs for SFYs o This projt is program to rpla upon ompltion. Prpar sign plans for a k rplamnt This is a task orr gnral nginring srvis ontrat spanning multipl fisal yars. Th onsultant will provi nginring xprtis as rqust by rit 12 an rit 3(shar task) for th trm of th ontrat. SFY D12/D3 GES FY Env Srvs D12/D3 GES FY Subsurf 09/09/ D12/D3 GES FY Traffi D12 an D3 --- ontrat for various nvironmntal srvis for SFY o This projt is programm to rpla upon ompltion. D12 an D GEC ontrat for pavmnt an brig subsurfa invstigationo This projt is programm to rpla upon ompltion. D12 & D3 SFY ontrat for traffi & safty rlat tasks. Tasks may inlu prparation or rviw of sp zons, signal stuis, safty stuis, traffi impat stuis, IMS, traffi portions of projt submissions, ODOT work orrs, t.o This projt is programm to rpla upon ompltion. Task orr ontrat to assist rits 12 an 3 with various tasks ovring most ODOT prqualifiation atgoris in Environmntal Srvis. SFY ESA an hazarous D12 an D3 Subsurfa Invstigation Pavmnt an Brigs- Task orr ontrat for SFY Majority of work is intn for pavmnt oring. D12 & D3 SFY ontrat for traffi & safty rlat tasks. 01/06/ $900,000 CUY SR Rpla th 20' onrt ulvrt along Brksvill R (SR-21) ovr Hmlok Crk loat just north of Slig Dr in Inpnn $3,500,000 CUY IR SW Dk Rpla th k of th ramp strutur from SR-176NB to IR-90 WB ovr IR-490 in Clvlan. Work will inlu stl rtrofits D12/D3 GES FY Survy rit 3 & yar Survying Contrat for SFYs o This projt is programm to rpla upon ompltion. Pag 7 of 8 Rpla th 20' onrt ulvrt along Brksvill R (SR-21) ovr Hmlok Crk loat just north of Slig Dr in Inpnn. Prpar onstrution ontrat plans to rpla th k of th strutur from SR-176NB to IR-90 WB. 2 yar survy srvis. rit Gnral Enginring Srvis (GES) Survy ontrat for 2020 & Shar ontrat btwn D12 an D3.

9 Constrution Projt Nam (i CRS) Projt Dsription Consultant Work Dsription 12 09/08/ $4,200,000 CUY SR Rpla th k of th Dtroit R (SR-2/SR-254) brig ovr IR-90 in Roky Rivr. Rpla th k of th Dtroit R brig ovr I-90 in Roky Rivr. 10/01/23 10/01/23 r it Subtot al: 9 T otal 7172 Pag 8 of 8

namib I A UnIVERSITY

namib I A UnIVERSITY r' namib I A UnIVERSITY OF SCIEnCE AnD TECHnOLOGY FACULTY OF MANAGEMENT SCIENCES DEPARTMENT MANAGEMENT QUALIFICATION: BACHELOR OF BUSINESSS QUALIFICATION CODE: BBAD/07BBMA COURSE CODE: BEM 711S LEVEL:

More information

Recommendations)&)Implementation)Plan)

Recommendations)&)Implementation)Plan) Community)Halth)Ns)Assssmnt) Rommnations)&)Implmntation)Plan) FY)2016)! Th!CHNA!onut!in!2015!in!ollaoration!with!th!Ellis!County!Halth!Dpartmnt!intifi! signifiant!halth!ns!within!ellis!county!an!hays!mial!cntr!ommunity.!!a!town!hall!mting!

More information

Preliminary seismic vulnerability assessment of Mussoorie Town, Uttarakhand (India) Received (in revised form): 22 nd February 2010

Preliminary seismic vulnerability assessment of Mussoorie Town, Uttarakhand (India) Received (in revised form): 22 nd February 2010 Original Artil Prliminary sismi vulnraility assssmnt of Mussoori Town, Uttarakhan (Inia) Riv (in rvis form): 22 n Fruary 2010 Girish Chanra Joshi is Snior Exutiv at th Disastr Mitigation an Managmnt Cntr,

More information

SECTION ADDENDUM NO. 2

SECTION ADDENDUM NO. 2 S Level 6 Vivarium uildout Section 00 9 3, Page UT ehavioral and iomedical Science uilding (S) ADDNDUM NO. 2 Houston, TX WHR Project No. G5303.00 DAT: September 3, 205 STION 00 9 3 ADDNDUM NO. 2 R: FROM:

More information

Bridge Maintenance Survey for Indiana Counties

Bridge Maintenance Survey for Indiana Counties Purdu Univrsity Purdu -Pubs Indiana Local Tchnical Assistanc Program (LTAP) Publications Indiana Local Tchnical Assistanc Program (LTAP) 1-2008 Bridg Maintnanc Survy for Indiana Countis Indiana LTAP Follow

More information

Office of Emergency Services (3055P)

Office of Emergency Services (3055P) Offic of Emrgncy Srvics (3055P) Dpartmnt: Shriff's Offic FY 2003 and 2004 Rcommndd Budgt Offic of Emrgncy Srvics (3055P) Program Outcom Statmnt Th Shriff s Offic of Emrgncy Srvics provids sarch and rscu;

More information

CHECKSHEET. For use with applications for building consent

CHECKSHEET. For use with applications for building consent CHECKSHEET Complx Rsintil, Inustril n Commril Builings Us for multi-unit wllings, motl/hotls, rst homs, hospitls, tntion uilings, ssmly uilings, hil r, ommril, inustril n othr uilings of similr ntur. For

More information

Priority Rating of Highway Routine Maintenance Activities

Priority Rating of Highway Routine Maintenance Activities 54 TRANSPORTATION RESEARC.H RECORD 1246 Priority Rating of Highway Routin Maintnan Ativitis TIEN F. FwA, KuMAREs C. SINHA, AND JoHN D. N. R1vERSON This papr prsnts a produr for dtrmining priority ratings

More information

Avalon Desk with Hutch Assembly Instructions ITEM #

Avalon Desk with Hutch Assembly Instructions ITEM # A. olt (0mm, / in) Assembly Instructions ITM # 705-70 hair Assembly HARWAR: PARTS LIST: Step Step. olt x pcs (5mm, / in). olt A A (75mm, in) Step Step. Washer. Lock Washer Allen Wrench x pc AUTION: Adult

More information

CALAVERAS BIG TREES STATE PARK WASTEWATER SYSTEM IMPROVEMENTS

CALAVERAS BIG TREES STATE PARK WASTEWATER SYSTEM IMPROVEMENTS ALIFORNIA DPARTNT PARKS AND RRATION AQUISITION AND SF # 0-05--000 PROJT A: RV WASTWATR TRATNT SYST THIS PROJT INLUDS TH ONSTRUTION. ONSTRUT A WASTWATR TRATNT SYST (WWTS) FOR TH RRATIONAL VHIL SANITATION

More information

Return of Organization Exempt From Income Tax

Return of Organization Exempt From Income Tax Form 99.0 Dpartmnt of th Trasury ntmal Rvnu Srvi A B For th 2009 alnar ChK if appilal: Rturn of Organization Exmpt From nom Tax OMS ~O"1545.0047 Unr stion 501(), 527, or 4947(a)(1) of th ntrnal Rvnu Co

More information

Analysis of piston behavior according to eccentricity ratio of disk in bent-axis type piston pump

Analysis of piston behavior according to eccentricity ratio of disk in bent-axis type piston pump Journal of Mhanial Sin an Thnology (8) 76~733 Journal of Mhanial Sin an Thnology www.springrlink.om/ontnt/738-494x DOI.7/s6-8-64-5 Analysis of piston bhavior aoring to ntriity ratio of isk in bnt-axis

More information

Exercise and Physical Activity Resource Center. eparc.ucsd.edu

Exercise and Physical Activity Resource Center. eparc.ucsd.edu Exrcis and Physical Activity Rsourc Cntr parc.ucsd.du EPARC: Th Cutting Edg of Exrcis Scinc Th Exrcis and Physical Activity Rsourc Cntr (EPARC) at UCSD is a joint vntur btwn th Dpartmnt of Family and Prvntiv

More information

A 7 14HP73 FULL 25 6 A 6 12HP53 FULL 15 6 NEW 30A / 120 V BREAKER IN EXISTING PANEL 1 FOR BOTH EA 1

A 7 14HP73 FULL 25 6 A 6 12HP53 FULL 15 6 NEW 30A / 120 V BREAKER IN EXISTING PANEL 1 FOR BOTH EA 1 MARIN PARK IMPRSSD CURRNT ANOD WLLS* NCAPSULATION OF BUS PARKOVR & GARAG H-PILS* 3 3 NUMBR NUMBR ITM PR WLL UNITS TOTAL PIL CAP LOCATION H-PIL NOM LNGTH NUMBR ANODS - OPTION : "Ø x 39.4" TUBULAR MIXD MTAL

More information

Installation manual. Daikin Altherma Domestic hot water tank kit EKVSU180A EKVSU260A. 180 l. 260 l

Installation manual. Daikin Altherma Domestic hot water tank kit EKVSU180A EKVSU260A. 180 l. 260 l Instlltion mnul Dikin Althrm Domsti hot wtr tnk kit EKVSU180A EKVSU260A Instlltion mnul Dikin Althrm Domsti hot wtr tnk kit English Tl of Contnts Tl of Contnts 1 Aout th oumnttion 2 1.1 Aout this oumnt...

More information

One River Environmental Assessment Stage 2 PIC. Welcome!

One River Environmental Assessment Stage 2 PIC. Welcome! On Rivr Environmntal Assssmnt Stag 2 PIC Wlcom! On Rivr Environmntal Assssmnt Wlcom to th On Rivr Environmntal Assssmnt Stag 2 Public Information Cntr No. 2 Plas xplor th prsntation ara to larn about th

More information

Going Below the Surface Level of a System This lesson plan is an overview of possible uses of the

Going Below the Surface Level of a System This lesson plan is an overview of possible uses of the Titl Acknowldgmnts Ovrviw Lngth Curriculum Contxt Lsson Objctiv(s) Assssmnt Systms Thinking Concpt(s) Instructional Considrations Matrials Going Blow th Surfac Lvl of a Systm This lsson plan is an ovrviw

More information

Digital Signal Processing Homework 7 Solutions in progress

Digital Signal Processing Homework 7 Solutions in progress Digital Signal Prossing Homwork 7 Solutions in progrss Du Wnsay 0 Novmbr 00 Problm 46 a, b, ) Fin th maximum valu of th magnitu of th frquny rspons ) Fin th pols an ros of H() f) Compar th minimum an maximum

More information

Thermodynamic analysis of the actual air cycle refrigeration system

Thermodynamic analysis of the actual air cycle refrigeration system Availabl onlin at www.sindirt.om Systms Enginring Prodia (2) 2 6 2 Intrnational Confrn on Ris and Enginring Managmnt (REM) hrmodynami analysis of th atual air yl rfrigration systm Liu Shngjun a,b, Zhang

More information

Question Paper 16 and 17 November 2005

Question Paper 16 and 17 November 2005 KEY SKILLS INFORMATION AND COMMUNICATION TECHNOLOGY Lvl 3 Lttings [KSI31] Qustion Ppr 16 n 17 Novmr 2005 WHAT YOU NEED This Qustion Ppr An Answr Covr Sht Ass to omputr, softwr n printr As to four t fils

More information

The Impact on Remote Maintenance of Varying the Aspect Ratio and Number of TF Coils for a Demonstration Fusion Power Plant

The Impact on Remote Maintenance of Varying the Aspect Ratio and Number of TF Coils for a Demonstration Fusion Power Plant EUOFUSION WPM-CP(6) 5466 D Wolff t al. Th Impact on mot Maintnanc of Varying th Aspct atio an Numbr of TF Coils for a Dmonstration Fusion Powr Plant Prprint of Papr to b submitt for publication in Procings

More information

Geotechnical Risk Analysis of the Local Flood Control Projects on the Kansas River in Topeka, Kansas

Geotechnical Risk Analysis of the Local Flood Control Projects on the Kansas River in Topeka, Kansas Missouri Univrsity of Scinc and Tchnology Scholars' Min Intrnational Confrnc on Cas Hisris in Gotchnical Enginring (2008) - Sixth Intrnational Confrnc on Cas Hisris in Gotchnical Enginring Aug 11th - Aug

More information

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders.

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders. SIDE MOTOR MOUNT Drawn 09-15-2013 Altrnat Mount and Location for a Trolling Motor Rv. 09-21-2013 Print in Landscap Mod with ¼ inch bordrs. Th primary purpos of locating th trolling motor nxt to th oprator

More information

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders.

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders. SIDE MOTOR MOUNT Altrnat Mount and Location for a Trolling Motor Drawn 09-15-2013 Rv. 07-11-2016 Print in Landscap Mod with ¼ inch bordrs. Th primary purpos of locating th trolling motor nxt to th oprator

More information

PRELIMINARY STUDY ON DISPLACEMENT-BASED DESIGN FOR SEISMIC RETROFIT OF EXISTING BUILDINGS USING TUNED MASS DAMPER

PRELIMINARY STUDY ON DISPLACEMENT-BASED DESIGN FOR SEISMIC RETROFIT OF EXISTING BUILDINGS USING TUNED MASS DAMPER Not: this papr was not abl to b rviwd in accordanc with DEST rquirmnts. PRELIMINARY STUDY ON DISPLACEMENT-BASED DESIGN FOR SEISMIC RETROFIT OF EXISTING BUILDINGS USING TUNED MASS DAMPER Chang-Yu Chn 1

More information

Form. Tick the boxes below to indicate your change(s) of circumstance and complete the relevant sections of this form

Form. Tick the boxes below to indicate your change(s) of circumstance and complete the relevant sections of this form tification of chang of circumstancs for EU studnts on full-tim courss - Acadmic Yar 2013/14 Form EUCO1 This form is also availabl at www.gov.uk/studntfinanc First nam(s) Surnam/family nam Important information

More information

EXECUTIVE SUMMARY 1. CLEAN. - meets recreational water quality guideline 2. GREEN

EXECUTIVE SUMMARY 1. CLEAN. - meets recreational water quality guideline 2. GREEN EXECUTIVE SUMMARY Mting Public Accssibility and Rcrational Nds in Urban Watrfront Opn Spac Systms: A Comparati.v Analysis of Missi.ssauga and Etobicok l

More information

Adelaide Wind Power Project: 2016 Post-Construction Wildlife Monitoring - Summary Report

Adelaide Wind Power Project: 2016 Post-Construction Wildlife Monitoring - Summary Report Alai Win Powr Projct: 2016 Post-Construction Willif Monitoring - Summar port Prpar for: Suncor Alai Win Limit Partnrship 150 6th Avnu SW Calgar AB T2P 3E Prpar b: Stantc Consulting Lt. 70 Southgat riv,

More information

Finding Finding The For The For ces In A T ces In A russ Truss V? Next Contents

Finding Finding The For The For ces In A T ces In A russ Truss V? Next Contents inin Th Th ors In Truss In this 19th ntury truss ri, th sizs of th iniviul mmrs r sin in proportion to th mnitus n hrtrs of th fors thy must rry. In this lsson, you will lrn th rphil thniqu for nlyzin

More information

Environmental Engineering Grade A Shock Tests

Environmental Engineering Grade A Shock Tests Environmntal Enginring Grad A Shok Tsts Juanito Dl Rosario and Stvn Murphy, SSC San Digo SPAWAR Systms Cntr San Digo 53560 Hull Strt San Digo, California, 92152-5001, USA Dl.Dlrosario@navy.mil Stvn.Murphy@navy.mil

More information

Approved by: N/A Date first published: Oct-2015 Version No. 1.0 Date updated: Oct-2015 Owner: Estates Review Date: Sep-2021

Approved by: N/A Date first published: Oct-2015 Version No. 1.0 Date updated: Oct-2015 Owner: Estates Review Date: Sep-2021 Co of Prti CCTV Protool Contnts Introution 2 Sop 2 Ownrship n Oprtion of th CCTV Systm 2 Prinipls 2 Purpos of th CCTV Systm 2 Systm Dtils 3 Dt Prottion At 1998 3 Ass to Informtion 3 Primry Rqusts to Viw

More information

Fuzzy-Neuro Control of an Exoskeletal Robot for Human Elbow Motion Support

Fuzzy-Neuro Control of an Exoskeletal Robot for Human Elbow Motion Support Procings of th 2001 IEEE Intrnational Confrnc on Robotics & Automation Soul, Kora May 21-26, 2001 Fuzzy-Nuro Control of an Exoskltal Robot for Human Elbow Motion Support Kazuo Kiguchi *1, Shingo Kariya

More information

Fusarium vs. Soybean

Fusarium vs. Soybean Fusarium vs. Soyban Gnsata, a company which proucs soyban s for commrcial sal in Nbraska, is rsponing to th migration of Sun Dath Synrom (SDS) into Nbraska soyban fils. An infstation of SDS is far which

More information

BEHAVIOUR OF DUCTILE HOLLOW REINFORCED CONCRETE COLUMNS. J.B. ManderM.J.N. Priestley

BEHAVIOUR OF DUCTILE HOLLOW REINFORCED CONCRETE COLUMNS. J.B. ManderM.J.N. Priestley 273 BEHVIOUR OF DUCTILE HOLLOW REINFORCED CONCRETE COLUMNS J.B. MandrM.J.N. Pristly and R. Park SYNOPSIS: This papr was prsntd at th Third South Paifi Rgional Confrn on Earthquak Enginring, Wllington,

More information

2. Transactional Recruitment Services

2. Transactional Recruitment Services Chlsa and Wstminstr Hospital Information Govrnanc Tam Chlsa Harbour Harbour Yard Unit 111, 1 st Floor London SW10 0XD Our Rf: FOI 2016-343 Dar Rqustr Thank you for your information rqust rcivd by us on

More information

Investigating Critical Driver Behavioral Patterns during the Yellow Phase at Signalized Intersections

Investigating Critical Driver Behavioral Patterns during the Yellow Phase at Signalized Intersections Investigating Critial Driver Behavioral Patterns uring the Yellow Phase at Signalize Intersetions Yue Liu, Gang-Len Chang, an Jie Yu Abstrat This paper presents the investigation results of river behavioral

More information

BYLAWS STAFF COUNCIL AT THE UNIVERSITY OF KENTUCKY. Section 2. The Council is not a forum for personal grievances or complaints.

BYLAWS STAFF COUNCIL AT THE UNIVERSITY OF KENTUCKY. Section 2. The Council is not a forum for personal grievances or complaints. BYLAWS GOVERNING THE COLLEGE OF ARTS and SCIENCES STAFF COUNCIL AT THE UNIVERSITY OF KENTUCKY Articl 1. Nam Th nam of this organization shall b th Univrsity of Kntucky Collg of Arts and Scincs Staff Council.

More information

Dr She Lok, Dr David Greenberg, Barbara Gill, Andrew Murphy, Dr Linda McNamara

Dr She Lok, Dr David Greenberg, Barbara Gill, Andrew Murphy, Dr Linda McNamara Dr Sh Lok, Dr David Grnbrg, Barbara Gill, Andrw Murphy, Dr Linda McNamara This is a joint working projct btwn Mount Vrnon Cancr ntwork and Roch Products Ltd. 1 Introduction Dscrib th work that Mount Vrnon

More information

Probability, Genetics, and Games

Probability, Genetics, and Games " Probability, Gntics, and Gams Hav you vr hard of gns? (W don t man th kind you war!) What color ar your ys? Can you curl your tongu? Your birth parnts gav you a uniqu st of gns that dtrmin such things.

More information

MATH 1300: Finite Mathematics EXAM 1 15 February 2017

MATH 1300: Finite Mathematics EXAM 1 15 February 2017 MATH 1300: Finit Mathmatics EXAM 1 15 Fbruary 2017 NAME:... SECTION:... INSTRUCTOR:... SCORE Corrct (A): /15 = % INSTRUCTIONS 1. DO NOT OPEN THIS EXAM UNTIL INSTRUCTED TO BY YOUR ROOM LEADER. All xam pags

More information

Steve Turner/Jet Bartlett Turner Commercial Properties Representing the Seller

Steve Turner/Jet Bartlett Turner Commercial Properties Representing the Seller 178.54+/- ACRES FOR SALE HWY. 29 EAST WILLIAMSON COUNTY, TEXAS Prsntd By: Stv Turnr/Jt Bartltt Turnr Commrcial Proprtis Rprsnting th Sllr Th Brokr is submitting th attachd information in its capacity as

More information

Assortment box of blind rivet nuts for thin-walled components 2330/12.02

Assortment box of blind rivet nuts for thin-walled components 2330/12.02 Assortmnt box of for thin-wall componnts 2330/12.02 Böllhoff Rpair olutions Crating thras? RIVK crat intrnal thras on thin-wall componnts. Two functions: rivting an scrwing Bnfits oa-baring thras on thin-wall

More information

Analysis of kinematic motion deviations of machining centers based on geometric tolerances

Analysis of kinematic motion deviations of machining centers based on geometric tolerances Bulltin of th JSME Journl of vn Mhnil Dsign, Sstms, n Mnufturing Vol.8, No.4, 4 nlsis of kinmti motion vitions of mhining ntrs bs on gomtri tolrns tsushi TKSI*, rt YOSID*, Wiroj TSN* Nobuhiro SUGIMUR*,

More information

FMEA Methodology for Quality Improvement in Sheet Metal Industry

FMEA Methodology for Quality Improvement in Sheet Metal Industry FMEA Mthodology for Quality Improvmnt in Sht Mtal Industry Vitthal Jumbad Dr. Babasahb Ambdkar Marathwada Univrsity, Lturr Maharashtra Institut of Thnology, Pun, Maharashtra Satput M. A. Lturr, Maharashtra

More information

TWO REFERENCE japollo LUNAR PARKING - ORBITS / T. P. TIMER. (NASA CR OR rmx OR AD NUMBER) OCTOBER 1965 GODDARD SPACE FLIGHT CENTER

TWO REFERENCE japollo LUNAR PARKING - ORBITS / T. P. TIMER. (NASA CR OR rmx OR AD NUMBER) OCTOBER 1965 GODDARD SPACE FLIGHT CENTER x-543-55-399 * 1 TWO REFERENCE japollo LUNAR PARKING - ORBITS / I - -. -! BY T. P. TIMER,< CFSTI PRICE(S) $ c 4 (PAGES1 (NASA CR OR rmx OR AD NUMBER) 277 I (CATEGORY) ff 653 July 65 OCTOBER 1965,r ; I

More information

Pharmacy in Primary Care Safety Climate Report

Pharmacy in Primary Care Safety Climate Report Summry Shows your phrmy rsults in omprison with ll othr phrmis who hv omplt th survy t th tim of ownloing your rport Communition Working Conitions Lrship Tmwork this ftor ovrs: honst isussion twn tm mmrs

More information

COMPREHENSIVE PLAN for GREGG TOWNSHIP UNION COUNTY, PENNSYLVANIA

COMPREHENSIVE PLAN for GREGG TOWNSHIP UNION COUNTY, PENNSYLVANIA COMPREHENSIVE PLAN for GREGG TOWNSHIP UNION COUNTY, PENNSYLVANIA prpard by a committ comprisd of Grgg Township Planning Commission Grgg Tbwnship Suprvisors Grgg Township Zoning Haring Board Union County

More information

2013 Open to Public Inspection

2013 Open to Public Inspection SCHEDULE H (Form 990) Dprtmnt of th Trsury Intrnl Rvnu Srvi If "Ys," ws it writtn poliy? If th orgniztion h multipl hospitl filitis, init whih of th following st sris pplition of th finnil ssistn poliy

More information

Gentamicin Therapy Induced Functional Type VII Collagen in RDEB Patients Harboring Nonsense Mutations. David T. Woodley and Mei Chen

Gentamicin Therapy Induced Functional Type VII Collagen in RDEB Patients Harboring Nonsense Mutations. David T. Woodley and Mei Chen Gntamicin Thrapy Inuc Functional Typ VII Collagn in RDEB Patints Harboring Nonsns Mutations Davi T. Wooly an Mi Chn Dpartmnt of Drmatology, Univrsity of Southrn California, Los Angls, CA EB2017 Mting,

More information

Redistribution and government tactical behaviour: An analysis of local public expenditure in China after 1994 tax reform

Redistribution and government tactical behaviour: An analysis of local public expenditure in China after 1994 tax reform Ristribution an govrnmnt tactical bhaviour: An analysis of local public xpnitur in China aftr 1994 tax rform Gabril Guggiola Plas consir for publication on th spcial issu of th Journal of Chins Economics

More information

Self-Powered Sensors for Monitoring of Highway Bridges

Self-Powered Sensors for Monitoring of Highway Bridges Snsors Journal, IEEE, vol. 9, 9, pp. 14-149 1 Slf-Powrd Snsors for Monitoring of Highway Bridgs Edward Sazonov, Mmbr, IEEE, Haodong Li, Mmbr, IEEE, Darrll Curry, and Pragasn Pillay, Fllow, IEEE Abstrat

More information

Landslide at the Highway D 8 Prague Dresden near Prackovice

Landslide at the Highway D 8 Prague Dresden near Prackovice Wolfgang Braunr Landscap-Architct Rgional Managr info@okoplan-wb.d Landslid at th Highway D 8 Pragu Drsdn nar Proposals for rdvlopmnt and idas for dsign Concptional sktchs English Vrsion: 2 Elb vally nar

More information

PHA Case Study III (Answers)

PHA Case Study III (Answers) PHA 5128 as Study III (Answrs) 1. TL is a 25 yar old mal who was admittd for a soft tissu infction in his abdomn. H is 5'10", 175 Ibs, WB 19, and BUN/Sr 12/1.1. Wound culturs ar positiv for Klbsilla pnumonia.

More information

AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME

AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME Michal D. Fltwood, Danill L. Paig, Chris S. Fick, and Knnth R. Laughry, Sr. Dpartmnt of Psychology Ric Univrsity Houston, TX flt@ric.du

More information

Student ID Department/Year. Final Examination. Introduction to Computer Networks Class#: 901 E31110 Fall :30-11:10 Tuesday January 12, 2010

Student ID Department/Year. Final Examination. Introduction to Computer Networks Class#: 901 E31110 Fall :30-11:10 Tuesday January 12, 2010 Nam Stunt ID Dpartmnt/Yar Final Examination Introution to Computr Ntworks Class#: 901 E31110 Fall 2009 9:30-11:10 Tusay January 12, 2010 Prohiit 1. You ar not allow to writ own th answrs using pnils. Us

More information

IOP Conference Series: Materials Science and Engineering. Related content PAPER OPEN ACCESS

IOP Conference Series: Materials Science and Engineering. Related content PAPER OPEN ACCESS IOP Confrnc Sris: Matrials Scinc and Enginring PAPER OPEN ACCESS Comparison of Sismic Rsponss for Rinforcd Concrt Buildings with Mass and Stiffnss Irrgularitis Using Pushovr and Nonlinar Tim History Analysis

More information

MATH 1300: Finite Mathematics EXAM 2 15 March 2017

MATH 1300: Finite Mathematics EXAM 2 15 March 2017 MATH 1300: Finit Mathmatics EXAM 2 15 March 2017 NAME:... SECTION:... INSTRUCTOR:... SCORE MC:(A) /12 * 7 = LA: /16 = Total: /100 = % INSTRUCTIONS 1. DO NOT OPEN THIS EXAM UNTIL INSTRUCTED TO BY YOUR ROOM

More information

Programme-Specific Examination and Study Regulations for the Consecutive Master Degree Programme

Programme-Specific Examination and Study Regulations for the Consecutive Master Degree Programme Programm-Spcific Examination and Study Rgulations for th Conscutiv astr Dgr Programm dical Tchnology and Halthcar Businss (EAH) (.Sc.) at Hamburg nivrsity of Applid Scincs (HA) in Coopration with Escola

More information

TABLE 1 - MICRON CODE CODE XX NOM. ABS. 2X AS 1098

TABLE 1 - MICRON CODE CODE XX NOM. ABS. 2X AS 1098 NOTS: 1. 2.. 4.. 6. 7. 1 2 4 MTRIL: ITTING: 04/04L STNR; 16/16L HN -16 IS TO N O P.N. IS: 16/16L STNR; 04L HN SPII. S ROUTR OR PRT MKUP. IS IR SRN MK UP PR N02-04. SSML PR OPM-02. SIGN: PR 1. RITRI; MIN

More information

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre Wast Managmnt of Cana Corporation Environmntal Assssmnt for a Nw Lanfill Footprint at th Wst Carlton Environmntal Cntr SOCIO-ECONOMIC EXISTING CONDITIONS REPORT DRAFT FOR DISCUSSION AND COMMENT Prpar by:

More information

3 Clinical Management Unit of Preventive Medicine,

3 Clinical Management Unit of Preventive Medicine, Intrnational Journal of Epimiology, 2014, 224 234 oi: 10.1093/ij/yt259 Avanc Accss Publication Dat: 14 January 2014 Cancr Cancr Is fluori a risk factor for bon cancr? Small ara analysis of ostosarcoma

More information

EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW

EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW I. Introduction. Thr ar two objctivs in this laboratory xrcis. Th first objctiv, (A), is th study of th bhavior of a body

More information

Presentation to the Senate Committee on Health & Human Services June 16, The University of Texas Health Science Center at Houston (UTHealth)

Presentation to the Senate Committee on Health & Human Services June 16, The University of Texas Health Science Center at Houston (UTHealth) Prsntation to th Snat Committ on Halth & Human Srvics Jun 16, 2016 Th Univrsity of Txas Halth Scinc Cntr at Houston (UTHalth) Stphn Glazir, MBA, FACHE Chif Oprating Officr, UTHalth HCPC 1 Th UTHalth Harris

More information

Verification Analysis of Spread Footing

Verification Analysis of Spread Footing Vrifiation manual o. Upat 03/016 Vrifiation Analysis of Spra Footing Program: Fil: Spra Footing Dmo_vm_n_0.gpa In this vrifiation manual you will fin a han-ma vrifiation analysis of aring apaity of a spra

More information

DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14.

DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14. SPORT NORTHERN IRELAND DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14. 1. PURPOSE OF PAPER 1.1 Th purpos of this papr is: to updat mmbrs on progrss that is bing mad in achiving Stratgy targt PE14

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SAO PAULO METRO LINE 5 PROJECT APPROVED ON APRIL 20, 2010

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SAO PAULO METRO LINE 5 PROJECT APPROVED ON APRIL 20, 2010 Public Disclosur Authorizd Th World Bank Sao Paulo Mtro Lin 5 Projct (P116170) DOCUMENT OF THE WORLD BANK REPORT NO.: RES27607 Public Disclosur Authorizd RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Part III Statement of Program Service Accomplishments

Part III Statement of Program Service Accomplishments Form 990 (008) BIG CAT RESCUE CORP 59-3330495 Pag Part III Statmnt of Program Srvi Aomplishmnts (s instrutions) 1 Brifly dsri th organization's mission: TO PROVIDE THE BEST HOME WE CAN FOR THE ANIMALS

More information

Highly Dynamic and Homogeneous Heating of Organo Sheets

Highly Dynamic and Homogeneous Heating of Organo Sheets PR O D U C T I O N O r g a no Sh ts Highly Dynamic and Homognous Hating of Organo Shts Th infrard hating tchnology dvlopd by KraussMaffi with an intllignt hardwar and softwar solution nabls fast and homognous

More information

1/28/18. DNA Replication. Watson and Crick. Double helix structure of DNA article in Nature

1/28/18. DNA Replication. Watson and Crick. Double helix structure of DNA article in Nature Rplication 2007-2008 Watson and Crick 19 articl in Natur Doubl hlix structur of It has not scapd our notic that th spcific pairing w hav postulatd immdiatly suggsts a possibl copying mchanism for th gntic

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for Fil #MVP7335MVM Applicant: City of Lino Laks Corps Contact: Marissa Mrriman Addrss: 8 Fifth Strt ast, Suit 7, St. Paul, Minnsota 55678 Mail: Marissa.V.Mrriman@usac.army.mil Phon: (65) 9536

More information

COMPUTER EDUCATION TECHNIQUES, INC. (ASP.NET ) SA:

COMPUTER EDUCATION TECHNIQUES, INC. (ASP.NET ) SA: ASP.NET: Hns-on Introution In orr to lrn whih qustions hv n nswr orrtly? 1. Print ths pgs. 2. Answr th qustions. 3. Sn this ssssmnt with th nswrs vi:. FAX to (212) 967-3498. Or. Mil th nswrs to th following

More information

FACT SHEET: PENINSULA OPEN SPACE TRUST S APPLE ORCHARD, EVENT CENTER & RIPARIAN EASEMENT PROPERTIES AS ADDITIONS TO LA HONDA CREEK OPEN SPACE PRESERVE

FACT SHEET: PENINSULA OPEN SPACE TRUST S APPLE ORCHARD, EVENT CENTER & RIPARIAN EASEMENT PROPERTIES AS ADDITIONS TO LA HONDA CREEK OPEN SPACE PRESERVE FACT SHT: PNINSULA OPN SPAC TRUST S APPL ORCHARD, VNT CNTR & RIPARIAN ASMNT PROPRTIS AS ADDITIONS TO LA HONDA CRK OPN SPAC PRSRV Siz: Approximatly 310 acrs, consisting of four distinct proprtis Location:

More information

National Assessment in Sweden. A multi-dimensional (ad)venture

National Assessment in Sweden. A multi-dimensional (ad)venture Challngs in Educational Masurmnt Contnt, Mthods and Consquncs Gothnburg, 12 Oct. 2016 National Assssmnt in Swdn A multi-dimnsional (ad)vntur Gudrun Erickson Univrsity of Gothnburg Dpt. of Education and

More information

120 3rd Avenue, Neptune, NJ

120 3rd Avenue, Neptune, NJ For Las Rtail Anchor Spac 5th Av 5th Av 3rd Av 3rd Av Mo rris Rout 35 21,000+ Cars/Day 3,500 SF Av SUBJECT PROPERTY 4th Av 120 3rd Avnu, Nptun, NJ Proprty Dtails Faturs Location Faturs BUILDING SIZE 99,500

More information

PermanentNet Data Model

PermanentNet Data Model PrmanntNt Data Modl Munich January 2012 PrmanntNt Data Modl Sit 2 Ntwork modl Th ntwork is build within Administrativ aras to afford updating by rsponsibl local authoritis. Administrativ aras Polygon fatur

More information

Cerebrovascular disease Defined from diagnosis ICD10: I60-69, ICD8:

Cerebrovascular disease Defined from diagnosis ICD10: I60-69, ICD8: Supplmntary Tabl 1: ICD cods Diagnoss, surgical procdurs, and pharmacothrapy usd for dfining th study population, comorbidity, and outcoms Study population Myocardial Infarction ICD8: 430 ICD10: I21-22

More information

MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE RECOMMENDATION

MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE RECOMMENDATION Los Ands County On Gatway Plaza 213.922.2000 r1 Mtropolitan Transportation Authority Los Angls, CA 90012-2952 mtro.nt MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE

More information

Construction and Inspection Report on Corrugated Polyethylene Pipe, N-12

Construction and Inspection Report on Corrugated Polyethylene Pipe, N-12 Transportation Kntucky Transportation Cntr Rsarch Rport Univrsity of Kntucky Yar 1989 Construction and nspction Rport on Corrugatd Polythyln Pip, N-12 L. John Flcknstin David L. Alln Univrsity of Kntucky,

More information

Safety Data Sheet. SECTION 1: Identification. SECTION 2: Hazard identification

Safety Data Sheet. SECTION 1: Identification. SECTION 2: Hazard identification 3M Avagard 9241 Antisptic Surgical Hand Scrub with Chlorhxidin Gluconat 4% w/w Safty Data Sht Copyright,2017,3M Company. All rights rsrvd. Copying and/or downloading of this information for th purpos of

More information

A e C l /C d. S j X e. Z i

A e C l /C d. S j X e. Z i DESIGN MODIFICATIONS TO ACHIEVE LOW-BOOM AND LOW-DRAG SUPERSONIC CONCEPTUAL DESIGNS Danil. B. L Advisor: Prof. Jams C. McDanil Univrsity of Virginia, Charlottsvill, VA 94 NASA Mntor: Dr. Wu Li NASA Langly

More information

Section 1. General Information on Pressure Pipe Made of Polyethylene Material

Section 1. General Information on Pressure Pipe Made of Polyethylene Material Sction 1 Gnral Information on Prssur Pip Mad of Polythyln Matrial History of Polythyln Matrial 5 Dsign Paramtrs of Polythyln Prssur Pips 5 Strngth Calculation for Polythyln Prssur Pips 7 Transport and

More information

Pirelli & C. Società per Azioni

Pirelli & C. Società per Azioni Pirlli & C. Socità pr Azioni Milan Vial Piro Albrto Pirlli n. 25 Numbr of Rgistration with th Milan Company Rgistr 00860340157 Shar Capital Euro 1,556,692.28 fully subscribd ANNUAL INFORMATION DOCUMENT

More information

OHA Launches Overdose Data Sharing Program Supporting Community Initiatives to Address Opioid Crisis

OHA Launches Overdose Data Sharing Program Supporting Community Initiatives to Address Opioid Crisis OHA exists to collaborate with member hospitals and health systems to ensure a healthy Ohio. Spring 2018 Hospital Insights OHA OPIOID RESPONSE INITIATIVE OHA Launches Overdose Data Sharing Program Supporting

More information

Or-Light Efficiency and Tolerance New-generation intense and pulsed light system

Or-Light Efficiency and Tolerance New-generation intense and pulsed light system Or-Light Efficincy and Tolranc Nw-gnration intns and pulsd light systm Dr Patricia BERGER INTRODUCTION Th us of pulsd and intns light systms (polychromatic, non-cohrnt and non-focussd light) is a commonly

More information

A NEW TESTING METHOD FOR CREEP BEHAVIOR OF SELF-COMPACTING CONCRETE AT EARLY AGE

A NEW TESTING METHOD FOR CREEP BEHAVIOR OF SELF-COMPACTING CONCRETE AT EARLY AGE A NEW TESTING METHOD FOR CREEP BEHAVIOR OF SELF-COMPACTING CONCRETE AT EARLY AGE Krittiya Kawman A dissrtation submittd to Kochi Univrsity of Tchnology in partial fulfillmnt of th rquirmnts for Th Dgr

More information

Telecom/Cabling Boot Camp informational session attended and certificate attached CALL (262) TO SCHEDULE TODAY!

Telecom/Cabling Boot Camp informational session attended and certificate attached CALL (262) TO SCHEDULE TODAY! Ma r kl mk ui ( ) 0 Tom/Cabing Training Training: Training wi tak pa at Gatway Thnia Cog s SC Johnson imet Cntr at 0 Rnaissan Bvd in Sturtvant bginning Monday, January 9, 01, and nding Friday, Apri 0,

More information

Energy Management Strategy Considering Cabin Heating for Plug-in Hybrid Electric Vehicle

Energy Management Strategy Considering Cabin Heating for Plug-in Hybrid Electric Vehicle EVS28 KINTEX, Kora, May 3-6, 215 Enrgy Managmnt Stratgy Considring Cabin Hating for Plug-in Hybrid Elctric Vhicl Hjin Shin 1, Sunyoung Park 1, Jamyoung Pi 1, Jingyu Choi 1, Sulgi L 1, Hyunsoo Kim 1, Inbom

More information

Soils Evaluation CAREER DEVELOPMENT EVENT. This is a Skills CDE

Soils Evaluation CAREER DEVELOPMENT EVENT. This is a Skills CDE Soils Evaluation CAREER DEVELOPMENT EVENT This is a Skills CDE 1055 SW Prairi Trail Pkwy Ankny, IA 50023 P: 515-965-7376 F: 515-965-7373 iowaffa.om AG SKILLS CAREER DEVELOPMENT EVENT GENERAL RULES AND

More information

Specifically, my intent is to also fulfill requirements as described in a provided letter from the City of Pleasant Hill1, excerpted as follows:

Specifically, my intent is to also fulfill requirements as described in a provided letter from the City of Pleasant Hill1, excerpted as follows: Mark Thomas, Pjt Managr SDG Arhitts, In. 3361 Walnut Blvd., Suit 12 Brntwood, CA. 94513 LLC 'fb) lfl1 ATTACHMET B w rm. n JU 1 216 J}) PLAIG DIVISIO CITY OF PLEASAT Hill 1 R.: Tr valuation and invntory

More information

APPLICATION OF HAZOP AND WHAT-IF SAFETY REVIEW TO THE PETROLEUM, PETROCHEMICAL AND CHEMICAL INDUSTRIES

APPLICATION OF HAZOP AND WHAT-IF SAFETY REVIEW TO THE PETROLEUM, PETROCHEMICAL AND CHEMICAL INDUSTRIES APPLICATION OF HAZOP AND WHAT-IF SAFETY REVIEW TO THE PETROLEUM, PETROCHEMICAL AND CHEMICAL INDUSTRIES Dnnis P. Nolan, P.E. NOYES PUBLICATIONS I n PI Park Ridg, Nw Jrsy, U.S.A. Copyright 1994 by Dnnis

More information

Hyderabad Divisional Office. Jeevan Prakash, , Secretariat Road Saifabad, Hyderabad Phone:

Hyderabad Divisional Office. Jeevan Prakash, , Secretariat Road Saifabad, Hyderabad Phone: Hyr Divisionl Offi. Jvn Prksh, 5-9-21, Srtrit Ro Sif, Hyr 500063 Phon: 040-23420744 Sunr Divisionl Offi Jvn Sgr, S. No 110-113-114 Bhin NTR Stium, Hyr - 500080 Phon: 040-27674542 Purhs of Plots/ Ry Built

More information

Annual Report: Fiscal Year July, 2006 June, 2007

Annual Report: Fiscal Year July, 2006 June, 2007 Snat Bill 94 (SB 94) Evaluation Annual Rport: Fical Yar 2006-07 July, 2006 Jun, 2007 For Colorao Dpartmnt of Human Srvic Offic of Chilrn, Youth an Family Srvic Diviion of Youth Corrction By 4855 Rivrbn

More information

AN ANALYTICAL METHOD FOR DEFINING THE PUMP'S POWER OPTIMUM OF A WATER-TO-WATER HEAT PUMP HEATING SYSTEM USING COP

AN ANALYTICAL METHOD FOR DEFINING THE PUMP'S POWER OPTIMUM OF A WATER-TO-WATER HEAT PUMP HEATING SYSTEM USING COP Nyrs, J.,: An Analytial Mthod for Dfining th Pump's Powr... THERMAL SCIENCE, Yar 207, Vol. 2, No. 5, pp. 999-200 999 Introdution AN ANALYTICAL METHOD FOR DEFINING THE PUMP'S POWER OPTIMUM OF A WATER-TO-WATER

More information

Difficult Heat Illness Problems; EAMC & Rhabdomyolysis

Difficult Heat Illness Problems; EAMC & Rhabdomyolysis This This This Forms of Hat Illnss Difficult Hat Illnss Problms; EAMC & Rhabdomyolysis Jorg E. Gómz, M.D. Associat Profssor Txas Childrn s Hospital, Baylor Collg of Mdicin - Houston Hat syncop Exrcis Associatd

More information

IBM Research Report. A Method of Calculating the Cost of Reducing the Risk Exposure of Non-compliant Process Instances

IBM Research Report. A Method of Calculating the Cost of Reducing the Risk Exposure of Non-compliant Process Instances RC24930 (W1001-025) January 8, 2010 Computr Scinc IBM Rsarch Rport A Mthod of Calculating th Cost of Rducing th Risk Exposur of Non-compliant Procss Instancs Yurdar N. Doganata, Francisco Curbra IBM Rsarch

More information

I F S C C L I M B I N G W O R L D C U P

I F S C C L I M B I N G W O R L D C U P 2 0 1 6 I F S C C L I M B I N G W O R L D C U P L E A D K R A N J S L O V E N I A 26 TH - 27 TH N O V E M B E R 2 0 1 6 O R G A N I S E D B Y : ORGANISATION Nam of th Organisr: PZS (Planinska zvza Slovnij

More information

Measuring the Value of Work Accomplishment Part Two: Can I use EVA if I don't collect actual cost data?

Measuring the Value of Work Accomplishment Part Two: Can I use EVA if I don't collect actual cost data? Masuring th Valu of Work Accomplishmnt Part Two: Can I us EVA if I don't collct actual cost data? Author's Not: This is th scond in a sris of articls on practical applications of th Earnd Valu Analysis

More information

L4-L7 network services in shared network test plan

L4-L7 network services in shared network test plan ntwork srvics twork tst plan Tst cass cratd by Swamy As th primary rquirmnt of this fatur is to support its srvics supportd, QA primary focus whil runn th follow tsts is to nsur vryth is functional w.r.to

More information

Octagon Table Set with 4 Stools & Striped Umbrella

Octagon Table Set with 4 Stools & Striped Umbrella Octagon Table Set US AND MAINTNANC: -Use on level surfaces only -Please check assembly at regular intervals, and frequently tighten hardware if necessary. If maintenance is not carried out, the product

More information

Application of Biomedical Digital Solutions: Virtual Flow Cytometry and Hematometrics in Pathology and Research

Application of Biomedical Digital Solutions: Virtual Flow Cytometry and Hematometrics in Pathology and Research Application of Biomdical Digital Solutions: Virtual Flow Cytomtry and Hmatomtrics in Pathology and Rsarch Hrnani D Cualing IHCFLOW Inc Lutz, FL, USA Can ths diagnostic imags bcom data instad of just picturs?

More information