1 CHAPTER 1.0 PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING 1.1 Pojct Objctivs Sction 15124(b) of th Califonia Envionmntal Quality Act (CEQA) Guidlins quis an Envionmntal Impact Rpot (EIR) to ppa a statmnt of objctivs sought by th poposd pojct. Th objctivs assist th County of San Digo (County), as lad agncy, in dvloping a asonabl ang of altnativs to valuat in th EIR. Th pojct objctivs will also aid dcision-maks in ppaing findings o a statmnt of oviding considations, if ncssay. Th statmnt of objctivs also includs th undlying pupos of th pojct. Th following a th pojct objctivs st foth by th poposd pojct: 1. Enhanc public accss to th lak and th amnitis of th pak. 2. Rsto and nhanc th natual aquatic functions of th lak. 3. Impov habitat fo aquatic and avian spcis. 1.2 Pojct Dsciption Lak Basin Rcontouing Th pojct poposs xcavation and gading of appoximatly 226,000 cubic yads of silt and sdimnt to contou th lakbd, dpn th ast and wst lak basins, and povid tntion basins (Tabl 1-1). Appoximatly 27,000 cubic yads of th xcavatd lak matial would b usd to stabiliz th banks of th lak basins and to cat gadd mounds suounding th basins, and fo landscaping and habitat cation. Th balanc of th matial (appoximatly 199,411 cubic yads) would b xpotd off-sit. Th gading would b dsignd to cat shallow aas in th ast lak basin fo nsting and fldgling young bids. Th pojct would also install undwat fatus to povid shlt fo fish. Following gading, th basins would b lind with bntonit clay up to th wat sufac lvl in th majoity of th wst basin and two ft blow th wat sufac lvl in th ast basin. Th bntonit clay lin would assist in duction of goundwat pcolation whil impoving wtland habitat. Th banks of th basins would b stabilizd by th placmnt of a lay of cobbl ock xtnding fom on foot blow th wat sufac lvl in th wst basin and two ft blow th wat sufac lvl in th ast basin, to a dpth of appoximatly fiv ft in both basins. Following constuction, both basins would fatu a maximum dpth of 10 ft, with th upp lvl of inundation occuing at an lvation of 394 ft abov man sa lvl. Th lak dpning would b conductd in two initial phass, with Phas 1 focusd on th ast basin and Phas 2 focusd on th wst basin. Phas 1 would includ dwating of th ast basin by pumping any xisting wat to th wst basin, th moval of matial fom th ast basin; xcavation and contouing of th ast basin, including cation of a sdimnt basin on th ast sid of th ast basin; cation of mounds; off-sit xpot of th maining xcavatd matial; dainag impovmnts; wat aation; wat ciculation; and landscap and iigation impovmnts. Phas 2 would includ moval of lak wat fom th wst basin. This would allow fo dying of th sdimnt in th wst basin. Aft dying, th sdimnt would b movd fom th wst basin, usd fo contouing and cation of mounds, and th maind would b xpotd offsit. A sdimnt basin would b catd on th noth sid of th wst basin. Som matu ts Lindo Lak Rstoation Pojct Supplmntal EIR Pag 1-1

2 would nd to b locatd o movd to allow fo th gading of th basins. Nw plantings and iigation would occu aound both basins. Raw wat fom th Hlix Wat Distict piplin would b usd fo th initial fill of th dpnd lak. Post-constuction wat lvls would b maintaind by using goundwat fom on-sit wlls. Dainag Impovmnts Dainag impovmnts would includ xtnsion of xisting stom dain pips; addition of stom dain inlt and outlt potction o ngy dissipats; and cation of sdimnt basins. Potction would b addd to cub inlts along oads locatd within and adjacnt to th pak land to captu sdimnt and duc flow ats and osion. Th is an xisting box culvt undnath th causway that histoically allowd wat to flow btwn th basins duing flood vnts. Th pojct poposs to plac this shallow bottom box culvt with a nw culvt that would povid a dpnd sction along with two additional 48-inch culvts though th causway that would allow wat and aquatic lif to ciculat btwn th two basins. Sdimnt basins a also poposd to duc futu sdimnt accumulation within th main lak basins. Ongoing maintnanc of th lak basins would qui annual monitoing of sdimnt lvls and gula moval of sdimnt on an as-ndd basis to maintain basin dpths. Each basin would includ maks to idntify sdimnt dpths. Whn accumulatd sdimnt achs a dpth of 12 inchs in any pat of th lak bottom, it would b movd. Pak Landscaping Impovmnts As dscibd abov, th lak basin contouing would poduc xcavatd silt and sdimnt that would b usd to cat landscapd mounds suounding th basins. In addition to ths mounds, oth poposd pak landscaping impovmnts includ installation of two nw floating fishing pis xtnding fom th wst and ast sids of th causway, two bid watching stations, dcoativ boulds, and ADA (Amicans with Disabilitis Act) impovmnts. Additionally, th pak s iigation systm would b modifid to povid fo tmpoay iigation of nw plantings as wll as sasonal and ongoing dought condition iigation. Accss and Ciculation Impovmnts Poposd pak accss and ciculation impovmnts includ th following: moval and placmnt of a pfabicatd bidg on th noth sid of th wst basin, installation of a nw pfabicatd pdstian bidg on th wstn sho of th wst basin that would connct th Laksid Community Cnt to th boathous island; a simulatd boadwalk to connct fom bhind th Community Cnt to th noth paking lot; and constuction of a stabilizd dcomposd ganit path aound th basins to impov ADA accss. Constuction Activitis Th lakbd dpning activitis (Phass 1 and 2) a anticipatd to tak appoximatly 36 months. Equipmnt poposd to b usd fo both phass includs xcavatos, backhos, dozs, loads and smi nd dumps. Bst managmnt pactics (BMPs) would b usd fo osion contol duing impovmnt activitis. Poposd BMPs includ th us of tmpoay constuction ntancs, fnc, fib olls, silt fnc, gavl bags, and stom dain inlt potction. Th maining pojct impovmnts (.g., stom dainag systm, public accss, ciculation, Pag 1-2 Lindo Lak Rstoation Pojct Supplmntal EIR

3 public amnitis) would b implmntd as pat of Phas 2, which is anticipatd to tak 16 months Pojct Backgound Lindo Lak is dividd into a similaly-sizd ast basin and wst basin, spaatd by an appoximatly 30-foot-wid causway that uns noth-south though th middl of th lak aa. Wat flow btwn th ast and wst basin is facilitatd by a mtal pip and valv undnath th causway. Th lak was oiginally fd by th wats of Quail Canyon Ck; howv, th ck has sinc bn dammd to cat naby Lak Jnnings. Wat supply to th lak is now limitd to uban and sufac unoff within th immdiat vicinity of th lak, fquntly laving th shallow ast basin of th lak in a dy stat. Ov tim, th lak basins fill with silt and sdimnts as thy collct unoff fom th suounding dainag aa. This aiss th lakbd lvation, which sults in shallow wat dpth and sasonal dying of th ast basin. By xcavating th silt and sdimnt, and thn gading and contouing th lakbds, th basins can b dpnd, allowing th lak to fill with a gat volum of wat. An EIR fo impovmnts to Lindo Lak Pak was ctifid by th County Boad of Supvisos on May 27, Th poposd impovmnts includd th following: th addition of th paking lots, picnic tabls, a fishing pi and a owboat concssion, location of th boat hous, as wll as, th dpning of th southwstn and wstn lak basins. Th dpning of th lak quid th movmnt of appoximatly 94,000 cubic yads of matial. Th matial was usd as fill fo shaping of th lak sholin and fo distibution at vaious locations acoss th pak popty. Th pojct also involvd using non-pmabl matial to sal th lakbd. On-sit wll wat and wat puchasd fom th Laksid Iigation Distict was poposd to fill th lak. Th ctifid EIR found mino ffcts to taffic ciculation, biology, vcto contol, and hydology. Ths ffcts w all dtmind to b mitigatd o avoidd to a lvl blow significanc. Subsquntly, a Supplmntal EIR (SEIR) was ppad fo impovmnts at Lindo Lak Pak in confomanc with a Pak Mast Plan datd Januay Th poposd impovmnts includd th following: th addition of 185 paking spacs, two nw pak ntancs, th addition of a 1,500-squa-foot community cnt building, th addition of a spay fountain/bandstand plaza, location of th tnnis couts, th addition of a multipupos fild, nw hossho aas, a nw tot lot, xpansion of th pacous, pdstian, qustian, and hiking tails, nw goup picnic tabls, novation and constuction of stooms, nw tuf and iigation systms, and th daining and dpning of th astn lak basin with distibution of th xcavatd matial fo us lswh on th pak popty. Wll wat was poposd to supplmnt and maintain th wat lvl in th ast basin, whil wat ciculation was impovd by using xisting lak wat fo tuf iigation. Th SEIR was ctifid by th County Boad of Supvisos on Fbuay 28, Th SEIR addssd potntial impacts to taffic and ciculation, nois, and hydology/wat quality. No significant nvionmntal ffcts w idntifid fo this pojct. 1.3 Pojct Location Th pojct sit is locatd within th Lindo Lak County Pak at Lindo Lan (Asssso s Pacl Numb ), and covs appoximatly acs. Th pojct sit is boundd by Vin and Chstnut stts to th wst, Laksho Div to th noth, Ptit Lan to Lindo Lak Rstoation Pojct Supplmntal EIR Pag 1-3

4 th ast, and Lindo Lan to th south. Th gional vicinity is shown on Figu 1-1 and th pojct location is shown on Figu 1-2. Lindo Lak is suoundd by a pak aa including walking tails, picnic aas, softball filds, hossho pits, tnnis couts, play aas, skat pak, gazbo (histoic fom boathous), community cnt, and a public libay. 1.4 Envionmntal Stting Rgional Stting Th Lindo Lak Rstoation Pojct (pojct) is locatd in th town cnt of th unincopoatd community of Laksid, in southwstn San Digo County, appoximatly on-quat mil south of Stat Rout 67. Th pojct sit is locatd within th Mto-Laksid-Jamul sgmnt of th Multipl Spcis Consvation Pogam County of San Digo Subaa Plan. Th majoity of th pojct sit is within a Biological Rsouc Co Aa, bcaus it was mappd as a P-Appovd Mitigation Aa on th wildlif agncis' pappovd mitigation map (Attachmnt F of Documnt No on fil with th Clk of th Boad) Local Stting Th Lindo Lak Pak aa is suoundd by nighbohood tail commcial (gocy), multifamily sidntial (apatmnts), singl-family sidntial uss, and Lindo Pak Elmntay School to th noth; singl-family sidntial to th ast and south; and a mix of commcial, light industial, sidntial, and public facilitis (Laksid Public Libay, Laksid Community Cnt) to th wst. 1.5 Intndd Uss of EIR This SEIR is an infomational documnt which will infom public agncy dcision-maks and th public gnally of th significant nvionmntal ffcts of a pojct, idntify possibl ways to minimiz th significant ffcts, and dscib asonabl altnativs to th pojct [CEQA Guidlins Sction 15121(a)]. This SEIR was ppad in accodanc with th quimnts of th County of San Digo Envionmntal Impact Rpot Fomat and Gnal Contnt Rquimnts (County of San Digo 2006), CEQA (Califonia Public Rsoucs Cod, Sction t sq.), and th CEQA Guidlins (14 Califonia Cod of Rgulations (CCR) Sction t sq.). Consistnt with CEQA Guidlins Sction (a), this SEIR has bn ppad as a Supplmntal EIR bcaus any of th conditions dscibd in CEQA Guidlins Sction would qui th ppaation of a subsqunt EIR, and only mino additions o changs would b ncssay to mak th pvious EIR adquatly apply to th pojct in th changd situation. Sction also stats: (b) Th supplmnt to th EIR nd contain only th infomation ncssay to mak th pvious EIR adquat fo th pojct as visd. (c) A supplmnt to an EIR shall b givn th sam kind of notic and public viw as is givn to a daft EIR und Sction Pag 1-4 Lindo Lak Rstoation Pojct Supplmntal EIR

5 (d) A supplmnt to an EIR may b ciculatd by itslf without ciculating th pvious daft o final EIR. () Whn th agncy dcids whth to appov th pojct, th dcision-making body shall consid th pvious EIR as visd by th supplmntal EIR. A finding und Sction shall b mad fo ach significant ffct shown in th pvious EIR as visd. Th oiginal pojct EIR was ctifid by th County Boad of Supvisos on May 27, 1976, and includd analysis of th impacts associatd th oiginal impovmnt pojct, as dscibd in Sction abov. In 1984, a SEIR was ctifid fo a scond Lindo Lak County Pak impovmnts pojct in confomanc with th County s 1983 Pak Mast Plan. Sinc that tim, a chang of cicumstancs not pviously considd in th 1984 SEIR has occud, including vaious additional nvionmntal gulations that hav bn nactd at th local, stat, and fdal lvl sinc In addition to th changs in gulatoy stting, cuntly poposd impovmnts to Lindo Lak Pak that w not includd among th pviously-appovd pojcts no analyzd in thi nvionmntal documnts includ th following: Excavation of a gat volum of lakbd silt and sdimnt than was pviously analyzd Off-sit hauling of th majoity of th xcavatd matial fo landfill disposal Vgtation moval associatd with basin gading Installation of cobbl ock along th laksho Nw hadscap Dainag impovmnts, including constuction of sdimnt basins with associatd fncing and gats Installation of a p-fabicatd pdstian bidg and boadwalk Thfo, th is substantial vidnc that th poposd pojct may hav significant advs impacts on th nvionmnt not pviously considd in th pviously-ctifid oiginal EIR o SEIR. Pusuant to CEQA Sction 15163, this nw SEIR has bn ppad to addss changs in cicumstancs and to povid mino changs and additions to th pviously ctifid EIRs in od to mak th pvious EIRs adquatly apply to th poposd pojct. In accodanc with Sction of th CEQA Guidlins, infomation fom th two pviously ctifid and appovd nvionmntal documnts fo Lindo Lak County Pak is hby incopoatd by fnc into this SEIR. Additionally, Sction stats: a) An EIR o ngativ dclaation may incopoat by fnc all o potions of anoth documnt which is a matt of public cod o is gnally availabl to th public. Wh all o pat of anoth documnt is incopoatd by fnc, th incopoatd languag shall b considd to b st foth in full as pat of th txt of th EIR o ngativ dclaation. b) Wh pat of anoth documnt is incopoatd by fnc, such oth documnt shall b mad availabl to th public fo inspction at a public plac o public building. Lindo Lak Rstoation Pojct Supplmntal EIR Pag 1-5

6 Th EIR o ngativ dclaation shall stat wh th incopoatd documnts will b availabl fo inspction. At a minimum, th incopoatd documnt shall b mad availabl to th public in an offic of th lad agncy in th county wh th pojct would b caid out o in on o mo public buildings such as county offics o public libais if th lad agncy dos not hav an offic in th county. c) Wh an EIR o ngativ dclaation uss incopoation by fnc, th incopoatd pat of th fncd documnt shall b bifly summaizd wh possibl o bifly dscibd if th data o infomation cannot b summaizd. Th lationship btwn th incopoatd pat of th fncd documnt and th EIR shall b dscibd. d) Wh an agncy incopoats infomation fom an EIR that has pviously bn viwd though th stat viw systm, th stat idntification numb of th incopoatd documnt should b includd in th summay o dsignation dscibd in subdivision (c). ) Exampls of matials that may b incopoatd by fnc includ but a not limitd to: 1) A dsciption of th nvionmntal stting fom anoth EIR. 2) A dsciption of th ai pollution poblms ppad by an ai pollution contol agncy concning a pocss involvd in th pojct. 3) A dsciption of th city o county gnal plan that applis to th location of th pojct. f) Incopoation by fnc is most appopiat fo including long, dsciptiv, o tchnical matials that povid gnal backgound but do not contibut dictly to th analysis of th poblm at hand. This SEIR valuats th potntial nvionmntal impacts associatd with implmntation of th cuntly poposd pojct. This is a supplmntal EIR to th oiginal EIR (1976) and SEIR (1984), dscibd abov, ppad fo ali stoation activitis at Lindo Lak County Pak. Public Rviw and Paticipation Pocss Pusuant to Sction of th Stat CEQA Guidlins, a Notic of Ppaation of th SEIR was issud on Mach 10, 2017 to infom psons and oganizations that may b concnd with th nvionmntal ffcts of th pojct, and to qust public commnt on th pojct and th contnts of th SEIR by wittn cospondnc o paticipation in a plannd scoping mting (Appndix A). Public agncis with spcific statutoy sponsibilitis w qustd to indicat thi spcific ol in th pojct appoval pocss. On th vning of Mach 16, 2017, a public scoping mting hostd by psntativs fom th County Dpatmnt of Public Woks and th Dpatmnt of Paks and Rcation was hld at th Laksid Community Cnt to discuss th pojct and th scop of th contnts of th SEIR. At th mting, it was potd that ppaation of nvionmntal studis was cuntly undway fo th following issu aas: biological soucs, cultual soucs, gnhous gas missions, gology and soils, hydology and wat quality, and taffic. Public commnt was civd and documntd in th mting minuts. Pag 1-6 Lindo Lak Rstoation Pojct Supplmntal EIR

7 This SEIR will b mad availabl fo viw by mmbs of th public and public agncis fo 31 days to povid commnts on th sufficincy of th documnt in idntifying and analyzing th possibl impacts on th nvionmnt and ways in which th significant ffcts of th pojct might b avoidd o mitigatd, as statd in CEQA Guidlins, Sction (14 CCR t sq.). As th dsignatd lad agncy, th County is sponsibl fo ppaing this documnt. Th dcision to appov th poposd pojct is within th puviw of th County Boad of Supvisos. Whn dciding whth to appov th pojct, th County will us th infomation includd in this SEIR to consid potntial impacts on th physical nvionmnt associatd with th pojct. Th County will consid wittn commnts civd on th SEIR in making its dcision whth to ctify th SEIR as complt and in complianc with CEQA, and also whth to appov o dny th pojct. Envionmntal considations and conomic and social factos may b wighd to dtmin th most appopiat cous of action. If th SEIR is ctifid and th pojct appovd, agncis with pmitting authoity ov all o potions of th pojct may us th SEIR as th basis fo thi valuation of nvionmntal ffcts of th pojct and appoval o dnial of applicabl pmits. 1.6 Pojct Inconsistncis with Applicabl Rgional and Gnal Plans Th pojct was viwd fo consistncy with th following applicabl gional and gnal plans: County of San Digo Gnal Plan Laksid Community Plan County Zoning Odinanc County of San Digo Paks Mast Plan This viw did not idntify any inconsistncis with ths plans. 1.7 List of Past, Psnt, and Rasonably Anticipatd Futu Pojcts in th Pojct Aa A list of past, psnt, and asonably anticipatd futu pojcts in th pojct aa was ppad in consultation with County staff that svs as th basis fo th cumulativ impact analysis. A dsciption of ths pojcts is povidd in Tabl 1-2, and th locations of ths pojcts a psntd in Figu Gowth Inducing Impacts CEQA quis that a discussion b ppad in nvionmntal documnts gading th ways in which a poposd pojct could b gowth inducing. CEQA Guidlins Sction (d) idntifis a pojct as gowth inducing if it would fost conomic gowth o population gowth, o sults in th constuction of nw housing, ith dictly o indictly, in th suounding nvionmnt. Nw mploys fom commcial o industial dvlopmnt, schools, golf couss, and nw population fom sidntial dvlopmnt psnt dict foms of gowth. Indict foms of gowth includ th dmand fo additional goods and svics associatd with th incas in pojct population that would duc o mov bais to gowth in oth naby locations. Lindo Lak Rstoation Pojct Supplmntal EIR Pag 1-7

8 Und CEQA, gowth inducmnt is not ncssaily considd dtimntal, bnficial, o of littl significanc to th nvionmnt. Th gowth inducing potntial of a pojct could b considd significant if it fosts gowth o sults in a concntation of population in xcss of what is assumd in adoptd mast plans, land us plans, o pojctions mad by gional planning agncis, such as th San Digo Association of Govnmnts. Additionally, a pojct could b considd gowth inducing if th pojct povids infastuctu o svic capacity to accommodat gowth byond th lvls cuntly pmittd by local o gional plans o policis. Th poposd pojct is limitd to impovmnts of Lindo Lak and would not constuct any nw housing o businss that would induc population gowth, no xtnd oadways o infastuctu that would indictly induc population gowth. Th poposd pojct would not chang th xisting land us at th pojct sit fom that of a County Pak, no would it affct th xisting o plannd zoning and land us dsignations of th suounding aas. Although th poposd pak impovmnts would b bnficial to naby sidnts who us th pak facilitis, thy would not induc population gowth, ith dictly o indictly. Tabl 1-1 Summay of Cut and Fill Quantitis (cubic yads [cy]) Phas Poposd Cut Poposd Expot On-Sit R-Us Phas 1 (East Basin) 101,000 cy 76,831 cy 24,169 cy Phas 2 (Wst Basin) 125,315 cy 122,580 cy 2,735 cy Total 226,315 cy 199,411 cy 26,904 cy Pag 1-8 Lindo Lak Rstoation Pojct Supplmntal EIR

9 Cumulativ Pojct Map Ky Pojct Nam Pojct Typ Location(s) 1 Lak Jnnings Maktplac 2 Ashwood II Condo Convsion 3 Gnhills Ranch Tabl 1-2 Past, Psnt, and Rasonabl Anticipatd Futu Pojcts in th Pojct Aa County of San Digo Rfnc Numb Shopping Cnt Gasolin with Food Mat and Ca Wash Rsidntial subdivision into nin lots on a ac sit Estat Rsidntial South sid of Old Highway 80 btwn Ridg Hill Road and Rios Canyon Road, 9288 Adlai Road 9370 Adlai Road 9385 Adlai Road, 4 Cst/Dhsa Estat Rsidntial Muth Vally 5 Cstlak Singl-Family Dtachd Old Hwy 80, 6 Magnolia Couts Singl-Family Dtachd 9317 Lak Jnnings Pak Road, 7 Clgg Singl-Family Dtachd E Lakviw Road 8 Julian Avnu Singl-Family Dtachd 9626 Chistmas T Lan, Majo Subdivision 9 Oakmont II Singl-Family Dtachd Locatd off of Flinn Spings Road and Oak Ck Road, 10 Sunny Ridg Estats 11 Enniss Sand Mins Singl-Family Dtachd Mino altations at th xisting mining aa El Nopal, Mono Avnu, Mono Avnu, Vigilant Road, Vigilant Road, TM5490 PDS2014-TM-5590 TM5356 PDS TM5140/TM5563 TM5317 TM5082 PDS TM5541 PDS TM 5286 PDS TM 5539 PDS TM5421 PDS TM PDS PDS Asssso's Pacl Numb(s) Potntial Rsoucs Affctd/Nots Potntial biological soucs, ai quality, and taffic impacts Potntial impacts to biological soucs impacts, nois, and utilitis and svic systms. Mitigatd Ngativ Dclaation appovd in Potntial biological soucs and cultual soucs impacts Pojct is idl Potntial impacts to biological soucs. EIR appovd in Pojct is idl. Sit is cuntly vacant/undvlopd land Ngativ Dclaation appovd in Ngativ Dclaation appovd in Potntial biological soucs and nois impacts. Mitigatd Ngativ Dclaation appovd in Nois and taffic impacts In Pogss. No nvionmntal documnts availabl as of th dat of this SEIR. Lindo Lak Rstoation Pojct Supplmntal EIR Pag 1-9

10 Cumulativ Pojct Map Ky Pojct Nam Pojct Typ Location(s) 12 Tun Sand Min (East County Sand Min) Tabl 1-2 Past, Psnt, and Rasonabl Anticipatd Futu Pojcts in th Pojct Aa County of San Digo Rfnc Numb Extaction of 1,175,000 cubic yads of matial (sand and top soil). Th Rclamation Plan consists of impoting 1,278,000 cubic yads of clan soil, ock, and asphalt fo us as onsit fill, channl ip-ap, and to constuct a potion of Slaughthous Ck and San Vicnt Ck channls to convy 100-ya stom. South of San Vicnt Avnu Boundd by SR-67 to th wst and Mono Avnu to th ast. 13 Sttl's Point Multi-Family Rsidntial I-8 Businss, 14 Hanson El Rstoation and Rchag El Mont Road, Mont Pond Flood Contol 15 Laksid Anaobic Digst Oganic wast pocssing and lctical gnation 1,500 ft south of Vigilant Road on th ast sid of SR-67, Asssso's Pacl Numb(s) PDS Potntial Rsoucs Affctd/Nots Appovd July 14, 2017 (MND numb PDS2009- ER ) TM5423 PDS Ngativ Dclaation appovd in PDS2014-LDGRMJ Unavailabl EIR has bn ciculatd fo public viw. PDS2018-MUP EIR has bn ciculatd fo public viw. Pag 1-10 Lindo Lak Rstoation Pojct Supplmntal EIR

11 San Macos E s UV 78 o c n C d i d o k Escondido S S a n t C a n t C a Y s a a Y s a k b Suthland Lak l l Santa Ysabl Rsvation S a t n a Y s a b l UV 79 C k Encinitas a n D S Faibanks Ranch i g R i v u i Lak Hodgs t o 15 n S a D D i R i v t o g u i t o g u i Poway S A N D I E G O C O U N T Y Ramona Msa Gand Rsvation San Digo County Estats S a n D i g o R i v Inaja and Cosmit Rsvation Los Pnasquitos Canyon Psv San Vicnt Rsvoi Baona Rsvation UV 282 UV 75 San Digo S w R t t w a i v USMC AIR STATION MIRAMAR USMC AIR STATION MIRAMAR Mission Tails UV UV Rgional Pak 5 UV SAN BERNARDINO Coonado National City ORANGE RIVERSIDE La Msa Lmon Gov Sant UV 125 Casa d Oo-Mount Hlix Sping Vally Bostonia El Cajon w S La Psa Swtwat Rsvoi UV 54 t w v R i a tt kj UV 67 Wint Gadns S a n Ganit Hills Rancho San Digo 8 D i o g R i v Habison Canyon Cst Sycuan Rsvation Jamul Jamul Indian Villag El Capitan Rsvoi Vijas Rsvation D S w t a t w R i v Clvland NF Lovland Rsvoi Batt Lak u z u l a Capitan Gand Rsvation Cuyapaip Alpin Rsvation S w t k C R i v SAN DIEGO O t a Chula Vista Low Otay Rsvoi C k C o t t d o o n w o y R i v Impial Bach MEXICO 0 Mils 5[ kj Pojct Location M:\JOBS5\8545\common_gis\fig1-1_EIR.mxd 12/17/2018 fmm FIGURE 1-1 Rgional Location

12 RD WHITEHILLS CARAWAY ST PETITE PETITE LN LN Imag souc: Namap (flown Januay 2017) LAUREL ST TAMIL RD KATIE LAKE CT BE ECHTREE ST LAKESHORE DR LAKESHORE DR LINDO LAKE PL SHENANDOAH DR PARKSIDE ST Pojct Bounday WOODSIDE AVE ST CHESTNUT LINDO LN AVE MAINE LINDO LN CARAWAY ST ST VINE LOS COCHES RD JULIAN AVE 0 Ft 250 [ M:\JOBS5\8545\common_gis\fig1-2_EIR.mxd 12/26/2018 fmm ST CYPRESS FIGURE 1-2 Pojct Location on Aial Photogaph

13 Imag souc: DigitalGlob (flowndcmb 2017) SR CANYON WILDCAT Pojct Bounday Cumulativ Pojcts 10 UV 67 SR LAKE 9 OLDE 80 COCHES LOS E J NNINGS PARK Mils 1 [ M:\JOBS5\8545\common_gis\fig1-3_EIR.mxd 12/17/2018 fmm FIGURE 1-3 Cumulativ Pojcts

14 This pag intntionally lft blank Pag 1-14 Lindo Lak Rstoation Pojct Supplmntal EIR

Item No Regional Council November 8, 2016

Item No Regional Council November 8, 2016 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Itm No. 14.1.6 Rgional Council Novmb 8, 2016 TO: Mayo Savag and Mmbs of Halifax Rgional Council SUBMITTED BY: Jacqus Dubé, Chif Administativ Offic DATE:

More information

ArresterFacts-001. Arrester Lead Length ArresterWorks.com

ArresterFacts-001. Arrester Lead Length ArresterWorks.com Th ast lad lngth issu is not a nw on, but is still outinly misundstood. If a stakhold wants th highst tun on thi ast invstmnt, thn th lads conncting th dvic should b as shot as possibl. This AstFacts will

More information

ORDINANCE NO

ORDINANCE NO ORINANCE NO. 2018-459 AN ORINANCE OF THE CITY COUNCIL OF THE CITY OF BIG BEAR LAKE, CALIFORNIA, AING SECTION 1.12.050 TO CHAPTER 1.12 OF TITLE 1 OF THE CITY OF BIG BEAR LAKE MUNICIPAL COE ESTABLISHING

More information

Interior Flooding in Washington, DC A first look at where it occurs in the District of Columbia

Interior Flooding in Washington, DC A first look at where it occurs in the District of Columbia Intio Flooding in Washington, DC A fist look at wh it occus in th Distict of Columbia DC Silv Jackts Intio Flooding Task Goup August 25, 2017 Figu 1: A potion of th map poducd by th DC Silv Jackts that

More information

Greenhills Operations Page 3. Hartley Lake. Fernie

Greenhills Operations Page 3. Hartley Lake. Fernie Bûlé HWY 43 HWY 43 Fosyth Foing Riv Opations Pag 2 Foing Riv Gnhills Opations Pag 3 Ewin C Boivin Elfo Wigt El Riv Lin Opations Pag 4 Hait La Gav La Gav Paii Consvation Lan Pag 8 Tlfo Cummings Elviw Opations

More information

Content Skills Assessments Lessons. Pull Ups with progressions. Stick Curl Ups with progressions. Push Ups with progressions

Content Skills Assessments Lessons. Pull Ups with progressions. Stick Curl Ups with progressions. Push Ups with progressions Tach: CORE Physical Education Gad 4 Ya: 2012-13 Cous: Physical Education Gad 4 Month: All Months S p t m b O c t o b P Class Wam Up Activity Essntial Qustions What a th bnfits of bing physically fit? How

More information

EFFICIENCY ANALYSIS OF INDIRECT VECTOR CONTROLLED THREE PHASE INDUCTION MOTOR DRIVE

EFFICIENCY ANALYSIS OF INDIRECT VECTOR CONTROLLED THREE PHASE INDUCTION MOTOR DRIVE ISSN (Pint) : 3 3765 ISSN (Onlin): 78 8875 Intnational Jounal of Advancd Rsach in Elctical, Elctonics and Instumntation Engining (An ISO 397: 7 Ctifid Oganization) Vol., Issu 8, August 13 EFFICIENCY ANALYSIS

More information

Practical Prefetching Techniques for Parallel File Systems. Hanover, NH Durham, NC user programs.

Practical Prefetching Techniques for Parallel File Systems. Hanover, NH Durham, NC user programs. Pactical Pftching Tchniqus fo Paalll Fil Systms David Kotz Cala Schlatt Ellis Dpt. of Math and Comput Scinc Dpt. of Comput Scinc Datmouth Collg Duk Univsity Hanov, NH 03755-3551 Duham, NC 7706 David.Kotz@Datmouth.du

More information

AMETI Eastern Busway. Update: Stage 2 & 3 (residential section) Let s get East Auckland Moving. September at.govt.nz/ameti

AMETI Eastern Busway. Update: Stage 2 & 3 (residential section) Let s get East Auckland Moving. September at.govt.nz/ameti AMTI astn Busway Upat: Sta 2 & 3 (sintial sction) Sptmb 2018 AMTI astn Busway is a tansfomational pojct in south-ast Aucklan that will significantly impov tanspot choics, liability an jouny tims in th

More information

EXECUTIVE SUMMARY 1. CLEAN. - meets recreational water quality guideline 2. GREEN

EXECUTIVE SUMMARY 1. CLEAN. - meets recreational water quality guideline 2. GREEN EXECUTIVE SUMMARY Mting Public Accssibility and Rcrational Nds in Urban Watrfront Opn Spac Systms: A Comparati.v Analysis of Missi.ssauga and Etobicok l

More information

What s in the Graph?

What s in the Graph? What s in th Gaph? Nam: Dat: Slct a psntation of a gaph fom th nwspap; cut it out and past it h. MA.D... Th studnt dscis, analyzs and gnalizs lationships, pattns, and functions using wods, symols, vaials,

More information

Caching and Writeback Policies in Parallel File Systems. Hanover, NH Durham, NC of a parallel I/O architecture to the user programs.

Caching and Writeback Policies in Parallel File Systems. Hanover, NH Durham, NC of a parallel I/O architecture to the user programs. Caching and Witback Policis in Paalll Fil Systms David Kotz Cala Schlatt Ellis Dpt. of Math and Comput Scinc Dpt. of Comput Scinc Datmouth Collg Duk Univsity Hanov, NH 03755-3551 Duham, NC 27706 David.Kotz@Datmouth.du

More information

Following the Caribou

Following the Caribou Following th Caibou Ag ang: 10 to 15 (Junio/Intmdiat; s Extnsions fo Snio option) Tim: 60 minuts Subjcts: Gogaphy, Math, Scinc, Wold Issus Rsoucs: Tacking th Pocupin Caibou Hd (pag 13) map, Th Eight Lifcycl

More information

Physical and Natural Features

Physical and Natural Features ATTAHMENT 1 Upp hattahooch Basin Pofil Th Mto Wat Distict psnts 57 pcnt of th ovall Upp hattahooch Hydologic Unit od (HU)-8 Basin, whil that potion of this HU-8 within th Distict psnts 18 pcnt of th total

More information

SOUTHERN SOCIOLOGICAL SOCIETY

SOUTHERN SOCIOLOGICAL SOCIETY 1 SOUTHERN SOCIOLOGICAL SOCIETY 2 BYLAWS 3 (Rvisd. Appovd Dcmb 1998, Dcmb 2012) 4 5 ARTICLE I - MEMBERSHIP AND DUES 6 7 Sction 1. Th mmbship ya of th Socity shall b fom July 1 though Jun 30. An 8 application

More information

Lesson 14 Coulomb s Law

Lesson 14 Coulomb s Law Physics 30 Lsson 14 oulomb s Law I. Histoical dvlopmnt of oulomb s Law In 1775, n anklin notd that a small nutal cok hanging na th sufac of an lctically chagd mtal can was stongly attactd to th outsid

More information

Public Investments Allocation and Regional Prosperity

Public Investments Allocation and Regional Prosperity Gaki-Polyzos-Sdolias, 222-233 Public Invstmnts Allocation and Rgional Pospity atha Gaki Dpatmnt of Planning and Rgional Dvlopmnt Univsity of Thssaly, Gc magaki@uth.g Safim Polyzos Dpatmnt of Planning and

More information

Speed Sensorless Vector Controlled Inverter Fed Induction Motor Drive Using Fuzzy Logic Controller

Speed Sensorless Vector Controlled Inverter Fed Induction Motor Drive Using Fuzzy Logic Controller Spd Snsolss Vcto Contolld Invt Fd Induction Moto Div Using Fuzzy Logic Contoll V. SaiPhannda 1, P.K.Das 2 Post Gaduat studnt(eee) G.V.P. Collg of Eng. (A) Associat Pofsso(EEE) G.V.P. Collg of Eng. (A)

More information

Business rules Country-by-Country XML V. 08/11/2017

Business rules Country-by-Country XML V. 08/11/2017 Businss uls County-by-County XML V. 08/11/2017 Elmnt Attibut Siz Input Rquimnt BUSINESS RULES TYPE ERROR ACK Xpath I.Mssag Had CBC_OECD Vsion xsd: sting Mandatoy Mandatoy = WongVsion cbc:cbc_oecd/@vsion

More information

PLAN BOTHNIA MSP 4/2012. PLAN BOTHNIA MSP 4 Stockholm, Sweden, January Document code: 4/3 Date: 18. January 2012

PLAN BOTHNIA MSP 4/2012. PLAN BOTHNIA MSP 4 Stockholm, Sweden, January Document code: 4/3 Date: 18. January 2012 Co-Financd Undr Europan Intgratd aritim Policy PLA BOTHIA SP 4/2012 PLA BOTHIA SP 4 Stockholm, Swdn, 25.-26. January 2012 Agnda Itm 4 Toward SP plan Documnt cod: 4/3 Dat: 18. January 2012 Submittd by:

More information

University of North Florida Career Services Program Review February 9-11, Table of Contents

University of North Florida Career Services Program Review February 9-11, Table of Contents Uni v s i t yo f No t hf l o i da Ca S v i c sp o g a mr v i w I np a t n s hi pwi t h: T hs o ut h nas s o c i a t i o no f Co l l g sa nde mpl o y s( S o ACE ) F b ua y9 1 1, 2 0 1 1 Uni v s i t yo f

More information

Grid Interaction of MV-connected CHP-plants during Disturbances

Grid Interaction of MV-connected CHP-plants during Disturbances Gid Intaction of MV-connctd CHP-plants duing Distubancs E.J. Cost, Studnt Mmb, IEEE, J.M.A. Myzik, and W.L. Kling, Mmb, IEEE Abstact Nowadays th amount of distibutd gnation (DG) units is incasing apidly.

More information

E r. R e e. e t. s e. 3 edition Nov, 2017 Mela Ground, Sector 34 Chandigarh

E r. R e e. e t. s e. 3 edition Nov, 2017 Mela Ground, Sector 34 Chandigarh t a E c on m o ic Po li cy o f R s n C C E P R c h d 3 dition 22 23 24 25 26 Nov, 2017 Mla Gound, Scto 34 Chandigah ABOUT SWADESHI Swadshi is a dynamic concpt which absobs changs with continuity. Th Swadshi

More information

Real Defects as the Major Challenge of Useful POD Evaluations

Real Defects as the Major Challenge of Useful POD Evaluations 7 th Euopan-Amican Wokshop on Riabiity of NDE Ra Dfcts as th Majo Chang of Usfu POD Evauations Dani KANZLER 1, Mato PAVLOVIC 2 1 Appid Vaidation of NDT Mapaqutstaß 14a, 13347 Bin, Gmany 2 BAM Bundsanstat

More information

Request for proposals to provide volume price agreement and fulfillment of: Copiers, Printers, Imaging Devices and Related Services and Software

Request for proposals to provide volume price agreement and fulfillment of: Copiers, Printers, Imaging Devices and Related Services and Software OETC-16R-Copis Rqust fo poposals to povid volum pic agmnt and fulfillmnt of: Copis, Pints, Imaging Dvics and Rlatd Svics and Softwa A Joint Coopativ Pocumnt by th public K-12 and High Education mmbs of

More information

Table of Contents. Introduction... 4 Puzzle Hints Picture Puzzles Shape Find... 7 Spun Shapes... 7

Table of Contents. Introduction... 4 Puzzle Hints Picture Puzzles Shape Find... 7 Spun Shapes... 7 Tabl of Contnts Intoduction... 4 Puzzl Hints... 5 6 Pictu Puzzls......... 7 29 Shap Find............... 7 Spun Shaps.............. 7 That s Not an Animal!...... 7 Rbus....8 What s Diffnt?.......... 8 Cayon

More information

A Direct Sequence Spread Spectrum (DSSS) system with a Transmitted Reference using the32-bit version of SystemView by ELANIX.

A Direct Sequence Spread Spectrum (DSSS) system with a Transmitted Reference using the32-bit version of SystemView by ELANIX. Application Not AN116A Ap 11, 1997 SystVi Y E L A N I X A Dict Squnc Spad Spctu (DSSS) syst ith a Tansittd Rfnc using th32-bit vsion of SystVi by ELANIX. Intoduction Th pupos of this syst is to sho ho

More information

An Eccentric Derivation of the Gravitational-Lens Effect

An Eccentric Derivation of the Gravitational-Lens Effect Jounal of Modn Physics, 01, 3, 1966-1971 http://dxdoiog/10436/jmp01314 Publishd Onlin Dcmb 01 (http://wwwscipog/jounal/jmp) An Eccntic Divation of th avitational-lns Effct Yoonsoo Bach Pak, l-tong Chon

More information

in the world s genebanks

in the world s genebanks Hditas 116: 155-162 (1992) A pliminay suvy of wild Titicun and Agilops spcis in th wold s gnanks T. HODGKIN, Y. J. ADHAM and K.. POWELL* IBPGR, c/o FAO, Via dll tt his 142, 145, Rom, Italy HODGKIN, T.,

More information

Project: Festival at the beach

Project: Festival at the beach : Fstival at th bach Dfinition Is about th planning and xcution of an 1-day opn-air fstival including various kinds of music such as indi, rgga and lctronic as wll as juggl-artist pformancs. Th fstival

More information

Potability of ground water supply in Sulu, Philippines

Potability of ground water supply in Sulu, Philippines Intnational Jounal of Dvlopmnt and Sustainability ISSN: 216-662 www.isdsnt.com/ijds Volum Numb 1 (21): Pags 246-246 ISDS Aticl ID: IJDS151 Potability of gound wat supply in Sulu, Philippins Jubaia Astapan

More information

VECTOR NEURAL NET IDENTIFING MANY STRONGLY DISTORTED AND CORRELATED PATTERNS

VECTOR NEURAL NET IDENTIFING MANY STRONGLY DISTORTED AND CORRELATED PATTERNS VECTOR NEURAL NET IDENTIFING ANY STRONGLY DISTORTED AND CORRELATED PATTERNS Bois V. Kyzhanovsky and Andy L. ikalian Institut of Optical Nual Tchnologis, Russian Acadmy of Scincs 44/ Vavilov Stt, 7333 oscow

More information

STABILITY ANALYSIS OF A FUZZY LOGIC CONTROLLER

STABILITY ANALYSIS OF A FUZZY LOGIC CONTROLLER Poc. of 997 Amican Contol Confnc, pp. 33-335, Albuququ, NM, Jun 4-6, 997. STABILITY ANALYSIS OF A FUZZY LOGIC CONTROLLER Gudal Aslan and Kwang Y. L Dpatmnt of Elctical Engining Th Pnnsylvania Stat Univsity

More information

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders.

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders. SIDE MOTOR MOUNT Drawn 09-15-2013 Altrnat Mount and Location for a Trolling Motor Rv. 09-21-2013 Print in Landscap Mod with ¼ inch bordrs. Th primary purpos of locating th trolling motor nxt to th oprator

More information

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders.

Alternate Mount and Location for a Trolling Motor. Print in Landscape Mode with ¼ inch borders. SIDE MOTOR MOUNT Altrnat Mount and Location for a Trolling Motor Drawn 09-15-2013 Rv. 07-11-2016 Print in Landscap Mod with ¼ inch bordrs. Th primary purpos of locating th trolling motor nxt to th oprator

More information

National Institute for Health and Care Excellence. Multimorbidity Scope Consultation Table 06/08/14-10/09/14

National Institute for Health and Care Excellence. Multimorbidity Scope Consultation Table 06/08/14-10/09/14 National Institut fo Halth and Ca Excllnc Multimobidity Scop Consultation Tabl 06/08/14-10/09/14 I 1. 1 3 7 2. 1 7 Collg of Physicians (RCP) Alzhim s Socity Od Sctio No 3 Gna l 1 Gna l Commnts Plas inst

More information

120 3rd Avenue, Neptune, NJ

120 3rd Avenue, Neptune, NJ For Las Rtail Anchor Spac 5th Av 5th Av 3rd Av 3rd Av Mo rris Rout 35 21,000+ Cars/Day 3,500 SF Av SUBJECT PROPERTY 4th Av 120 3rd Avnu, Nptun, NJ Proprty Dtails Faturs Location Faturs BUILDING SIZE 99,500

More information

On the Strain Saturation Conditions for Polycrystalline Ferroelastic Materials

On the Strain Saturation Conditions for Polycrystalline Ferroelastic Materials C. M. Landis Mm. ASME -mail: landis@ic.du Dpatmnt of Mchanical Engining and Matials Scinc, MS 21, Ric Univsity, P.O. Box 1892, Houston, TX 77251 On th Stain Satuation Conditions fo Polycystallin Folastic

More information

Form. Tick the boxes below to indicate your change(s) of circumstance and complete the relevant sections of this form

Form. Tick the boxes below to indicate your change(s) of circumstance and complete the relevant sections of this form tification of chang of circumstancs for EU studnts on full-tim courss - Acadmic Yar 2013/14 Form EUCO1 This form is also availabl at www.gov.uk/studntfinanc First nam(s) Surnam/family nam Important information

More information

RAPID CONTROL PROTOTYPING APPROACH TO FUZZY SPEED CONTROL OF BRUSHLESS DC MOTOR

RAPID CONTROL PROTOTYPING APPROACH TO FUZZY SPEED CONTROL OF BRUSHLESS DC MOTOR RAPID CONTROL PROTOTYPING APPROACH TO FUZZY SPEED CONTROL OF BRUSHLESS DC MOTOR R. Njat TUNCAY Zynp ERENAY Muat YILMAZ Özgü USTUN -mail: tuncay@lk.itu.du.t znay@boun.du.t myilmaz@lk.itu.du.t ustun@lk.itu.du.t

More information

YGES Weekly Lesson Plan Template. Name: Kindergarten- ELA Date: Dec. 7-11, Monday Tuesday Wednesday Thursday Friday

YGES Weekly Lesson Plan Template. Name: Kindergarten- ELA Date: Dec. 7-11, Monday Tuesday Wednesday Thursday Friday Nam: Kirgartn- ELA Dat: Dc. -11, 015 Monday Tusday Wdnsday Thursday Friday Standard(s):..I....I....I....I....I.. Essntial Qustion/ Ky Qustion Activating Stratgy: Lsson Opnr What ar th jobs of th author

More information

MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE RECOMMENDATION

MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE RECOMMENDATION Los Ands County On Gatway Plaza 213.922.2000 r1 Mtropolitan Transportation Authority Los Angls, CA 90012-2952 mtro.nt MEASURE R PROJECT DELIVERY COMMITTEE May 19,201 1 SUBJECT: HIGH DESERT CORRIDOR UPDATE

More information

Gabbard Diagram Formation: The General Theory for Elliptical Orbits

Gabbard Diagram Formation: The General Theory for Elliptical Orbits Avancs in Aospac Scinc an Applications. Volum 8, Numb (018), pp. 99-11 Rsach Inia Publications http://www.ipublication.com Gabba Diagam Fomation: Th Gnal Thoy fo Elliptical Obits Robt C. Rynols 1, Ajun

More information

Company registration number: ROI FRS 105 Demo Client UNAUDITED FINANCIAL STATEMENTS for the year ended 31 December 2017

Company registration number: ROI FRS 105 Demo Client UNAUDITED FINANCIAL STATEMENTS for the year ended 31 December 2017 Company rgistration numbr: 999955 UNAUDITED FINANCIAL STATEMENTS for th yar ndd 31 Dcmbr 2017 Profit and Loss Account Not Turnovr 422,560 383,200 Othr incom 1,000-423,560 383,200 Cost of raw matrials and

More information

Bridge Maintenance Survey for Indiana Counties

Bridge Maintenance Survey for Indiana Counties Purdu Univrsity Purdu -Pubs Indiana Local Tchnical Assistanc Program (LTAP) Publications Indiana Local Tchnical Assistanc Program (LTAP) 1-2008 Bridg Maintnanc Survy for Indiana Countis Indiana LTAP Follow

More information

Company registration number: ROI FRS 105 Demo Client UNAUDITED FINANCIAL STATEMENTS for the year ended 31 January 2018

Company registration number: ROI FRS 105 Demo Client UNAUDITED FINANCIAL STATEMENTS for the year ended 31 January 2018 Company rgistration numbr: 999955 UNAUDITED FINANCIAL STATEMENTS for th yar ndd 31 January 2018 Unauditd Financial Statmnts CONTENTS PAGE Dirctors and Othr Information 1 Dirctor s Rport 2 Accountant s

More information

THE MANNHEIM-KAZANAS SOLUTION, THE CONFORMAL

THE MANNHEIM-KAZANAS SOLUTION, THE CONFORMAL THE MANNHEIM-KAZANAS SOLUTION, THE CONFOMAL GEOMETODYNAMICS AND THE DAK MATTE M.V. Gobatnko, S.Yu. Sdov ussian Fdal Nucla Cnt - All-ussia sach Institut of Expimntal Physics, Saov, Nizhny Novgood gion Abstact

More information

PRINCIPLES OF SAFETY BUS SYSTEMS. HIMA GmbH+CoKG, Brühl, Germany 1 University of Kassel, Computer architecture & System programming, Germany 2

PRINCIPLES OF SAFETY BUS SYSTEMS. HIMA GmbH+CoKG, Brühl, Germany 1 University of Kassel, Computer architecture & System programming, Germany 2 PRINCIPLES OF SAFETY BUS SYSTEMS Böcsök J 1,2.Schwaz M.H. 2, Holub P. 1,2 HIMA GmbH+CoKG, Bühl, Gmany 1 Univsity of Kassl, Comput achitctu & Systm pogamming, Gmany 2 Abstact: This pap dscibs th quimnts

More information

Going Below the Surface Level of a System This lesson plan is an overview of possible uses of the

Going Below the Surface Level of a System This lesson plan is an overview of possible uses of the Titl Acknowldgmnts Ovrviw Lngth Curriculum Contxt Lsson Objctiv(s) Assssmnt Systms Thinking Concpt(s) Instructional Considrations Matrials Going Blow th Surfac Lvl of a Systm This lsson plan is an ovrviw

More information

6.0 Cumulative Impacts

6.0 Cumulative Impacts 6.0 umulativ Impacts Th alifornia nvironmntal Quality Act (QA) rquirs an valuation of a projct s contribution to cumulativ nvironmntal impacts. According to Sction 15355 of th QA Guidlins, cumulativ impacts

More information

DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14.

DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14. SPORT NORTHERN IRELAND DISCUSSION ON THE TIMEFRAME FOR THE ACHIEVEMENT OF PE14. 1. PURPOSE OF PAPER 1.1 Th purpos of this papr is: to updat mmbrs on progrss that is bing mad in achiving Stratgy targt PE14

More information

List 3 ways these pictures are the same, and three ways they are different.

List 3 ways these pictures are the same, and three ways they are different. List 3 ways ths picturs ar th sam, and thr ways thy ar diffrnt. Human Nuron Comptition i i i i Follow dirctions on th sht in Bindr. 1. Mak Storyboard today and all plans to show nuron firing 2. Monday

More information

ARCHAEOLOGY IN TUCSON

ARCHAEOLOGY IN TUCSON ARCHAEOLOGY IN TUCSON Vol. 3, No. 2 Nwsltt of th Institut fo Amican Rsach Sping 1989 RETURN TO HONEY BEE VILLAGE Hony B Villag is slowly yilding its scts. Aft two wks of digging by volunts fom th Foundation

More information

ANALYSIS OF THE WELDING DEFORMATION OF RESISTANCE SPOT WELDING FOR SHEET METAL WITH UNEQUAL THICKNESS

ANALYSIS OF THE WELDING DEFORMATION OF RESISTANCE SPOT WELDING FOR SHEET METAL WITH UNEQUAL THICKNESS Asian Pacific Confnc fo Matials and Mchanics 29 at Yokohama, Japan, Novmb 13-16 ANALYI OF HE WELDING DEFORMAION OF REIANCE PO WELDING FOR HEE MEAL WIH UNEQUAL HICKNE Yuanxun Wang a Png Zhang a Zhigang

More information

Peace River Regional District REPORT. To: Chair and Directors Date: May 27, 2016 From: Chris Cvik, CAO

Peace River Regional District REPORT. To: Chair and Directors Date: May 27, 2016 From: Chris Cvik, CAO -3 Pa iv gional Distit EPOT To: hai an Ditos Dat: May 27, 216 Fom: his vi, AO Subjt: gional Distit Wilfis EOMMENDATION(S): 1. That th gional Boa onfim thi onsnt of th following ations that w untan fom

More information

Analysis of the Deterioration Effects of Stator Insulation on the its Electro-Thermal Property

Analysis of the Deterioration Effects of Stator Insulation on the its Electro-Thermal Property Intnational Jounal of Elctical and Elctonics Engining 3:11 9 Analysis of th Dtioation Effcts of Stato Insulation on th its Elcto-Thmal Popty Diako Aii, Ahmad Gholami, Abolfal Vahdi Abstact Elctical machiny

More information

Characterization and Modeling of Symmetric and Asymmetric Damping Properties of a Magnetorheological Damper

Characterization and Modeling of Symmetric and Asymmetric Damping Properties of a Magnetorheological Damper Pocdings of th 7th WSEAS Intnational Confnc on Simulation, Modlling and Optimization, Bijing, China, Sptmb 15-17, 7 331 Chaactization and Modling of Symmtic and Asymmtic Damping Poptis of a Magntohological

More information

EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW

EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW EXPERIMENT 4 DETERMINATION OF ACCELERATION DUE TO GRAVITY AND NEWTON S SECOND LAW I. Introduction. Thr ar two objctivs in this laboratory xrcis. Th first objctiv, (A), is th study of th bhavior of a body

More information

A 7 14HP73 FULL 25 6 A 6 12HP53 FULL 15 6 NEW 30A / 120 V BREAKER IN EXISTING PANEL 1 FOR BOTH EA 1

A 7 14HP73 FULL 25 6 A 6 12HP53 FULL 15 6 NEW 30A / 120 V BREAKER IN EXISTING PANEL 1 FOR BOTH EA 1 MARIN PARK IMPRSSD CURRNT ANOD WLLS* NCAPSULATION OF BUS PARKOVR & GARAG H-PILS* 3 3 NUMBR NUMBR ITM PR WLL UNITS TOTAL PIL CAP LOCATION H-PIL NOM LNGTH NUMBR ANODS - OPTION : "Ø x 39.4" TUBULAR MIXD MTAL

More information

FACT SHEET: PENINSULA OPEN SPACE TRUST S APPLE ORCHARD, EVENT CENTER & RIPARIAN EASEMENT PROPERTIES AS ADDITIONS TO LA HONDA CREEK OPEN SPACE PRESERVE

FACT SHEET: PENINSULA OPEN SPACE TRUST S APPLE ORCHARD, EVENT CENTER & RIPARIAN EASEMENT PROPERTIES AS ADDITIONS TO LA HONDA CREEK OPEN SPACE PRESERVE FACT SHT: PNINSULA OPN SPAC TRUST S APPL ORCHARD, VNT CNTR & RIPARIAN ASMNT PROPRTIS AS ADDITIONS TO LA HONDA CRK OPN SPAC PRSRV Siz: Approximatly 310 acrs, consisting of four distinct proprtis Location:

More information

Induction Machine Based Flywheel Energy Storage (FES) System Fed From a 20 khz AC Link

Induction Machine Based Flywheel Energy Storage (FES) System Fed From a 20 khz AC Link nduction Machin Basd Flywhl Engy Stoag (FES) Systm Fd Fom a 0 khz AC Link 1 fan Alan, Mmb EEE Eg Univsity Bonova, zmi, 35100, TURKEY Email: ifanalan@i.og Abstact - This study intoducs a fild ointd contolld

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for Fil #MVP7335MVM Applicant: City of Lino Laks Corps Contact: Marissa Mrriman Addrss: 8 Fifth Strt ast, Suit 7, St. Paul, Minnsota 55678 Mail: Marissa.V.Mrriman@usac.army.mil Phon: (65) 9536

More information

Information Visualization

Information Visualization Infomation Visualization How Nw Gaphical EDA Tchniqus Can Rval Hiddn Rlationships Btwn th Ciminal Bhavio of dal Pisons and Thi Thinking Pattns David DsJadins, U.S. Buau of th Cnsus, and Dnis Golumbaski,

More information

High-resolution synthetic-aperture digital holography with digital phase and pupil correction

High-resolution synthetic-aperture digital holography with digital phase and pupil correction High-solution synthtic-aptu digital hologaphy with digital phas and pupil coction Abbi E. Tippi, Abhishk Kuma and Jams R. Finup * Institut of Optics, Univsity of Rochst, Rochst, NY 14627 USA * finup@optics.ochst.du

More information

Frequency Scanning Fibre Interferometer for Absolute Distance Measurements over a Large Target Area

Frequency Scanning Fibre Interferometer for Absolute Distance Measurements over a Large Target Area 9th ntnational Wokshop on Acclato Alignmnt, Sptmb 6-9, 6 JA-6- Fquncy Scanning Fib ntfomt fo Absolut Distanc Masumnts ov a Lag Tagt Aa Yanmi Han, Amin Richold, Colin Py, Richad Bingham John Adam nstitut

More information

Hidden Trends in 90 Years of Harvard Business Review

Hidden Trends in 90 Years of Harvard Business Review Hiddn Tnds in 9 Yas of Havad Businss Rviw Chia-Chi Tsai Chao-Lin Liu Wi-Ji Huang Man-Kwan Shan Dpatmnt of Comput Scinc National Chngchi Univsity, Taipi, Taiwan {99736, chaolin, 1731, mkshan}@nccu.du.tw

More information

Photovoltaic Poles and Powerline at Duncan Creek Gage near French Meadows Trail (13E41) Tunnel Pipeline Other Trail

Photovoltaic Poles and Powerline at Duncan Creek Gage near French Meadows Trail (13E41) Tunnel Pipeline Other Trail Photovotaic Pos an in at Duan Crk nar rh aows Trai 3E4 Aiary an Othr aciitis Duan Crk Divrsion Simnt Disposa Ara Non-Projct Gnra Accss oa Duan Crk Divrsion Primitiv cration Sit Projct oa Projct Trai cration

More information

MATH 1300: Finite Mathematics EXAM 1 15 February 2017

MATH 1300: Finite Mathematics EXAM 1 15 February 2017 MATH 1300: Finit Mathmatics EXAM 1 15 Fbruary 2017 NAME:... SECTION:... INSTRUCTOR:... SCORE Corrct (A): /15 = % INSTRUCTIONS 1. DO NOT OPEN THIS EXAM UNTIL INSTRUCTED TO BY YOUR ROOM LEADER. All xam pags

More information

Pressure Response of Line Sources

Pressure Response of Line Sources PRESSURE RESPONSE OF INE ARRAYS Audio Engining Socit Convntion Pap 5649 Psntd at th 113th Convntion Octob 5-8 os Angls, CA. USA This convntion pap has bn poducd fom th autho's advanc manuscipt, without

More information

YOUR VIEWS ABOUT YOUR HIGH BLOOD PRESSURE

YOUR VIEWS ABOUT YOUR HIGH BLOOD PRESSURE YOUR VIEWS ABOUT YOUR HIGH BLOOD PRESSURE W ar intrstd in your viws about your high blood prssur. Ths ar statmnts othr popl hav mad about thir high blood prssur. Plas show how much you or dis with ach

More information

National Assessment in Sweden. A multi-dimensional (ad)venture

National Assessment in Sweden. A multi-dimensional (ad)venture Challngs in Educational Masurmnt Contnt, Mthods and Consquncs Gothnburg, 12 Oct. 2016 National Assssmnt in Swdn A multi-dimnsional (ad)vntur Gudrun Erickson Univrsity of Gothnburg Dpt. of Education and

More information

Landslide at the Highway D 8 Prague Dresden near Prackovice

Landslide at the Highway D 8 Prague Dresden near Prackovice Wolfgang Braunr Landscap-Architct Rgional Managr info@okoplan-wb.d Landslid at th Highway D 8 Pragu Drsdn nar Proposals for rdvlopmnt and idas for dsign Concptional sktchs English Vrsion: 2 Elb vally nar

More information

Research Article 3D Space-Time Visualization of Player Behaviour in Pervasive Location-Based Games

Research Article 3D Space-Time Visualization of Player Behaviour in Pervasive Location-Based Games Hinawi Publishing Copoation Intnational Jounal of Comput Gams Tchnology Volum 28, Aticl ID 192153, 5 pags oi:1.1155/28/192153 Rsach Aticl 3D Spac-Tim Visualization of Play Bhaviou in Pvasiv Location-Bas

More information

PRACTICAL FINITE ELEMENT PROCEDURE FOR ACHIEVING MESH OBJECTIVITY IN LOCAL BUCKLING ANALYSIS OF STEEL STRUCTURES BY BEAM ELEMENTS

PRACTICAL FINITE ELEMENT PROCEDURE FOR ACHIEVING MESH OBJECTIVITY IN LOCAL BUCKLING ANALYSIS OF STEEL STRUCTURES BY BEAM ELEMENTS Advancd Stl Constuction ol. 5, o., pp. 4-6 (9) 4 PRACTICA FIITE EEMET PROCEDURE FOR ACHIEIG MESH OBJECTIITY I OCA BUCKIG AAYSIS OF STEE STRUCTURES BY BEAM EEMETS Eiki Yamaguchi Pofsso, Dpatmnt of Civil

More information

Adopted: November 10, 2010

Adopted: November 10, 2010 Adoptd: Novmbr 10, 2010 Last Amndd: Octobr 9, 2013 Pag Intntionally Lft Blan 2 Acnowldgmnts Planning Commission Chryl Chandlr Adolfo Gorra John Kurstn Laurn Martindal Michal Sullivan Bob Fullrton Joc Jacobr

More information

Exercise and Physical Activity Resource Center. eparc.ucsd.edu

Exercise and Physical Activity Resource Center. eparc.ucsd.edu Exrcis and Physical Activity Rsourc Cntr parc.ucsd.du EPARC: Th Cutting Edg of Exrcis Scinc Th Exrcis and Physical Activity Rsourc Cntr (EPARC) at UCSD is a joint vntur btwn th Dpartmnt of Family and Prvntiv

More information

Office of Emergency Services (3055P)

Office of Emergency Services (3055P) Offic of Emrgncy Srvics (3055P) Dpartmnt: Shriff's Offic FY 2003 and 2004 Rcommndd Budgt Offic of Emrgncy Srvics (3055P) Program Outcom Statmnt Th Shriff s Offic of Emrgncy Srvics provids sarch and rscu;

More information

MATH 1300: Finite Mathematics EXAM 2 15 March 2017

MATH 1300: Finite Mathematics EXAM 2 15 March 2017 MATH 1300: Finit Mathmatics EXAM 2 15 March 2017 NAME:... SECTION:... INSTRUCTOR:... SCORE MC:(A) /12 * 7 = LA: /16 = Total: /100 = % INSTRUCTIONS 1. DO NOT OPEN THIS EXAM UNTIL INSTRUCTED TO BY YOUR ROOM

More information

Steve Turner/Jet Bartlett Turner Commercial Properties Representing the Seller

Steve Turner/Jet Bartlett Turner Commercial Properties Representing the Seller 178.54+/- ACRES FOR SALE HWY. 29 EAST WILLIAMSON COUNTY, TEXAS Prsntd By: Stv Turnr/Jt Bartltt Turnr Commrcial Proprtis Rprsnting th Sllr Th Brokr is submitting th attachd information in its capacity as

More information

IMA/AMA/EFFICIENCY PRACTICE

IMA/AMA/EFFICIENCY PRACTICE IMA/AMA/EFFICIENCY PRACTICE A cat of bananas wighing 3000 N is shipp fom South Amica to Nw Yok, wh it is unloa by a ock wok who lifts th cat by pulling with a foc of 200 N on th op of a pully. What is

More information

Approximation Schemes for two-player pursuit evasion games with visibility constraints

Approximation Schemes for two-player pursuit evasion games with visibility constraints Rootics: Scinc and Systms 2008 Zuich, CH, Jun 25-28, 2008 Appoximation Schms fo two-play pusuit asion gams with isiility constaints Souah Bhattachaya Sth Hutchinson Dpatmnt of Elctical and Comput Engining

More information

City of Destin, Florida

City of Destin, Florida City of Dstin, Florida PUBLIC SERVICES DEPARTMENT 4200 Indian Bayou Trail Dstin, Florida 32541 Phon (850)-837-4242 www.cityofdstin.com RIGHT-OF-WAY VACATION APPLICATION RVAC - A pr-application mting is

More information

AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME

AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME AN ANALYSIS OF TELEPHONE MESSAGES: MINIMIZING UNPRODUCTIVE REPLAY TIME Michal D. Fltwood, Danill L. Paig, Chris S. Fick, and Knnth R. Laughry, Sr. Dpartmnt of Psychology Ric Univrsity Houston, TX flt@ric.du

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT COPPER MOUNTAIN RESORT 2013 MOUNTAIN IMPROVEMENTS PROJECT ENVIRONMENTAL ASSESSMENT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT August 2013 USDA Forst Srvic Whit Rivr National Forst Dillon Rangr

More information

SETTING THE PROCESS AIM: THE EFFECT OF MEASUREMENT UNCERTAINTY

SETTING THE PROCESS AIM: THE EFFECT OF MEASUREMENT UNCERTAINTY Pocdings, XVII IMKO Wold Congss, Jun 7, 003, Dubovnik, Coatia Pocdings, XVII IMKO Wold Congss, Jun 7, 003, Dubovnik, Coatia 4 XVII IMKO Wold Congss Mtology in th 3d Millnnium Jun 7, 003, Dubovnik, Coatia

More information

FINITE ELEMENT STRESS ANALYSIS OF ELASTIC BEAMS UNDER NON-UNIFORM TORSION

FINITE ELEMENT STRESS ANALYSIS OF ELASTIC BEAMS UNDER NON-UNIFORM TORSION Damjan anić Goan ukalj osip nić DO: 0.78/OF.4006 333-4 849-39 FE ELEME RE LY OF ELC EM UDER O-UFORM ORO umma his pap psnts a two-dimnsional finit lmnt fomulation fo th stss analsis of lastic bams subjctd

More information

1.0 RELEVANT ENVIRONMENTAL LEGISLATION

1.0 RELEVANT ENVIRONMENTAL LEGISLATION 16 Novmbr 2016 Rfrnc No. 1521417-006-L-Rv1 Kn Curry Parsons Inc. Suit 2300, Mtrotowr 1 4710 Kingsway Burnaby, BC V5H 4M2 MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE: BRUNETTE AVENUE INTERCHANGE ENVIRONMENTAL

More information

A Neural Network Based Stator Current MRAS Observer for Speed Sensorless Induction Motor Drives

A Neural Network Based Stator Current MRAS Observer for Speed Sensorless Induction Motor Drives A Nual Ntwok Basd Stato Cunt MRAS Obsv fo Spd Snsolss Induction Moto Divs Shady M. Gadou, Damian Giaouis and J. W. Finch School of Elctic Elctonic and Comput Engining, Nwcastl Univsity, UK {Shady.Gadou,

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Taspotatio dvisoy Boad of th Mtopolita Coucil of th Twi Citis DTE: Dcmb 5, 2018 TO: FROM: CTION TRNSMITTL No. 2018-57 Taspotatio dvisoy Boad Tchical dvisoy Committ PREPRED BY: Jo Babau, Sio Pla (651-602-1705)

More information

IEnvironmental Protection Agency

IEnvironmental Protection Agency IEnvironmntal Protction Agncy 14 APR B0Q ORAL HEARlNa RECEIVED Dublin Wast to Enrgy Projct f OH Sub No. I I Rcd From: FiYiL, EPA Oral Haring Combind Brif of Evidnc - Watr Mr. Hans Jacob Vstd Dr. Dort Rasmussn

More information

Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development

Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development ECO/WKP(0)5 Unclassifid English - O. English Unclassifid ECO/WKP(0)5 Oganisation d Coopéation t d Dévloppmnt Économiqus Oganisation fo Economic Co-opation and Dvlopmnt 08-Ap-0 English - O. English ECONOMICS

More information

gamm in o P g D s ast Intnational M s i d u t S s u Fut ku sity of Tu iv n U, s onomic chool of Ec Tuku S www.utu.fi/ffc/masts www.utu.fi Mast s Dg Pogamm in Futus Studis (FUTU) Th Finland Futus Rsach

More information

Plan for the implementation of the National Public Procurement Strategy

Plan for the implementation of the National Public Procurement Strategy Plan for th implmntation of th National Public Procurmnt Stratgy -219 OVERALL OBJECTIVE Furthr improv and modrniz th intgratd public procurmnt systm which nabls mor fficint us of public funds basd on transparncy,

More information

Afton Wind Farm, S36C Variation Application

Afton Wind Farm, S36C Variation Application Afton Wind Farm, S36C Variation Application Non-Tchnical Summary 2015 [Typ txt] Contnts 1. Introduction... 1 1.1. Th Applicant and Agnt... 1 1.2. Background... 1 1.3. Th Proposd Dvlopmnt... 1 2. Non-Tchnical

More information

Modelling and Design of a Low Speed Flux Reversal Machine

Modelling and Design of a Low Speed Flux Reversal Machine Modlling and Dsign of a Low Spd Flux Rvsal Machin R. Saou, M.E. Zaïm and K. Alitouch. Abstact This pap is dvotd to th lctomagntic dsign and th optimization of a 10 kw, 50 dict div Flux Rvsal Machin, xcitd

More information

Catriona Crossan Health Economics Research Group (HERG), Brunel University

Catriona Crossan Health Economics Research Group (HERG), Brunel University MAPGuid: Modlling of clinical pathways to assss cost-ffctivnss in NICE guidlins: impact on stakholdr viws of th importanc of potntial updat topics Catriona Crossan Halth Economics Rsarch Group (HERG),

More information

North County San Diego Programs

North County San Diego Programs Updated 1.8.16 North County San Diego Programs BPSR Escondido Clubhouse Member-run clubhouse Address: 474 W. Vermont Ave, Suite 105A, Escondido 92025 Phone Number: (760) 737-7125 BPSR Kinesis North Address:

More information

Transportation. Grangegorman Development Agency. April 2011

Transportation. Grangegorman Development Agency. April 2011 Granggorman Dvlopmnt Agncy April 2011 Granggorman Ara Transport Assssmnt Prpard by:... Chckd by:... Robrt Klly Eoin O Mahony Snior Consultant Principal Consultant Approvd by:... Cormac O Brin Dirctor Granggorman

More information

Resolution in Support of Measure A, Santa Clara County Park Charter Fund Extension

Resolution in Support of Measure A, Santa Clara County Park Charter Fund Extension R-16-44 Meeting 16-08 April 13, 2016 AGENDA ITEM AGENDA ITEM 12 Resolution in Support of Measure A, Santa Clara County Park Charter Fund Extension GENERAL MANAGER S RECOMMENDATION Adopt a resolution in

More information